CN105205593A - Team information integrated comprehensive display system - Google Patents
Team information integrated comprehensive display system Download PDFInfo
- Publication number
- CN105205593A CN105205593A CN201510565182.1A CN201510565182A CN105205593A CN 105205593 A CN105205593 A CN 105205593A CN 201510565182 A CN201510565182 A CN 201510565182A CN 105205593 A CN105205593 A CN 105205593A
- Authority
- CN
- China
- Prior art keywords
- teams
- groups
- module
- submodule
- risk management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention provides a team information integrated comprehensive display system which mainly comprises a display platform formed by a touch screen display computer. The main interface of the display platform at least comprises a company logo, time, the number of safe operation days and a display window. The display window at least comprises four functional modules of center overview, risk management and control, rules and regulations and team culture. The a) center overview module also comprises three submodules of the center situation, team introduction and team members; b) the risk management and control module comprises two submodules of power grid overview and risk management and control, wherein the power grid overview module mainly introduces the basic situation of the power grid, and risk management and control module mainly introduces power grid plans and dangerous point analysis; c) the rule and regulation module is divided into a safe production submodule, a team construction submodule and a management system submodule, and the corresponding rules and regulations are respectively put into the submodules so that a directory list is formed for reference; and d) the team culture module is included.
Description
Technical field
What the present invention relates to is a kind of teams and groups information integral overview display systems, is mainly applicable to grid company and runs teams and groups, as a platform of Team Construction, shift management and displaying.
Background technology
The method of existing displaying teams and groups information mainly contains notice board, publicity board etc., and content comprises teams and groups' overview, work program etc., and concrete grammar comprises:
One is the teams and groups' publicity board making specialty, and feature is that content is fixed, and upgrades inconvenient, takes up room many (or showing when space is certain that content is limited);
Two is adopt notice board to show teams and groups' information.Feature is that content modification is convenient, shows that contents and forms is restricted.
Summary of the invention
The object of the invention is to the deficiency overcoming prior art existence, and provide one can better show teams and groups' information, integrate scattered teams and groups' information, can conveniently increase, revised context, teams and groups' information integral overview display system of the functions such as collection teams and groups informative presentations, personnel's introduction, electrical network overview, work program, teams and groups' honor and collective activity displaying.
The object of the invention is to have come by following technical solution, a kind of teams and groups information integral overview display system, it mainly comprises one and shows by touch screen the display platform that computer is formed, the main interface of described display platform at least comprises the mark of company, time, safe operation number of days and impression window, wherein said impression window at least comprises: General Profile, risk management and control, rules and regulations and teams and groups' culture four functional modules, wherein said:
A) General Profile module: it comprises again center situation, teams and groups' brief introduction and teams and groups personnel three submodules, mainly introduces department, the basic condition of teams and groups and teams and groups personnel basic condition;
B) risk management and control module: it comprises electrical network overview and risk management and control two submodules, and wherein electrical network profiling module mainly introduces electrical network basic condition, and described risk management and control mainly introduces electrical network plan and Analysis about Dangerous Point;
C) rules and regulations module: it is not subdivided into safety in production, Team Construction and management system, and put into corresponding rules and regulations respectively, form a directory listing, for consulting;
D) teams and groups' culture module: it is divided into teams and groups' culture, teams and groups' honor, recreational and sports activities three submodules, and is mixed the mode of comment by photo, the photo that wherein teams and groups' culture submodule main presentation teams and groups work climate is relevant and poster.
As preferably: in described impression window, wherein:
A), in General Profile module, the methods of exhibiting that described center situation submodule adopts photo, chart, word to combine mainly introduces basic condition and teams and groups' setting of department, and built-in template is that picture adds explanation word; Because the variation of this partial content is less, uploads after the typesetting such as photo, word in the mode of whole pictures generally in advance, thus avoid single bandwagon effect; The multiple pages shown can automatic sequence be play, or manual switchover is play, and freely watches to coordinate respectively or manually explains;
Described teams and groups' brief introduction submodule mainly introduces the information such as setting, teams and groups' personnel component situation, teams and groups' responsibility of Zu Nei bottom class, main employing pushes away the form of word;
Described teams and groups personnel submodule mainly introduces the basic condition of every member in teams and groups, comprises date of birth, registration days, technical skills level and Mission Statement etc.The left side, interface is work one one-by-one inch photograph of personnel, and the right is every basic condition.
B) in risk management and control module,
The methods of exhibiting of described electrical network overview submodule is identical with the methods of exhibiting of General Profile, shows that content comprises electrical network main wiring diagram, power load situation, transformer station and power plant's scale etc.; This partial content is more fixing equally, and maintenance period is longer, is uploaded to system after content chart and text composition can being organized into picture;
The method that described risk management and control submodule adopts form and word to combine, listing the contents such as recent electrical network schedule work, Analysis about Dangerous Point, is the module needing real-time update.
D) in teams and groups' culture module,
The photo that described culture submodule main presentation teams and groups of teams and groups working environment, specific works scene etc. are relevant to work, embodies the work climate of teams and groups;
Described teams and groups' honor submodule is the honor of showing that teams and groups once obtained, and mainly presents the achievement that teams and groups obtain;
All kinds of match photo that the style class activity that described recreational and sports activities submodule main presentation teams and groups carry out, teams and groups personnel participate in and other collective activity outline, embody teams and groups' health environment-friendly, positive free life.
As preferably: described impression window also comprises welcomes two modules in interface and leader care, and wherein said welcome interface module is made up of negative picture and salutatory, and negative picture wherein freely chooses and arranges, rolling broadcasting; Salutatory is Freely input and typesetting, set font and color;
Described leader shows loving care for module to adopt the mode of picture configuration instruction word, displaying company or other unit leader come inspection and guide time related materials, emphasis is shown the guidance that leader works to department or teams and groups and to the care of this department, these teams and groups and personnel and great kindness, is embodied the construction achievement of teams and groups simultaneously.
The present invention can better show teams and groups' information, integrates scattered teams and groups' information, can conveniently increase, revised context, the functions such as collection teams and groups informative presentations, personnel's introduction, electrical network overview, work program, teams and groups' honor and collective activity displaying.
Accompanying drawing explanation
Fig. 1 is functional module block scheme of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the present invention will be described in detail: shown in Fig. 1, a kind of teams and groups of the present invention information integral overview display system, it mainly comprises one and shows by touch screen the display platform that computer is formed, the main interface of described display platform at least comprises the identification LOGO of company, time, safe operation number of days and impression window, wherein said impression window at least comprises: General Profile, risk management and control, rules and regulations and teams and groups' culture four functional modules, wherein said:
A General Profile module: it comprises again center situation, teams and groups' brief introduction and teams and groups personnel three submodules, mainly introduces department, the basic condition of teams and groups and teams and groups personnel basic condition;
B risk management and control module: it comprises electrical network overview and risk management and control two submodules, and wherein electrical network profiling module mainly introduces electrical network basic condition, and described risk management and control mainly introduces electrical network plan and Analysis about Dangerous Point;
C rules and regulations module: it is not subdivided into safety in production, Team Construction and management system, and put into corresponding rules and regulations respectively, form a directory listing, for consulting;
D teams and groups culture module: it is divided into teams and groups' culture, teams and groups' honor, recreational and sports activities three submodules, and is mixed the mode of comment by photo, the photo that wherein teams and groups' culture submodule main presentation teams and groups work climate is relevant and poster.
Shown in figure, in described impression window, wherein:
A), in General Profile module, the methods of exhibiting that described center situation submodule adopts photo, chart, word to combine mainly introduces basic condition and teams and groups' setting of department, and built-in template is that picture adds explanation word; Because the variation of this partial content is less, uploads after the typesetting such as photo, word in the mode of whole pictures generally in advance, thus avoid single bandwagon effect; The multiple pages shown can automatic sequence be play, or manual switchover is play, and freely watches to coordinate respectively or manually explains;
Described teams and groups' brief introduction submodule mainly introduces the information such as setting, teams and groups' personnel component situation, teams and groups' responsibility of Zu Nei bottom class, main employing pushes away the form of word;
Described teams and groups personnel submodule mainly introduces the basic condition of every member in teams and groups, comprises date of birth, registration days, technical skills level and Mission Statement etc.The left side, interface is work one one-by-one inch photograph of personnel, and the right is every basic condition.
B) in risk management and control module,
The methods of exhibiting of described electrical network overview submodule is identical with the methods of exhibiting of General Profile, shows that content comprises electrical network main wiring diagram, power load situation, transformer station and power plant's scale etc.; This partial content is more fixing equally, and maintenance period is longer, is uploaded to system after content chart and text composition can being organized into picture;
The method that described risk management and control submodule adopts form and word to combine, listing the contents such as recent electrical network schedule work, Analysis about Dangerous Point, is the module needing real-time update.
D) in teams and groups' culture module,
The photo that described culture submodule main presentation teams and groups of teams and groups working environment, specific works scene etc. are relevant to work, embodies the work climate of teams and groups;
Described teams and groups' honor submodule is the honor of showing that teams and groups once obtained, and mainly presents the achievement that teams and groups obtain;
All kinds of match photo that the style class activity that described recreational and sports activities submodule main presentation teams and groups carry out, teams and groups personnel participate in and other collective activity outline, embody teams and groups' health environment-friendly, positive free life.
In the preferred embodiment of the invention, described impression window also comprises welcomes two modules in interface and leader's care, and wherein said welcome interface module is made up of negative picture and salutatory, and negative picture wherein freely chooses and arranges, and rolls and plays; Salutatory is Freely input and typesetting, set font and color;
Described leader shows loving care for module to adopt the mode of picture configuration instruction word, displaying company or other unit leader come inspection and guide time related materials, emphasis is shown the guidance that leader works to department or teams and groups and to the care of this department, these teams and groups and personnel and great kindness, is embodied the construction achievement of teams and groups simultaneously.
Display module slightly makes an amendment and goes for the displaying of more eurypalynous teams and groups by the present invention.
Described display systems function mainly contains:
One is for visiting personnel's Dynamic Display teams and groups situation, grid condition;
This system adopts the multiple technique of expression such as chart, photo, word to introduce teams and groups' overview, personnel's overview, electrical network overview etc., and be showed on touch screen computer, the instrument of teams and groups and grid condition can be understood as visit personnel voluntarily, also can introduce the reference of explanation person as teams and groups;
Two is contribute to teams and groups personnel to understand network operation plan, dangerous point fast;
This system comprises power grid risk pre-control module, comprising contents such as electrical network overview and network operation plan, Analysis about Dangerous Point, combine closely with current electric grid is actual, teams and groups personnel are by checking that related content can understand the change conditions of current electric grid fast, thus services better, raise the efficiency;
Three is can as a work data storehouse for consulting;
Using a module as this system such as relevant for work rules and regulations, administrative provisions etc., improve bibliographic structure, teams and groups personnel can consult by platform the file and regulation that need in work easily, serve the function of teams and groups' data bank.
Four is promote Team Construction and management level;
This display platform set numerous key elements of shift management, comprise the contents such as personnel's situation, rules and regulations, teams and groups' activity, can as the Team Construction instrument of a system, effectively management all kinds of system of teams and groups and documentation, picture information, honor achievement etc., promotes shift management level.
Embodiment: teams and groups of the present invention display systems is that touch screen shows that computer is formed, and based on operation of power networks teams and groups, main interface comprises company LOGO, time, safe operation number of days and impression window, and impression window is divided into again following 6 modules:
One is welcome interface: welcome interface when can visit for leader's inspection and guide or Migrant women.Be made up of negative picture and salutatory, wherein negative picture freely can choose setting, and broadcasting of rolling; Salutatory can Freely input typesetting, set font and color etc.;
Two is General Profiles: comprise again General Profile, teams and groups' brief introduction, teams and groups personnel 3 submodules.Major function is introduce department, the basic condition of teams and groups and the basic condition of teams and groups personnel.
General Profile mainly introduces basic condition and teams and groups' setting of department, and adopt the methods of exhibiting that photo, chart, word combine, built-in template is that picture adds explanation word.Because the variation of this partial content is less, uploads after the typesetting such as photo, word in the mode of whole pictures generally in advance, thus avoid single bandwagon effect.The multiple pages shown can automatic sequence be play, or manual switchover is play, and freely watches to coordinate respectively or manually explains.
The information such as setting, teams and groups' personnel component situation, teams and groups' responsibility of Zu Nei bottom class is mainly introduced in teams and groups' brief introduction, main employing pushes away the form of word.
Teams and groups personnel introduce the basic condition of every member in teams and groups, comprise date of birth, registration days, technical skills level and Mission Statement etc.The left side, interface is work one one-by-one inch photograph of personnel, and the right is every basic condition.
Three is risk management and controls: comprise electrical network overview and risk management and control two submodules.The content such as electrical network dangerous point under the basic condition of main presentation electrical network scale and wiring, current maintenance mode.
The methods of exhibiting of electrical network overview is identical with the methods of exhibiting of General Profile, shows that content comprises electrical network main wiring diagram, power load situation, transformer station and power plant's scale etc.This partial content is more fixing equally, and maintenance period is longer.System is uploaded to after content chart and text composition can being organized into picture.
The method that risk management and control adopts form and word to combine, listing the contents such as recent electrical network schedule work, Analysis about Dangerous Point, is the module needing real-time update.
Four is rules and regulations: be subdivided into again safety in production, Team Construction and management system, puts into corresponding rules and regulations respectively, and forms a directory listing, for conveniently consulting.Display form is mainly the form that text above pushes away automatically, can arrange and automatically plays all files or select to play hot file.
Five is teams and groups' culture: point teams and groups' culture, teams and groups' honor, recreational and sports activities 3 submodules, display form is the mode that comment mixed by photo, and concrete template is distinguished to some extent, to reach better bandwagon effect.
The photo that culture module main presentation teams and groups of teams and groups working environment, specific works scene etc. are relevant to work, embodies the work climate of teams and groups.The honor that honor displaying teams and groups of teams and groups once obtained, mainly presents the achievement that teams and groups obtain.All kinds of match photo that the style class activity that recreational and sports activities main presentation teams and groups carry out, teams and groups personnel participate in and other collective activity outline, embody teams and groups' health environment-friendly, positive free life.
Six is that leader shows loving care for: the main mode adopting picture to join comment, displaying company or other unit leader come inspection and guide time related materials, emphasis represents the guidance of leader to department or teams and groups' work and the care to this department, these teams and groups and personnel and great kindness, embodies the achievement of Team Construction simultaneously.
Claims (3)
1. teams and groups' information integral overview display system, it mainly comprises one and shows by touch screen the display platform that computer is formed, it is characterized in that the main interface of described display platform at least comprises the mark of company, time, safe operation number of days and impression window, wherein said impression window at least comprises: General Profile, risk management and control, rules and regulations and teams and groups' culture four functional modules, wherein said:
A General Profile module: it comprises again center situation, teams and groups' brief introduction and teams and groups personnel three submodules, mainly introduces department, the basic condition of teams and groups and teams and groups personnel basic condition;
B risk management and control module: it comprises electrical network overview and risk management and control two submodules, and wherein electrical network profiling module mainly introduces electrical network basic condition, and described risk management and control mainly introduces electrical network plan and Analysis about Dangerous Point;
C rules and regulations module: it is not subdivided into safety in production, Team Construction and management system, and put into corresponding rules and regulations respectively, form a directory listing, for consulting;
D teams and groups culture module: it is divided into teams and groups' culture, teams and groups' honor, recreational and sports activities three submodules, and is mixed the mode of comment by photo, the photo that wherein teams and groups' culture submodule main presentation teams and groups work climate is relevant and poster.
2. teams and groups according to claim 1 information integral overview display system, is characterized in that in described impression window, wherein:
In a General Profile module, the methods of exhibiting that described center situation submodule adopts photo, chart, word to combine mainly introduces basic condition and teams and groups' setting of department, and built-in template is that picture adds explanation word; Because the variation of this partial content is less, uploads after the typesetting such as photo, word in the mode of whole pictures generally in advance, thus avoid single bandwagon effect; The multiple pages shown can automatic sequence be play, or manual switchover is play, and freely watches to coordinate respectively or manually explains;
Described teams and groups' brief introduction submodule mainly introduces the information such as setting, teams and groups' personnel component situation, teams and groups' responsibility of Zu Nei bottom class, main employing pushes away the form of word;
Described teams and groups personnel submodule mainly introduces the basic condition of every member in teams and groups, comprises date of birth, registration days, technical skills level and Mission Statement etc.;
The left side, interface is work one one-by-one inch photograph of personnel, and the right is every basic condition;
In b risk management and control module,
The methods of exhibiting of described electrical network overview submodule is identical with the methods of exhibiting of General Profile, shows that content comprises electrical network main wiring diagram, power load situation, transformer station and power plant's scale etc.; This partial content is more fixing equally, and maintenance period is longer, is uploaded to system after content chart and text composition can being organized into picture;
The method that described risk management and control submodule adopts form and word to combine, listing the contents such as recent electrical network schedule work, Analysis about Dangerous Point, is the module needing real-time update;
In d teams and groups culture module,
The photo that described culture submodule main presentation teams and groups of teams and groups working environment, specific works scene etc. are relevant to work, embodies the work climate of teams and groups;
Described teams and groups' honor submodule is the honor of showing that teams and groups once obtained, and mainly presents the achievement that teams and groups obtain;
All kinds of match photo that the style class activity that described recreational and sports activities submodule main presentation teams and groups carry out, teams and groups personnel participate in and other collective activity outline, embody teams and groups' health environment-friendly, positive free life.
3. teams and groups according to claim 1 and 2 information integral overview display system, it is characterized in that described impression window also comprises and welcome two modules in interface and leader's care, wherein said welcome interface module is made up of negative picture and salutatory, negative picture wherein freely chooses and arranges, and rolls and play; Salutatory is Freely input and typesetting, set font and color;
Described leader shows loving care for module to adopt the mode of picture configuration instruction word, displaying company or other unit leader come inspection and guide time related materials, emphasis is shown the guidance that leader works to department or teams and groups and to the care of this department, these teams and groups and personnel and great kindness, is embodied the construction achievement of teams and groups simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510565182.1A CN105205593A (en) | 2015-09-08 | 2015-09-08 | Team information integrated comprehensive display system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510565182.1A CN105205593A (en) | 2015-09-08 | 2015-09-08 | Team information integrated comprehensive display system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105205593A true CN105205593A (en) | 2015-12-30 |
Family
ID=54953261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510565182.1A Pending CN105205593A (en) | 2015-09-08 | 2015-09-08 | Team information integrated comprehensive display system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105205593A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108710487A (en) * | 2018-04-13 | 2018-10-26 | 重庆三峡学院 | A kind of computer based Ancient Chinese Literature domain form with develop display systems |
CN111539854A (en) * | 2020-03-26 | 2020-08-14 | 山东云昂信息科技有限公司 | Intelligent cloud management system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103412797A (en) * | 2013-08-27 | 2013-11-27 | 国家电网公司 | Control system for large screen display in electric power operation monitoring center |
CN203405719U (en) * | 2013-08-27 | 2014-01-22 | 国家电网公司 | Large-screen display system for electric power operation monitoring center |
CN103679560A (en) * | 2013-12-23 | 2014-03-26 | 贵阳供电局 | Concentrated display system for intelligent community |
CN104537573A (en) * | 2014-12-17 | 2015-04-22 | 国家电网公司 | Power grid operation information panoramic visualized display system |
CN204539177U (en) * | 2015-01-07 | 2015-08-05 | 国家电网公司 | Operation monitoring analysis shows unified platform |
-
2015
- 2015-09-08 CN CN201510565182.1A patent/CN105205593A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103412797A (en) * | 2013-08-27 | 2013-11-27 | 国家电网公司 | Control system for large screen display in electric power operation monitoring center |
CN203405719U (en) * | 2013-08-27 | 2014-01-22 | 国家电网公司 | Large-screen display system for electric power operation monitoring center |
CN103679560A (en) * | 2013-12-23 | 2014-03-26 | 贵阳供电局 | Concentrated display system for intelligent community |
CN104537573A (en) * | 2014-12-17 | 2015-04-22 | 国家电网公司 | Power grid operation information panoramic visualized display system |
CN204539177U (en) * | 2015-01-07 | 2015-08-05 | 国家电网公司 | Operation monitoring analysis shows unified platform |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108710487A (en) * | 2018-04-13 | 2018-10-26 | 重庆三峡学院 | A kind of computer based Ancient Chinese Literature domain form with develop display systems |
CN108710487B (en) * | 2018-04-13 | 2021-09-14 | 重庆三峡学院 | Chinese ancient literature layout form and evolution display system based on computer |
CN111539854A (en) * | 2020-03-26 | 2020-08-14 | 山东云昂信息科技有限公司 | Intelligent cloud management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Serrano et al. | Evaluation of value stream mapping in manufacturing system redesign | |
CN104036060B (en) | A kind of online checking method of engineering drawing and system | |
CN103699953A (en) | Project management system, and data processing method and device thereof | |
Chia et al. | Need for a new workplace safety and health (WSH) strategy for the fourth Industrial Revolution | |
CN105070109A (en) | A blended learning evaluation system and method based on the cloud computing and the Internet of things technology | |
Xing et al. | Challenges, obligations, and pending career interruptions: securing meanings at the exit stage of sport mega-event work | |
Kennedy et al. | Making meaningful decisions about time, workload and pedagogy in the digital age: The course resource appraisal model | |
CN101777073A (en) | Data conversion method based on XML form | |
CN105205593A (en) | Team information integrated comprehensive display system | |
Pohl et al. | How to successfully publish interdisciplinary research: learning from an Ecology and Society Special Feature | |
Ghosh et al. | Structuring data needs for effective integration of building information modeling (BIM) with healthcare facilities management | |
Pereira et al. | Computerized nursing staffing: a software evaluation | |
dos Santos et al. | Methodology of risk analysis to health and occupational safety integrated for the principles of lean manufacturing | |
McClarigan et al. | Yes, we can and did: Engaging and empowering nurses through shared governance in a rural health care setting | |
Chasey et al. | A case study on the social aspect of sustainability in construction | |
CN102799971A (en) | Tobacco supply-by-order process control system | |
Ross et al. | Collaboration enhances community wellbeing: A community development research framework | |
CN103136768A (en) | Electric power communication network graph standardized software | |
Singleton et al. | From framework to the frontline: designing a structure and process for drug supply shortage planning | |
Boyce et al. | A novel collaborative planning methodology for complex infrastructure design projects | |
Carroll | Leadership in lean, empowering manufacturing organizations | |
Villarino et al. | Human Resources Training, Qualification and Knowledge Management in Reactor Physics Analysis | |
CN111311040A (en) | Visual railway transportation balance planning method and system | |
Stojanova et al. | Optimization models for scheduling in kindergarten and healthcare centers | |
CN115526510A (en) | Power failure plan integration method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151230 |