CN105178136A - Construction method for antifreeze road body - Google Patents

Construction method for antifreeze road body Download PDF

Info

Publication number
CN105178136A
CN105178136A CN201510357001.6A CN201510357001A CN105178136A CN 105178136 A CN105178136 A CN 105178136A CN 201510357001 A CN201510357001 A CN 201510357001A CN 105178136 A CN105178136 A CN 105178136A
Authority
CN
China
Prior art keywords
layer
road
laid
heating cable
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510357001.6A
Other languages
Chinese (zh)
Inventor
何家忠
杨杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jiazhong Timber Industry Co Ltd
Original Assignee
Zhejiang Jiazhong Timber Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jiazhong Timber Industry Co Ltd filed Critical Zhejiang Jiazhong Timber Industry Co Ltd
Priority to CN201510357001.6A priority Critical patent/CN105178136A/en
Publication of CN105178136A publication Critical patent/CN105178136A/en
Pending legal-status Critical Current

Links

Abstract

The invention belongs to the field of road construction and particularly relates to a construction method for an antifreeze road body. The construction method for the antifreeze road body comprises the following steps that 1, power-on test is conducted on heating cables to be laid before the heating cables to be laid enter a field, whether the heating cables work normally is detected, and the road face base layer is leveled and cleaned; 2, a damp-proof layer is laid; 3, a heat insulation layer and a reflection layer are laid; 4, a heat dissipation layer is laid; 5, a heating cable layer is laid; 6, a temperature sensing probe is arranged; 7, a road face cushion layer is laid; and 8, a road surface layer is laid. The problem of road face freezing is solved thoroughly, the road face is heated before the road face freezes, the performance of the road body is improved while it is ensured that the road face does not freeze, and the situation that the road face freezes to affect the performance of the road body and shorten the service life of the road body is prevented. The service life of the road body can be prolonged through the design of the road body, and safety of the road face is improved.

Description

The construction method of a kind of antifreeze road body
Technical field
The invention belongs to road construction field, be specifically related to the construction method of a kind of antifreeze road body.
Background technology
Existing conventional pavement snow melting de-icing method mainly comprises artificial or mechanical removal method, spreads Snow Agent method etc., and snow melt deicing effect is all undesirable, and can only carry out snow melt again when there is ice and snow road, can not amass prevent before road surface at ice and snow.The existing Snow Agent the most generally used also can damage existing Pavement Performance, and the problem such as Snow-melting speed is slow, intelligence degree is low, efficiency is low, energy consumption is large.
Summary of the invention
The object of the invention is the construction method that a kind of antifreeze road body is provided for the problems referred to above.
Above-mentioned technical purpose of the present invention is achieved by the following technical programs:
A construction method for antifreeze road body, comprises the steps:
One, heating cable to be laid advance of marching into the arena is worked electrical testing, check every root heating cable whether can normally work, and sub-surface is levelling and clean out;
Two, damp-proof course is laid;
Three, heat insulation layer and reflecting layer is laid;
Four, heat dissipating layer is laid;
Five, lay heating cable layer: be laid on heat dissipating layer by heating cable, and with connector heating cable and heat insulation layer and/or heat dissipating layer be connected heating cable position is fixed;
Six, temperature-sensing probe is set: hard sleeve is set between the heating cable laid, and hard sleeve is fixed, again temperature-sensing probe is located in hard sleeve, and the external temperature controller (10) of temperature-sensing probe and road is electrically connected, then away from the one end at body edge, road, shutoff is carried out to hard sleeve;
Seven, paving fills out bed course, and spreading the thickness filled out is 2-5cm;
Eight, road surface pavement layer.
Heat insulation layer: in order to block heat transmission, reduces the techonosphere of unavailable heat loss; Damp-proof course: for preventing the techonosphere of moisture through ground of building lot or soil.
The heat conduction that the application adopts heating cable to produce is to supercrust, and arranging heat road surface conduction upward as much as possible by heat insulation layer, improve heating efficiency.
The conduction depending heat self radiation and bed course alone there will be slow or heat radiation inequality of dispelling the heat, the problems such as temperature-sensing probe data are inaccurate, the application adopts the heat dissipating layer be pressed against on heating cable layer to be scattered as quickly as possible by heat, guarantee pavement temperature is even, reduces the temperature error of temperature-sensing probe.
As preferably, described reflecting layer is be glued at the aluminium foil layer on described heat insulation layer.
As preferably, described heat dissipating layer is metal net layer, crimping or connected by conductor between adjacent metal stratum reticulare.
Metal net layer as heat dissipating layer, thus makes sub-surface to penetrate on insulating layer, and wraps wire lath and heating cable thus can play the effect of better fixing metal net and heating cable, guarantees that heat radiation evenly.Also can reduce road surface because of the setting of interlayer simultaneously and cause the risk of staggered floor, improve the steadiness on road surface.
As preferably, described wire lath is connected with grounding wire.
As preferably, described temperature-sensing probe leaves even temperature gap between described cable cable.
The setting of even temperature gap is guaranteed can not closely get close between temperature-sensing probe and heating cable, thus the data that the heat that the data of guarantee gained are heating cable generations obtains after heating layer evenly scatters, for temperature control provides reliable reference, guarantee that the temperature on road surface is in control range as much as possible, reduce unnecessary energy consumption, raise the efficiency.
Collect by temperature controller the temperature data that temperature-sensing probe gathers constantly, road pavement temperature is analyzed, reach that temperature controller specifies open the temperature of heating cable time, namely temperature controller sends the energising of instruction heating cable and starts heating.
As preferably, described bed course is the cement bed course of backfill.
As preferably, described cement bed course is cement mortar or pea gravel concrete.
As preferably, after step 7 completes, detect whole heat-generating system in 24-48 hour and before road surface pavement layer, problem points is repaired.
As preferably, described connector is staple.
As preferably, described heating cable layer comprises and uniform is multiplely arranged in the hot zone that described reflecting layer is formed by least one heating cable.
As preferably, described heating cable is roundabout to be back and forth arranged on described reflecting layer, and the outer side edges of described heating cable layer near sub-surface limit is 8-12cm to the distance on described sub-surface limit.
The thickness of bed course, when 2-5cm, can ensure that the heat of heating cable is fully utilized, and ensures again that bed course can protect heating cable layer well simultaneously.Heating cable layer back gauge sub-surface limit 8-12cm, whole road surface is heated evenly, and ensures again sub-surface simultaneously and has enough wide joint face between cement bed course and supercrust, ensureing the intensity of road body.
For guaranteeing that heating is effectively carried out in practice, can on sub-surface uniform multiple hot zone, each hot zone arranges one group of heat-generating system, often the circuit organized between heat-generating system is independent circuits, in parallel between independent circuits, wherein one group breaks down because of unpredictable situation, can not have influence on the duty of other system.
The heating cable of the application adopts filament carbon fibre cable, have very high safety, heating-up temperature also can not be too high, and too high temperature body performance of satisfying the need equally impacts, what can extend road body by the design of the application road body makes the life-span, improves the safety on road surface.
In sum, the present invention has following beneficial effect:
1, the application extensively can apply to winter temperature lower ground district, may be used on speedway or common road solving speedway, common road is icy on road causes running car generation traffic accident problem; Also may be used on outdoor public place to solve concrete structure road surface (square) and freeze and cause pedestrian's safety hidden danger to ask to carry; For some manufacturing enterprises, the structure of the application solution plant area temperature in outdoor winter also can be used to cross low concrete cargo handling platform and to freeze, cause factory's handling operation security hidden trouble.
2, the application's structure is simple, intelligence degree is high, energy consumption is low, long service life.
3, the application thoroughly solves problem icy on road, and namely road pavement heats before icy on road, ensures the performance turn improving road body while road surface can not freeze, and prevents road surface from freezing affect road body performance, shortening road body application life.
Accompanying drawing explanation
Fig. 1 is the application's structural representation one;
Fig. 2 is the application's structural representation two;
Fig. 3 is that the application has multiple hot zones layout structure schematic diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail.
This specific embodiment is only explanation of the invention; it is not limitation of the present invention; those skilled in the art can make to the present embodiment the amendment not having creative contribution as required after reading this manual, as long as but be all subject to the protection of Patent Law in right of the present invention.
Embodiment one:
A construction method for antifreeze road body, comprises the steps:
One, heating cable to be laid advance of marching into the arena is worked electrical testing, check every root heating cable whether can normally work, and by levelling for sub-surface 1 and clean out;
Two, lay damp-proof course 2, damp-proof course can select PVC moisture sealer;
Three, lay heat insulation layer 3 and reflecting layer 4, reflecting layer is the aluminium foil layer be glued on heat insulation layer;
Four, lay heat dissipating layer 5, the application selects wire lath as heat dissipating layer, and crimp between adjacent metal stratum reticulare or connected by conductor, conductor can select copper cash, and by wire lath ground connection.
Five, lay heating cable layer 6: be laid on heat dissipating layer by heating cable 62, and with staple heating cable and heat insulation layer and heat dissipating layer be connected heating cable position is fixed;
Six, temperature-sensing probe is set: hard sleeve 9 is set between the heating cable laid, and hard sleeve is fixed, again temperature-sensing probe is located in hard sleeve, and the external temperature controller 10 of temperature-sensing probe and road is electrically connected, then away from the one end at body edge, road, shutoff is carried out to hard sleeve; For ensureing the harmony of measured temperature, temperature-sensing probe leaves even temperature gap 63 to sending out between cable cable, prevents temperature-sensing probe from directly affecting the reference value of measured temperature by heating cable and hard sleeve by heating cable.
Seven, paving fills out bed course 7, and the bed course that the application selects is cement bed course, the optional cement mortar of cement bed course or pea gravel concrete.Detect whole heat-generating system in 24-48 hour and before road surface pavement layer after completing, by carrying out the detection of insulation against ground resistance to system, require that insulaion resistance is greater than 500, the construction section point not meeting test stone is repaired.Note protecting the heating cable paved during cement backfill, the spacing of mating formation of heating cable protection jacket layer or change heating cable can not be destroyed.
Eight, road surface pavement layer (8).Lay, as A by the designing requirement difference of field of employment: lay concrete pavement layer by the designing requirement of high speed common road.B: lay concrete pavement layer by the designing requirement of prevailing roadway.C: lay layer of concrete by the designing requirement of kinds of goods loading/unloading platform.
Described heating cable layer comprises and uniform is multiplely arranged in the hot zone that described reflecting layer is formed by least one heating cable.
Described heating cable is roundabout to be back and forth arranged on described reflecting layer.
The thickness of described bed course 7 is 2cm, and the outer side edges of described heating cable layer near sub-surface limit is 8cm to the distance on described sub-surface limit.
Embodiment two:
The thickness that is in described bed course 7 different from above-described embodiment is 5cm, and the outer side edges of described heating cable layer near sub-surface limit is 12cm to the distance on described sub-surface limit.
Embodiment three:
The thickness that is in described bed course 7 different from above-described embodiment is 3cm, and the outer side edges of described heating cable layer near sub-surface limit is 10cm to the distance on described sub-surface limit.
The application thoroughly solves problem icy on road, and namely road pavement heats before icy on road, ensures the performance turn improving road body while road surface can not freeze, and prevents road surface from freezing affect road body performance, shortening road body application life.Adopt carbon fiber cable simultaneously, have very high safety, heating-up temperature also can not be too high, and too high temperature body performance of satisfying the need equally impacts, and what can extend road body by the design of the application road body makes the life-span, improves the safety on road surface.

Claims (10)

1. a construction method for antifreeze road body, is characterized in that: comprise the steps:
One, heating cable to be laid advance of marching into the arena is worked electrical testing, check every root heating cable whether can normally work, and by levelling for sub-surface (1) and clean out;
Two, damp-proof course (2) is laid;
Three, heat insulation layer (3) and reflecting layer (4) is laid;
Four, heat dissipating layer (5) is laid;
Five, lay heating cable layer (6): be laid on heat dissipating layer by heating cable (62), and with connector heating cable and heat insulation layer and/or heat dissipating layer be connected heating cable position is fixed;
Six, temperature-sensing probe is set: hard sleeve (9) is set between the heating cable laid, and hard sleeve is fixed, again temperature-sensing probe is located in hard sleeve, and the external temperature controller (10) of temperature-sensing probe and road is electrically connected, then away from the one end at body edge, road, shutoff is carried out to hard sleeve;
Seven, paving fills out bed course (7), and spreading the thickness filled out is 2-5cm;
Eight, road surface pavement layer (8).
2. the construction method of a kind of antifreeze road body according to claim 1, is characterized in that: described reflecting layer is be glued at the aluminium foil layer on described heat insulation layer.
3. the construction method of a kind of antifreeze road body according to claim 1, is characterized in that: described heat dissipating layer is metal net layer, crimping or connected by conductor between adjacent metal stratum reticulare.
4. the construction method of a kind of antifreeze road body according to claim 3, is characterized in that: described wire lath is connected with grounding wire.
5. the construction method of a kind of antifreeze road body according to claim 1, is characterized in that: leave even temperature gap (63) between described temperature-sensing probe to described cable cable.
6. the construction method of a kind of antifreeze road body according to claim 1, is characterized in that: described bed course is the cement bed course of backfill.
7. the construction method of a kind of antifreeze road body according to claim 6, is characterized in that: described cement bed course is cement mortar or pea gravel concrete.
8. the construction method of a kind of antifreeze road body according to claim 1, is characterized in that: after step 7 completes, detect whole heat-generating system in 24-48 hour and before road surface pavement layer, repair problem points.
9. the construction method of a kind of antifreeze road body according to claim 1, is characterized in that: described heating cable layer comprises and uniform is multiplely arranged in the hot zone that described reflecting layer is formed by least one heating cable.
10. the construction method of a kind of antifreeze road body according to the arbitrary claim of claim 1-9, it is characterized in that: described heating cable is roundabout to be back and forth arranged on described reflecting layer, and the outer side edges of described heating cable layer near sub-surface limit is 8-12cm to the distance on described sub-surface limit.
CN201510357001.6A 2015-06-25 2015-06-25 Construction method for antifreeze road body Pending CN105178136A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510357001.6A CN105178136A (en) 2015-06-25 2015-06-25 Construction method for antifreeze road body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510357001.6A CN105178136A (en) 2015-06-25 2015-06-25 Construction method for antifreeze road body

Publications (1)

Publication Number Publication Date
CN105178136A true CN105178136A (en) 2015-12-23

Family

ID=54900527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510357001.6A Pending CN105178136A (en) 2015-06-25 2015-06-25 Construction method for antifreeze road body

Country Status (1)

Country Link
CN (1) CN105178136A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004019185A (en) * 2002-06-14 2004-01-22 T-Net Japan Co Ltd Freezing preventive pavement construction method
CN102322011A (en) * 2011-06-08 2012-01-18 长安大学 Active pavement thermal insulation anti-skid facility and construction method thereof
CN202131554U (en) * 2011-06-08 2012-02-01 长安大学 Active heat-insulation antiskid facility for road surfaces
US20120132634A1 (en) * 2008-11-29 2012-05-31 Shide Song Deicing method based on carbon/glass fiber hybrid textile
CN104631277A (en) * 2015-01-10 2015-05-20 黄友锋 Pavement construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004019185A (en) * 2002-06-14 2004-01-22 T-Net Japan Co Ltd Freezing preventive pavement construction method
US20120132634A1 (en) * 2008-11-29 2012-05-31 Shide Song Deicing method based on carbon/glass fiber hybrid textile
CN102322011A (en) * 2011-06-08 2012-01-18 长安大学 Active pavement thermal insulation anti-skid facility and construction method thereof
CN202131554U (en) * 2011-06-08 2012-02-01 长安大学 Active heat-insulation antiskid facility for road surfaces
CN104631277A (en) * 2015-01-10 2015-05-20 黄友锋 Pavement construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
侯雪梅: "一种新型的融雪化冰系统", 《西安邮电大学学报》 *

Similar Documents

Publication Publication Date Title
CN104894944A (en) Anti-freezing road
KR100923663B1 (en) Snow melting apparatus on paved road and installing mehod thereof
KR102197761B1 (en) Upward heat concentrating snow melting system and its installation method using electric heat line on paved roads
CN105178137A (en) Construction method for anti-icing road face
CN104631276A (en) Carbon fiber composite geogrid with electric heating function
KR20150009795A (en) Snow melting apparatus on paved road and installing mehod thereof
CN105887604A (en) Operation roadbed damage disposal device and treatment method
Yang et al. Prefabricated flexible conductive composite overlay for active deicing and snow melting
WO2000055427A1 (en) Method of resurfacing roads and bridge decks
CN104929016B (en) A kind of antifreeze road surface
CN111926651A (en) Electric heating ice-proof snow-melting system for road and paving method thereof
CN204753303U (en) Frostproofing road surface
Peng et al. The machine learning based finite element analysis on road engineering of built-in carbon fiber heating wire
CN105040548A (en) Road body construction method with cold preventing function
CN105178136A (en) Construction method for antifreeze road body
CN206157521U (en) Carbon fiber road surface snow -melting system that generates heat
CN204982593U (en) Way body with frostproofing function of resisting cold
CN204982594U (en) Novel frostproofing road surface
CN204940060U (en) A kind of Novel road body structure
CN104929015A (en) Novel road body structure
CN104963419B (en) Heat preservation heating plate structure
CN213653097U (en) Electric heating type self-snow-melting asphalt pavement heating wire packaging structure
CN108103887A (en) A kind of electrical heating ice-melt snow pavement structure and its construction method
CN104975549A (en) Road body with anti-cold anti-freezing function
CN103669162B (en) Resistance net facility and laying method of supplying power to thereof for road surface deicing snow

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151223