CN105203153B - Electric power user major fault risk index prediction device and prediction method - Google Patents

Electric power user major fault risk index prediction device and prediction method Download PDF

Info

Publication number
CN105203153B
CN105203153B CN201410302037.XA CN201410302037A CN105203153B CN 105203153 B CN105203153 B CN 105203153B CN 201410302037 A CN201410302037 A CN 201410302037A CN 105203153 B CN105203153 B CN 105203153B
Authority
CN
China
Prior art keywords
risk index
power consumer
prediction
reliability
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410302037.XA
Other languages
Chinese (zh)
Other versions
CN105203153A (en
Inventor
齐伟夫
王海波
潘泳超
丁木
孙佳琪
赵硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410302037.XA priority Critical patent/CN105203153B/en
Publication of CN105203153A publication Critical patent/CN105203153A/en
Application granted granted Critical
Publication of CN105203153B publication Critical patent/CN105203153B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to an electric power user major fault risk index prediction device and prediction method and belongs to the electric power fault prediction technical field. The electric power user major fault risk index prediction device and prediction method provided by the invention have the advantages of high accuracy and high prediction efficiency. The prediction device of the invention comprises a signal acquisition unit, an A/D conversion unit, a central processing unit, a 4G communication transmission unit and a man-machine interaction information display unit. The prediction device is structurally characterized in that the output port of the signal acquisition unit is connected with the input port of the A/D conversion unit; the output port of the A/D conversion unit is connected with the data input port of the central processing unit; the information output ports of the central processing unit are connected with the information input port of the 4G communication transmission unit and the information input port of the man-machine interaction information display unit respectively.

Description

A kind of power consumer significant trouble risk index prediction meanss and Forecasting Methodology
Technical field
The invention belongs to power failure electric powder prediction, more particularly to a kind of power consumer significant trouble risk index is pre- Survey device and Forecasting Methodology.
Background technology
Power consumer in power system, occur significant trouble when, extensive load loss can be brought to power system with And larger grid stability impacts, user capacity is bigger, impact and lose bigger that its failure and power failure are caused to electrical network, Therefore, real-time monitoring is carried out to the electric parameter and environment parament at power consumer critical point, and according to monitoring parameter to electric power User's significant trouble risk is predicted, and electric network emergency measure is arranged according to predicting the outcome, and can be prevented effectively from electric power Impact and impact that user's significant trouble brings on electrical network, significantly improve Power System Reliability and economy.
The content of the invention
The present invention is aiming at the problems referred to above, there is provided a kind of degree of accuracy is high, the power consumer significant trouble that predictive efficiency is high Risk index prediction meanss and Forecasting Methodology.
For achieving the above object, the present invention adopts the following technical scheme that the present invention includes that signal gathering unit, A/D are changed Unit, CPU, 4G communications unit and human-machine interactive information display unit, its structural feature signal gathering unit Output port be connected with the input port of A/D converting units, the output port of A/D converting units and the number of CPU It is connected according to input port, the information output port of CPU information input port respectively with 4G communications units, The information input port of human-machine interactive information display unit is connected.
Used as a kind of preferred version, signal gathering unit of the present invention includes voltage sensor, current sensor, rainfall Quantity sensor, vibrating sensor, baroceptor, voltage sensor signals output port, current sensor signal output port, Rainfall amount sensor signal output port, vibration sensor signal output port, baroceptor signal output port respectively with The input port of A/D converting units is connected.
Used as another kind of preferred version, voltage sensor of the present invention adopts DH51D6V0.4B models, current sensor Using DHC03B models, rainfall amount sensor adopts BL~YW900 model radar level gauges, vibrating sensor to adopt STA9200A Model, baroceptor adopts LC~QA1 models.
Secondly, A/D converting units of the present invention adopt TLC2543 serial a/d transducers, CPU to adopt type Number for STC89C51 single-chip microcomputer, 4G communications unit using ME3760 models LTE module, human-machine interactive information shows single Unit adopts the LCD MODULE of HG1286402C models;
Voltage sensor signals output port, current sensor signal output port, rainfall amount sensor signal output part Mouth, vibration sensor signal output port, baroceptor signal output port connect respectively through correspondence after signaling conversion circuit Be connected to the input AIN0~AIN4 of A/D converter TLC2543, the outfan EOC of A/D converter TLC2543, I/O, IN, OUT, CS are connected respectively the P0.0-P0.4 pins of single-chip microcomputer STC89C51 chips, single-chip microcomputer STC89C51 chips P1.0~P1.7 connections corresponding with the D0~D7 of LCD MODULE, the P2.0~P1.4 and liquid crystal of single-chip microcomputer STC89C51 chips The corresponding connection of RS, RW, CS1, CS2, EN of display module, RXD, TXD pin and 4G communication modules of STC89C51 chips DATA, DATA1 end correspondence of ME3760 is connected, and the ATN1 ends of 4G communication modules are connected with antenna.
In addition, signaling conversion circuit of the present invention adopts TLC4501 chips.(signaling conversion circuit is set, it is ensured that signal The bandwidth of collection, switching rate and voltage gain, while reducing input offset voltage and electric current and temperature drift)
A kind of power consumer significant trouble risk index Forecasting Methodology, comprises the steps:
Step 1:Voltage, electric current, rainfall, vibration number, the ambient atmosphere pressure parameter of collection power consumer, electric power is used Voltage, electric current, rainfall, vibration number, the ambient atmosphere pressure at family is used as input quantity;
Step 2:Set up reliability model
Reliability Rs (x) model is:
Fault rate λiFor constant 0.13,
Step 4:Calculate the upper lower limit value of reliability
N=5, the reliability upper limit is:
Its lower limit model is:
Step 5:Calculating judges that stop condition is:
In formula, ε is equal to 0.02.(ε is computational accuracy, and Jing long term tests take 0.02 and reach good prediction effect)
Step 6:Calculate and match somebody with somebody power consumer significant trouble risk index value:He=R (x)
Step 7:Will be with power consumer significant trouble risk index value:Predicting the outcome for He=R (x) is aobvious by Liquid Crystal Module Show and afield dispatch terminal is sent by 4G transport modules, so that maintainer is overhauled in time.
Beneficial effect of the present invention.
The present invention by the use of the voltage of direct measurement power consumer, electric current, rainfall, vibration number, ambient atmosphere pressure as Input quantity, and finally utilize A/D converting units, CPU CPU, human-machine interactive information display unit and 4G transport modules Realize the monitoring of power consumer material risk index.This method avoids what traditional method was caused when setting up model and Selecting All Parameters Error, and extract simple with input quantity, degree of accuracy is high, and accuracy is good, the characteristics of predictive efficiency is high.
Power consumer significant trouble risk is made prediction, electrical network major accident can be prevented, improve power quality, improved Electricity consumption reliability, while prediction process meets requirement of real-time, improves the efficiency of data acquisition and process, improves power consumer weight The speed and precision of major break down risk profile, is realized power distribution network electric power is used with degree of precision and compared with the advantage of short response time The significant trouble at family is predicted.
Description of the drawings
With reference to the accompanying drawings and detailed description the present invention will be further described.The scope of the present invention not only limits to In the statement of herein below.
Fig. 1 is schematic block circuit diagram of the present invention.
Fig. 2 is circuit theory diagrams of the present invention.
Specific embodiment
As illustrated, power consumer significant trouble risk index Forecasting Methodology of the present invention, comprises the steps, including it is as follows Step:
Step 1:Voltage, electric current, rainfall, vibration number, the ambient atmosphere pressure parameter of collection power consumer, electric power is used Voltage, electric current, rainfall, vibration number, the ambient atmosphere pressure at family is used as input quantity:S=(10.98,339.12,10.13, 21.90,1.00,3.57);
Step 2:Set up reliability model
When all subsystems in the production system being made up of n subsystem, only system all break down, whole system Ability failure.Such system belongs to parallel system.
Reliability RsX () model is:
Fault rate λiFor constant 0.13,
Parallel system, subsystem quantity directly affects system dependability.
Step 4:Calculate the upper lower limit value of reliability
N=5, the reliability upper limit is:
N be subsystem number, qiTo cause the fault rate of the subsystem of the system failure;V is the quantity of this subsystem.System System Lower Confidence Limit RlIt is exactly various shape probability of state sums that system can normally be run.
Its lower limit model is:
Step 5:Calculating judges that stop condition is:
In formula, ε is equal to 0.02.
Step 6:Calculate and match somebody with somebody power consumer significant trouble risk index value:He=R (x)
Step 7:Will be with power consumer significant trouble risk index value:Predicting the outcome for He=R (x) is aobvious by Liquid Crystal Module Show and afield dispatch terminal is sent by 4G transport modules, so that maintainer is overhauled in time.
It is understood that above with respect to the specific descriptions of the present invention, being merely to illustrate the present invention and being not limited to this Technical scheme described by inventive embodiments, it will be understood by those within the art that, still the present invention can be carried out Modification or equivalent, to reach identical technique effect;As long as meet use needs, all protection scope of the present invention it It is interior.

Claims (1)

1. a kind of power consumer significant trouble risk index Forecasting Methodology, it is characterised in that comprise the steps:
Step 1:Voltage, electric current, rainfall, vibration number, the ambient atmosphere pressure parameter of collection power consumer, by power consumer Voltage, electric current, rainfall, vibration number, ambient atmosphere pressure are used as input quantity;
Step 2:Set up reliability model
Reliability RsX () model is:
R s ( x ) = 1 - Π i = 1 n [ 1 - e - λ i x ] - - - ( 1 )
Fault rate λiFor constant 0.13,
Step 3:Calculate the upper lower limit value of reliability
N=5, the reliability upper limit is:
R u ( x ) = Π i = 1 5 R i ( x ) [ 1 - Π i = 1 5 ( 1 - q i ( x ) ) ] - - - ( 2 )
Its lower limit model is:
R l ( x ) = Π j = 1 5 R j ( x ) { 1 + Σ j = 1 5 ( q j ( x ) R j ( x ) ) } - - - ( 3 )
Step 4:Calculating judges that stop condition is:
R ( x ) - R u ( x ) - R l ( x ) ( 1 - R u ( x ) ) ( 1 - R l ( x ) ) < &epsiv; - - - ( 4 )
In formula, ε is equal to 0.02;
Step 5:Calculate and match somebody with somebody power consumer significant trouble risk index value:He=R (x)
Step 6:Will be with power consumer significant trouble risk index value:Predicting the outcome for He=R (x) is shown simultaneously by Liquid Crystal Module Afield dispatch terminal is sent by 4G transport modules, so that maintainer is overhauled in time.
CN201410302037.XA 2014-06-27 2014-06-27 Electric power user major fault risk index prediction device and prediction method Active CN105203153B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410302037.XA CN105203153B (en) 2014-06-27 2014-06-27 Electric power user major fault risk index prediction device and prediction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410302037.XA CN105203153B (en) 2014-06-27 2014-06-27 Electric power user major fault risk index prediction device and prediction method

Publications (2)

Publication Number Publication Date
CN105203153A CN105203153A (en) 2015-12-30
CN105203153B true CN105203153B (en) 2017-04-19

Family

ID=54950960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410302037.XA Active CN105203153B (en) 2014-06-27 2014-06-27 Electric power user major fault risk index prediction device and prediction method

Country Status (1)

Country Link
CN (1) CN105203153B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107169645B (en) * 2017-05-09 2020-11-03 云南电力调度控制中心 Power transmission line fault probability online evaluation method considering influence of rainstorm disaster

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446990A (en) * 2008-08-18 2009-06-03 中国电力科学研究院 Method for appraising voltage stability in case of large disturbance probability
CN102721922A (en) * 2012-06-29 2012-10-10 沈阳工业大学 Breaker insulating coefficient prediction unit and method
CN102736025A (en) * 2012-06-29 2012-10-17 沈阳工业大学 Device and method for predicting electric remaining service life of circuit breaker
CN202676874U (en) * 2012-06-29 2013-01-16 沈阳工业大学 Breaker insulating coefficient prediction device
CN103399218A (en) * 2013-06-21 2013-11-20 沈阳工业大学 Device and method for predicting load index of switch cabinet
CN103578042A (en) * 2013-10-14 2014-02-12 国家电网公司 Hieratical assessment method for degree of reliability of power transformer
CN103679297A (en) * 2013-12-26 2014-03-26 杭州国电电气设备有限公司 Method and device for calculating power supply reliability of power distribution network
CN203981211U (en) * 2014-06-27 2014-12-03 国家电网公司 A kind of power consumer significant trouble risk index prediction unit

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446990A (en) * 2008-08-18 2009-06-03 中国电力科学研究院 Method for appraising voltage stability in case of large disturbance probability
CN102721922A (en) * 2012-06-29 2012-10-10 沈阳工业大学 Breaker insulating coefficient prediction unit and method
CN102736025A (en) * 2012-06-29 2012-10-17 沈阳工业大学 Device and method for predicting electric remaining service life of circuit breaker
CN202676874U (en) * 2012-06-29 2013-01-16 沈阳工业大学 Breaker insulating coefficient prediction device
CN103399218A (en) * 2013-06-21 2013-11-20 沈阳工业大学 Device and method for predicting load index of switch cabinet
CN103578042A (en) * 2013-10-14 2014-02-12 国家电网公司 Hieratical assessment method for degree of reliability of power transformer
CN103679297A (en) * 2013-12-26 2014-03-26 杭州国电电气设备有限公司 Method and device for calculating power supply reliability of power distribution network
CN203981211U (en) * 2014-06-27 2014-12-03 国家电网公司 A kind of power consumer significant trouble risk index prediction unit

Also Published As

Publication number Publication date
CN105203153A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN102116847B (en) Single battery performance parameter acquisition system for battery pack
CN203908712U (en) Online stress-monitoring system used for power line tower
CN103336230B (en) Device and method for predicting cable insulation failure rate in power distribution network
CN102721921A (en) Predication device and method for remaining service life of circuit breaker
CN102736025A (en) Device and method for predicting electric remaining service life of circuit breaker
CN102025170A (en) Display calculation type storage battery instant electric quantity charge-discharge protection management system
CN105203153B (en) Electric power user major fault risk index prediction device and prediction method
CN203037317U (en) Remote water level monitoring device based on global system for mobile communication (GSM)
CN202793513U (en) Urban inland inundation monitoring terminal
CN105300442B (en) A kind of outdoor electric automobile charging pile health index assessment device and appraisal procedure
CN201716103U (en) Vibration detection device for micro-variation capacitance pole tower
CN103336199A (en) Device and method for predicting fault rate of totally-closed tube type busbar
CN103323756B (en) Overhead line insulation filth degree prediction device and method in power distribution network
CN202734938U (en) Vehicle load weighing system
CN202815532U (en) Tap water supply monitoring system based on cloud computing
CN105207615B (en) Photovoltaic power generation energy storage equipment fault risk index prediction device and prediction method
CN105699796A (en) Distribution transformer fuse remaining life prediction device and distribution transformer fuse remaining life prediction method
CN214011489U (en) Electric automobile alternating-current charging stake metering device remote monitoring system
CN203981211U (en) A kind of power consumer significant trouble risk index prediction unit
CN105277813B (en) A kind of open air electricity charge are paid dues equipment fault risk index prediction meanss and prediction technique
CN203911868U (en) Fault risk index prediction apparatus of photovoltaic power generation energy storage apparatus
CN105203152B (en) A kind of photovoltaic power generation equipment failure risk exponential forecasting device and Forecasting Methodology
CN203908597U (en) Fault risk index prediction apparatus of photovoltaic power generation apparatus
CN203941251U (en) A kind of outdoor electricity charge equipment failure risk index prediction unit of paying dues
CN203365615U (en) Failure rate prediction device for totally-enclosed tubular bus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant