CN105207264B - Meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines - Google Patents

Meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines Download PDF

Info

Publication number
CN105207264B
CN105207264B CN201510690777.XA CN201510690777A CN105207264B CN 105207264 B CN105207264 B CN 105207264B CN 201510690777 A CN201510690777 A CN 201510690777A CN 105207264 B CN105207264 B CN 105207264B
Authority
CN
China
Prior art keywords
frequency
lan
control
isolated
security
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510690777.XA
Other languages
Chinese (zh)
Other versions
CN105207264A (en
Inventor
董宸
夏彦辉
邹宇
王强强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing SAC Automation Co Ltd
Original Assignee
Nanjing SAC Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing SAC Automation Co Ltd filed Critical Nanjing SAC Automation Co Ltd
Priority to CN201510690777.XA priority Critical patent/CN105207264B/en
Publication of CN105207264A publication Critical patent/CN105207264A/en
Application granted granted Critical
Publication of CN105207264B publication Critical patent/CN105207264B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines, not only counted when setting up the frequency security constraint of isolated LAN and Wind turbines grid-connected frequency constraint, consider requirement of the isolated LAN internal loading to frequency of supply simultaneously, the OPC definite value factors of unit in LAN, more meet user's actual need, ensure the accuracy of constraints, and quantify the control cost of each FREQUENCY CONTROL scheme, obtain considering the coordination optimization control program of control cost and control effect, preferable control effect can be obtained while control cost is reduced using this method, the frequency security of isolated LAN has been effectively ensured, have a good application prospect.

Description

Meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines
Technical field
The invention belongs to the grid-connected Optimized-control Technique field of power system, and in particular to one kind is counted and Wind turbines are grid-connected will The isolated LAN network frequencies optimal control method asked.
Background technology
Under the present situation of current energy shortage, new energy is all being greatly developed in countries in the world.Energy knot is carried forward vigorously in country Under structure adjustment, development low-carbon clean energy resource and effort GHG emissions mitigation strategy and policy are guided, in " Renewable Energy Law " etc. one Serial policy, the guidance of law and standard and foster down, China's regenerative resource, particularly wind-power electricity generation are developed rapidly.
The wind energy resources of China is mainly distributed on the sea wind area prevailing of northwest, northeast, Inner Mongol and southeastern coast, in recent years, As a large amount of high energy-consuming enterprises adjourn to the ground such as northwest, northeast and Inner Mongol, on-site elimination approach is provided for new energy such as wind-powered electricity generations, and So that supply network form is to development in pluralism.At present, use more supply network form for:High energy-consuming industry is relied on, is led to Cross based on new energy such as wind-powered electricity generations, colm thermoelectricity for supplement the isolated LAN method of operation, promote wind-powered electricity generation directly with height The combination of power consumption industry, realizes that the new energy such as wind-powered electricity generation are converted on the spot with highly energy-consuming combination and resource high-efficiency, is ensureing high consumption While energy enterprise practical need for electricity, environmental emission reduction benefit is realized.
Bulk power system has the characteristics of installed capacity is big, spare capacity is sufficient, and the LAN of isolated operation, and installation is held Amount is typically close with system load capacity, and the spare capacity of power network is less, and system response has larger difference with bulk power grid, therefore It is easier to cause the big ups and downs of frequency during barrier, so as to cause frequency dangerous, particularly with the office of high permeability wind power integration Domain net, the secondary pulse that the grid-connected frequency requirement of Wind turbines, failure rear fan off-grid are produced to system frequency etc. is all to isolated The FREQUENCY CONTROL scheme of LAN proposes new challenge, if would potentially result in network system without effective FREQUENCY CONTROL scheme Collapse.
Likewise, in view of the particularity of isolated LAN internal loading (electrolytic aluminium, steel-making, chemical industry etc.) frequency requirement, power network The security constraint of frequency should more consider to net the demand of interior user in system, and relevant at present mains frequency security constraint Standard is that, from power network angle, the frequency security constraint in isolated LAN can not indiscriminately imitate the standard of bulk power grid, and should mostly Determined according to oneself practical operation situation how to carry out isolated LAN network frequencies optimal control, be current urgent problem.
The content of the invention
Technical problem solved by the invention is the frequency optimization control for the isolated LAN for overcoming high permeability wind power integration Problem processed.The isolated LAN network frequencies optimal control method of the grid-connected requirement of meter and Wind turbines of the present invention, can reduce control Preferable control effect is obtained while cost, the frequency security of isolated LAN has been effectively ensured, before good application Scape.
In order to solve to reach above-mentioned purpose, the technical solution adopted in the present invention is:
A kind of meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines, it is characterised in that:Including Following steps,
Step (A), to isolate LAN be modeled and fault set screening, by time-domain-simulation observe failure under isolate The disturbed track of frequency of LAN;
Step (B), the load in the grid-connected frequency constraint of meter and Wind turbines, isolated LAN is wanted to frequency of supply The OPC definite value factors of unit in LAN are sought, isolated, is adjusted, is met on the basis of mains frequency security regulations The isolated LAN network frequencies security constraint of practical operation situation, the frequency security of isolated LAN is constrained to y (fl,fh), wherein, fhAnd flThe upper limit value and lower limit value of frequency security constraint is represented respectively;
Step (C), according under failure isolate LAN the disturbed track of frequency, with reference to isolated LAN frequency security about Beam, judges whether the frequency of isolated LAN is safe, if safety, exits optimization;Otherwise, into step (D);
Step (D), based on controllable measure space, to control Least-cost as optimization aim, the power for isolating LAN is put down Weighing apparatus is constraints with frequency security, sets up optimization object function, using optimized algorithm, tries to achieve the frequency optimization of isolated LAN Control program,
(D1) shown in, the optimization object function of foundation, such as formula (1),
min Lsum(X, λ)
X=(x1, x2... ..xn)
λ=(λ1, λ2... .. λn) (1)
Constraints f (t) ∈ y (fl,fh)
PG(t)+PW(t)≥PL(t)
UL≤Ui≤UH
Wherein, X is the set in optional control measure space, x1, x2... ..xnFor each control measure space, λ is each control The set of the corresponding control cost of measure, λ1, λ2... .. λnFor the corresponding control cost of each control measure, Lsum(X, λ) is total Control cost, min Lsum(X, λ) is total minimum control cost, and f (t) represents that t isolates the frequency of LAN system Value, PG(t) it is the power output of t period conventional power units, PW(t) it is the power output of t period Wind turbines, PL(t) it is the t periods Power needed for isolated LAN internal loading, UiFor power network interior nodes voltage, UH、ULRespectively voltage security constrains upper and lower limit;
(D2) optimization constraints constitutes new object function minL to be placed in the form of penalty function in object functionsum, As shown in formula (2),
minLsum=Lsum(I)+σ1·g22·h2 (2)
Wherein:Lsum(I) it is former object function, σ1And σ2It is penalty factor, g is the constraints of inequality;H is equation Constraints;
(D3) new object function minLsum is solved using optimized algorithm, the frequency for obtaining isolated LAN system is excellent Change control measure.
The isolated LAN network frequencies optimal control method of the foregoing grid-connected requirement of meter and Wind turbines, it is characterised in that: (D1) the corresponding control cost of each control measure, calculates according to formula (3) and obtains,
Wherein, λiFor the corresponding control cost of i-th of control measure in control measure space, m is in the control measure The unit number of excision, δjTo cut off the control cost of j-th of unit;τ、PLRespectively lose the control cost of specific load and be somebody's turn to do The load that LAN system loses is isolated under control measure.
The isolated LAN network frequencies optimal control method of the foregoing grid-connected requirement of meter and Wind turbines, it is characterised in that:Step Suddenly requirement (B), by the load in the grid-connected frequency constraint of meter and Wind turbines, isolated LAN to frequency of supply, isolated office The OPC definite value factors of unit, are adjusted on the basis of mains frequency security regulations in the net of domain, and the mains frequency is advised safely It is set to《Power system security stability Calculation technical specification》With《Wind power plant access power system technology regulation》.
The beneficial effects of the invention are as follows:The isolated LAN network frequencies optimization control of the grid-connected requirement of meter and Wind turbines of the present invention Method processed, not only counted when setting up the frequency security constraint of isolated LAN and Wind turbines grid-connected frequency constraint, examine simultaneously Considered requirement of the isolated LAN internal loading to frequency of supply, in LAN unit OPC definite value factors, more meet user actual Demand, it is ensured that the accuracy of constraints, and quantify the control cost of each FREQUENCY CONTROL scheme, obtain considering control cost With the coordination optimization control program of control effect, preferably control can be obtained while control cost is reduced using this method and imitated Really, the frequency security of isolated LAN has been effectively ensured, has had a good application prospect.
Brief description of the drawings
Fig. 1 be the present invention meter and the grid-connected requirement of Wind turbines isolated LAN network frequencies optimal control method flow Figure.
Fig. 2 is the formulation flow chart of the frequency security constraint of the isolated LAN of the present invention.
Fig. 3 is the schematic diagram of the requirement of wind farm grid-connected frequency.
Embodiment
Below in conjunction with Figure of description, the present invention is further illustrated.
The isolated LAN network frequencies optimal control method of the grid-connected requirement of meter and Wind turbines of the present invention, is setting up isolated office Domain net frequency security constraint when not only count and Wind turbines grid-connected frequency constraint, while considering isolated LAN internal loading The OPC definite value factors of unit, more meet user's actual need, it is ensured that constraints in requirement, LAN to frequency of supply Accuracy, and quantify the control cost of each FREQUENCY CONTROL scheme, obtain considering control cost and the coordination of control effect is excellent Change control program, preferable control effect can be obtained while control cost is reduced using this method, be effectively ensured isolated The frequency security of LAN, as shown in figure 1, following steps are specifically included,
Step (A), to isolate LAN be modeled and fault set screening, by time-domain-simulation observe failure under isolate The disturbed track of frequency of LAN;
Step (B), the load in the grid-connected frequency constraint of meter and Wind turbines, isolated LAN is wanted to frequency of supply The OPC definite value factors of unit in LAN are sought, isolated, is adjusted, is met on the basis of mains frequency security regulations The isolated LAN network frequencies security constraint of practical operation situation, the frequency security of isolated LAN is constrained to y (fl,fh), wherein, fhAnd flThe upper limit value and lower limit value of frequency security constraint is represented respectively;
The mains frequency security regulations are《Power system security stability Calculation technical specification》With《Wind power plant accesses electric power Systems technology is provided》, wherein LAN network frequencies security constraint is not directly to continue to use《Power system security stability Calculation technology is advised Model》To the regulation of mains frequency safety, but in this, as reference, in the grid-connected frequency constraints of meter and Wind turbines, LAN The factor such as OPC definite values of unit in requirement of the load to frequency of supply, LAN, determines the frequency security constraint of LAN, more Tally with the actual situation, as shown in Figure 2;Wherein, the grid-connected frequency constraint of Wind turbines refers to according to national standard《Wind power plant is accessed Power system technology is provided》Grid-connected frequency to wind power plant proposes requirement:, can be according to wind-powered electricity generation when wind-powered electricity generation field frequencies range is less than 48Hz The interior Wind turbines in field allow depending on the low-limit frequency of operation;When frequency is between 48Hz-49.5Hz, it is desirable to which wind power plant has At least run 30min ability;When frequency is between 49.5Hz-50.2Hz, continuously can normally it run;Frequency is higher than During 50.2Hz, it is desirable to which wind power plant has an ability at least running 5min, and perform that dispatching of power netwoks department assigns cut machine plan high week Slightly, do not allow the Wind turbines of stopped status grid-connected, as shown in Figure 3;
Step (C), according under failure isolate LAN the disturbed track of frequency, with reference to isolated LAN frequency security about Beam, judges whether the frequency of isolated LAN is safe, if safety, exits optimization;Otherwise, into step (D);
Step (D), based on controllable measure space, to control Least-cost as optimization aim, the power for isolating LAN is put down Weighing apparatus is constraints with frequency security, sets up optimization object function, using optimized algorithm, tries to achieve the frequency optimization of isolated LAN Control program,
(D1) shown in, the optimization object function of foundation, such as formula (1),
min Lsum(X, λ)
X=(x1, x2... ..Xn)
λ=(λ1, λ2... .. λn) (1)
Constraints f (t) ∈ y (fl,fh)
PG(t)+PW(t)≥PL(t)
UL≤Ui≤UH
Wherein, X is the set in optional control measure space, x1, x2... ..xnFor each control measure space, λ is each control The set of the corresponding control cost of measure, λ1, λ2... .. λnFor the corresponding control cost of each control measure, Lsum(X, λ) is total Control cost, min Lsum(X, λ) is total minimum control cost, and f (t) represents that t isolates the frequency of LAN system Value, PG(t) it is the power output of t period conventional power units, conventional power unit includes current thermoelectricity, water power, Gas Generator Set, diesel engine Group etc. is exerted oneself stable unit, PW(t) it is the power output of t period Wind turbines, PL(t) LAN internal loading is isolated for the t periods Required power, UiFor power network interior nodes voltage, UH、ULRespectively voltage security constrains upper and lower limit;
The corresponding control cost of each control measure, calculates according to formula (3) and obtains,
Wherein, λiFor the corresponding control cost of i-th of control measure in control measure space, m is in the control measure The unit number of excision, δjTo cut off the control cost of j-th of unit;τ、PLRespectively lose the control cost of specific load and be somebody's turn to do The load that LAN system loses is isolated under control measure;
(D2) optimization constraints constitutes new object function minL to be placed in the form of penalty function in object functionsum, As shown in formula (2),
minLsum=Lsum(I)+σ1·g22·h2 (2)
Wherein:Lsum(I) it is former object function, σ1And σ2It is penalty factor, g is the constraints of inequality;H is equation Constraints;
(D3) new object function minLsum is solved using optimized algorithm, the frequency for obtaining isolated LAN system is excellent Change control measure, the optimized algorithm includes particle cluster algorithm of the prior art, genetic algorithm etc., can solved.
General principle, principal character and the advantage of the present invention has been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, the original for simply illustrating the present invention described in above-described embodiment and specification Reason, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (2)

1. meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines, it is characterised in that:Including following step Suddenly,
Step (A), to isolate LAN be modeled and fault set screening, pass through time-domain-simulation observe failure under isolate local The disturbed track of frequency of net;
Step (B), by count and the grid-connected frequency constraints of Wind turbines, isolated LAN in requirement of the load to frequency of supply, The OPC definite value factors of unit, are adjusted on the basis of mains frequency security regulations, obtain meeting reality in isolated LAN The isolated LAN network frequencies security constraint of running situation, the frequency security of isolated LAN is constrained to y (fl,fh), wherein, fhWith flThe upper limit value and lower limit value of frequency security constraint is represented respectively;
Step (C), according to the disturbed track of frequency that LAN is isolated under failure, is constrained with reference to the frequency security of isolated LAN, Judge whether the frequency of isolated LAN is safe, if safety, exits optimization;Otherwise, into step (D);
Step (D), based on controllable measure space, to control Least-cost as optimization aim, isolate LAN power-balance and Frequency security is constraints, sets up optimization object function, using optimized algorithm, tries to achieve the frequency optimization control of isolated LAN Scheme,
(D1) optimization object function set up, shown in such as formula (1),
min Lsum(X, λ)
X=(x1, x2... xn)
λ=(λ1, λ2... .. λn) (1)
Constraints f (t) ∈ y (fl,fh)
PG(t)+PW(t)≥PL(t)
UL≤Ui≤UH
Wherein, X is the set in optional control measure space, x1, x2... ..xnFor each control measure space, λ arranges for each control Apply the set of the corresponding control cost of space difference, λ1, λ2... .. λnDistinguish corresponding control generation for each control measure space Valency, Lsum(X, λ) is total control cost, minLsum(X, λ) is total minimum control cost, and f (t) represents that t isolates local The frequency values of net system, PG(t) it is the power output of t period conventional power units, PW(t) it is the power output of t period Wind turbines, PL(t) for the power needed for the t periods isolate LAN internal loading, UiFor power network interior nodes voltage, UH、ULRespectively voltage security Constrain upper and lower limit;
(D2) optimization constraints constitutes new object function minL to be placed in the form of penalty function in object functionsum, it is such as public Shown in formula (2),
minLsum=Lsum(I)+σ1·g22·h2 (2)
Wherein:Lsum(I) it is former object function, σ1And σ2It is penalty factor, g is the constraints of inequality;H is equality constraint Condition;
(D3) using optimized algorithm to new object function minLsumSolve, obtain the frequency optimization control of isolated LAN system Measure;
Wherein, the corresponding control cost in (D1) each control measure space, calculates according to formula (3) and obtains,
λ i = Σ j = 1 m δ j + τ * P L - - - ( 3 )
Wherein, λiFor the corresponding control cost in i-th of control measure space in control measure spatial aggregation, m is the control measure The unit number cut off in space, δjTo cut off the control cost of j-th of unit;τ、PLRespectively lose the control generation of specific load The load that LAN system loses is isolated under valency and the control measure space.
2. meter according to claim 1 and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines, its It is characterised by:Step (B), by the load in the grid-connected frequency constraint of meter and Wind turbines, isolated LAN to frequency of supply It is required that, in isolated LAN unit OPC definite value factors, be adjusted on the basis of mains frequency security regulations, the electricity Net frequency security is defined as《Power system security stability Calculation technical specification》With《Wind power plant access power system technology regulation》.
CN201510690777.XA 2015-10-22 2015-10-22 Meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines Active CN105207264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510690777.XA CN105207264B (en) 2015-10-22 2015-10-22 Meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510690777.XA CN105207264B (en) 2015-10-22 2015-10-22 Meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines

Publications (2)

Publication Number Publication Date
CN105207264A CN105207264A (en) 2015-12-30
CN105207264B true CN105207264B (en) 2017-07-25

Family

ID=54954772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510690777.XA Active CN105207264B (en) 2015-10-22 2015-10-22 Meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines

Country Status (1)

Country Link
CN (1) CN105207264B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107482678B (en) * 2017-08-15 2019-09-06 重庆大学 A kind of double-fed fan motor field is through soft direct join net system failure traversing control method
CN110570080B (en) * 2019-07-23 2023-02-03 南京国电南自电网自动化有限公司 Startup control method, device and system for enterprise self-contained power grid

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102522781A (en) * 2011-12-26 2012-06-27 国电南瑞科技股份有限公司 Method for participating area control error (ACE) control by uniformly modeling wind power plant and thermal power plant
CN103311940A (en) * 2013-07-08 2013-09-18 东南大学 Integrated control method for micro-grid load and energy accumulation
CN103825279A (en) * 2014-02-21 2014-05-28 华南理工大学 Micro-grid system voltage stability control method based on robust control

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110153096A1 (en) * 2009-12-22 2011-06-23 Sujan Kumar Pal Method and system for monitoring operation of a wind farm

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102522781A (en) * 2011-12-26 2012-06-27 国电南瑞科技股份有限公司 Method for participating area control error (ACE) control by uniformly modeling wind power plant and thermal power plant
CN103311940A (en) * 2013-07-08 2013-09-18 东南大学 Integrated control method for micro-grid load and energy accumulation
CN103825279A (en) * 2014-02-21 2014-05-28 华南理工大学 Micro-grid system voltage stability control method based on robust control

Also Published As

Publication number Publication date
CN105207264A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN104377726B (en) A kind of peak regulating method of extensive new energy grid-connected power
CN103577891B (en) A kind of micro-network optimization chemical combination of many isolated islands containing distributed power source makes operation method
CN105375533B (en) A kind of independent micro-capacitance sensor operational mode Forecasting Methodology containing wind, light regenerative resource
CN109861301B (en) Production simulation method for source-grid load-storage coordination power system
CN103473604A (en) Method for evaluating comprehensive property of day-ahead power generation plan
CN109861277A (en) A kind of configuration method and system of charging station photovoltaic and stored energy capacitance
CN106549419A (en) Independent microgrid system method for designing based on universal gravitation algorithm
CN105207264B (en) Meter and the isolated LAN network frequencies optimal control method of the grid-connected requirement of Wind turbines
CN109004679A (en) A kind of method for monitoring safety and stability of electric network of renewable energy access
CN109615244A (en) A kind of integrated evaluating method for considering different type power supply and networking
CN106099991A (en) A kind of power grid wind electricity digestion capability appraisal procedure
CN109299862B (en) A kind of convex loose appraisal procedure of wind-powered electricity generation maximum digestion capability
CN110311386A (en) A kind of capacity configuration optimizing method based on the spontaneous idle and SVG reactive compensation of PSO new energy power station
CN105958535A (en) Distributed power supply cluster control system and control method thereof
Li et al. Research on the control strategy of energy storage participation in power system frequency regulation
Chen et al. The control strategy of energy storage system for primary frequency regulation and wind power ramp control
CN103023025B (en) A kind of polynary regenerative resource complementary power generation system of pollution assessment and method
CN202455093U (en) Reverse power protection system of photovoltaic grid-connected inverter
Huang et al. Optimal design of an island microgrid with considering scheduling optimization
CN205231763U (en) Honourable firewood that contains compound energy storage stores up little grid system
CN107196331A (en) A kind of new energy based on power network peak valley amplitude versus frequency characte is dissolved method
Habib et al. Demand and application of energy storage technology in renewable energy power system
CN104184158A (en) Energy storage system control method and control device
CN106451528B (en) A kind of large-scale wind power off-grid control method of comprehensive FACTS and HVDC coordination optimization
CN106485593B (en) Power grid side new energy power generation limitation reason analysis method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant