CN105161228B - Insulation sleeve assembly for overhead wire and application method of insulation sleeve assembly - Google Patents

Insulation sleeve assembly for overhead wire and application method of insulation sleeve assembly Download PDF

Info

Publication number
CN105161228B
CN105161228B CN201510512481.9A CN201510512481A CN105161228B CN 105161228 B CN105161228 B CN 105161228B CN 201510512481 A CN201510512481 A CN 201510512481A CN 105161228 B CN105161228 B CN 105161228B
Authority
CN
China
Prior art keywords
group
pair
gear shaping
installation
sheath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510512481.9A
Other languages
Chinese (zh)
Other versions
CN105161228A (en
Inventor
高晓宁
孙国娣
李培培
陈吉洋
濮实
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Zhongxin Weiye New Technology Development Co ltd
Yangzhou Guangyuan Group Co ltd
State Grid Corp of China SGCC
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
Suzhou Zhongxin Weiye New Technology Development Co ltd
Yangzhou Guangyuan Group Co ltd
State Grid Corp of China SGCC
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zhongxin Weiye New Technology Development Co ltd, Yangzhou Guangyuan Group Co ltd, State Grid Corp of China SGCC, Yangzhou Power Supply Co of Jiangsu Electric Power Co filed Critical Suzhou Zhongxin Weiye New Technology Development Co ltd
Priority to CN201510512481.9A priority Critical patent/CN105161228B/en
Publication of CN105161228A publication Critical patent/CN105161228A/en
Application granted granted Critical
Publication of CN105161228B publication Critical patent/CN105161228B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to an insulation sleeve assembly for an overhead wire and an application method of the insulation sleeve assembly, and provides an insulation sleeve assembly simple in structure and convenient to operate for the overhead wire and an application method of the insulation sleeve assembly. The insulation sleeve assembly comprises a sleeve group and an installation group, wherein the sleeve group comprises a sleeve body and a pair of nozzles, the sleeve body is a sleeve, the sleeve is provided with a broken gap along an axial direction, the two ends of the broken gap are respectively provided with ear plates arranged oppositely in an outward extension way, the pair of nozzles are respectively and symmetrically connected to the two ends of the sleeve body, the nozzles are sleeved on the sleeve body, the mouth parts of the nozzles are in corresponding to the broken gap of the sleeve body, a plurality of first flexible insertion gears are arranged on opposite surfaces of the mouth parts of the nozzles respectively in a staggered manner to form a first insertion gear group and a second insertion gear group, the installation group comprises a first installation group and a pair of second installation groups, the first installation group is used for connecting the sleeve body, and the pair of second installation groups are respectively used for connecting the pair of nozzles. By the insulation sleeve assembly, the working efficiency is improved, and the cost is saved.

Description

A kind of insulating sheath component and its using method for aerial condutor
Technical field
The present invention relates to the insulating sheath component in electric power safety field, more particularly, to aerial condutor and its user Method.
Background technology
With developing rapidly for power distribution network, supplying channels are covered by trees, the factors shadow such as heavy corrosion, external force destruction Ring.In order to solve this problem, suspended insulated guide wire transmission of electricity is employed, aerial condutor solves conventional bare conductor in running In a difficult problem, price is again cheap than cable power transmission, therefore, be widely used in power distribution network.
But due to 1, city distribution geographical environment complexity, it occur frequently that the situation of short circuit grounding and unexpected tripping operation, causes Power supply reliability is reduced;2nd, trees, the impact of the extrinsic factor such as metal film and soda acid weather that flies to float easily are received to be highly prone to external force Destruction;3rd, after use, pouring and thunder and lightning etc. is poured because long-term by sunlight irradiation, rainwater, it is possible to create crackle or desquamation, shadow Ring its mechanical performance and insulating properties.So, a layer insulating is wrapped up in the outside of original overhead bare conductor core.
However, in prior art, insulating sheath when mounted, needs electric power personnel are delivered to eminence by lift truck and Row is installed back and forth(Due to insulating sheath length it is longer), increase working time, complex operation.
The content of the invention
The present invention is directed to problem above, there is provided a kind of simple structure, convenient to operate, improve work efficiency for making somebody a mere figurehead The insulating sheath component of wire and its using method.
The technical scheme is that:Including sheath group and installation group, the sheath group includes sheath body and a pair of pipes Mouthful,
The sheath body is sleeve pipe, and described sleeve pipe is in axial direction provided with tear, and the two ends of the tear are outside respectively Extension is provided with the otic placode being oppositely arranged,
The mouth of pipe described in a pair is respectively symmetrically the two ends for being connected to the sheath body, and the mouth of pipe is socketed in the sheath sheet On body, the tear of the oral area correspondence sheath body of the mouth of pipe is respectively equipped with the oral area opposite face of the mouth of pipe some Stagger the flexible gear shaping one of setting, forms gear shaping group one and gear shaping group two;
The installation group includes installation group one and a pair of installation groups two, and the installation group one is used for connecting sheath body, one The installation group two is respectively used to connect a line up;
The installation group one includes T-bar one, a pair of bull sticks one and a pair of abaculus, and the T-bar one has one He of cross bar Vertical rod one, a pair of bull sticks one are symmetrical and are hinged the two ends for arranging the cross bar one, the sheath body positioned at a pair of bull sticks one it Between and positioned at the top of cross bar one, abaculus described in a pair is symmetrically arranged on bull stick one described in a pair, the abaculus it is outer Side is respectively equipped with outward-dipping flexibility block, the caulking groove being communicated with the otic placode and a groove, and the abaculus and a block are fitted It is located in the caulking groove and a groove with ground;
The installation group two includes T-bar two, a pair of bull sticks two and a pair of gear shaping groups, and the T-bar two has cross bar two With vertical rod two, a pair of bull sticks two are symmetrical and are hinged the two ends for arranging the cross bar two, and the mouth of pipe is located between a pair of bull sticks two And positioned at the top of cross bar two, described in a pair, gear shaping group is symmetrically arranged on bull stick two described in a pair, gear shaping described in a pair Group is respectively used to connect the gear shaping group one and gear shaping group two.
The gear shaping group includes arm-tie and is located at some gear shapings two being uniformly arranged of arm-tie side, and the bull stick two connects The arm-tie.
The section of the abaculus is in arc-shaped, and the top of the arm-tie is in arc-shaped.
The vertical rod one and vertical rod two are expansion link.
The bull stick one and bull stick two are connecting rod, and the connecting rod includes the horizontally disposed pull bar being connected as a single entity and inclination The bull stick of setting, the bull stick are inclined towards outside.
A kind of using method of the insulating sheath component for aerial condutor, comprises the following steps:
1), installation group be connected with sheath group,
1.1), sheath body be connected with installation group one, a pair of abaculus are individually positioned in the caulking groove of a pair of otic placodes, its In, a block is placed in a groove;
1.2), a line up be connected with a pair of installation groups two, a pair of gear shaping groups are connected into the gear shaping group one in the mouth of pipe respectively With gear shaping group two;
2), sheath group rise, rise band by the vertical rod two in the vertical rod one in installation group one and a pair of installation groups two synchronous Dynamic sheath group;
3), sheath group install, in sheath body and mouth of pipe contact wire, vertical rod one in installation group one continues to rise, The rotation of bull stick one pulls otic placode to open tear, meanwhile, the vertical rod two in installation group two continues to rise, and the rotation of bull stick two pulls the mouth of pipe Interior gear shaping group one and gear shaping group two are opened so that conducting wire cladding is internal in sheath sheet;
4), assembling and dismantling be installed remove, vertical rod one in installation group one continues to rise so that abaculus departs from caulking groove, and a pair of otic placodes are multiple It is former;Gear shaping group is departed from gear shaping group one and gear shaping group two, gear shaping group one and gear shaping by the vertical rod difference level in a pair of installation groups two Group two is engaged;
5), finish.
Insulating sheath component in the present invention includes sheath group and installation group, and sheath group is used for coated wire, and installation group is used Coat in rising sheath group, being open;Sheath group includes sheath body and a line up, and installation group includes installation group one and installs Abaculus in installation group one and a block are separately positioned on the caulking groove of otic placode by group two, sheath body and one interoperation of installation group In a groove, you can realize connection, meanwhile, it is easy to bull stick one to pull otic placode by abaculus, so as to tear is opened;
A pair of gear shaping groups are connected gear shaping group one and gear shaping group in the mouth of pipe by the mouth of pipe and two interoperation of installation group respectively Two, you can realization connection, meanwhile, it is easy to bull stick two to pull gear shaping groups one and gear shaping group two by a pair of gear shaping groups, so as to manage The oral area of mouth is opened;
In work, tear and mouth of pipe oral area by two jack-up of vertical rod one and a pair of vertical rods, are opened respectively by staff on ground Open so that conducting wire cladding is in insulating sheath, convenient to operate;Due to insulating sheath it is longer, it is to avoid staff overhead from Another place's work is moved at one, saves the time, it is safe and reliable.Then, installation group one and installation group two are removed, a pair of otic placodes Restore, gear shaping group one and gear shaping group two are engaged, complete to install.
The present invention improves work efficiency, saves cost.
Description of the drawings
Fig. 1 is the structural representation of sheath group in the present invention,
Fig. 2 is the left view of Fig. 1,
Fig. 3 is the structural representation of the mouth of pipe in the present invention,
Fig. 4 is the left view of Fig. 3,
Fig. 5 is the structural representation of installation group two in the present invention,
Fig. 6 is the attachment structure schematic diagram of the mouth of pipe and installation group two in the present invention,
Fig. 7 is the structural representation of sheath body in the present invention,
Fig. 8 is the left view of Fig. 7,
Fig. 9 is the structural representation of installation group one in the present invention,
Figure 10 is the attachment structure schematic diagram of sheath body and installation group one in the present invention;
In figure, 1 is sheath body, and 10 is tear, and 11 is otic placode, and 111 is caulking groove, and 112 is a groove,
2 is the mouth of pipe, and 20 is oral area, and 21 is gear shaping one, and 22 is gear shaping group one, and 23 is gear shaping group two,
3 is installation group one, and 31 is T-bar one, and 311 is cross bar one, and 312 is vertical rod one, and 32 is bull stick one, and 33 is abaculus, 34 is a block,
4 is installation group two, and 41 is T-bar two, and 411 is cross bar two, and 412 is vertical rod two, and 42 is bull stick two, and 43 is gear shaping Group, 431 is arm-tie, and 432 is gear shaping two,
5 is pull bar, and 6 is bull stick.
Specific embodiment
As Figure 1-10 shows, including sheath group and installation group, the sheath group includes sheath body 1 and a pair of pipes to the present invention Mouth 2, in work, sheath body and the mouth of pipe are isolation material, with flexibility.
The sheath body 1 is sleeve pipe, and described sleeve pipe is in axial direction provided with tear 10, the two ends difference of the tear 10 Stretch out and be provided with the otic placode 11 being oppositely arranged,
The mouth of pipe 2 described in a pair is respectively symmetrically the two ends for being connected to the sheath body 1, and the mouth of pipe 2 is socketed in the shield On set body 1(Both are fixedly connected), the tear 10 of the correspondence of the oral area 20 sheath body 1 of the mouth of pipe 2(In work, pipe The unlatching of mouth oral area can drive tear to open), on the oral area opposite face of the mouth of pipe 2, it is respectively equipped with the soft of some settings of staggering Property gear shaping 1, form gear shaping group 1 and gear shaping group 2 23;
The installation group includes installation group 1 and a pair of installation groups 24, and the installation group 1 is used for connecting sheath body 1, installation group 24 described in a pair is respectively used to connect a line up 2;
As shown in figure 9, the installation group 1 includes T-bar 1, a pair of bull sticks 1 and a pair of abaculus 33, the T-shaped Bar 1 has cross bar 1 and a vertical rod 1, and a pair of bull sticks 1 are symmetrical and are hinged the two ends for arranging the cross bar 1, The sheath body 1 is located between a pair of bull sticks 1 and positioned at the top of cross bar 1, and described in a pair, abaculus 33 is respectively symmetrically It is arranged on bull stick 1 described in a pair, the outside of the abaculus 33 is respectively equipped with outward-dipping flexibility block 34, the ear The caulking groove 111 being communicated with plate 11 and a groove 112, the abaculus 33 and a block 34 are adaptedly located at the caulking groove 111 and prop up In groove 112;At work, inclined block is set, as T-bar one needs jack-up upwards, a block provides resistance and avoids abaculus Depart from caulking groove, so as to realize the breakdown action of otic placode.As a block has flexibility, during installation, a block enters from caulking groove with abaculus Enter, subsequently into a groove.
Bull stick one is articulated and connected, and realizes that T-bar one is rising(Action upwards)When, bull stick one opens dynamic to respective outside Make, be easy to follow-up tear breakdown action;
As shown in figure 5, the installation group 24 includes T-bar 2 41, a pair of bull sticks 2 42 and a pair of gear shaping groups 43, the T Shape bar 2 41 has cross bar 2 411 and a vertical rod 2 412, and a pair of bull sticks 2 42 are symmetrical and be hinged and arrange the two of the cross bar 2 411 End, the mouth of pipe 2 are located between a pair of bull sticks 2 42 and positioned at the top of cross bar 2 411, and described in a pair, gear shaping group 43 is right respectively Title is arranged on bull stick 2 42 described in a pair, and gear shaping group 43 described in a pair is respectively used to connect the gear shaping group 1 and gear shaping group 2 23.
Bull stick two is articulated and connected, and realizes that T-bar two is rising(Action upwards)When, bull stick two opens dynamic to respective outside Make, be easy to the breakdown action of follow-up mouth of pipe oral area;
The gear shaping group 43 includes arm-tie 431 and is located at some gear shapings 2 432 being uniformly arranged of 431 side of arm-tie, institute State bull stick two and connect the arm-tie.In work, gear shaping two is connected with gear shaping one, and in the presence of bull stick two, level is pulled arm-tie Mouth of pipe oral area is opened;Meanwhile, gear shaping two is horizontally moveable, departs from from gear shaping group one and gear shaping group two, easy to operate, can Lean on.
The section of the abaculus 33 is in arc-shaped, and the top of the arm-tie 431 is in arc-shaped;In work, it is oppositely arranged, shape Into the placement space of wire, it is easy to the unlatching of subsequent operation, i.e. tear and mouth of pipe oral area.
The vertical rod 1 and vertical rod 2 412 are expansion link, are easy to stretch and rise sheath body and the mouth of pipe, and operation can Lean on.
The bull stick 1 and bull stick 2 42 are connecting rod, and the connecting rod includes the horizontally disposed pull bar 5 being connected as a single entity With the bull stick 6 being obliquely installed, the bull stick is towards outside inclination;In work, pull bar connects abaculus and gear shaping group, bull stick point respectively It is not hinged on cross bar one and cross bar two.In work, by the jack-up action of T-bar one, two, bull stick rotation, pull bar level are drawn It is dynamic, the oral area of tear and the mouth of pipe is opened.
A kind of using method of the insulating sheath component for aerial condutor, comprises the following steps:
1), installation group be connected with sheath group,
1.1), sheath body be connected with installation group one, a pair of abaculus are individually positioned in the caulking groove of a pair of otic placodes, its In, a block is placed in a groove;
1.2), a line up be connected with a pair of installation groups two, a pair of gear shaping groups are connected into the gear shaping group one in the mouth of pipe respectively With gear shaping group two;
2), sheath group rise, rise band by the vertical rod two in the vertical rod one in installation group one and a pair of installation groups two synchronous Dynamic sheath group;
3), sheath group install, in sheath body and mouth of pipe contact wire(Arc-shaped is set, is formed wire and is placed empty Between), the continuation rise of vertical rod one in installation group one, the rotation pulling otic placode unlatching tear of bull stick one, meanwhile, standing in installation group two Bar two continues to rise, and the rotation of bull stick two pulls gear shaping group one and gear shaping group two in the mouth of pipe to open so that conducting wire cladding is in sheath This is in vivo;
4), assembling and dismantling be installed remove, vertical rod one in installation group one continues to rise so that abaculus departs from caulking groove, and a pair of otic placodes are multiple It is former(With elasticity);Gear shaping group is departed from gear shaping group one and gear shaping group two, gear shaping by the vertical rod difference level in a pair of installation groups two Group one and gear shaping group two are engaged, so as to realize the sealing of the mouth of pipe;
5), finish.
The present invention is easy to operate, saves cost, labor time.

Claims (3)

1. a kind of insulating sheath component for aerial condutor, it is characterised in that including sheath group and installation group, the sheath group Including sheath body and a line up,
The sheath body is sleeve pipe, and described sleeve pipe is in axial direction provided with tear, and the two ends of the tear stretch out respectively The otic placode being oppositely arranged is provided with,
The mouth of pipe described in a pair is respectively symmetrically the two ends for being connected to the sheath body, and the mouth of pipe is socketed in the sheath body On, the tear of the oral area correspondence sheath body of the mouth of pipe is respectively equipped with some mistakes on the oral area opposite face of the mouth of pipe The flexible gear shaping one put is opened up, gear shaping group one and gear shaping group two is formed;
The installation group includes installation group one and a pair of installation groups two, and the installation group one is used for connecting sheath body, a pair of institutes State installation group two to be respectively used to connect a line up;
The installation group one includes T-bar one, a pair of bull sticks one and a pair of abaculus, and the T-bar one has cross bar one and vertical rod One, a pair of bull sticks one are symmetrical and are hinged the two ends for arranging the cross bar one, the sheath body be located between a pair of bull sticks one and Positioned at the top of cross bar one, abaculus described in a pair is symmetrically arranged on the pull bar on bull stick one described in a pair, the abaculus Outside be respectively equipped with outward-dipping flexibility block, the caulking groove being communicated with the otic placode and a groove, the abaculus and Block is adaptedly located in the caulking groove and a groove;
The installation group two includes T-bar two, a pair of bull sticks two and a pair of gear shaping groups, and the T-bar two has cross bar two and stands Bar two, a pair of bull sticks two are symmetrical and are hinged the two ends for arranging the cross bar two, and the mouth of pipe is located between a pair of bull sticks two and position In the top of cross bar two, described in a pair, gear shaping group is symmetrically arranged on bull stick two described in a pair, gear shaping component described in a pair The gear shaping group one and gear shaping group two Yong Yu not be connected;
The gear shaping group includes arm-tie and is located at some gear shapings two being uniformly arranged of arm-tie side, and the pull bar of the bull stick two connects Connect the arm-tie;
The bull stick one and bull stick two are connecting rod, and the connecting rod includes the horizontally disposed pull bar being connected as a single entity and is obliquely installed Bull stick, the bull stick towards outside incline.
2. a kind of insulating sheath component for aerial condutor according to claim 1, it is characterised in that the vertical rod one It is expansion link with vertical rod two.
3. the using method of the insulating sheath component for aerial condutor described in a kind of claim 1, it is characterised in that include Following steps:
1), installation group be connected with sheath group,
1.1), sheath body be connected with installation group one, a pair of abaculus are individually positioned in the caulking groove of a pair of otic placodes, wherein, will Prop up block to be placed in a groove;
1.2), a line up be connected with a pair of installation groups two, a pair of gear shaping groups are connected into the gear shaping group one in the mouth of pipe respectively and are inserted Tooth group two;
2), sheath group rise, the vertical rod two in the vertical rod one in installation group one and a pair of installation groups two synchronous rise is driven into shield Set group;
3), sheath group install, in sheath body and mouth of pipe contact wire, vertical rod one in installation group one continues to rise, bull stick One rotation pulls otic placode to open tear, meanwhile, the vertical rod two in installation group two continues to rise, and the rotation of bull stick two is pulled in the mouth of pipe Gear shaping group one and gear shaping group two are opened so that conducting wire cladding is internal in sheath sheet;
4), assembling and dismantling be installed remove, vertical rod one in installation group one continues to rise so that abaculus departs from caulking groove, and a pair of otic placodes restore;One Gear shaping group one and gear shaping group two, gear shaping group one and gear shaping group two are departed from by gear shaping group to the difference level of bull stick two in installation group two Engagement;
5), finish.
CN201510512481.9A 2015-08-19 2015-08-19 Insulation sleeve assembly for overhead wire and application method of insulation sleeve assembly Active CN105161228B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510512481.9A CN105161228B (en) 2015-08-19 2015-08-19 Insulation sleeve assembly for overhead wire and application method of insulation sleeve assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510512481.9A CN105161228B (en) 2015-08-19 2015-08-19 Insulation sleeve assembly for overhead wire and application method of insulation sleeve assembly

Publications (2)

Publication Number Publication Date
CN105161228A CN105161228A (en) 2015-12-16
CN105161228B true CN105161228B (en) 2017-03-22

Family

ID=54802053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510512481.9A Active CN105161228B (en) 2015-08-19 2015-08-19 Insulation sleeve assembly for overhead wire and application method of insulation sleeve assembly

Country Status (1)

Country Link
CN (1) CN105161228B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105932605B (en) * 2016-06-13 2018-06-29 国家电网公司 One kind lives across line insulation wrap jacket and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0461794A1 (en) * 1990-06-12 1991-12-18 AT&T Corp. Aerial cable
CN2364536Y (en) * 1999-01-22 2000-02-16 山东省莱芜塑料制品(集团)总厂 Overhead steel strand single-side knot insulation protection sleeve
US6245991B1 (en) * 1997-09-30 2001-06-12 John Patrick Ryan Utility pole guy wire breakaway connector
CN2520601Y (en) * 2001-11-12 2002-11-13 霍晓林 Warning protection sleeve of overhead cable
CN203491027U (en) * 2013-10-10 2014-03-19 国家电网公司 Insulating protective pipe
CN204966185U (en) * 2015-08-19 2016-01-13 江苏省电力公司扬州供电公司 A insulating sheath subassembly for air wire

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5317745B2 (en) * 2009-02-13 2013-10-16 中国電力株式会社 Wire covering

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0461794A1 (en) * 1990-06-12 1991-12-18 AT&T Corp. Aerial cable
US6245991B1 (en) * 1997-09-30 2001-06-12 John Patrick Ryan Utility pole guy wire breakaway connector
CN2364536Y (en) * 1999-01-22 2000-02-16 山东省莱芜塑料制品(集团)总厂 Overhead steel strand single-side knot insulation protection sleeve
CN2520601Y (en) * 2001-11-12 2002-11-13 霍晓林 Warning protection sleeve of overhead cable
CN203491027U (en) * 2013-10-10 2014-03-19 国家电网公司 Insulating protective pipe
CN204966185U (en) * 2015-08-19 2016-01-13 江苏省电力公司扬州供电公司 A insulating sheath subassembly for air wire

Also Published As

Publication number Publication date
CN105161228A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN104575825B (en) Overhead power transmission aluminium profiles twisted wire
CN105161228B (en) Insulation sleeve assembly for overhead wire and application method of insulation sleeve assembly
CN204966185U (en) A insulating sheath subassembly for air wire
CN107068258A (en) Power network overhead transmission line aluminum stranded conductor
CN102914842B (en) First-aid repair adapter connector box for optical fiber composite overhead insulating phase lines and manufacture method thereof
CN209418186U (en) Novel seabed cable filler strip
CN104616800B (en) A kind of hot type expanding Optical Fiber Composite aluminium alloy frame hollow wire
CN208189276U (en) A kind of high voltage power cable
CN217388194U (en) Cold contraction power cable accessory
CN103174321A (en) Compound tower for power grid power transmission line and compound cross arm structure thereof
CN201616287U (en) Externally-sheathed insulating sleeve
CN101800093A (en) Externally-sleeved insulated sleeve
CN204834192U (en) Insulating sheath mechanism
CN208723124U (en) Graphene grounding rod vertical connecting structure
CN204834210U (en) Insulating sheath subassembly
CN203145552U (en) Composite tower used for power grid power lines and composite cross arm structure thereof
CN206907541U (en) Armored cable
CN205583171U (en) A ground wire drainage clamp structure for ice -melt of 500kV transmission line ground wire direct current
CN207925175U (en) The anti-icing overhead ground wire of intelligence
CN202939338U (en) Emergency repair connector box for optical fiber composite overhead insulated phase line
CN215632091U (en) Treadable composite cross arm
CN203931616U (en) The dual-purpose cable of a kind of mine
CN208062672U (en) The Line tool is crossed in a kind of high-altitude
CN213460289U (en) Parallel bundling overhead insulated cable terminal
CN213519306U (en) Control cable harness of wind power generator cabin

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant