CN105137897B - A kind of iron tower of power transmission line group founds safe construction method - Google Patents

A kind of iron tower of power transmission line group founds safe construction method Download PDF

Info

Publication number
CN105137897B
CN105137897B CN201510527676.0A CN201510527676A CN105137897B CN 105137897 B CN105137897 B CN 105137897B CN 201510527676 A CN201510527676 A CN 201510527676A CN 105137897 B CN105137897 B CN 105137897B
Authority
CN
China
Prior art keywords
pulling force
bearing rope
construction method
pole
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510527676.0A
Other languages
Chinese (zh)
Other versions
CN105137897A (en
Inventor
高鹏飞
徐军
刘玉杰
陶光立
李磊
熊浩淋
王静
林雯
曹雪飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd
Original Assignee
GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd filed Critical GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd
Priority to CN201510527676.0A priority Critical patent/CN105137897B/en
Publication of CN105137897A publication Critical patent/CN105137897A/en
Application granted granted Critical
Publication of CN105137897B publication Critical patent/CN105137897B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

A kind of iron tower of power transmission line group founds safe construction method, tower erection system includes basis, on the basis of pole bottom is temporarily fixed at by bearing rope, pole top is temporarily fixed on ground by outer drawstring, pole is provided with lifting part, hoisting line one end be fixed on sling on thing, the other end is connected by the lifting part on pole with motor-driven grinding mill, described warning system includes the pulling force sensor being located on rope, and pulling force sensor is connected by wireless network with supervising device;The supervising device includes controller and the motor-driven grinding mill switch, phonetic alarm, the visual alarm that are connected respectively with controller.Construction method passes through the judgement to different parts value of thrust size, it is indicated that be which position goes wrong, to instruct the construction of tower erection.It is an advantage of the current invention that the security during improving tower erection, can prevent security incident, guarantee personal safety.

Description

A kind of iron tower of power transmission line group founds safe construction method
Technical field
The invention belongs to Phase of Electric Power Projects field, more particularly to a kind of iron tower of power transmission line group founds safety automatic-alarming system System and construction method.
Background technology
In the construction of electric power transmission line tower erection, largely using drawstring outside interior suspension and interior bracing wire pole group tower construction Method, the main Work tool that this method is used includes pole, pole bracing wire, lifting rope(Including lifting tackle pulley, suspension centre rope, lead Messenger etc.), bearing rope and tricing line etc..Instrument Force Calculation should be first by the lift heavy of each time of full tower and corresponding pole inclination angle, control Angle is combined over the ground for rope making and bracing wire, but special circumstances often occurs in work progress, and such as wind-force is excessive, or rises Hanging part part is overweight etc. on a small quantity, runs into what the general foundation construction experience of such case was handled.
The content of the invention
The technical solution adopted for the present invention to solve the technical problems is to provide a kind of vertical safety of iron tower of power transmission line group certainly Dynamic warning system and construction method, when occurring value of thrust during tower erection more than normal value, are then made by alarm, stopping The modes such as industry, improve the security of tower erection, can also be judged by the value of thrust to different parts, be which locally occurs Problem, in order to be improved to follow-up tower erection, overcomes the generation of dangerous situation.
The technical scheme is that, a kind of iron tower of power transmission line group founds safety automatic-alarming system, tower erection system Including basis, on the basis of pole bottom is temporarily fixed at by bearing rope, pole top is temporarily fixed at ground by outer drawstring On, pole be provided with lifting part, hoisting line one end be fixed on sling on thing, the other end passes through the lifting part and machine on pole Dynamic to be twisted connection, described warning system includes the pulling force sensor being located on rope, and pulling force sensor passes through wireless network and prison Control device connection;
The supervising device includes controller and the motor-driven grinding mill switch, phonetic alarm, the lamp that are connected respectively with controller Light crossing-signal.
Further, pulling force sensor includes bracing wire pulling force sensor, bearing rope pulling force sensor, hoisting line pull sensing Device, bracing wire pulling force sensor is located on outer drawstring, and bearing rope pulling force sensor is located on bearing rope, and hoisting line pulling force sensor is set On hoisting line.
Further, warning system also includes anemometry device, on the basis of anemometry device is arranged on, and connects with controller Connect.
A kind of iron tower of power transmission line group, which founds safe construction method, includes the outer drawstring of collection, bearing rope, lifting rope tension in real time Data, assessment risk, corrective measure;
Described real-time collection outer drawstring, bearing rope, hoisting line pulling force data, divide on outer drawstring, bearing rope, hoisting line Pulling force sensor is not set, and the data that pulling force sensor is gathered are collected;
The assessment risk, if the pulling force data on outer drawstring, bearing rope, hoisting line exceeds setting value, shows Lifting part weight is overweight;If the pulling force data of outer drawstring, bearing rope exceeds setting value, show that extraneous interim dynamic load is external Drawstring, the influence of bearing rope exceed setting limit;If the pulling force data of outer drawstring exceeds setting value, show that pole sets angle The influence for spending the bigger than normal or extraneous external drawstring of interim dynamic load exceedes setting limit;If the pulling force data of bearing rope is beyond setting Value, then show that pole sets angle bigger than normal;If the pulling force data on hoisting line exceeds setting value, show lifting part weight It is overweight;
The corrective measure, if lifting part weight is overweight, carries out decomposing reduction hoisting weight to lifting part;If It is that extraneous interim dynamic load exceedes setting limit, suspension of works waits extraneous interim dynamic load to disappear or weaken;If pole is set Angle is bigger than normal, can be by reducing the weight of lifting part or adjusting few pole to set angle.
Further, safe construction method also includes urgent danger prevention, and the urgent danger prevention in the real-time outer drawstring of collection, is held During support rope, the pulling force data of hoisting line, if a certain item pulling force data increases too fast, send out an emergency signal, will lift by crane Part is transferred to ground.
Further, outer drawstring, bearing rope, the pulling force data process of hoisting line are gathered in real time, also gather construction area Wind data, wind data exceedes after setting value, suspension of works.
It is an advantage of the current invention that the real time measure is carried out by the pulling force to the different parts rope during tower erection, And pulling force data is handled, whether belonged to according to pulling force data in normal range (NR), can be with to instruct the construction of tower erection The security of construction is increased substantially, the generation of security incident is reduced.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples:
A kind of iron tower of power transmission line groups of Fig. 1 found safety automatic-alarming systematic schematic diagram.
A kind of iron tower of power transmission line groups of Fig. 2 found safety automatic-alarming system operating diagram.
A kind of iron tower of power transmission line groups of Fig. 3 found safe construction method.
As schemed, 1-pole;2-outer drawstring;3-chock;4-lifting block;5-bearing rope;6-hoisting line;7-tower Piece;8-reinforcement members;9-tricing line;10-climb root rope;11-corner block;12-motor-driven grinding mill;14-motor-driven grinding mill is opened Close;15-phonetic alarm;16-visual alarm;17-bracing wire pulling force sensor;18-bearing rope pulling force sensor;20— Anemometry device;21-controller.
Embodiment
As in Fig. 2, tower erection system includes basis, on the basis of the bottom of pole 1 is temporarily fixed at by bearing rope 5, embraces The top of bar 1 is temporarily fixed on ground by outer drawstring 2, and pole 1 is provided with lifting part(Tower piece 7), preferably lifting slide Car 4, lifting block 4 is also secured on tower piece 7 simultaneously, and the one end of hoisting line 6, which is fixed on, slings thing(On the lifting block 4 of tower piece 7) The upper, other end passes through the lifting part on pole 1(Lifting block on pole 1)And pass through corner block 11 and motor-driven grinding mill 12 Connection, it is preferred that also set on tower piece 7 to there is reinforcement members 8, strengthens tower piece 7 strong during lifting by reinforcement members 8 Control tower piece 7 and the tricing line 9 of basic distance are additionally provided with degree, tower piece 7, and climbs root rope 10, it is preferred that chock 3 makes hoisting line 6 It is separated from each other between pole 1.
As shown in figure 1, a kind of iron tower of power transmission line group founds the pull sensing that safety automatic-alarming system includes being located on rope Device, pulling force sensor is connected by wireless network with supervising device, it is preferred that pulling force sensor includes bracing wire pulling force sensor 17th, bearing rope pulling force sensor 18, hoisting line pulling force sensor 19, bracing wire pulling force sensor 17 are located on outer drawstring 2, bearing rope Pulling force sensor 18 is located on bearing rope 5, and hoisting line pulling force sensor 19 is located on hoisting line 6;
Supervising device includes controller 21 and the motor-driven grinding mill switch 14, the phonetic alarm that are connected respectively with controller 21 15th, visual alarm 16, during work, bracing wire pulling force sensor 17, bearing rope pulling force sensor 18, hoisting line pulling force sensor 19 One or more of, the pulling force data of collection is beyond setting value in controller 21, and controller 21 switchs 14, language to motor-driven grinding mill Sound alarm 15, visual alarm 16 send instruction respectively, and instruction motor-driven grinding mill switch 14 is closed, and motor-driven grinding mill 12 stops work Make, phonetic alarm 15 sends audible alarm, visual alarm 16 and sends light warning.
It is preferred that, warning system also includes anemometry device 20, on the basis of anemometry device 20 is arranged on, with controller 21 Connection, during work, when the air speed value that anemometry device 20 is determined exceedes the setting value in controller 21, controller 21 is to motor-driven strand Mill switch 14, phonetic alarm 15, visual alarm 16 send instruction respectively, and instruction motor-driven grinding mill switch 14 is closed, motor-driven strand Mill 12 is stopped, and phonetic alarm 15 sends audible alarm, visual alarm 16 and sends light warning.
As in Fig. 3, a kind of iron tower of power transmission line group, which founds safe construction method, to be included gathering outer drawstring, bearing rope in real time, rises Weight rope tension data, assessment risk, corrective measure, it is preferred that gather outer drawstring, bearing rope, the pulling force data of hoisting line in real time The wind data of process, also collection construction area, wind data exceedes after setting value, and general wind-force setting value is strong breeze, Setting value should be moderate breeze, suspension of works at local such as mountain top or air port;
The outer drawstring of collection, bearing rope, the pulling force data of hoisting line, set respectively on outer drawstring, bearing rope, hoisting line in real time Pulling force sensor is put, and the data that pulling force sensor is gathered are collected;
Risk is assessed, if the pulling force data on outer drawstring, bearing rope, hoisting line goes beyond the limit of setting value, is shown Lifting part weight is overweight;If the pulling force data of outer drawstring, bearing rope exceeds setting value, show extraneous interim dynamic load(One As refer to wind, or rain, snow etc.)External drawstring, the influence of bearing rope overstep the extreme limit setting value;If the pulling force data of outer drawstring surpasses Go out limit setpoint, then show that pole sets angle bigger than normal or the influence of the extraneous external drawstring of interim dynamic load exceedes setting pole Limit;If the pulling force data of bearing rope exceeds setting value, show that pole sets angle bigger than normal;If the pulling force number on hoisting line According to setting value is gone beyond the limit of, then show that lifting part weight is overweight;Typically to carry out examination before lifting to hang, examination hangs to be risen Hanging object slings 30 centimeters or so or from original 20 centimeters or so of position from the ground, and strict monitoring is outer during examination is hung draws Rope, bearing rope, the pulling force data of hoisting line, examination have a pulling force data close to 9 the percent of limit setpoint during hanging Ten, then need to stop construction lookup reason, the analysis method of reason is as above method, and simply pulling force setting value is set to 90 the percent of limit setpoint;
Corrective measure, if lifting part weight is overweight, carries out decomposing reduction hoisting weight to lifting part;If outer The interim dynamic load in boundary exceedes setting limit, and suspension of works waits extraneous interim dynamic load to disappear or weaken, with reference to anemometry device 20, The wind data of collection;, can be by reducing the weight of lifting part or adjusting few pole if pole sets angle bigger than normal Angle is set, after the completion of corrective measure, then examination is carried out and hangs, method is hung in examination, and to hang method identical with assessing risk examination, try to hang it is qualified after Continue to lift by crane, it is on the contrary then stop.
Safe construction method also includes urgent danger prevention, the urgent danger prevention, in the real-time outer drawstring of collection, bearing rope, lifting During the pulling force data of rope, if a certain item pulling force data increases too fast, in general within one second or two seconds, pulling force increases Long 20 percent, then send out an emergency signal, lifting part is transferred to ground, then according to data analysis reason, then improved Measure, then try to hang, draw trouble to safety is eliminated.

Claims (3)

1. a kind of iron tower of power transmission line group founds safe construction method, it is characterised in that:The safe construction method includes adopting in real time The outer drawstring of collection, bearing rope, hoisting line pulling force data, assessment risk, corrective measure;
Described real-time collection outer drawstring, bearing rope, hoisting line pulling force data, set respectively on outer drawstring, bearing rope, hoisting line Pulling force sensor is put, and the data that pulling force sensor is gathered are collected;
The assessment risk, if the pulling force data on outer drawstring, bearing rope, hoisting line exceeds setting value, shows lifting Component weight is overweight;If the pulling force data of outer drawstring, bearing rope exceeds setting value, show that extraneous interim dynamic load is externally drawn Rope, the influence of bearing rope exceed setting limit;If the pulling force data of outer drawstring exceeds setting value, show that pole sets angle The influence of the external drawstring of bigger than normal or extraneous interim dynamic load exceedes setting limit;If the pulling force data of bearing rope is beyond setting Value, then show that pole sets angle bigger than normal;If the pulling force data on hoisting line exceeds setting value, show lifting part weight It is overweight;
The corrective measure, if lifting part weight lifting, carries out decomposing reduction hoisting weight to lifting part;If outer The interim dynamic load in boundary exceedes setting limit, and suspension of works waits extraneous interim dynamic load to disappear or weaken;If pole sets angle It is bigger than normal, can be by reducing the weight of lifting part or adjusting few pole to set angle.
2. a kind of iron tower of power transmission line group according to claim 1 founds safe construction method, it is characterised in that:Described peace Full construction method also includes urgent danger prevention, the urgent danger prevention, in the real-time pulling force number for gathering outer drawstring, bearing rope, hoisting line During, if a certain item pulling force data increases too fast, send out an emergency signal, lifting part is transferred to ground.
3. a kind of iron tower of power transmission line group according to claim 1 founds safe construction method, it is characterised in that:Described reality When collection outer drawstring, bearing rope, the wind data of the pulling force data process of hoisting line, also collection construction area, wind data is super Cross after setting value, suspension of works.
CN201510527676.0A 2015-08-26 2015-08-26 A kind of iron tower of power transmission line group founds safe construction method Active CN105137897B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510527676.0A CN105137897B (en) 2015-08-26 2015-08-26 A kind of iron tower of power transmission line group founds safe construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510527676.0A CN105137897B (en) 2015-08-26 2015-08-26 A kind of iron tower of power transmission line group founds safe construction method

Publications (2)

Publication Number Publication Date
CN105137897A CN105137897A (en) 2015-12-09
CN105137897B true CN105137897B (en) 2017-10-13

Family

ID=54723276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510527676.0A Active CN105137897B (en) 2015-08-26 2015-08-26 A kind of iron tower of power transmission line group founds safe construction method

Country Status (1)

Country Link
CN (1) CN105137897B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106840498A (en) * 2017-01-10 2017-06-13 岳永刚 The method of testing of wire-drawing tension, device and system and tension tester
CN106643913A (en) * 2017-02-24 2017-05-10 共友时代(北京)科技股份有限公司 Monitoring device for construction of electric power tower and system
CN113607129B (en) * 2021-07-28 2023-03-31 三峡大学 Method and system for measuring and calculating gradient threshold of suspension holding pole in real time

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080084094A (en) * 2007-03-14 2008-09-19 김문식 A warning method and safety device for the tower crane
WO2009064491A2 (en) * 2007-11-15 2009-05-22 Tony Jolly System and method for erecting a tower
CN201614245U (en) * 2009-12-30 2010-10-27 扬州工三电力机具有限公司 Maneuvering milling machine with overload protecting device
CN202694078U (en) * 2012-07-02 2013-01-23 国家电网公司交流建设分公司 Whole-course monitoring system for suspended pole tower assembling
CN203204439U (en) * 2013-05-10 2013-09-18 山西省电力公司供电工程承装公司 Wireless monitoring device for safety of tower erection
CN204883293U (en) * 2015-08-26 2015-12-16 葛洲坝集团电力有限责任公司 Transmission line iron tower assemblage safety automatic alarm system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080084094A (en) * 2007-03-14 2008-09-19 김문식 A warning method and safety device for the tower crane
WO2009064491A2 (en) * 2007-11-15 2009-05-22 Tony Jolly System and method for erecting a tower
CN201614245U (en) * 2009-12-30 2010-10-27 扬州工三电力机具有限公司 Maneuvering milling machine with overload protecting device
CN202694078U (en) * 2012-07-02 2013-01-23 国家电网公司交流建设分公司 Whole-course monitoring system for suspended pole tower assembling
CN203204439U (en) * 2013-05-10 2013-09-18 山西省电力公司供电工程承装公司 Wireless monitoring device for safety of tower erection
CN204883293U (en) * 2015-08-26 2015-12-16 葛洲坝集团电力有限责任公司 Transmission line iron tower assemblage safety automatic alarm system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
悬浮抱杆组塔全程监控系统的研究与实现;刘建锋;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20140715(第07期);C042-483:P69 *

Also Published As

Publication number Publication date
CN105137897A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105137897B (en) A kind of iron tower of power transmission line group founds safe construction method
CN204883293U (en) Transmission line iron tower assemblage safety automatic alarm system
CN203053686U (en) Hanging basket safety lock detecting bench
CN108249311A (en) Crane anti-strong wind intelligence control system and control method
CN103708360B (en) Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method
CN203998746U (en) Portable suspension installation
CN205795604U (en) High-lift operation hanging cradle
CN110441161A (en) Safety belt static load pull force tester and method based on crane
CN116621053A (en) Crane with crane body
CN207451565U (en) Portable steel pipe tower aids in ladder stand
CN105540455A (en) Multifunctional monitoring hoisting tower with gravity testing
CN204162333U (en) Based on the tower machine monitoring device of STM32
CN206859697U (en) A kind of discharging platform overload alarm
CN109110647A (en) A kind of intelligent tower crane control system and method
CN110733988B (en) Method for improving safety of temporary support frame of internal climbing arm tower crane
CN208792726U (en) A kind of high altitude operation anti-falling safe hanging basket
CN107724663A (en) It is a kind of to be automatically positioned the nacelle device not shaken
CN208843629U (en) A kind of crane upper mechanism is from dismantling device and crane
CN207347061U (en) A kind of mechanical whole freight weight limit power-off protection apparatus and its ground jack of application
CN208308309U (en) A kind of crane load protective device
CN208814542U (en) A kind of New Type Construction Hoist
CN205772978U (en) A kind of spiral arm hoisting apparatus
CN202657877U (en) Circuit equipment construction lifting frame
CN206553164U (en) A kind of detection means of safety lock of high-rise working cradle
CN207312960U (en) A kind of high-altitude operation vehicle lift heavy detecting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant