CN105155753B - A kind of two layers of top installation method - Google Patents
A kind of two layers of top installation method Download PDFInfo
- Publication number
- CN105155753B CN105155753B CN201510493077.1A CN201510493077A CN105155753B CN 105155753 B CN105155753 B CN 105155753B CN 201510493077 A CN201510493077 A CN 201510493077A CN 105155753 B CN105155753 B CN 105155753B
- Authority
- CN
- China
- Prior art keywords
- centimetres
- layers
- flitches
- flitch
- big
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The invention discloses a kind of two layers of top installation method, comprise the following steps:A) get the raw materials ready;B) material is cut out;C) splice;D) circle two wires light bar is fixed on to the reverse side of two layer of eight valve and three layers of pintongs;E) the ready-made frameworks of step c) are fixed on the keel of top;F) two layers of eight big valve is taken out, our need figures to be mounted as follows are first constituted on the ground, the figure that ground has been spelled being installed on the mounted frameworks of step e one by one;G) three layers of four valvula are taken out, first constitute on the ground it is as follows we need figure to be mounted, the figure that ground has been spelled being installed on the mounted frameworks of step e one by one.The present invention substantially reduces construction period and reduces the risk of workman's high-rise working by advance assembled rice word framework and two layers eight big valve and three layers of four valvula, then be installed on the keel of roof on the ground.
Description
【Technical field】
The present invention relates to the technical field of house ornamentation, particularly a kind of technical field of two layers of top installation method.
【Background technology】
Building is for air attractive in appearance, and indoor canopy will carry out ceiling decoration.As building span is increasing, furred ceiling
Size is larger, and incident difficulty of construction is also increasing.More particularly there is the furred ceiling requirement of pattern requirement handsome in appearance,
Need the physical dimension of strict control pattern;Conventional method is installed, it is necessary to spend a large amount of by setting up scaffold to eminence
Human and material resources, time, difficulty are big, and speed of application is slower, less efficient, and there is larger security risk.
【The content of the invention】
The purpose of the present invention is exactly to solve the problems of the prior art, proposes a kind of two layers of top installation method, can make to apply
Greatly shortened between man-hour.
To achieve the above object, the present invention proposes a kind of two layers of top installation method, comprises the following steps:
A) get the raw materials ready:Triangular keel three, flitch four, 40, two wires lamp card of circle matches somebody with somebody 80, screw, two layers eight big valve with
Three layers of four valvula, two round two wires light bar;
B) material is cut out:Log side is cut into 1.7 meters of one, 82 centimetres of flitch, two, 90 centimetres of flitch flitches two, 84 centimetres
Triangular keel, is cut into 1.7 meter one by two, 50 centimetres of flitch, two, 46 centimetres of flitch, two, 58 centimetres flitches four of flitch
Root, 82 centimetres two, 58 centimetres four;
C) splice:By two 84 centimetres of flitches and two 90 centimetres of flitches splicing big frames of rectangularity, in big inframe by 50
Centimetre flitch, 46 centimetres of flitches splicing small frames of rectangularity and 50 centimetres of flitches are parallel with 90 centimetres of flitches, by 1.7 meters of wood
Side, two 82 centimetres of flitches, four H unit lengths flitches are connected on big frame in rice font, and 82 centimetres of triangular keels are connected
In on 82 centimetres of flitches, 1.7 meters of triangular keels are connected on 1.7 meters of flitches, and 58 centimetres of triangular keels are connected to 58 centimetres of flitches
On;
D) circle two wires light bar is fixed using circle two wires lamp card around two layer of eight valve and three layers of pintongs reverse side outer edge;
E) ready-made framework in step c) is fixed on the keel of top;
F) the eight big valve of two layers of taking-up, first composition needs two layer pattern to be mounted, the figure that ground has been spelled on the ground
Shape being installed on the mounted frameworks of step e) one by one;
G) three layers of four valvula are taken out, first composition needs three layer pattern to be mounted, the figure that ground has been spelled on the ground
Being installed in step e) on mounted framework one by one;
Preferably, the step d) will justify after the light bar fixation of two wires, then will circle two wires light bar and external power cord
It is connected and two circle two wires light bar is in parallel, the round two wires lamp card is fixed by screws in two layer of eight valve and three layers of pintongs reverse side.
Preferably, eight of two layers big valve is installed on the framework of step e) installations by the step f) one by one
During, the distance for keeping two layer eight big valve both sides longer sides center is 365mm, treats that two layer of eight big valve is all fixed on step
Size fine setting is carried out when e) on the framework of installation.
Preferably, find out reserved external power cord when installing last block valvula in the step g, and will be from
Expose in hole in the middle of three layers of pintongs.
Preferably, following closely connection using rifle between flitch in the step c, it is desirable to which the flitch frame after connection must be solid, jail
Gu;It is not allow for de- nail, missing nail phenomenon.
Beneficial effects of the present invention:The present invention passes through advance assembled rice word framework and two layers eight big valve and three on the ground
Four valvula of layer, then be installed on the keel of roof, substantially reduce construction period and reduce the risk of workman's high-rise working.
The feature and advantage of the present invention will be described in detail by embodiment combination accompanying drawing.
【Brief description of the drawings】
Fig. 1 is a kind of flitch connection frame schematic diagram of two layers of top installation method of the present invention;
Fig. 2 is a kind of two layers eight big valve top view of two layers of top installation method of the present invention;
Fig. 3 is a kind of three layers of four valvula top view of two layers of top installation method of the present invention.
In figure:1-1.7 meters of flitches, 2-82 centimetres of flitch, 3-90 centimetres of flitch, 4-84 centimetres of flitch, 5-50 centimetres of flitch,
6-46 centimetres of flitch, 7-58 centimetres of flitch.
【Embodiment】
Refering to Fig. 1, Fig. 2 and Fig. 3, a kind of two layers of top installation method of the present invention comprises the following steps:
A) get the raw materials ready:Triangular keel three, flitch four, 40, two wires lamp card of circle matches somebody with somebody 80, screw, two layers eight big valve with
Three layers of four valvula, two round two wires light bar;
B) material is cut out:Log side is cut into 1.7 meters of one, 82 centimetres of flitch, two, 90 centimetres of flitch flitches two, 84 centimetres
Triangular keel, is cut into 1.7 meter one by two, 50 centimetres of flitch, two, 46 centimetres of flitch, two, 58 centimetres flitches four of flitch
Root, 82 centimetres two, 58 centimetres four;
C) splice:By two 84 centimetres of flitches and two 90 centimetres of flitches splicing big frames of rectangularity, in big inframe by 50
Centimetre flitch, 46 centimetres of flitches splicing small frames of rectangularity and 50 centimetres of flitches are parallel with 90 centimetres of flitches, by 1.7 meters of wood
Side, two 82 centimetres of flitches, four H unit lengths flitches are connected on big frame in rice font, and 82 centimetres of triangular keels are connected
In on 82 centimetres of flitches, 1.7 meters of triangular keels are connected on 1.7 meters of flitches, and 58 centimetres of triangular keels are connected to 58 centimetres of flitches
On;
D) circle two wires light bar is fixed using circle two wires lamp card around two layer of eight valve and three layers of pintongs reverse side outer edge;
E) ready-made framework in step c) is fixed on the keel of top;
F) the eight big valve of two layers of taking-up, first composition needs two layer pattern to be mounted, the figure that ground has been spelled on the ground
Shape being installed on the mounted frameworks of step e) one by one;
G) three layers of four valvula are taken out, first composition needs three layer pattern to be mounted, the figure that ground has been spelled on the ground
Being installed in step e) on mounted framework one by one;
The step d) will justify after the light bar fixation of two wires, then circle two wires light bar is connected and two circles two with external power cord
Line light bar is in parallel, and the round two wires lamp card is fixed by screws in two layer of eight valve and three layers of pintongs reverse side.
During eight of two layers big valve is installed on the framework of step e) installations by the step f) one by one,
The distance for keeping two layer eight big valve both sides longer sides center is 365mm, treats that two layer of eight big valve is all fixed on step e) and installed
Into framework on when carry out size fine setting.
In the step g when installing last block valvula, reserved external power cord is found out, and will be from three layers of pintongs
Between hole expose.
Connection is followed closely using rifle between flitch in the step c, it is desirable to which the flitch frame after connection must be solid, firmly;Do not allow
There are de- nail, missing nail phenomenon.
Of the invention a kind of two layers of top installation methods, by the ground in advance assembled rice word framework and two layers eight big valve with
Three layers of four valvula, then be installed on the keel of roof, substantially reduce construction period and reduce the risk of workman's high-rise working.
Above-described embodiment is the description of the invention, is not limitation of the invention, it is any to simple transformation of the present invention after
Scheme belong to protection scope of the present invention.
Claims (5)
1. a kind of two layers of top installation method, it is characterised in that:Comprise the following steps:
A) get the raw materials ready:Triangular keel three, flitch four, 40, two wires lamp card of circle, 80, screw, two layers eight big valve and three layer four
Piece valvula, two round two wires light bar;
B) material is cut out:Log side is cut into (1) one, 82 centimetres flitch unit length flitches (2) two, 90 centimetres of 1.7 meters of flitches
(3) two, 84 centimetres of flitch (4) two, 50 centimetres of flitch flitch (5) two, 46 centimetres flitches (6) two, 58 centimetres of flitches
(7) four, triangular keel is cut into 1.7 meters one, 82 centimetres two, 58 centimetres four;
C) splice:By two 84 centimetres of flitches and two 90 centimetres of flitches (3) splicing big frames of rectangularity, in big inframe by 50 lis
Meter Mu Fang (5), 46 centimetres of flitches (6) splicing small frames of rectangularity and 50 centimetres of flitches (5) are parallel with 90 centimetres of flitches (3), general
Piece 1.7 meters of flitches (1), two 82 centimetres of flitches (2), four 58 centimetres of flitches (7) are connected on big frame in rice font, by 82
Centimetre triangular keel is connected on 82 centimetres of flitches, and 1.7 meters of triangular keels are connected on 1.7 meters of flitches (1), 58 centimetres of delta queues
Bone is connected on 58 centimetres of flitches (7);
D) circle two wires light bar is fixed using circle two wires lamp card around two layer of eight valve and three layers of pintongs back side outer edge;
E) ready-made framework in step c) is fixed on the keel of top;
F) the eight big valve of two layers of taking-up, first composition needs two layer pattern to be mounted, the figure one that ground has been spelled on the ground
Piece is a piece of to be installed on the mounted frameworks of step e);
G) three layers of four valvula are taken out, first composition needs three layer pattern to be mounted on the ground, the figure that ground has been spelled is a piece of
A piece of is installed in step e) on mounted framework.
2. a kind of two layers of top installation method as claimed in claim 1, it is characterised in that:The step d) consolidates circle two wires light bar
After fixed, then circle two wires light bar is connected and two round two wires light bar parallel connections with external power cord, the round two wires lamp card passes through
Screw is fixed on two layer of eight valve and three layers of pintongs back side.
3. a kind of two layers of top installation method as claimed in claim 1, it is characterised in that:The step f) is big by eight of two layers
During valve is installed on the framework of step e) installations one by one, keep two layer eight big valve both sides longer sides center away from
From for 365mm, size fine setting is carried out when two layer of eight big valve is all fixed on the framework of step e) installations.
4. a kind of two layers of top installation method as claimed in claim 1, it is characterised in that:Last is being installed in the step g)
During block valvula, reserved external power cord is found out, and will expose from the hole in the middle of three layers of pintongs.
5. a kind of two layers of top installation method as claimed in claim 1, it is characterised in that:Rifle is used in the step c) between flitch
Nail connection, it is desirable to which the flitch frame after connection must be solid, firmly;It is not allow for de- nail, missing nail phenomenon.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510493077.1A CN105155753B (en) | 2015-08-12 | 2015-08-12 | A kind of two layers of top installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510493077.1A CN105155753B (en) | 2015-08-12 | 2015-08-12 | A kind of two layers of top installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105155753A CN105155753A (en) | 2015-12-16 |
CN105155753B true CN105155753B (en) | 2017-08-25 |
Family
ID=54796763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510493077.1A Active CN105155753B (en) | 2015-08-12 | 2015-08-12 | A kind of two layers of top installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105155753B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29715891U1 (en) * | 1997-09-04 | 1998-02-12 | Gesler Schlosserei Gmbh | Balcony ceiling component for transferring the area load to the balcony ceiling base frame |
CN103758342A (en) * | 2014-01-07 | 2014-04-30 | 山东新港国际模板工程技术有限公司 | Tool-type top form for buildings |
CN204282618U (en) * | 2014-11-24 | 2015-04-22 | 浙江巨奥铝业有限公司 | A kind of aluminium alloys furred ceiling assembly |
CN104631685A (en) * | 2015-02-06 | 2015-05-20 | 浙江巨森建材科技有限公司 | Triangular keel and hanging piece structure thereof |
-
2015
- 2015-08-12 CN CN201510493077.1A patent/CN105155753B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29715891U1 (en) * | 1997-09-04 | 1998-02-12 | Gesler Schlosserei Gmbh | Balcony ceiling component for transferring the area load to the balcony ceiling base frame |
CN103758342A (en) * | 2014-01-07 | 2014-04-30 | 山东新港国际模板工程技术有限公司 | Tool-type top form for buildings |
CN204282618U (en) * | 2014-11-24 | 2015-04-22 | 浙江巨奥铝业有限公司 | A kind of aluminium alloys furred ceiling assembly |
CN104631685A (en) * | 2015-02-06 | 2015-05-20 | 浙江巨森建材科技有限公司 | Triangular keel and hanging piece structure thereof |
Also Published As
Publication number | Publication date |
---|---|
CN105155753A (en) | 2015-12-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105155753B (en) | A kind of two layers of top installation method | |
CN105672624A (en) | Fixing method and structure of EPS decoration line | |
CN205382702U (en) | Scaffold prevents dust, prevents dry, printing opacity heat preservation safety cover | |
CN204645463U (en) | Wood facing | |
CN205063146U (en) | Stiff and straight line furred ceiling turning structure of gypsum of preventing ftractureing | |
CN105041000B (en) | A kind of old wall transformation insulation construction | |
CN205116520U (en) | Prevent plasterboard suspended ceiling of fracture | |
CN105421643B (en) | A kind of vaulted curved surface furred ceiling and preparation method thereof | |
CN201649514U (en) | Solar battery wall brick | |
CN207228423U (en) | Suitable for the mounting assembly of curved surface aluminium veneer curtain wall | |
CN207144350U (en) | Metope wallpaper structure | |
CN203905346U (en) | Hollow shading and ventilating decorative grid of outer wall | |
CN208916555U (en) | A kind of elevator top ceiling structure | |
CN105421752A (en) | Dustproof drying-proof light-transmission and heat-insulation protective cover of scaffold and installing method of protective cover | |
CN105201118A (en) | Crack resistant gypsum board suspended ceiling and back-to-back type mounting and splicing method | |
CN206174836U (en) | Ceiling installation convenient to adjust light intensity | |
CN203542760U (en) | Spliced wood board | |
Srisuwan | Fabric façade: an intelligent skin | |
ES2029058T3 (en) | CABIN FOR THE PLASTERING OF BUILDING FACADES. | |
CN204940624U (en) | A kind of Multifunctional sector-shaped curtain wall | |
CN216076130U (en) | Gypsum lines and gypsum lines furred ceiling | |
CN204456782U (en) | The syndeton of a kind of EPS moulding and exterior wall | |
CN202467453U (en) | Door and window | |
CN203796074U (en) | Anti-deformation composite door frame for wooden house | |
CN209429331U (en) | A kind of curtain wall and wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |