CN105137284A - Positioning and auxiliary emergency repair device for emergency maintenance of power distribution network, and application method - Google Patents

Positioning and auxiliary emergency repair device for emergency maintenance of power distribution network, and application method Download PDF

Info

Publication number
CN105137284A
CN105137284A CN201510538497.7A CN201510538497A CN105137284A CN 105137284 A CN105137284 A CN 105137284A CN 201510538497 A CN201510538497 A CN 201510538497A CN 105137284 A CN105137284 A CN 105137284A
Authority
CN
China
Prior art keywords
distribution network
power distribution
repairing
emergency
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510538497.7A
Other languages
Chinese (zh)
Inventor
李晓志
丛玉頔
曹琳琳
丛君宇
韩超先
单喜斌
麻亚鹏
宋宗勋
刘天祥
于卫卫
张瀚
王志英
邹丽莎
李梦奕
于丽
夏晓晨
连雯雅
丛楠楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510538497.7A priority Critical patent/CN105137284A/en
Publication of CN105137284A publication Critical patent/CN105137284A/en
Pending legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to the power distribution network emergency maintenance technical field, concretely a positioning and auxiliary emergency repair device for the emergency maintenance of a power distribution network, and an application method. The positioning and auxiliary emergency repair device comprises a positioning device and an auxiliary emergency repair device. The positioning device comprises an inductance module (1) used for inducting power distribution network current, an analog input module, a micro-processor (2), a GPS sending module (3), a standby emergency power supply (4), a GPS receiving module (5) an a central emergency maintenance scheduling computer (6). The inductance module (1) is in communication connection with the micro-processor (2) through the analog input module; the GPS sending module (3) is in communication connection with the micro-processor (2). The positioning and auxiliary emergency repair device has the characteristics of simple structure, accurate positioning, and rapid fault reaction, can perform preliminary analytical judgment on a fault, and provide emergency power supply support in emergency maintenance, and possesses high market popularization values.

Description

A kind of power distribution network repairing is located and auxiliary rush repair equipment and using method
Technical field
The present invention relates to power distribution network damage repair technology field, be specifically related to a kind of accurate positioning, fault reaction power distribution network repairing rapidly location and auxiliary rush repair equipment and using method.
Background technology
Power distribution network repairing is the important step in power distribution network related work, when power distribution network breaks down and rushes to repair, often need the preliminary judgement Distribution Network Equipment point broken down being carried out to precise positioning and fault within the shortest time, but the repairing location of power distribution network often relies on the phone of fault zone to circulate a notice of to realize the location of general orientation now, and preliminary analysis judgement can not be carried out to failure condition, greatly have impact on the efficiency of repairing.
Summary of the invention
Object of the present invention mainly in order to solve the problems of the technologies described above, and provides a kind of accurate positioning, fault reaction power distribution network repairing rapidly location and auxiliary rush repair equipment and using method.
The technical measures that the present invention adopts are:
A kind of power distribution network repairing location and auxiliary rush repair equipment, comprise power distribution network body, described power distribution network body is primarily of cable, shaft tower and substation transformer composition, described power distribution network repairing location and auxiliary rush repair equipment comprise locating device and auxiliary rush repair equipment, described locating device comprises the inductor module for responding to power distribution network electric current, Analog input mModule, microprocessor, GPS sending module, spare emergent power source, GPS receiver module and central authorities' repairing scheduling computing machine, inductor module is connected by communication by Analog input mModule and microprocessor, GPS sending module and microprocessor are connected by communication, spare emergent power source is respectively inductor module, Analog input mModule, microprocessor and GPS sending module are powered, central authorities' repairing scheduling computing machine is connected with the wireless telecommunications of GPS sending module by GPS receiver module, described auxiliary rush repair equipment exports utility outlets by emergency light group and emergency power pack, described emergency light group and emergency power pack export utility outlets and are electrically connected with spare emergent power source respectively.
Described spare emergent power source is lithium battery group, and described lithium battery group is by the power taking of power distribution network body or by solar energy photovoltaic panel power taking.
A using method for power distribution network repairing location and auxiliary rush repair equipment, is characterized in that comprising the following steps:
A. described power distribution network repairing location and auxiliary rush repair equipment are arranged near the vitals such as the shaft tower of power distribution network body and substation transformer, when power-off or other abnormal conditions appear in power distribution network, GPS sending module sends elaborate position signal and abnormal current data to GPS receiver module;
B. central authorities' repairing scheduling computer screen demonstrates the particular location at the power distribution network position of breaking down, and staff has been with corresponding repairing instrument to rush for trouble spot according to shown position and the corresponding repair personnel of abnormal current data placement;
C. in repair personnel's repairing process, emergency light group can be opened and thrown light in fault zone, also export utility outlets power taking, to use some to need the repairing instrument of electricity consumption by emergency power pack.
Also have antirust explosion-proof housing, described power distribution network repairing location and auxiliary rush repair equipment are encapsulated in antirust explosion-proof housing.
Advantage of the present invention is: power distribution network repairing of the present invention location and auxiliary rush repair equipment structure simple, accurate positioning, fault reaction is rapid, and makes initial analysis judgement to fault, there is provided emergency power pack support when rushing to repair, there is good market popularization value.
Accompanying drawing explanation
Fig. 1 is structure principle chart of the present invention.
In figure: 1, inductor module; 2, microprocessor; 3, GPS sending module; 4, spare emergent power source; 5, GPS receiver module; 6, central authorities' repairing scheduling computing machine; 7, emergency light group; 8, emergency power pack exports utility outlets; 9, antirust explosion-proof housing.
Embodiment
Below in conjunction with accompanying drawing, the present invention will be further described.
As shown in Figure 1, the present invention includes power distribution network body, described power distribution network body is primarily of cable, shaft tower and substation transformer composition, described power distribution network repairing location and auxiliary rush repair equipment comprise locating device and auxiliary rush repair equipment, described locating device comprises the inductor module 1 for responding to power distribution network electric current, Analog input mModule, microprocessor 2, GPS sending module 3, spare emergent power source 4, GPS receiver module 5 and central authorities' repairing scheduling computing machine 6, inductor module 1 is connected by communication by Analog input mModule and microprocessor 2, GPS sending module 3 and microprocessor 2 are connected by communication, spare emergent power source 4 is respectively inductor module 1, Analog input mModule, microprocessor 2 and GPS sending module 3 are powered, central authorities' repairing scheduling computing machine 6 is connected with GPS sending module 3 wireless telecommunications by GPS receiver module 5, described auxiliary rush repair equipment exports utility outlets 8 by emergency light group 7 and emergency power pack, described emergency light group 7 and emergency power pack export utility outlets 8 and are electrically connected with spare emergent power source 4 respectively.
Described spare emergent power source 4 is lithium battery groups, and described lithium battery group is by the power taking of power distribution network body or by solar energy photovoltaic panel power taking.
Described using method comprises the following steps:
A. described power distribution network repairing location and auxiliary rush repair equipment are arranged near the vitals such as the shaft tower of power distribution network body and substation transformer, when power-off or other abnormal conditions appear in power distribution network, GPS sending module 3 sends elaborate position signal and abnormal current data to GPS receiver module 5;
B. the display screen of central authorities' repairing scheduling computing machine 6 demonstrates the particular location at the power distribution network position of breaking down, and staff has been with corresponding repairing instrument to rush for trouble spot according to shown position and the corresponding repair personnel of abnormal current data placement;
C. in repair personnel's repairing process, emergency light group 7 pairs of fault zones can be opened and throw light on, also export utility outlets 8 power taking, to use some to need the repairing instrument of electricity consumption by emergency power pack.
Also have antirust explosion-proof housing 9, described power distribution network repairing location and auxiliary rush repair equipment are encapsulated in antirust explosion-proof housing.
Working method and principle: in the circuit in power distribution network, electric current occurs abnormal, inductor module 1 induction current change in real time, when variable quantity exceedes set threshold values, trigger GPS sending module 3 and send elaborate position signal and abnormal current data to GPS receiver module 5, start the spare emergent power source 4 of Full Charge Capacity simultaneously, spare emergent power source 4 keeps electricity sufficient when circuit is normal by the power taking of power distribution network body or by solar energy photovoltaic panel power taking, the display screen of central authorities' repairing scheduling computing machine 6 demonstrates the particular location at the power distribution network position of breaking down and fault to be correlated with inductive data, staff has been with corresponding repairing instrument to rush for trouble spot according to shown position and the corresponding repair personnel of abnormal current data placement, the power supply that relying on emergency light group 7 and emergency power pack to export utility outlets 8 provides carries out rush repair to fault, power distribution network repairing location and auxiliary rush repair equipment are encapsulated in antirust explosion-proof housing, can serviceable life of effective extension device.

Claims (4)

1. a power distribution network repairing location and auxiliary rush repair equipment, comprise power distribution network body, described power distribution network body is primarily of cable, shaft tower and substation transformer composition, it is characterized in that described power distribution network repairing location and auxiliary rush repair equipment comprise locating device and auxiliary rush repair equipment, described locating device comprises the inductor module (1) for responding to power distribution network electric current, Analog input mModule, microprocessor (2), GPS sending module (3), spare emergent power source (4), GPS receiver module (5) and central authorities' repairing scheduling are with computing machine (6), inductor module (1) is connected by communication by Analog input mModule and microprocessor (2), GPS sending module (3) and microprocessor (2) are connected by communication, spare emergent power source (4) is respectively inductor module (1), Analog input mModule, microprocessor (2) and GPS sending module (3) power supply, central authorities' repairing scheduling computing machine (6) is connected with GPS sending module (3) wireless telecommunications by GPS receiver module (5), described auxiliary rush repair equipment exports utility outlets (8) by emergency light group (7) and emergency power pack, described emergency light group (7) and emergency power pack export utility outlets (8) and are electrically connected with spare emergent power source (4) respectively.
2. a kind of power distribution network repairing location according to claim 1 and auxiliary rush repair equipment, is characterized in that described spare emergent power source (4) is lithium battery group, and described lithium battery group is by the power taking of power distribution network body or by solar energy photovoltaic panel power taking.
3. a kind of power distribution network repairing location according to claim 1 and auxiliary rush repair equipment, is characterized in that antirust explosion-proof housing (9) in addition, and described power distribution network repairing location and auxiliary rush repair equipment are encapsulated in antirust explosion-proof housing.
4. a using method for power distribution network repairing location and auxiliary rush repair equipment, is characterized in that described using method comprises the following steps:
A. described power distribution network repairing location and auxiliary rush repair equipment are arranged near the vitals such as the shaft tower of power distribution network body and substation transformer, when power-off or other abnormal conditions appear in power distribution network, GPS sending module (3) sends elaborate position signal and abnormal current data to GPS receiver module (5);
B. the display screen of central authorities' repairing scheduling computing machine (6) demonstrates the particular location at the power distribution network position of breaking down, and staff has been with corresponding repairing instrument to rush for trouble spot according to shown position and the corresponding repair personnel of abnormal current data placement;
C. in repair personnel's repairing process, emergency light group (7) can be opened and thrown light in fault zone, also export utility outlets 8 power taking, to use some to need the repairing instrument of electricity consumption by emergency power pack.
CN201510538497.7A 2015-08-28 2015-08-28 Positioning and auxiliary emergency repair device for emergency maintenance of power distribution network, and application method Pending CN105137284A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510538497.7A CN105137284A (en) 2015-08-28 2015-08-28 Positioning and auxiliary emergency repair device for emergency maintenance of power distribution network, and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510538497.7A CN105137284A (en) 2015-08-28 2015-08-28 Positioning and auxiliary emergency repair device for emergency maintenance of power distribution network, and application method

Publications (1)

Publication Number Publication Date
CN105137284A true CN105137284A (en) 2015-12-09

Family

ID=54722699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510538497.7A Pending CN105137284A (en) 2015-08-28 2015-08-28 Positioning and auxiliary emergency repair device for emergency maintenance of power distribution network, and application method

Country Status (1)

Country Link
CN (1) CN105137284A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106443364A (en) * 2016-11-17 2017-02-22 济南龙航电力设备有限公司 Active distribution network maintenance system
CN113809984A (en) * 2021-09-16 2021-12-17 国网吉林省电力有限公司长春供电公司 Method for realizing automatic tracking and self-power taking of distribution transformation variation in digital distribution area
CN114280424A (en) * 2021-12-30 2022-04-05 山西恒运售电有限公司 Power failure positioning system for power line repair

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204142367U (en) * 2014-04-29 2015-02-04 山西省电力公司太原供电分公司 A kind of substation transformer temperature anomaly warning system with remote notification function
CN204439779U (en) * 2014-11-15 2015-07-01 卿三光 A kind of high voltage distribution line failure is reported to the police and is indicated locating device
CN204964681U (en) * 2015-08-28 2016-01-13 国家电网公司 Distribution network is salvageed with location and supplementary equipment of salvageing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204142367U (en) * 2014-04-29 2015-02-04 山西省电力公司太原供电分公司 A kind of substation transformer temperature anomaly warning system with remote notification function
CN204439779U (en) * 2014-11-15 2015-07-01 卿三光 A kind of high voltage distribution line failure is reported to the police and is indicated locating device
CN204964681U (en) * 2015-08-28 2016-01-13 国家电网公司 Distribution network is salvageed with location and supplementary equipment of salvageing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王承宇等: "GPS技术在断路器控制器中的应用", 《化工自动化及仪表》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106443364A (en) * 2016-11-17 2017-02-22 济南龙航电力设备有限公司 Active distribution network maintenance system
CN113809984A (en) * 2021-09-16 2021-12-17 国网吉林省电力有限公司长春供电公司 Method for realizing automatic tracking and self-power taking of distribution transformation variation in digital distribution area
CN114280424A (en) * 2021-12-30 2022-04-05 山西恒运售电有限公司 Power failure positioning system for power line repair

Similar Documents

Publication Publication Date Title
CN201637791U (en) Online monitoring system for high-voltage shunt capacitor
CN107370201B (en) Direct-current power supply system based on storage battery series-parallel combination
CN101237157A (en) Contact type energy-saving high-frequency switch DC power system
CN202602134U (en) Portable DC system load transfer auxiliary tank
CN110588412A (en) Electric automobile modularization fills electric pile system
CN202929154U (en) Line fault indicator and a line fault online monitoring system
CN105137284A (en) Positioning and auxiliary emergency repair device for emergency maintenance of power distribution network, and application method
CN202903947U (en) Line fault indicator
CN202050288U (en) Distributed direct current power supply uninterrupted power supply system
CN103457358A (en) Power distribution equipment working condition on-line monitoring and early-warning system
CN204721106U (en) Based on the power transmission line overhead ground wire electromagnetism energy taking device of super capacitor
CN201673232U (en) High voltage transmission line intelligent monitoring terminal
CN205283260U (en) Online monitored control system of power module based on cloud ware
CN106707368B (en) Novel power supply mode's transmission line environment meteorological monitoring device
CN202978733U (en) Power distribution network device
CN204964681U (en) Distribution network is salvageed with location and supplementary equipment of salvageing
CN102570597A (en) Remote monitoring system of direct current power supply
CN106990329A (en) A kind of distribution line dead electricity alarm signal harvester
CN206804794U (en) A kind of distribution line dead electricity alarm signal harvester
CN203166587U (en) Solar energy storage power supply system
CN202602351U (en) Time sharing power supply energy storage system for residence
CN202134946U (en) Battery remote control system
CN203813535U (en) Power supply device used for electricity larceny prevention inspection device
CN202978436U (en) Remote automatic control system applied to distribution circuit
CN202749903U (en) Power distributor for communication data center machine room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151209