CN105148656A - Comprehensive disposal system for malodorous organic exhaust gas - Google Patents

Comprehensive disposal system for malodorous organic exhaust gas Download PDF

Info

Publication number
CN105148656A
CN105148656A CN201510431909.7A CN201510431909A CN105148656A CN 105148656 A CN105148656 A CN 105148656A CN 201510431909 A CN201510431909 A CN 201510431909A CN 105148656 A CN105148656 A CN 105148656A
Authority
CN
China
Prior art keywords
pipe
gas
discharge
permanently connected
mutually permanently
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510431909.7A
Other languages
Chinese (zh)
Other versions
CN105148656B (en
Inventor
孙浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong LIANHANG Environmental Protection Technology Co.,Ltd.
Original Assignee
Tianjin Hope Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Hope Environmental Protection Technology Co Ltd filed Critical Tianjin Hope Environmental Protection Technology Co Ltd
Priority to CN201510431909.7A priority Critical patent/CN105148656B/en
Publication of CN105148656A publication Critical patent/CN105148656A/en
Application granted granted Critical
Publication of CN105148656B publication Critical patent/CN105148656B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The invention discloses a comprehensive disposal system for malodorous organic exhaust gas. The system comprises a fixed gas collecting hood, a first gas collecting pipe, a second gas collecting pipe, a movable gas collecting hood, a pulley, a gas inlet fan, an electrostatic precipitator, a first gas inlet pipe, an active carbon filler layer, an adsorption tower, a first gas outlet, a first gas outlet pipe, a spraying and washing tower, a settling pond, a PH detector, an atomizing sprayer, a gas-water separator, a second gas outlet, a second gas outlet pipe, a photocatalytic purification device, a supporting column, a water storage tank, a water inlet pipe, a circulating pump, a first communicating pipe, a second communicating pipe, a kalifying metering pump, a pressurizing pump, an automatic kalifying device, a sodium hypochlorite generator, a third gas outlet pipe, a centrifugal fan, a chimney and a circulating water pipe. The system is characterized in that the first gas collecting pipe is arranged at the upper end of the fixed gas collecting hood and the first gas collecting hood is fixedly connected with the first gas collecting pipe. The system disclosed by the invention has the advantages of being convenient to install and good in purification effect.

Description

A kind of rotten exhaust organic gas joint disposal system
Technical field
The present invention relates to exhaust-gas treatment field, particularly relate to a kind of rotten exhaust organic gas joint disposal system.
Background technology
At present, foul gas as the typical environmental hazard of one by countries in the world are generally acknowledged.China also starts to pay attention to the monitoring to foul gas and control in recent years, has formulated emission standard for odor pollutants, (GB14554-93) and supporting analytical method.In these foul gas beyond vulcanisation hydrogen and ammonia, be mostly VOCs (volatile organic matter).According to emission standard for odor pollutants (GB14554-93), wherein priority control project has ammonia, trimethylamine, hydrogen sulfide, first sulphur hydrogen, methyl mercaptan, methyl sulfide, methyl disulfide, carbon disulfide and styrene.These odorants have lower olfactory threshold, can enter in human body by contact, breathing and the approach such as water and food, cause serious harm to human body.Therefore, in Wastewater Treatment Design process, suitable deodorization process system is configured by imperative.The peaceful Ji of PAMC certificate described in second-time burning gas such as high temperature incineration is slowly added dropwise to the dissolving of band stirring and heating measures wherein uniformly.Usually adopt adsorbent to purify in foul waste gas treatment system, the application of fixed bed is more common.If only need short-term flow of process air, so usually only need an adsorbent equipment, this will there to be time enough interval between adsorption cycle certainly, to carry out the regeneration of adsorbent.But owing to usually requiring pending gas continuous flow, one or more devices that can operate in such a way therefore must be adopted.Be used for from air-flow, remove the prevailing adsorption system form of pollutant, be made up of many fixed bed devices, these devices carry out adsorption operations and regenerative operation sequentially, keep continuously to make air-flow.If intermittently operated and batch operation practical, then simple single bed adsorption is just enough, and at this moment absorption phase and regeneration stage can hocket.Bacterium and fungi are two kinds of main microorganisms.Bacterium is applicable to the pollutant of good water solubility, utilizes bacterium to carry out biodegradation, can obtain good removal effect.But for the organic matter that solubility in water is low, the water layer of bacterium surface will affect the mass transfer rate of organic gas, and the too high treatment effeciency that causes of resistance to mass tranfer reduces.Fungal organism drips filter tower and have acidproof, siccostabile feature relative to traditional bio-trickling filter, it has stronger degradation capability to hydrophobicity hardly degraded organic substance, the pH value that fungi adapts to is wide, when there is acid accumulation in processing procedure, does not need the pH value adding alkali adjustment circulation fluid.Filamentous fungi directly can contact with gas to have and reduce a series of advantage such as resistance to mass tranfer, elimination capacity height.The method that sewage treatment plant extensively adopts exposes many shortcomings in Long-Time Service.Chemical absorption method can only absorb the material of acidity or alkalescence, although purification efficiency is general, reagent cost is higher, and service condition is harsh; Absorption method technique is simple, but shortcoming to be cost too high, need to regularly replace active carbon; Burning method need with refinery's combustion gas or fuel oil combustion-supporting, add operating cost, and secondary pollution existed to environment; Bioanalysis is comparatively emerging, but still needs extra auxiliary agent as component extender, general needs 1 to two year needs to change bacterial classification, simultaneously on the ingredient stability of foul gas, concentration has requirement.Based on above reason, need a kind of more succinctly, the more efficient and rotten exhaust organic gas joint disposal system of good purification.
Summary of the invention
Technical problem to be solved by this invention is for above-mentioned the deficiencies in the prior art, provide a kind of rotten exhaust organic gas joint disposal system, the present invention adopts fixed set gas hood and mobile set gas hood to collect waste gas, is provided with adsorption tower and spray column, can realize continuous operation and run.The present invention has the easy for installation and advantage of good purification.
Technical scheme of the present invention is: a kind of rotten exhaust organic gas joint disposal system, comprise: fixed set gas hood, first discharge, second discharge, mobile set gas hood, pulley, ventilating fan, electrostatic precipitator, first air inlet pipe, active carbon filler layer, adsorption tower, first gas outlet, first escape pipe, spray scrubber, sedimentation basin, PH detector, Dey-Dose, moisture trap, second gas outlet, second escape pipe, smell photocatalysis purifier, support column, storage tank, water inlet pipe, circulating pump, first communicating pipe, second communicating pipe, add alkali measuring pump, booster pump, automatic alkali adding device, hypochlorite generator, 3rd escape pipe, centrifugal blower, chimney and circulating water pipe, it is characterized in that: described fixed set gas hood upper end is provided with the first discharge, described fixed set gas hood and the first discharge are mutually permanently connected, described first discharge lower end is provided with the second discharge, described second discharge and the first discharge are interconnected, described second discharge lower end is provided with mobile set gas hood, described mobile set gas hood and the second discharge are interconnected, described mobile set gas hood lower end is provided with pulley, described first discharge one end is provided with ventilating fan, described first discharge and ventilating fan are mutually permanently connected, described ventilating fan side is provided with electrostatic precipitator, described ventilating fan and electrostatic precipitator are interconnected, described electrostatic precipitator side is provided with the first air inlet pipe, described electrostatic precipitator and first air inlet pipe one end are mutually permanently connected, the described first air inlet pipe other end is provided with adsorption tower, be mutually permanently connected bottom described first air inlet pipe and adsorption tower, activated carbon adsorption layer is provided with in described adsorption tower, described adsorption tower side is provided with the first gas outlet, described first side, gas outlet is provided with the first escape pipe, described first escape pipe one end and the first gas outlet are mutually permanently connected, the described first escape pipe other end and described spray scrubber are mutually permanently connected, Dey-Dose is provided with in described spray scrubber, described Dey-Dose upper end is provided with moisture trap, described spray scrubber lower end is provided with sedimentation basin, described spray scrubber upper end is provided with the second gas outlet, described second upper end, gas outlet is provided with the second escape pipe, described second escape pipe one end and described smell photocatalysis purifier are mutually permanently connected, described smell photocatalysis purifier side is provided with the 3rd escape pipe, described 3rd escape pipe side is provided with chimney, described 3rd escape pipe and chimney are mutually permanently connected, described spray scrubber side is provided with circulating water pipe, described circulating water pipe upper end and Dey-Dose are interconnected, described circulating water pipe lower end and sedimentation basin are interconnected, described circulating water pipe upper end was provided with for the first communicating pipe, described first communicating pipe and circulating water pipe are mutually permanently connected, described first communicating pipe is provided with booster pump, described booster pump side is provided with hypochlorite generator, described circulating water pipe side was provided with for the second communicating pipe, described second communicating pipe and circulating water pipe are mutually permanently connected, described second communicating pipe is provided with and adds alkali measuring pump, the described alkali measuring pump side that adds is provided with automatic alkali adding device, described circulating water pipe is provided with circulating pump, described circulating pump lower end is provided with water inlet pipe, water inlet pipe one end is provided with storage tank, described water inlet pipe and storage tank are mutually permanently connected, described storage tank lower end is provided with support column, described storage tank is mutually permanently connected by support column and smell photocatalysis purifier.
Further, described pulley is provided with two.
Further, described sedimentation basin side is provided with PH detector.
Further, described 3rd escape pipe is provided with centrifugal blower.
Beneficial effect of the present invention is: a kind of rotten exhaust organic gas joint disposal system, comprise: fixed set gas hood, first discharge, second discharge, mobile set gas hood, pulley, ventilating fan, electrostatic precipitator, first air inlet pipe, active carbon filler layer, adsorption tower, first gas outlet, first escape pipe, spray scrubber, sedimentation basin, PH detector, Dey-Dose, moisture trap, second gas outlet, second escape pipe, smell photocatalysis purifier, support column, storage tank, water inlet pipe, circulating pump, first communicating pipe, second communicating pipe, add alkali measuring pump, booster pump, automatic alkali adding device, hypochlorite generator, 3rd escape pipe, centrifugal blower, chimney and circulating water pipe, it is characterized in that: described fixed set gas hood upper end is provided with the first discharge, described fixed set gas hood and the first discharge are mutually permanently connected, described first discharge lower end is provided with the second discharge, described second discharge and the first discharge are interconnected, described second discharge lower end is provided with mobile set gas hood, described mobile set gas hood and the second discharge are interconnected, described mobile set gas hood lower end is provided with pulley, described first discharge one end is provided with ventilating fan, described first discharge and ventilating fan are mutually permanently connected, described ventilating fan side is provided with electrostatic precipitator, described ventilating fan and electrostatic precipitator are interconnected, described electrostatic precipitator side is provided with the first air inlet pipe, described electrostatic precipitator and first air inlet pipe one end are mutually permanently connected, the described first air inlet pipe other end is provided with adsorption tower, be mutually permanently connected bottom described first air inlet pipe and adsorption tower, activated carbon adsorption layer is provided with in described adsorption tower, described adsorption tower side is provided with the first gas outlet, described first side, gas outlet is provided with the first escape pipe, described first escape pipe one end and the first gas outlet are mutually permanently connected, the described first escape pipe other end and described spray scrubber are mutually permanently connected, Dey-Dose is provided with in described spray scrubber, described Dey-Dose upper end is provided with moisture trap, described spray scrubber lower end is provided with sedimentation basin, described spray scrubber upper end is provided with the second gas outlet, described second upper end, gas outlet is provided with the second escape pipe, described second escape pipe one end and described smell photocatalysis purifier are mutually permanently connected, described smell photocatalysis purifier side is provided with the 3rd escape pipe, described 3rd escape pipe side is provided with chimney, described 3rd escape pipe and chimney are mutually permanently connected, described spray scrubber side is provided with circulating water pipe, described circulating water pipe upper end and Dey-Dose are interconnected, described circulating water pipe lower end and sedimentation basin are interconnected, described circulating water pipe upper end was provided with for the first communicating pipe, described first communicating pipe and circulating water pipe are mutually permanently connected, described first communicating pipe is provided with booster pump, described booster pump side is provided with hypochlorite generator, described circulating water pipe side was provided with for the second communicating pipe, described second communicating pipe and circulating water pipe are mutually permanently connected, described second communicating pipe is provided with and adds alkali measuring pump, the described alkali measuring pump side that adds is provided with automatic alkali adding device, described circulating water pipe is provided with circulating pump, described circulating pump lower end is provided with water inlet pipe, water inlet pipe one end is provided with storage tank, described water inlet pipe and storage tank are mutually permanently connected, described storage tank lower end is provided with support column, described storage tank is mutually permanently connected by support column and smell photocatalysis purifier.The present invention adopts fixed set gas hood and mobile set gas hood to collect waste gas, is provided with adsorption tower and spray column, can realize continuous operation and run.The present invention has the easy for installation and advantage of good purification.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Wherein: 1, fixed set gas hood 2, first discharge 3, second discharge
4, mobile set gas hood 5, pulley 6, ventilating fan
7, electrostatic precipitator 8, first air inlet pipe 9, active carbon filler layer
10, adsorption tower 11, first gas outlet 12, first escape pipe
13, spray scrubber 14, sedimentation basin 15, PH detector
16, Dey-Dose 17, moisture trap 18, second gas outlet
19, the second escape pipe 20, smell photocatalysis purifier 21, support column
22, storage tank 23, water inlet pipe 24, circulating pump
25, the first communicating pipe 27 communicating pipe 26, second, add alkali measuring pump
28, booster pump 29, automatic alkali adding device 30, hypochlorite generator
31, the 3rd escape pipe 32, centrifugal blower 33, chimney
34, circulating water pipe
Detailed description of the invention
Below in conjunction with accompanying drawing, brief description is made to the specific embodiment of the present invention.
As shown in Figure 1, a kind of rotten exhaust organic gas joint disposal system, comprise: fixed set gas hood 1, first discharge 2, second discharge 3, mobile set gas hood 4, pulley 5, ventilating fan 6, electrostatic precipitator 7, first air inlet pipe 8, active carbon filler layer 9, adsorption tower 10, first gas outlet 11, first escape pipe 12, spray scrubber 13, sedimentation basin 14, PH detector 15, Dey-Dose 16, moisture trap 17, second gas outlet 18, second escape pipe 19, smell photocatalysis purifier 20, support column 21, storage tank 22, water inlet pipe 23, circulating pump 24, first communicating pipe 25, second communicating pipe 26, add alkali measuring pump 27, booster pump 28, automatic alkali adding device 29, hypochlorite generator 30, 3rd escape pipe 31, centrifugal blower 32, chimney 33 and circulating water pipe 34, it is characterized in that: described fixed set gas hood 1 upper end is provided with the first discharge 2, described fixed set gas hood 1 and the first discharge 2 are mutually permanently connected, described first discharge 2 lower end is provided with the second discharge 3, described second discharge 3 and the first discharge 2 are interconnected, described second discharge 3 lower end is provided with mobile set gas hood 4, described mobile set gas hood 4 and the second discharge 3 are interconnected, described mobile set gas hood 4 lower end is provided with pulley 5, described first discharge 2 one end is provided with ventilating fan 6, described first discharge 2 is mutually permanently connected with ventilating fan 6, described ventilating fan 6 side is provided with electrostatic precipitator 7, described ventilating fan 6 is interconnected with electrostatic precipitator 7, described electrostatic precipitator 7 side is provided with the first air inlet pipe 8, described electrostatic precipitator 7 and first air inlet pipe 8 one end are mutually permanently connected, described first air inlet pipe 8 other end is provided with adsorption tower 10, be mutually permanently connected bottom described first air inlet pipe 8 and adsorption tower 10, activated carbon adsorption layer 9 is provided with in described adsorption tower 10, described adsorption tower 10 side is provided with the first gas outlet 11, described first side, gas outlet 11 is provided with the first escape pipe 12, described first escape pipe 12 one end and the first gas outlet 11 are mutually permanently connected, described first escape pipe 12 other end and described spray scrubber 13 are mutually permanently connected, Dey-Dose 16 is provided with in described spray scrubber 13, described Dey-Dose 16 upper end is provided with moisture trap 17, described spray scrubber 13 lower end is provided with sedimentation basin 14, described spray scrubber 13 upper end is provided with the second gas outlet 18, described second upper end, gas outlet 18 is provided with the second escape pipe 19, described second escape pipe 19 one end and described smell photocatalysis purifier 20 are mutually permanently connected, described smell photocatalysis purifier 20 side is provided with the 3rd escape pipe 31, described 3rd escape pipe 31 side is provided with chimney 33, described 3rd escape pipe 31 is mutually permanently connected with chimney 33, described spray scrubber 13 side is provided with circulating water pipe 34, described circulating water pipe 34 upper end and Dey-Dose 16 are interconnected, described circulating water pipe 34 lower end and sedimentation basin 14 are interconnected, described circulating water pipe 34 upper end was provided with for the first communicating pipe 25, described first communicating pipe 25 is mutually permanently connected with circulating water pipe 34, described first communicating pipe 25 is provided with booster pump 28, described booster pump 28 side is provided with hypochlorite generator 30, described circulating water pipe 34 side was provided with for the second communicating pipe 26, described second communicating pipe 26 is mutually permanently connected with circulating water pipe 34, described second communicating pipe 26 is provided with and adds alkali measuring pump 27, described alkali measuring pump 27 side that adds is provided with automatic alkali adding device 29, described circulating water pipe 34 is provided with circulating pump 24, described circulating pump 24 lower end is provided with water inlet pipe 23, water inlet pipe 23 one end is provided with storage tank 22, described water inlet pipe 23 is mutually permanently connected with storage tank 22, described storage tank 22 lower end is provided with support column 21, described storage tank 22 is mutually permanently connected by support column 21 and smell photocatalysis purifier 20.Working method: produce feature for rotten exhaust organic gas, fixed set gas hood and mobile set gas hood is adopted to collect waste gas, electrostatic precipitator is provided with in adsorption tower front-end process, effectively prevent Particle Blocking rear end active carbon filler, be provided with adsorption tower and spray scrubber, realize purification continuous operation to run, the present invention is provided with pH and detects mouth in sedimentation basin side, emission gases is detected, NaOH in sedimentation basin or copper sulphate absorbent solution produce high-pressure fog by slurry circulating pump through sprayer, stench gas with foreign flavor fully contacts with the absorbent solution of atomization and reacts, solution absorption is carried out to toxic gases such as hydrogen sulfide, non-secondary pollution, substantially deodorizing is realized through spray scrubber purified gas, disinfection, the supersaturation moisture content removed in gas by moisture separator more laggard enter next stage treating apparatus, under centrifugal blower suction function, waste gas enters plasma and photocatalysis associated treatment module, industry stench gas with foreign flavor molecule is at high pressure, under high-frequency impulse corona electric field action, the breakdown generation ionization of gas, obtain at normal temperatures and pressures and comprise electronics, ion, atom and free radical are at interior non-equilibrium low temperature plasma, in gas chemistry process, utilize high energy electron, free radical isoreactivity particle causes the pollutant generation electrochemical reaction in waste gas, the surface of cell membrane protein ingredient of destroy microorganisms, the peculiar smell of the various discharge of pollutant sources of oxidation is decomposed within the extremely short time, stink pollutant, exhaust gas concentration is reduced and kind minimizing, improve treatment effeciency, make poisonous and harmful, difficult degradation exhaust emission further thoroughly decompose reach innoxious object.Waste gas is under the synergy of photocatalysis treatment module simultaneously, because ultraviolet has killing effect to bacterial propagule, ultraviolet irradiates 2s to the aerosol containing staphylococcus aureus, MRSE, serratia marcesens, hay bacillus brood body and spores of bacillus subtilin, the chemical bond rupture of bacteria molecule makes nucleic acid damage, and killing rate reaches more than 99.5%.
Above embodiment, only in order to technical scheme of the present invention to be described, can not limit scope of the present invention with this; To the amendment that the technical scheme described in foregoing embodiments is carried out, or to the equivalent replacement that wherein portion of techniques feature is carried out, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme, all should still remain within the scope of the patent.

Claims (4)

1. a rotten exhaust organic gas joint disposal system, comprise: fixed set gas hood, first discharge, second discharge, mobile set gas hood, pulley, ventilating fan, electrostatic precipitator, first air inlet pipe, active carbon filler layer, adsorption tower, first gas outlet, first escape pipe, spray scrubber, sedimentation basin, PH detector, Dey-Dose, moisture trap, second gas outlet, second escape pipe, smell photocatalysis purifier, support column, storage tank, water inlet pipe, circulating pump, first communicating pipe, second communicating pipe, add alkali measuring pump, booster pump, automatic alkali adding device, hypochlorite generator, 3rd escape pipe, centrifugal blower, chimney and circulating water pipe, it is characterized in that: described fixed set gas hood upper end is provided with the first discharge, described fixed set gas hood and the first discharge are mutually permanently connected, described first discharge lower end is provided with the second discharge, described second discharge and the first discharge are interconnected, described second discharge lower end is provided with mobile set gas hood, described mobile set gas hood and the second discharge are interconnected, described mobile set gas hood lower end is provided with pulley, described first discharge one end is provided with ventilating fan, described first discharge and ventilating fan are mutually permanently connected, described ventilating fan side is provided with electrostatic precipitator, described ventilating fan and electrostatic precipitator are interconnected, described electrostatic precipitator side is provided with the first air inlet pipe, described electrostatic precipitator and first air inlet pipe one end are mutually permanently connected, the described first air inlet pipe other end is provided with adsorption tower, be mutually permanently connected bottom described first air inlet pipe and adsorption tower, activated carbon adsorption layer is provided with in described adsorption tower, described adsorption tower side is provided with the first gas outlet, described first side, gas outlet is provided with the first escape pipe, described first escape pipe one end and the first gas outlet are mutually permanently connected, the described first escape pipe other end and described spray scrubber are mutually permanently connected, Dey-Dose is provided with in described spray scrubber, described Dey-Dose upper end is provided with moisture trap, described spray scrubber lower end is provided with sedimentation basin, described spray scrubber upper end is provided with the second gas outlet, described second upper end, gas outlet is provided with the second escape pipe, described second escape pipe one end and described smell photocatalysis purifier are mutually permanently connected, described smell photocatalysis purifier side is provided with the 3rd escape pipe, described 3rd escape pipe side is provided with chimney, described 3rd escape pipe and chimney are mutually permanently connected, described spray scrubber side is provided with circulating water pipe, described circulating water pipe upper end and Dey-Dose are interconnected, described circulating water pipe lower end and sedimentation basin are interconnected, described circulating water pipe upper end was provided with for the first communicating pipe, described first communicating pipe and circulating water pipe are mutually permanently connected, described first communicating pipe is provided with booster pump, described booster pump side is provided with hypochlorite generator, described circulating water pipe side was provided with for the second communicating pipe, described second communicating pipe and circulating water pipe are mutually permanently connected, described second communicating pipe is provided with and adds alkali measuring pump, the described alkali measuring pump side that adds is provided with automatic alkali adding device, described circulating water pipe is provided with circulating pump, described circulating pump lower end is provided with water inlet pipe, water inlet pipe one end is provided with storage tank, described water inlet pipe and storage tank are mutually permanently connected, described storage tank lower end is provided with support column, described storage tank is mutually permanently connected by support column and smell photocatalysis purifier.
2., according to a kind of rotten exhaust organic gas joint disposal system described in claim 1, it is characterized in that: described pulley is provided with two.
3., according to a kind of rotten exhaust organic gas joint disposal system described in claim 1, it is characterized in that: described sedimentation basin side is provided with PH detector.
4. according to a kind of rotten exhaust organic gas joint disposal system described in claim 1, it is characterized in that: described 3rd escape pipe is provided with centrifugal blower.
CN201510431909.7A 2015-07-21 2015-07-21 A kind of rotten exhaust organic gas joint disposal system Active CN105148656B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510431909.7A CN105148656B (en) 2015-07-21 2015-07-21 A kind of rotten exhaust organic gas joint disposal system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510431909.7A CN105148656B (en) 2015-07-21 2015-07-21 A kind of rotten exhaust organic gas joint disposal system

Publications (2)

Publication Number Publication Date
CN105148656A true CN105148656A (en) 2015-12-16
CN105148656B CN105148656B (en) 2018-05-04

Family

ID=54789882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510431909.7A Active CN105148656B (en) 2015-07-21 2015-07-21 A kind of rotten exhaust organic gas joint disposal system

Country Status (1)

Country Link
CN (1) CN105148656B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105521689A (en) * 2016-02-02 2016-04-27 云南昆船第一机械有限公司 Aluminum alloy casting waste gas treating device and method
CN105688640A (en) * 2016-04-25 2016-06-22 中钢集团武汉安全环保研究院有限公司 Landfill work face vehicle-mounted movable deodorizing device
CN105833642A (en) * 2016-04-27 2016-08-10 中国海洋石油总公司 Waste gas purification treatment system and method in sewage treatment station
CN106861404A (en) * 2017-04-10 2017-06-20 黄嘉铭 A kind of foul gas cleaning treatment system
CN109173573A (en) * 2017-06-30 2019-01-11 王锦林 A kind of energy-saving air purification device
CN110215811A (en) * 2019-06-04 2019-09-10 中工国际工程股份有限公司 The low dense stench processing system of one kind and method
CN112147248A (en) * 2020-09-23 2020-12-29 浙江求实环境监测有限公司 Method for rapidly determining content of benzene series components in waste gas of fixed pollution source
CN112354310A (en) * 2020-10-25 2021-02-12 山东天智信息科技有限公司 Multistage purification treatment system of industrial waste gas
CN114570172A (en) * 2022-03-03 2022-06-03 张震渝 Thermal power plant waste gas treatment equipment and treatment process
CN117180900A (en) * 2023-11-07 2023-12-08 江苏煌灿新材料科技有限公司 Be suitable for printing and dyeing technology high temperature stench tail gas processing apparatus that singes

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2751869Y (en) * 2004-11-26 2006-01-18 北京西山除尘器厂 Dust removal peculiar smell removing multifunction purifying tower
CN102600692A (en) * 2012-03-05 2012-07-25 广东东日环保有限公司 Purifying device for industrial organic waste gas
CN103721510A (en) * 2013-12-13 2014-04-16 江苏中科睿赛污染控制工程有限公司 VOCs high-efficiency processing method
WO2015064793A1 (en) * 2013-10-31 2015-05-07 한국에너지기술연구원 Carbon dioxide separation recovery device having oxygen separation device and method for separating and recovering carbon dioxide from flue gas using same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2751869Y (en) * 2004-11-26 2006-01-18 北京西山除尘器厂 Dust removal peculiar smell removing multifunction purifying tower
CN102600692A (en) * 2012-03-05 2012-07-25 广东东日环保有限公司 Purifying device for industrial organic waste gas
WO2015064793A1 (en) * 2013-10-31 2015-05-07 한국에너지기술연구원 Carbon dioxide separation recovery device having oxygen separation device and method for separating and recovering carbon dioxide from flue gas using same
CN103721510A (en) * 2013-12-13 2014-04-16 江苏中科睿赛污染控制工程有限公司 VOCs high-efficiency processing method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105521689A (en) * 2016-02-02 2016-04-27 云南昆船第一机械有限公司 Aluminum alloy casting waste gas treating device and method
CN105521689B (en) * 2016-02-02 2018-06-26 云南昆船机械制造有限公司 Aluminium alloy casts emission-control equipment adding method
CN105688640A (en) * 2016-04-25 2016-06-22 中钢集团武汉安全环保研究院有限公司 Landfill work face vehicle-mounted movable deodorizing device
CN105833642A (en) * 2016-04-27 2016-08-10 中国海洋石油总公司 Waste gas purification treatment system and method in sewage treatment station
CN106861404A (en) * 2017-04-10 2017-06-20 黄嘉铭 A kind of foul gas cleaning treatment system
CN109173573A (en) * 2017-06-30 2019-01-11 王锦林 A kind of energy-saving air purification device
CN110215811A (en) * 2019-06-04 2019-09-10 中工国际工程股份有限公司 The low dense stench processing system of one kind and method
CN112147248A (en) * 2020-09-23 2020-12-29 浙江求实环境监测有限公司 Method for rapidly determining content of benzene series components in waste gas of fixed pollution source
CN112354310A (en) * 2020-10-25 2021-02-12 山东天智信息科技有限公司 Multistage purification treatment system of industrial waste gas
CN114570172A (en) * 2022-03-03 2022-06-03 张震渝 Thermal power plant waste gas treatment equipment and treatment process
CN117180900A (en) * 2023-11-07 2023-12-08 江苏煌灿新材料科技有限公司 Be suitable for printing and dyeing technology high temperature stench tail gas processing apparatus that singes
CN117180900B (en) * 2023-11-07 2024-01-30 江苏煌灿新材料科技有限公司 Be suitable for printing and dyeing technology high temperature stench tail gas processing apparatus that singes

Also Published As

Publication number Publication date
CN105148656B (en) 2018-05-04

Similar Documents

Publication Publication Date Title
CN105148656A (en) Comprehensive disposal system for malodorous organic exhaust gas
CN202962243U (en) Treatment system for industrial stink smelly gases
CN204485561U (en) Emission-control equipment
CN203853005U (en) VOCs (Volatile Organic Compounds) waste gas purification device
CN103055669A (en) Exhaust purification treatment method and device
CN103990363A (en) Malodorous gas collecting and purifying integrated equipment and method thereof
CN103727599A (en) Air cleaning device and method for removing formaldehyde and PM2.5
CN203797809U (en) Industrial air purifier
CN203671775U (en) Air cleaner for eliminating formaldehyde and PM2.5
CN112791555A (en) Waste gas treatment device
CN205627559U (en) Integrated tubular gas treating system
CN115722052B (en) Device and method for removing volatile organic compounds in industrial waste gas
CN107174922A (en) A kind of closed waste gas circulation processing system of air film
CN111514744A (en) Handle organic waste gas's multistage catalytic oxidation tower
CN110694467A (en) A clarification plant for handling waste gas is produced to bio-pharmaceuticals fungus sediment
KR20160030679A (en) Air furification apparatus using hydroxyl radical
CN203469781U (en) UV light oxygen deodorizer
CN208553748U (en) A kind of photoelectric catalysis degrading dimethylamine device
CN113713589A (en) Advanced treatment method of high-sulfur ammonia organic waste gas
CN113634104A (en) Treatment process of waste gas generated in kitchen waste treatment process
CN208193974U (en) A kind of purifying processing device of coating machine drying gas
CN209237705U (en) Dimethylamine exhaust gas controlling device in a kind of synthetic leather industry
CN203155065U (en) Waste gas purification treatment device
CN212396238U (en) Waste gas purification device for rubber glove oven production line
CN210584408U (en) High-efficient sterilization, many function combination exhaust treatment device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 300000 Xiqing District, Beizhen, No. Star Road, Tianjin energy saving building, floor 80, 22

Applicant after: Hope Technology (Tianjin) Limited by Share Ltd

Address before: 300000 Tianjin District of Xiqing City Industrial Zone Zhonglian Automobile Industrial Park 3-116

Applicant before: Tianjin Hope Environmental Protection Technology Co., Ltd

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210415

Address after: 226600 99 Huayuan Road, Hai'an town, Hai'an City, Nantong City, Jiangsu Province

Patentee after: JIANGSU GREEN LEAF ENVIRONMENTAL ENGINEERING Group Ltd.

Address before: 300000 22 / F, Tianjin energy saving building, 80 Xingguang Road, Zhongbei Town, Xiqing District, Tianjin

Patentee before: HOPE TECHNOLOGY (TIANJIN) Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220325

Address after: 226600 No. 88-9, Changjiang West Road, Hai'an town, Hai'an City, Nantong City, Jiangsu Province

Patentee after: Nantong LIANHANG Environmental Protection Technology Co.,Ltd.

Address before: 226600 99 Huayuan Road, Hai'an town, Hai'an City, Nantong City, Jiangsu Province

Patentee before: JIANGSU GREEN LEAF ENVIRONMENTAL ENGINEERING Group Ltd.

TR01 Transfer of patent right