CN105182193A - owts testing method for short-time power failure of distribution power cable - Google Patents

owts testing method for short-time power failure of distribution power cable Download PDF

Info

Publication number
CN105182193A
CN105182193A CN201510523902.8A CN201510523902A CN105182193A CN 105182193 A CN105182193 A CN 105182193A CN 201510523902 A CN201510523902 A CN 201510523902A CN 105182193 A CN105182193 A CN 105182193A
Authority
CN
China
Prior art keywords
cable
owts
india
power
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510523902.8A
Other languages
Chinese (zh)
Inventor
刘钧元
李季
孙福锋
李聪利
张渭鹏
方静
吴锴
秦涛
郭世刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510523902.8A priority Critical patent/CN105182193A/en
Publication of CN105182193A publication Critical patent/CN105182193A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to an owts testing method for a short-time power failure of a distribution power cable, and the method comprises the steps: (1) confirming that a load current is less than a rated current of rubber insulating cable replacement equipment; (2) cutting off switches at two sides of a cable circuit to be tested (owts testing), and removing a cable terminal connected with the switches; (3) confirming that switches at two sides are cut off; (4) enabling terminals at two ends of a rubber insulating cable replacement part to be connected to the switches at two sides of the cable circuit to be tested (owts testing); (5) confirming that the rubber insulating cable replacement part is consistent with an original phase sequence; (6) switching on the power-supply side switch; (7) switching on the power-receiving side switch, and enabling the rubber insulating cable replacement part to be put in operation; (8) monitoring the current of a rubber insulating cable; (9) carrying out implementation and completing the owts testing of the cable.

Description

The owts method of testing that a kind of distribution power cable has a power failure in short-term
Technical field
The invention belongs to cable machinery detection technique field, the owts method of testing that especially a kind of distribution power cable has a power failure in short-term.
Background technology
At present, distribution power cable is except carrying out routine withstand voltage test, after Condition Based Maintenance Putting in Practice, more effective off-line test method is exactly owts test, the partial discharge quantity of cable and waveform are tested, thus carry out the equipment general level of the health grasping cable, this method has been applied to have in the external good areas of operation level such as Singapore and has been tested effect preferably.But this method is a kind of off-line testing method, cannot live detection be carried out when testing, cable first must be had a power failure.Along with the raising that power supply reliability requires, a lot of user can only accept the power failure in short-term within 10 minutes, and will carry out owts test job like this cannot carry out.This patent is exactly the owts of the power failure in short-term method of testing will inventing a kind of distribution cable, under the reliable prerequisite of guarantee user power utilization, is grasped the general level of the health of cable machinery by owts.
Summary of the invention
The object of the invention is to overcome prior art deficiency, the owts method of testing that a kind of distribution power cable has a power failure in short-term is provided.
The technical solution used in the present invention is:
The owts method of testing that distribution power cable has a power failure in short-term, the steps include:
(1) confirm that load current is less than India-rubber cable alternate device rated current;
(2) disconnect the switch treating owts test cable circuit both sides, remove the cable termination that switch therewith connects;
(3) confirm that both sides switch disconnects;
(4) the terminal at India-rubber cable Substitute For Partial two ends is connected to the switch treating owts test cable circuit both sides;
(5) confirm that India-rubber cable Substitute For Partial is consistent with original system phase sequence;
(6) power transmission side of closing switch;
(7) power side of closing switch, makes India-rubber cable Substitute For Partial put into operation;
(8) monitor India-rubber cable electric current;
(9) implement and complete cable owts to test.
And, with reference to step (2) ~ sequence of operation (7), exit bypath system, recover to have overhauled cable line and run.
Advantage of the present invention and good effect are:
After the owts method of testing that distribution power cable provided by the invention has a power failure in short-term only need complete with test before owts test starts, carry out power failure operation in short-term, be generally less than 10 minutes, test period (4-5 hours) uses India-rubber cable to substitute former twisted polyethylene cable and powers, ensure that responsible consumer, large charge circuit, protect the power supply reliability of the circuits such as electric line, the state-detection of cable can be completed simultaneously, find out the cable that problem is put in existence office.India-rubber cable has good flexible and returnability, can reuse, and discharges conveniently on the one hand, can reuse on the other hand, can not cause investment waste.
Embodiment:
Below by embodiment, the invention will be further described, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
The owts method of testing that distribution power cable has a power failure in short-term, the steps include:
(1) confirm that load current is less than India-rubber cable alternate device rated current;
(2) disconnect the switch treating owts test cable circuit both sides, remove the cable termination that switch therewith connects;
(3) confirm that both sides switch disconnects;
(4) the terminal at India-rubber cable Substitute For Partial two ends is connected to the switch treating owts test cable circuit both sides;
(5) confirm that India-rubber cable Substitute For Partial is consistent with original system phase sequence;
(6) power transmission side of closing switch;
(7) power side of closing switch, makes India-rubber cable Substitute For Partial put into operation;
(8) monitor India-rubber cable electric current;
(9) implement and complete cable owts to test;
With reference to step (2) ~ sequence of operation (7), exit bypath system, recover to have overhauled cable line and run.
In the present embodiment, India-rubber cable substitute-in short-term power failure owts test cable circuit instrument be equipped with see the following form
Job step
1. Work tool accumulating and detection
Use India-rubber cable and relevant device must check it, it is qualified to detect.Receive insulating tool, safety appliance and auxiliary implement, use electric pressure and the test period of Work tool should be checked.Receive insulating tool, should check that well-tended appearance can't harm.Insulating tool and safety appliance, 2500V insulation meter or insulation tester must be used to carry out Insulation monitoring, and resistance must not lower than 700MW.Before Work tool transport, various Work tool should leave in tool bag or tool box, and metal tools and insulating tool should separately load and transport, and causes appearance to damage to prevent mutual grazing.
2. the preparation before execute-in-place
Checking apparatus title and numbering.Convene staff to hand over work to one's successor task, carry out dangerous point and inform, explain safety practice and technical measures, confirm that each shift member knows to shift member, check that whether the shift member state of mind is good, whether personnel are suitable.
3. operation steps
(1) staff enters operation field, and work car enters scene, is parked in correct position, carries out every preliminary work, measures and treats owts test cable load current, confirms that load current is less than bypath system rated current; Lay India-rubber cable and relevant device and carry out insulation resistance detection;
(2) owts test cable power side switch and power transmission side switch are treated in disconnection successively; Take the connection of maintenance cable termination and both sides switch apart, will cable be overhauled out of service; Bypass cable terminal is connected with both sides switch, checks and confirm that phase sequence is errorless.Close power transmission side, power side switch successively, bypath system put into operation, and monitors bypass cable electric current;
(3) treat owts test cable and carry out owts test.
Necessary safety practice should be taked in tested cable two ends, if special messenger is guard, prevents personnel to be strayed into test site;
Should examine the state of tested cable before on-test, whether cable two ends completely disconnect with other equipment of electrical network, and three-phase is unsettled, separates safe distance, except tested mutually except, other two corresponding ground connection, lightning arrester and PT need dismounting;
After the license obtaining on-the-spot responsible official, carry out applied voltage test;
When changing wiring or off-test, first should disconnect high-voltage power supply, equipment and cable are fully discharged, then carry out other operations;
(4) bypass cable power side, power transmission side switch is disconnected successively; Take apart bypass cable terminal and the connection of both sides switch, bypass cable is out of service; Maintenance cable termination is connected with both sides switch, checks and confirm that phase sequence is errorless; Close power transmission side, power side switch successively, and recovery system runs.
(5) India-rubber cable and relevant device is regained.
4 safety notices
Cable must not contact with ground or other hard object in the process of discharging, and must not be stressed.Strengthen site safety, red leukorrhea and warning mark have been enclosed in perform region.Tighten traffic management, personnel special messenger should be increased if desired and assist to safeguard traffic order.Must not be carried out this when safe distance specifies and cannot take safety measures and work joint using circuit to work to be less than with upper layer circuit.Upper and lower tool for transmitting, material all should use insulating cord, forbid to throw, throw away.
Although disclose embodiments of the invention for the purpose of illustration, but it will be appreciated by those skilled in the art that: in the spirit and scope not departing from the present invention and claims, various replacement, change and amendment are all possible, therefore, scope of the present invention is not limited to the content disclosed in embodiment.

Claims (2)

1. the owts method of testing that has a power failure in short-term of distribution power cable, is characterized in that: the steps include:
(1) confirm that load current is less than India-rubber cable alternate device rated current;
(2) disconnect the switch treating owts test cable circuit both sides, remove the cable termination that switch therewith connects;
(3) confirm that both sides switch disconnects;
(4) the terminal at India-rubber cable Substitute For Partial two ends is connected to the switch treating owts test cable circuit both sides;
(5) confirm that India-rubber cable Substitute For Partial is consistent with original system phase sequence;
(6) power transmission side of closing switch;
(7) power side of closing switch, makes India-rubber cable Substitute For Partial put into operation;
(8) monitor India-rubber cable electric current;
(9) implement and complete cable owts to test.
2. the owts method of testing that has a power failure in short-term of distribution power cable according to claim 1, is characterized in that: with reference to step (2) ~ sequence of operation (7), exit bypath system, recover to have overhauled cable line and run.
CN201510523902.8A 2015-08-24 2015-08-24 owts testing method for short-time power failure of distribution power cable Pending CN105182193A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510523902.8A CN105182193A (en) 2015-08-24 2015-08-24 owts testing method for short-time power failure of distribution power cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510523902.8A CN105182193A (en) 2015-08-24 2015-08-24 owts testing method for short-time power failure of distribution power cable

Publications (1)

Publication Number Publication Date
CN105182193A true CN105182193A (en) 2015-12-23

Family

ID=54904404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510523902.8A Pending CN105182193A (en) 2015-08-24 2015-08-24 owts testing method for short-time power failure of distribution power cable

Country Status (1)

Country Link
CN (1) CN105182193A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305901A (en) * 2011-06-03 2012-01-04 西安福润德电子科技有限公司 Method for detecting cable fault point by impact oscillating wave principle
CN103499778A (en) * 2013-09-26 2014-01-08 国家电网公司 Method for evaluating insulation performance of power cable in stage with voltage being 35kV or below 35kV
CN104502825A (en) * 2014-12-02 2015-04-08 西安交通大学 OWTS power cable oscillation wave test equipment and test method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305901A (en) * 2011-06-03 2012-01-04 西安福润德电子科技有限公司 Method for detecting cable fault point by impact oscillating wave principle
CN103499778A (en) * 2013-09-26 2014-01-08 国家电网公司 Method for evaluating insulation performance of power cable in stage with voltage being 35kV or below 35kV
CN104502825A (en) * 2014-12-02 2015-04-08 西安交通大学 OWTS power cable oscillation wave test equipment and test method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
牛捷: "10kV电缆线路不停电作业旁路系统研究", 《中国电业(技术版)》 *
罗俊华 等: "15kV柔性旁路电缆的不停电抢修作业技术", 《高电压技术》 *
肖辉 等: "10kV电缆线路不停电作业旁路系统", 《大众用电》 *

Similar Documents

Publication Publication Date Title
Prévé Protection of electrical networks
US9054557B2 (en) Voltage balancing of symmetric HVDC monopole transmission lines after earth faults
US10640000B2 (en) Method and device for detecting a direct-current fault current
US20100013498A1 (en) System And Method To Determine The Impedance Of A Disconnected Electrical Facility
CN101587157B (en) Bus differential protection polarity test method
CN103837798B (en) The quick diagnosis device of one-phase earthing failure in electric distribution network character
MX2008013960A (en) Method and device for maintenance of high-voltage switchgear with voltage.
WO2014005635A1 (en) A power bay protection device and a method for protecting power bays
CN104590028A (en) Electric locomotive contact network voltage detection device
CN104466943B (en) Safety equipment and method for electric facility
CN110320432B (en) Single-phase line-breaking fault detection and protection method and system
CN103441431B (en) A kind of distribution box becomes temporary earthing device and earthing method
CN105529681A (en) Leakage protection circuit for low-voltage ungrounded system and realization method
JP2004239863A (en) Grounding method for transformer
CN105182193A (en) owts testing method for short-time power failure of distribution power cable
CN203386910U (en) Power distribution box-type substation temporary grounding device
CN107305233A (en) One kind 20 to 10kV distribution lines are grounded strategy, algorithm and circuit between constituency
RU2293342C2 (en) METHOD FOR DETERMINING POSITION AND DISTANCE FOR ONE-PHASED GROUNDING SPOT IN ELECTRIC NETWORKS OF 6-35 kV WITH ISOLATED OR COMPENSATED NEUTRAL
CN107991533A (en) Voltage-phase localization method based on single-phase cable
CN204613346U (en) A kind of ground loop detector
CN102707206A (en) Reclosure device for insulation detection
CN208423213U (en) A kind of portable short-circuit grounding wire
CN202693726U (en) Detection circuit and detection system for electric transmission and transformation equipment
JP2009177947A (en) Emergency connection circuit and connection device used for the same
CN214755172U (en) Live-line replacement device for lightning arrester counter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151223

RJ01 Rejection of invention patent application after publication