CN105137360A - One-key discharge method for storage battery of transformer station - Google Patents

One-key discharge method for storage battery of transformer station Download PDF

Info

Publication number
CN105137360A
CN105137360A CN201510546379.0A CN201510546379A CN105137360A CN 105137360 A CN105137360 A CN 105137360A CN 201510546379 A CN201510546379 A CN 201510546379A CN 105137360 A CN105137360 A CN 105137360A
Authority
CN
China
Prior art keywords
action
discharge
template
storage batteries
sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510546379.0A
Other languages
Chinese (zh)
Other versions
CN105137360B (en
Inventor
刘国永
徐传伦
张宪强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhiyang Innovation Technology Co Ltd
Original Assignee
SHANDONG ZHIYANG ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG ZHIYANG ELECTRIC CO Ltd filed Critical SHANDONG ZHIYANG ELECTRIC CO Ltd
Priority to CN201510546379.0A priority Critical patent/CN105137360B/en
Publication of CN105137360A publication Critical patent/CN105137360A/en
Application granted granted Critical
Publication of CN105137360B publication Critical patent/CN105137360B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a one-key discharge method for a storage battery of a transformer station, and the method is characterized in that the method comprises the following steps: building a sequential control table template according to different storage batteries; executing sequential control operations according to a sequential control table; configuring a control strategy template and a protection strategy template for different storage batteries, so as to guarantee the execution safety of each sequential control operation; building a discharge cut-off strategy template for different storage batteries, so as to calculate the discharge time and quantity which serve as the conditions for operation cut-off. The method effectively irons out the defects in the prior art, avoids accidents caused by errors which are caused by human factors, and achieves the automaton and intelligentization of a discharge process of storage batteries.

Description

Storage batteries of transformer substation group one key charging method
Technical field:
The present invention relates to a kind of storage batteries of transformer substation group one key charging method, belong to electrical substation monitoring field.
Background technology:
The method of operation of the floating charging method of operation of Long-Time Service pressure-limit current-limit or only pressure limiting not current limliting, cannot judge the existing capacity of valve-control storage battery, inside whether dehydration or dry and cracked.Only have by checking discharging test, accumulator Problems existing could be found, correct assessment battery pack actual capacity and the general level of the health.
At present, the discharge process of maintainer is follow following steps substantially:
1, check that whether I, II section busbar voltage is normal, check that whether DC load electric current is normal, whether two sections of busbar voltages are consistent, manually determine whether according to these conditions the bus connection switch (or disconnecting link) that can close.If condition meets, then close bus connection switch (or disconnecting link);
2, the cell switch (or disconnecting link) preparing to carry out the battery pack of checking discharging test is pulled open;
3, the charging set direct current output switch preparing to carry out the battery pack of checking discharging test is pulled open;
4, again check that whether busbar voltage, DC load electric current be normal, if normal, enter next step;
5, discharge instrument is accessed, setting discharge parameter;
6, close discharge switch, starts electric discharge.In discharge process, the ruuning situation of discharge equipment of looking over one's shoulder and accumulator battery voltage situation of change, and it is unchanged to check that the outward appearance of accumulator has.Battery pack monomer voltage needs separated in time manual measurement record once (to be generally 30 to 60 minutes).
7, after having discharged, charging is recovered.
These steps of above-mentioned electric discharge, overall process is all manual operation, and the voltage measurement in discharge process and record compare labor intensive, the more difficult assurance of degree of accuracy of measurement.Supervision particularly in discharge process, the judgement of abnormal conditions are all manually carry out, and its accuracy and promptness can not ensure.
Summary of the invention:
The object of the invention is to, provide one can overcome above-mentioned defect, the storage batteries of transformer substation group one key charging method that work efficiency is high.
Method provided by the present invention; set up vertical sequence table template according to different batteries; sequence operation is performed according to sequence table; simultaneously for different batteries group configuration control strategy masterplate and Preservation tactics masterplate are for ensureing the security performing each sequence operation; and be that different battery pack sets up electric discharge clipping strategy masterplate calculating discharge time and discharge capacity, as the condition of shut-down operation.
The output of control strategy template is as the Rule of judgment of each sequence action executing, and only have the output of control strategy template to meet the requirements and this operation just can be allowed to start, control strategy masterplate main contents are defined as follows:
(1) object is performed;
(2) perform an action;
(3) relationship object;
(4) export.
Preservation tactics template is the set of the safety precautions in sequence table template implementation, only has ready conditions all to meet just to allow this operational motion or execution; Operation in the process of implementation, needs moment check protection condition, only all meets with these conditions, just allows this action or operation to continue to perform, otherwise stops immediately.
Preservation tactics formwork structure is identical with control strategy formwork structure.
Relevant action is performed according to sequence table content order, by sequence table content, find the hardware device of executable operations, according to stipulations composition control message, send to hardware device by serial communication mode, hardware device carries out stipulations Decoding Analysis, after confirmation message is correct, control corresponding topworks's action according to message content, circulation executes sequence table content successively.
Sequence table main contents are as follows:
(1) type of action;
(2) action object;
(3) sequence number is operated;
(4) denomination of dive;
(5) the result of the action.
Electric discharge clipping strategy masterplate typing discharge time and discharge capacity, both is certain value, as long as any one meets certification condition with regard to shut-down operation among both.
The correctness of above-mentioned masterplate file is the key factor of executable operations, according to the sequence table masterplate of coupling, performs a key discharge process.In this process; the constraint of each the step content of operation all controlled policy template before operation in sequence table template; the constraint of protected policy template and electric discharge clipping strategy template in operation, these three kinds of constraint conditions perfectly solve problems faced in the property checked discharge process.
The invention has the beneficial effects as follows:
Operations is preserved with the form of Policy Table, uses, can carry out change and the adjustment of tactful content according to actual conditions as permanent data.By the present invention, realize robotization and the intellectuality of battery power discharge.Whole process can realize tight monitoring by this technology.By control strategy, before operation performs, judge the feasibility of operation; Accurately judge by Preservation tactics the abnormal occurrence that discharge process occurs, timely shut-down operation, ensure the security of process; Automatically calculate discharge time and discharge capacity by electric discharge clipping strategy, meet cut-off condition and stop immediately.With these three kinds of strategies for technical foundation; the monomer voltage of real time record battery pack in discharge process and group pressure; by to calculating and the supervision of organizing the correlation parameters such as pressure, monomer voltage, discharge time, discharge capacity, effectively can protect electric battery, prevent the generation of anomalous event.One key discharge technology can improve security in discharge process and work efficiency, when saving human resources, achieves the intellectuality of the transformer station's property checked electric discharge.
Accompanying drawing explanation
Fig. 1 process flow diagram of the present invention;
Embodiment
First gathered the group pressure of battery pack by accumulator monitoring equipment, monomer voltage, electric current, temperature, the data such as AC-input voltage, and gather mother simultaneously, female throwing, accumulator, electric discharge, the real-time status of the switches such as charging or disconnecting link.Then the process of data mode is carried out, particularly by time-division processing principle, selectable counterweight dotted state data carry out monitoring and analyzing, and increase and remove the processing policies such as the time of quivering, the feedback electric battery current state enabling example stable, for a key electric discharge provides safe condition adjudgement support.
The foundation that one key electric discharge automatically performs comes from sequence masterplate table, and then this masterplate table is pre-configured preserves in a database, and its overall process is as follows:
(1) a key electric discharge sequence masterplate table is read;
(2) each operation is performed successively according to sequence masterplate tabular order sequence;
(3) check, verify this execution result operated;
(4) next step operation is continued;
(5) process terminates, and exits sequence process.
The realization of control strategy:
Control strategy is that the checking before action executing checks condition, judges whether current operation allows to perform according to its output valve.This strategy comes from the control strategy masterplate in database, allows user to carry out additions and deletions according to on-site actual situations and changes operation.Can check whether switch currently allows point, closing operation, effectively shields all DC system faults relating to switching manipulation and cause according to control strategy.
The realization of Preservation tactics:
Preservation tactics is that the checking in action executing process checks condition.In discharge process, to constantly calculate according to Preservation tactics circulation the various conditions related in Preservation tactics and whether meet, if having one ineligible, this sequence process just terminates immediately.This strategy efficiently avoid the cell damage phenomenon that battery pack deep discharge causes, and avoids the generation of straight-flow system accident.
The generation of electric discharge form:
Electric discharge form is that after sequence process terminates, this example generates automatically, is the first reflection of electric battery quality, the displaying directly perceived of a key discharge technology achievement especially.According to actual conditions, this form can carry out form customization.

Claims (5)

1. a storage batteries of transformer substation group one key charging method; it is characterized in that setting up vertical sequence table template according to different batteries; sequence operation is performed according to sequence table; simultaneously for different batteries group configuration control strategy masterplate and Preservation tactics masterplate are for ensureing the security performing each sequence operation; and be that different battery pack sets up electric discharge clipping strategy masterplate calculating discharge time and discharge capacity, as the condition of shut-down operation.
2. storage batteries of transformer substation group one key charging method according to claim 1, it is characterized in that configuration control strategy template, the output of control strategy template is as the Rule of judgment of each sequence action executing, only having the output of control strategy template to meet the requirements just can allow this operation to start, and control strategy masterplate main contents are defined as follows:
(1) object is performed;
(2) perform an action;
(3) relationship object;
(4) export.
3. storage batteries of transformer substation group one key charging method according to claim 1, it is characterized in that configuration protection policy template, Preservation tactics is the set of the safety precautions in sequence table template implementation, only has ready conditions all to meet just to allow this operational motion or execution; Operation in the process of implementation, needs moment check protection condition, only all meets with these conditions, just allows this action or operation to continue to perform, otherwise stops immediately.
4. storage batteries of transformer substation group one key charging method according to claim 1, it is characterized in that performing relevant action according to sequence table content order, according to sequence table content, find the hardware device of executable operations, according to stipulations composition control message, send to hardware device by serial communication mode, hardware device carries out stipulations Decoding Analysis, after confirmation message is correct, control corresponding topworks's action according to message content, circulation executes sequence table content successively;
Sequence table main contents are as follows:
(1) type of action;
(2) action object;
(3) sequence number is operated;
(4) denomination of dive;
(5) the result of the action.
5. storage batteries of transformer substation group one key charging method according to claim 1, it is characterized in that electric discharge clipping strategy masterplate typing discharge time and discharge capacity, both is certain value, as long as any one meets certification condition with regard to shut-down operation among both.
CN201510546379.0A 2015-08-31 2015-08-31 One key charging method of storage batteries of transformer substation group Active CN105137360B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510546379.0A CN105137360B (en) 2015-08-31 2015-08-31 One key charging method of storage batteries of transformer substation group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510546379.0A CN105137360B (en) 2015-08-31 2015-08-31 One key charging method of storage batteries of transformer substation group

Publications (2)

Publication Number Publication Date
CN105137360A true CN105137360A (en) 2015-12-09
CN105137360B CN105137360B (en) 2018-09-11

Family

ID=54722767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510546379.0A Active CN105137360B (en) 2015-08-31 2015-08-31 One key charging method of storage batteries of transformer substation group

Country Status (1)

Country Link
CN (1) CN105137360B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786859A (en) * 2016-12-12 2017-05-31 国网北京市电力公司 Method for discharging storage batteries, device and system

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101430368A (en) * 2008-09-12 2009-05-13 张天任 Full-automatic charge-discharge intelligent data acquisition system of accumulator
CN101572426A (en) * 2009-03-13 2009-11-04 温州市创力电子有限公司 Charge-discharge control system of storage battery
CN201797356U (en) * 2010-09-21 2011-04-13 河南省电力公司郑州供电公司 Automatic monitoring device for maintaining whole check-up charging and discharging process of storage battery
CN102064611A (en) * 2011-01-06 2011-05-18 国电南瑞科技股份有限公司 Transformer substation sequentialization control system with visualization and interactivity
EP2424070A2 (en) * 2010-08-26 2012-02-29 Hitachi Ltd. Battery control system and vehicle system with battery control system
KR20120045278A (en) * 2010-10-29 2012-05-09 현대자동차주식회사 Control logic and method of battery charge and discharge in hybrid vehicle
CN102751785A (en) * 2012-05-21 2012-10-24 中国电力科学研究院 Modularization sequential control system and realization method thereof
CN202712900U (en) * 2012-07-06 2013-01-30 赵振涛 Discharging system for multiple lithium battery groups
CN103023085A (en) * 2012-08-09 2013-04-03 江苏科技大学 Independent photovoltaic storage battery grouping management method
CN103441570A (en) * 2013-06-18 2013-12-11 国家电网公司 One-button type sequential control operation control method based on integrated information platform
JP5447712B2 (en) * 2011-09-21 2014-03-19 日本電気株式会社 Battery control system, battery control device, battery control method, and program
EP1837944B1 (en) * 2006-03-24 2014-04-23 Hitachi, Ltd. Electric power supply control apparatus
CN104158287A (en) * 2014-07-20 2014-11-19 国家电网公司 Transformer station storage battery remote maintenance system
CN104319837A (en) * 2014-10-17 2015-01-28 东风电动车辆股份有限公司 Battery pack structure of electric automobile and charging and discharging method of battery pack
CN104505947A (en) * 2015-01-07 2015-04-08 山东鲁能智能技术有限公司 Transformer substation direct current power supply monitoring system and transformer substation direct current power supply monitoring method
CN104571058A (en) * 2015-01-22 2015-04-29 汪福利 Remote online intelligent monitoring system for storage batteries

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1837944B1 (en) * 2006-03-24 2014-04-23 Hitachi, Ltd. Electric power supply control apparatus
CN101430368A (en) * 2008-09-12 2009-05-13 张天任 Full-automatic charge-discharge intelligent data acquisition system of accumulator
CN101572426A (en) * 2009-03-13 2009-11-04 温州市创力电子有限公司 Charge-discharge control system of storage battery
EP2424070A2 (en) * 2010-08-26 2012-02-29 Hitachi Ltd. Battery control system and vehicle system with battery control system
CN201797356U (en) * 2010-09-21 2011-04-13 河南省电力公司郑州供电公司 Automatic monitoring device for maintaining whole check-up charging and discharging process of storage battery
KR20120045278A (en) * 2010-10-29 2012-05-09 현대자동차주식회사 Control logic and method of battery charge and discharge in hybrid vehicle
CN102064611A (en) * 2011-01-06 2011-05-18 国电南瑞科技股份有限公司 Transformer substation sequentialization control system with visualization and interactivity
JP5447712B2 (en) * 2011-09-21 2014-03-19 日本電気株式会社 Battery control system, battery control device, battery control method, and program
CN102751785A (en) * 2012-05-21 2012-10-24 中国电力科学研究院 Modularization sequential control system and realization method thereof
CN202712900U (en) * 2012-07-06 2013-01-30 赵振涛 Discharging system for multiple lithium battery groups
CN103023085A (en) * 2012-08-09 2013-04-03 江苏科技大学 Independent photovoltaic storage battery grouping management method
CN103441570A (en) * 2013-06-18 2013-12-11 国家电网公司 One-button type sequential control operation control method based on integrated information platform
CN104158287A (en) * 2014-07-20 2014-11-19 国家电网公司 Transformer station storage battery remote maintenance system
CN104319837A (en) * 2014-10-17 2015-01-28 东风电动车辆股份有限公司 Battery pack structure of electric automobile and charging and discharging method of battery pack
CN104505947A (en) * 2015-01-07 2015-04-08 山东鲁能智能技术有限公司 Transformer substation direct current power supply monitoring system and transformer substation direct current power supply monitoring method
CN104571058A (en) * 2015-01-22 2015-04-29 汪福利 Remote online intelligent monitoring system for storage batteries

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
尉镔: "直流电源智能监控系统研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786859A (en) * 2016-12-12 2017-05-31 国网北京市电力公司 Method for discharging storage batteries, device and system

Also Published As

Publication number Publication date
CN105137360B (en) 2018-09-11

Similar Documents

Publication Publication Date Title
CN107219470B (en) On-line checking discharge device and method for storage battery pack
CN208306388U (en) A kind of reliable non-on-board charger of high safety
CN103051065A (en) Distribution-automation distributed type FA (feeder automation) linkage test method and system
CN102663530A (en) Safety early warning and evaluating system for high-voltage direct current transmission system
CN103197271B (en) A kind of method of inspection of MMC topological flexibility direct current transportation test platform
CN206211665U (en) A kind of straight-flow system
CN106571688A (en) Method for monitoring operation mode of direct-current system and operation states of disconnecting switches
CN107276052B (en) A kind of DC protection system and its control method
CN109582004B (en) Intelligent detection platform
CN104020761A (en) Automatic feeder testing system free of networking
CN102280864B (en) Post-failure live treatment method for protection device of distribution network system and portable protection device
CN104020762A (en) Automatic feeder testing method free of networking
CN112462289A (en) Storage battery pack online capacity checking management device
CN114755518A (en) Test method and test platform for control logic of energy storage system
CN104297676B (en) Method, device and system for monitoring circuit breaker of wind generating set
CN104198951A (en) Reliability validation method of 380V mobile emergency power source of nuclear power station
CN105137360A (en) One-key discharge method for storage battery of transformer station
CN106532930B (en) The intelligent monitor system of static synchronous compensator
CN112394293A (en) Online evaluation device, method and system for performance and state of energy storage system
CN207366659U (en) A kind of direct-current charging post electric fault simulation system
CN207232351U (en) A kind of alternating-current charging pile electric fault simulation system
CN102759712A (en) Battery testing device and testing method thereof
CN202696130U (en) Bus splitting locking monopole logic circuit of alternating-current station control
CN202206125U (en) Portable protection device for electrification process after distribution system protection device failure
CN107727967A (en) Large power energy storage system simulation test platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 255086 Zibo high tech Zone, Shandong Road, No. 135, block E, Room 405

Patentee after: Zhiyang Innovation Technology Co., Ltd.

Address before: 255086 Zibo high tech Zone, Shandong Road, No. 135, block E, Room 405

Patentee before: SHANDONG ZHIYANG ELECTRIC CO., LTD.

CP01 Change in the name or title of a patent holder