CN105155530B - Implementation method for special-shaped pile stirring drilling machine - Google Patents

Implementation method for special-shaped pile stirring drilling machine Download PDF

Info

Publication number
CN105155530B
CN105155530B CN201510480550.2A CN201510480550A CN105155530B CN 105155530 B CN105155530 B CN 105155530B CN 201510480550 A CN201510480550 A CN 201510480550A CN 105155530 B CN105155530 B CN 105155530B
Authority
CN
China
Prior art keywords
shovel
shaft
knife
arm
rectangular shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510480550.2A
Other languages
Chinese (zh)
Other versions
CN105155530A (en
Inventor
陈子银
黄美英
谢峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Gaohang Intellectual Property Operation Co ltd
Jiangsu College of Safety Technology
Original Assignee
Jiangsu College of Safety Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu College of Safety Technology filed Critical Jiangsu College of Safety Technology
Priority to CN201510480550.2A priority Critical patent/CN105155530B/en
Publication of CN105155530A publication Critical patent/CN105155530A/en
Application granted granted Critical
Publication of CN105155530B publication Critical patent/CN105155530B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a special-shaped pile stirring drilling machine. The lower end of a first stirring shaft, the lower end of a second stirring shaft, the lower end of a fourth stirring shaft and the lower end of a fifth stirring shaft are each provided with a first stirring drilling bit, and a second stirring drilling bit is arranged at the lower end of a third stirring shaft; the second stirring drilling bit is located in the middle portion, and the diameter of the second stirring drilling bit is larger than the diameter of the first stirring drilling bits; a first cutter shovel and a third cutter shovel are fixedly connected together through two connecting plates, a plurality of first shovel teeth are fixed to the lower end of the first cutter shovel and the lower end of the third cutter shovel respectively, a plurality of second shovel teeth are arranged in the direction from the first cutter shovel to the third cutter shovel, and a plurality of second shovel teeth are arranged in the direction from the third cutter shovel to the first cutter shovel; and a second cutter shovel and a fourth cutter shovel are fixedly connected together through another two connecting plates, a plurality of first shovel teeth are fixed to the lower end of the second cutter shovel and the lower end of the fourth cutter shovel respectively, a plurality of second shovel teeth are arranged in the direction from the second cutter shovel to the fourth cutter shovel, and a plurality of second shovel teeth are arranged in the direction from the fourth cutter shovel to the second cutter shovel.

Description

A kind of implementation of shaped pile agitation driller
Technical field
The present invention relates to a kind of agitation driller, the shaped pile agitation driller of application in particularly a kind of building foundation engineering.
Background technology
At present, in building foundation engineering, the agitation driller of application is all to become one by one or more stirring bits Circular stake or row circle stake.
Content of the invention
The present invention compensate for disadvantage mentioned above, there is provided a kind of shaped pile agitation driller.
The present invention is achieved through the following technical solutions:
A kind of shaped pile agitation driller, main drilling rod lower end fixed motor upper end, motor lower end is provided with transfer gear, transfer Device lower end is provided with shaft one, shaft two, shaft three, shaft four, shaft five side by side, shaft one, shaft two, Shaft four, the lower end of shaft five are respectively equipped with a stirring drill bit one, and shaft three lower end is provided with a stirring drill bit two; Stirring drill bit two is located at middle part, has a diameter larger than the diameter of stirring drill bit one;Transfer gear front left part is provided with a bias Disk one, eccentric fixing short axle one on eccentric disc one, in short axle one insertion rectangular shaped rim one, pole one is fixed on main drilling rod, rectangle The lower end of upper arm one, the left front portion of the hinged pole in upper end one of upper arm one, rectangular shaped rim one are fixed in the upper end of frame one Lower end be fixed on the upper end of the lower arm of force one, the lower end fixing cutter shovel one of the lower arm of force one;Transfer gear back left part is provided with one partially Cartridge three, eccentric fixing short axle three on eccentric disc three, in short axle three insertion rectangular shaped rim three, the upper end of rectangular shaped rim three is fixed on The lower end of upper arm three, the left back portion of the hinged pole in upper end one of upper arm three, the lower arm of force is fixed in the lower end of rectangular shaped rim three Three upper end, the lower end fixing cutter shovel three of the lower arm of force three;Transfer gear front right part is provided with an eccentric disc two, on eccentric disc two partially The heart fixes short axle two, and in short axle two insertion rectangular shaped rim two, pole two is fixed on main drilling rod, and the upper end of rectangular shaped rim two is fixed on The lower end of upper arm two, the right front portion of the hinged pole in upper end two of upper arm two, the lower arm of force is fixed in the lower end of rectangular shaped rim two Two upper end, the lower end fixing cutter shovel two of the lower arm of force two;Transfer gear back right part is provided with an eccentric disc four, on eccentric disc four partially The heart fixes short axle four, and in short axle four insertion rectangular shaped rim four, the lower end of upper arm four, upper power are fixed in the upper end of rectangular shaped rim four The right rear portion of the hinged pole in upper end two of arm four, the upper end of the lower arm of force four is fixed in the lower end of rectangular shaped rim four, the lower arm of force four Lower end fixing cutter shovel four;Knife shovel one and knife shovel three are connected and fixed by two pieces of connecting plates, and the lower end of knife shovel one and knife shovel Three lower end fixes multiple teeth one respectively, and knife shovel one is provided with multiple teeth two, knife shovel three-dimensional knife shovel one to the direction of knife shovel three Direction be provided with multiple teeth two;Knife shovel two and knife shovel four are connected and fixed by another two pieces of connecting plates, the lower end of knife shovel two And the lower end of knife shovel four fixes multiple teeth one respectively, knife shovel two is provided with multiple teeth two, knife shovel four to the directions of knife shovel four Direction to knife shovel two is provided with multiple teeth two.
The present invention has the characteristics that following:
Right left swing is moved simultaneously for knife shovel two of the present invention and knife shovel four;On teeth one on knife shovel one, teeth two and knife shovel three Teeth one, teeth two and knife shovel two on teeth one, teeth two and knife shovel four on teeth one, teeth two opposite at the same time By the soil layer cutting stirring within four knife shovels, beyond four small cylinders in swing, agitation driller is formed in being drilled down into Special-shaped cement soil pile.
Brief description
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is the front view of the present invention;
Fig. 2 is the rearview of the present invention;
Fig. 3 is a a view of Fig. 1;
Fig. 4 is the b b view of Fig. 1;
Fig. 5 is the c c view of Fig. 1;
Fig. 6 is the cross-sectional view of the become shaped pile of the present invention.
In figure: 1, main drilling rod, 2, motor, 3, transfer gear, 4, pole one, 5, pole two, 6, upper arm one, 7, upper arm Two, 8, rectangular shaped rim one, 9, rectangular shaped rim two, 10, eccentric disc one, 11, eccentric disc two, 12, short axle one, 13, short axle two, 14, The lower arm of force one, 15, the lower arm of force two, 16, knife shovel one, 17, knife shovel two, 18, teeth one, 19, shaft one, 20, shaft two, 21st, shaft three, 22, shaft four, 23, shaft five, 24, stirring drill bit one, 25, stirring drill bit two, 26, upper arm three, 27th, upper arm four, 28, rectangular shaped rim three, 29, rectangular shaped rim four, 30, eccentric disc three, 31, eccentric disc four, 32, short axle three, 33, Short axle four, 34, the lower arm of force three, 35, the lower arm of force four, 36, knife shovel three, 37, knife shovel four, 38, teeth two, 39, connecting plate.
Specific embodiment
Accompanying drawing is a kind of specific embodiment of the present invention, and this embodiment main drilling rod 1 lower end fixed motor 2 upper end is electronic Machine lower end is provided with transfer gear 3, and transfer gear lower end is provided with shaft 1, shaft 2 20, shaft 3 21, shaft four side by side 22nd, shaft 5 23, shaft one, shaft two, shaft four, the lower end of shaft five are respectively equipped with a stirring drill bit one 24, shaft three lower end is provided with a stirring drill bit 2 25;Stirring drill bit two is located at middle part, has a diameter larger than stirring drill bit One diameter;Transfer gear front left part is provided with an eccentric disc 1, eccentric fixing short axle 1 on eccentric disc one, and short axle one is inserted Enter in rectangular shaped rim 1, the lower end of upper arm 1, the hinged pole in upper end of upper arm one are fixed in the upper end of rectangular shaped rim one One 4 left front portion, pole one is fixed on main drilling rod, and the upper end of the lower arm of force 1, the lower arm of force are fixed in the lower end of rectangular shaped rim one One lower end fixing cutter shovel 1;Transfer gear 3 back left part is provided with an eccentric disc 3 30, eccentric fixing short axle on eccentric disc three 3 32, in short axle three insertion rectangular shaped rim 3 28, the lower end of upper arm 3 26, upper arm three are fixed in the upper end of rectangular shaped rim three The hinged pole in upper end 1 left back portion, the upper end of the lower arm of force 3 34 is fixed in the lower end of rectangular shaped rim three, under the lower arm of force three End fixing cutter shovel 3 36;Transfer gear front right part is provided with an eccentric disc 2 11, and on eccentric disc two, eccentric fixing short axle 2 13, short In axle two insertion rectangular shaped rim 29, the lower end of upper arm 27, the upper end hinge of upper arm two are fixed in the upper end of rectangular shaped rim two Connect the right front portion of pole 25, pole two is fixed on main drilling rod, the upper end of the lower arm of force 2 15 is fixed in the lower end of rectangular shaped rim two, The lower end fixing cutter shovel 2 17 of the lower arm of force two;Transfer gear back right part is provided with an eccentric disc 4 31, eccentric solid on eccentric disc four Determine short axle 4 33, in short axle four insertion rectangular shaped rim 4 29, the lower end of upper arm 4 27 is fixed in the upper end of rectangular shaped rim four, on The right rear portion of the hinged pole in upper end 25 of the arm of force four, the upper end of the lower arm of force 4 35, the lower arm of force are fixed in the lower end of rectangular shaped rim four Four lower end fixing cutter shovel 4 37;Knife shovel one and knife shovel three are connected and fixed by two pieces of connecting plates 39, the lower end of knife shovel one And the lower end of knife shovel three fixes multiple teeth 1 respectively, knife shovel one is provided with multiple teeth 2 38, knife to the direction of knife shovel three The direction of shovel three-dimensional knife shovel one is provided with multiple teeth two;Knife shovel two and knife shovel four are connected and fixed by another two pieces of connecting plates, The lower end of the lower end of knife shovel two and knife shovel four fixes multiple teeth one respectively, and knife shovel two is provided with multiple shovels to the direction of knife shovel four Tooth two, the direction that knife shovels four-way knife shovel two is provided with multiple teeth two.
The present invention is additionally provided with high pressure slurry pump, and high pressure slurry pump is supplied respectively to cement mortar to each stirring drill bit, during work, Motor drives shaft one, shaft three, shaft five to rotate clockwise by transfer gear, drives shaft two, shaft Four counterclockwise, thus, shaft three drives stirring drill bit two cutting stirring soil layer to become a big soil cement cylinder, stirs Mix axle one, shaft two, shaft four, shaft five drive the stirring drill bit one under it to cut stirring soil layer to become four to take respectively The little soil cement cylinder connecing;Motor drives eccentric disc one and eccentric disc three synchronization to rotate clockwise by transfer gear, drives Eccentric disc two and the synchronous counterclockwise of eccentric disc four;Eccentric disc one drives short axle one to rotate in rotation process, and short axle one exists Stir rectangular shaped rim one in rotation process, carry by upper arm one, the lower arm of force one moving knife shovel one to swing, eccentric disc three is turning Short axle three is driven to rotate during dynamic, short axle three is stirred rectangular shaped rim three in rotation process, passed through upper arm three, the lower arm of force three Band moving knife shovel three swings, and thus, knife shovel one and knife shovel San Tong method swing;Eccentric disc two drives short in rotation process Axle two rotates, and short axle two stirs rectangular shaped rim two in rotation process, carries moving knife to shovel two right left sides by upper arm two, the lower arm of force two Swing, eccentric disc four drives short axle four to rotate in rotation process, and short axle four is stirred rectangular shaped rim four in rotation process, passed through Right left swing is moved simultaneously for upper arm four, the lower arm of force four band moving knife shovel four, and thus, right left swing is moved simultaneously for knife shovel two and knife shovel four;Knife shovels Teeth one on teeth one on teeth one on one, teeth two and knife shovel three, teeth two and knife shovel two, teeth two and knife Shovel during the teeth one on four, teeth two swing at the same time in opposite directions within four knives are shoveled, the soil layer beyond four small cylinders is cut Cut stirring, agitation driller forms special-shaped cement soil pile in being drilled down into.

Claims (1)

1. a kind of implementation of shaped pile agitation driller, main drilling rod (1) lower end fixed motor (2) upper end, motor lower end It is provided with transfer gear (3), transfer gear lower end is provided with shaft one (19), shaft two (20), shaft three (21), shaft side by side Four (22), shaft five (23), shaft one, shaft two, shaft four, the lower end of shaft five are respectively equipped with a stirring Drill bit one (24), shaft three lower end is provided with a stirring drill bit two (25);Stirring drill bit two is big positioned at middle part, its diameter Diameter in stirring drill bit one;Transfer gear front left part is provided with an eccentric disc one (10), eccentric fixing short axle on eccentric disc one One (12), in short axle one insertion rectangular shaped rim one (8), the lower end of upper arm one (6), upper power are fixed in the upper end of rectangular shaped rim one The left front portion of the hinged pole in upper end one (4) of arm one, pole one is fixed on main drilling rod, and the lower end of rectangular shaped rim one is fixed on and is exerted oneself The upper end of arm one (14), the lower end fixing cutter shovel one (16) of the lower arm of force one;Transfer gear (3) back left part is provided with an eccentric disc three (30), eccentric fixing short axle three (32) on eccentric disc three, in short axle three insertion rectangular shaped rim three (28), the upper end of rectangular shaped rim three It is fixed on the lower end of upper arm three (26), the left back portion of the hinged pole in upper end one (4) of upper arm three, the lower end of rectangular shaped rim three It is fixed on the upper end of the lower arm of force three (34), the lower end fixing cutter shovel three (36) of the lower arm of force three;Transfer gear front right part is provided with one Eccentric disc two (11), eccentric fixing short axle two (13) on eccentric disc two, in short axle two insertion rectangular shaped rim two (9), rectangular shaped rim The lower end of upper arm two (7), the right front portion of the hinged pole in upper end two (5) of upper arm two, rectangular shaped rim are fixed in two upper end The upper end of the lower arm of force two (15), the lower end fixing cutter shovel two (17) of the lower arm of force two are fixed in two lower end;Transfer gear back right part It is provided with an eccentric disc four (31), eccentric fixing short axle four (33) on eccentric disc four, short axle four inserts rectangular shaped rim four (29) Interior, the lower end of upper arm four (27) is fixed in the upper end of rectangular shaped rim four, behind the right side of the hinged pole in upper end two (5) of upper arm four Portion, pole two is fixed on main drilling rod, and the upper end of the lower arm of force four (35), the lower end of the lower arm of force four are fixed in the lower end of rectangular shaped rim four Fixing cutter shovel four (37);Knife shovel one and knife shovel three are connected and fixed by two pieces of connecting plates (39), knife shovel one lower end and The lower end of knife shovel three fixes multiple teeth one (18) respectively, and knife shovel one is provided with multiple teeth two (38), knife to the direction of knife shovel three The direction of shovel three-dimensional knife shovel one is provided with multiple teeth two;Knife shovel two and knife shovel four are connected and fixed by another two pieces of connecting plates, The lower end of the lower end of knife shovel two and knife shovel four fixes multiple teeth one respectively, and knife shovel two is provided with multiple shovels to the direction of knife shovel four Tooth two, the direction that knife shovels four-way knife shovel two is provided with multiple teeth two;It is characterized in that: agitation driller is additionally provided with high-pressure slurry Pump, high pressure slurry pump is supplied respectively to cement mortar to each stirring drill bit, and during work, motor drives shaft by transfer gear First, shaft three, shaft five rotate clockwise, and drive shaft two, shaft four counterclockwise, thus, shaft three Drive stirring drill bit two cutting stirring soil layer to become a big soil cement cylinder, shaft one, shaft two, shaft four, Shaft five drives the stirring drill bit one cutting stirring soil layer under it to become the little soil cement cylinder of four overlap joints respectively;Electronic Machine drives eccentric disc one and eccentric disc three synchronization to rotate clockwise by transfer gear, drives eccentric disc two and eccentric disc four synchronous anti- Hour hands rotate;Eccentric disc one drives short axle one to rotate in rotation process, and short axle one stirs rectangular shaped rim in rotation process First, pass through upper arm one, the lower arm of force one carries moving knife shovel one to move left and right, eccentric disc three drives three turns of short axle in rotation process Dynamic, short axle three is stirred rectangular shaped rim three in rotation process, is carried by upper arm three, the lower arm of force three moving knife shovel three to move left and right, Thus, knife shovel one and knife shovel San Tong method move left and right;Eccentric disc two drives short axle two to rotate in rotation process, and short axle two exists Stir rectangular shaped rim two in rotation process, carry by upper arm two, the lower arm of force two moving knife shovel two right sides to move left, eccentric disc four is turning Short axle four is driven to rotate during dynamic, short axle four is stirred rectangular shaped rim four in rotation process, passed through upper arm four, the lower arm of force four The right side moves left band moving knife shovel four simultaneously, and thus, the right side moves left simultaneously for knife shovel two and knife shovel four;Teeth one on knife shovel one, teeth Two and knife shovel three on teeth one, teeth two and knife shovel two on teeth one, teeth two and knife shovel four on teeth one, shovel Tooth two moves towards middle soil layer cutting stirring within shoveling four knives, beyond four small cylinders at the same time, and agitation driller exists It is drilled down into the special-shaped cement soil pile of middle formation.
CN201510480550.2A 2015-08-09 2015-08-09 Implementation method for special-shaped pile stirring drilling machine Expired - Fee Related CN105155530B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510480550.2A CN105155530B (en) 2015-08-09 2015-08-09 Implementation method for special-shaped pile stirring drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510480550.2A CN105155530B (en) 2015-08-09 2015-08-09 Implementation method for special-shaped pile stirring drilling machine

Publications (2)

Publication Number Publication Date
CN105155530A CN105155530A (en) 2015-12-16
CN105155530B true CN105155530B (en) 2017-02-01

Family

ID=54796550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510480550.2A Expired - Fee Related CN105155530B (en) 2015-08-09 2015-08-09 Implementation method for special-shaped pile stirring drilling machine

Country Status (1)

Country Link
CN (1) CN105155530B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421437A (en) * 2015-12-31 2016-03-23 卢兴耐 Pile forming machine for T-shaped piles in rectangular eye-splice
CN105421441A (en) * 2015-12-31 2016-03-23 卢兴耐 Rectangular splicing equipment for n-shaped piles and rectangular piles

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101097359B1 (en) * 2009-01-23 2011-12-23 석정건설주식회사 New Deep Cement Mixing Process for Strengthening Weak Soil and Apparatus therefor
CN102635125A (en) * 2012-04-23 2012-08-15 张永忠 Vibration smw (soil mixing wall) construction method pile machine
CN104612138B (en) * 2014-12-31 2016-07-06 宗琪 Five axle SMW engineering method stake machines
CN104746513B (en) * 2015-04-12 2016-11-30 重庆晨宇机床制造有限公司 Five axle SMW engineering method stake machines
CN104727313A (en) * 2015-04-12 2015-06-24 张璐 Four-end stirring drill rig
CN104762960B (en) * 2015-04-12 2016-06-15 山东恒泰工程集团有限公司 Equalising torque agitation driller

Also Published As

Publication number Publication date
CN105155530A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN104863138A (en) Hexagonal prism composite cement soil pile machine
CN105862812A (en) Rectangular pile and H-shaped pile opening inserting device
CN105155530B (en) Implementation method for special-shaped pile stirring drilling machine
CN105155529B (en) Shaped pile agitation driller
CN104863501B (en) Rectangular opening drilling and digging machine
CN104762960A (en) Torque-balanced mixing and drilling machine
CN105019914A (en) Y-shaped tunnel excavator
CN105064348A (en) Using method of special-shaped pile stirring drilling machine
CN105003276A (en) Special tunnel excavator
CN105134241A (en) Fillet triangle tunnel excavator
CN105421373A (en) Trapezoidal drilling and stirring machine
CN104775420B (en) Gang drill agitation driller
CN105442579A (en) H-shaped eye-splice pile drilling stirring machine
CN105484242A (en) Rounded-corner pentagonal drilling and stirring machine
CN105672261A (en) Round corner trapezoidal drilling stirring machine
CN105421439A (en) Round-corner pentagonal drilling mixer
CN105625389A (en) Billet triangular drilling stirrer
CN105484234A (en) Triangular drilling and stirring machine
CN105421370A (en) Triangular drilling and stirring machine
CN105625317A (en) Arch drilling stirrer
CN105625394A (en) Rounded-angle trapezoidal drilling and stirring machine
CN105484253A (en) Rounded triangular drill stirring machine
CN105421372A (en) Trapezoidal drilling and stirring machine
CN105603976A (en) Arch-shaped drilling and stirring machine
CN105484249A (en) Rounded square drill stirring machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Chen Ziyin

Inventor after: Huang Meiying

Inventor after: Xie Feng

Inventor before: Zhang Yongzhong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161201

Address after: 221000, 1, University Road, Jiawang District, Jiangsu, Xuzhou

Applicant after: JIANGSU College OF SAFETY TECHNOLOGY

Address before: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Effective date of registration: 20161201

Address after: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: Ji'nan road 276800 in Shandong Province, Rizhao City Donggang District No. 277 Belvedere Garden

Applicant before: Zhang Yongzhong

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170201