CN105135143B - A kind of freezing prevention tubing water trap and its application method - Google Patents

A kind of freezing prevention tubing water trap and its application method Download PDF

Info

Publication number
CN105135143B
CN105135143B CN201510339653.7A CN201510339653A CN105135143B CN 105135143 B CN105135143 B CN 105135143B CN 201510339653 A CN201510339653 A CN 201510339653A CN 105135143 B CN105135143 B CN 105135143B
Authority
CN
China
Prior art keywords
piston
control valve
pipeline
bleed valve
freezing prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510339653.7A
Other languages
Chinese (zh)
Other versions
CN105135143A (en
Inventor
江龙红
王骏驰
王玉元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Group Co Ltd SISG
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201510339653.7A priority Critical patent/CN105135143B/en
Publication of CN105135143A publication Critical patent/CN105135143A/en
Application granted granted Critical
Publication of CN105135143B publication Critical patent/CN105135143B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/07Arrangement or mounting of devices, e.g. valves, for venting or aerating or draining

Abstract

The invention discloses a kind of freezing prevention tubing water trap and method, it is characterised in that including bleed valve, described bleed valve includes overcoat;Outer casing inner wall top coordinates is combined with pressure adjusting nut provided with piston, lower thread, and pressure adjusting nut is provided with the through hole for emptying;Spring is provided between pressure adjusting nut and piston;It is provided with and is used for and piston bottom surface and spacing inner ring above outer casing inner wall, pressure adjustment bolt;The top of inner ring, overcoat wall are provided with the connection floss hole communicated with overcoat inner chamber;Connector is connected with floss hole;Described freezing prevention tubing water trap also includes venting control valve, and one end of venting control valve connects with pipeline communication, the other end with above-mentioned connector;After above-mentioned bleed valve upper end connection control valve with pipeline communication;Compared with prior art, solve the problems, such as the ponding of ponding inside discharge tube during the stoppage in transit maintenance of severe cold weather lower water-supply-pipe road, prevent from increasing supplementary maintenance expense, the labor intensity for reducing personnel and operating risk after freezing pipeline, saved the repair time.

Description

A kind of freezing prevention tubing water trap and its application method
Technical field
The invention is related to a kind of freezing prevention tubing water trap and its application method.
Background technology
In modern industry, neither one industrial department be it is dry, also without one industry get along well water directly or Connect and be related, more industrial utilization water come cooling device or product cooling, and each factory is tieed up using the various effects of water The normal production of shield, antifreeze waterpipe is also a content very intractable in routine work.
In order to make in pipeline immobilising water not freeze freezing pipeline in severe cold season, two kinds of solution party are typically taken Method:
One kind is to increase insulation material in pipeline external, and water temperature in pipeline can be made to keep above freezing in the short time, prevented Volume produces expansion tear bad tube wall after water freezing, undesirable the effect of this method if water does not flow for a long time in pipeline;
Another method is the low spot in pipeline tendency, i.e., the position welding wire head installation row of water can be stockpiled after cutting off the water Water valve, pipeline can be emptied, laid due to pipeline is influenceed by physical features factor and other constructions, and ups and downs, this just needs The welded and installed draining valve at the pipeline of all remaining water, quantity is various, and some is dead between pipeline and valve Pool, it is easily caused icing failure.
Water pipeline is because aerial or buried-pipe laying, and outside have heat-insulation layer, so daily point inspection can only be by estimating and estimating Meter, accuracy is extremely low, only relies on scheduled overhaul to complete conventional maintenance be extremely difficult, leakage occurs unavoidably, and other Reason needs to cut off supply channel, the water in pipeline is lost pressure in not flow regime.
Only needing disengagement failure point upland water can in 0 DEG C of weather temperature >, during handling failure, easily processing is asked Topic, but also need to empty residual ponding in all pipelines of cutting off the water in time after severe cold season, closing upper water, now uniquely rely on Manual operation completes pipe drainage task, not only wastes time and energy, and the aerial laying of many pipelines, higher apart from ground, manually Job safety risk is larger, so the unartificial draining of pipeline progress to maintenance of cutting off the water is necessary.
The content of the invention
To solve the above problems, the invention provides a kind of freezing prevention tubing water trap and its application method, pass through setting Bleed valve, discharge tube inner product water problems when solving the stoppage in transit maintenance of severe cold weather lower water-supply-pipe road, meanwhile, prevent freezing pipe Increase supplementary maintenance expense behind road, reduce the labor intensity and operating risk of personnel, saved the repair time.
To reach above-mentioned purpose, the invention solves by the following technical programs:
A kind of freezing prevention tubing water trap, it is characterised in that including bleed valve, described bleed valve includes overcoat;In overcoat Wall top coordinates is combined with pressure adjusting nut provided with piston, lower thread, and pressure adjusting nut is provided with logical for what is emptied Hole;Spring is provided between pressure adjusting nut and piston;It is provided with and is used for and piston bottom surface above outer casing inner wall, pressure adjustment bolt Cooperation and spacing inner ring;The top of inner ring, overcoat wall are provided with the connection floss hole communicated with overcoat inner chamber;With floss hole It is connected with connector;Described freezing prevention tubing water trap also includes venting control valve, one end of venting control valve and pipeline Connection, the other end connect with above-mentioned connector;After above-mentioned bleed valve upper end connection control valve with pipeline communication.
Preferably, it is described outer to put provided with a fixing bolt.
Preferably, the upper surface of inner ring is provided with the sealing ring with piston bottom surface.
Preferably, the periphery of piston is provided with sealing ring.
Preferably, piston and pressure adjustment block are provided with guide pad corresponding with spring.
Preferably, bleed valve is integral by being threadedly coupled with control valve.
Preferably, bleed valve is connected with venting control valve by union, and union horizontal component is in be horizontally mounted or by draining Control valve to bleed valve direction is in the tendency gradually reduced, is connected by connector with the discharge connector of bleed valve.
A kind of freezing prevention tubing water discharge method, after above-mentioned connected mode;
Manifold pressure is normal, i.e., pipeline normal use when, water under high pressure in pipeline by control valve, enter excretion Valve, water under high pressure push down on piston, piston and inner ring seal, and water under high pressure enters excretion after discharge connector, connector Control valve simultaneously finally flows back to pipeline;
When overpressure is reduced, it is necessary to during draining, the low pressure water in pipeline is through controlling bleed valve, connector, discharge to connect Mouth is entered in the chamber below the piston position of venting control valve, and is passed through the emptying through hole on pressure adjusting nut and discharged.
The operation principle and beneficial effect of the invention are shown:
The invention device includes note bleed valve, venting control valve, control valve, union, chaining part and connecting pipe.
The critical piece of the invention is bleed valve, and it plays a part of a branch leading, passes through connection under high pressure Pipe communicates with pipeline, is not used in draining;Under low pressure, water can be discharged by bleed valve.
Described bleed valve includes outer tube, piston, pressure adjusting nut, spring, discharge connector and connector.
Its middle external tube, piston, spring, pressure adjusting nut are used to adjust pressure, meet piston can be promoted to enter under high pressure Row moves, and is not enough to promote piston movement under low pressure.
Whether piston, which is promoted, forms two kinds of mode of communicating:
Mode one:It is exactly under high pressure, promotes piston, piston is in below discharge connector, will be controlled by discharging connector Valve processed is turned on venting control valve, and water under high pressure is back in pipeline;
Mode two:It is exactly under low pressure, is not enough to promote piston, piston is in more than discharge connector, connected by discharging Mouthful, by the channel conductive on venting control valve, bleed valve, pressure adjusting nut, so as to realize the discharge of low pressure water.
Bleed valve is integral by being threadedly coupled with control valve, and the connecting pipe by being added on pipeline couples with pipeline. The horizontal component of union is in be horizontally mounted or by venting control valve to bleed valve direction in the tendency gradually reduced, passes through connector It is connected with the discharge connector of bleed valve.
When the fluid pressure in pipeline is reduced to setting discharge value, the water in pipeline flows through convergence piece, excretion control Valve, union and bleed valve discharge.When convergence piece in the device is needed installed in the low spot, i.e. service conduits draining of pipeline tendency Low dot location.
To sum up, it is the advantages of this equipment:
1st, the labor intensity and operating risk of operating personnel can be reduced.
2nd, there is no slough in the present apparatus, will not freeze to fail due to severe cold season.
3rd, the spring adjustment that the present apparatus is taken, can arbitrarily adjust discharge pressure as needed.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawings can also be obtained according to these accompanying drawings;
Fig. 1 is draining control valve scheme of installation;
Fig. 2 is bleed valve insight structural map;
Fig. 3 is the front view of discharge pressure adjusting nut;
Fig. 4 is the side view of discharge pressure adjusting nut;
Fig. 5 is the front view of overcoat;
Fig. 6 is the side view of overcoat;
In figure:1st, bleed valve 2, venting control valve 3, control valve 4, union 5, convergence piece 6, pipeline 7, connecting pipe 8th, discharge connector 9, overcoat 10, piston 11, " O " type sealing ring 12, spring 13, fixing bolt 14, spring cavity 15, Pressure adjusting nut 16, connector 17, discharge port.
Embodiment
The correlation technique content do not addressed below can use or use for reference prior art.
In order that those skilled in the art more fully understand the technical scheme in the application, it is real below in conjunction with the application The accompanying drawing in example is applied, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described implementation Example only some embodiments of the present application, rather than whole embodiments.It is common based on the embodiment in the application, this area The every other embodiment that technical staff is obtained under the premise of creative work is not made, it should all belong to the application protection Scope.
A kind of freezing prevention tubing water trap, including bleed valve 1, described bleed valve include overcoat 9;Overcoat 9 in the present embodiment For cylindrical tube shape structure.Shown in Fig. 2.
Outer casing inner wall top coordinates is combined with pressure adjusting nut 15, pressure adjusting nut provided with piston 10, lower thread 15 are provided with through hole --- the discharge port 17 for emptying.
Spring 12 is provided between pressure adjusting nut 15 and piston 10;It is provided with and uses above outer casing inner wall, pressure adjustment bolt In with piston bottom surface and spacing inner ring 18;
The top of inner ring, overcoat wall are provided with the connection floss hole 8 communicated with overcoat inner chamber;It is provided with discharge connector 8 Connector 16.
Described freezing prevention tubing water trap also includes venting control valve 2, and one end of venting control valve 2 passes through convergence piece 5 Connected with pipeline 6, the other end is connected by union 4 with above-mentioned connector 16;After above-mentioned bleed valve upper end connection control valve 3 Connected by connecting pipe 7 with pipeline 6, shown in Fig. 2.
The fixed form of pressure adjusting nut 15 is as follows:A fixing bolt 13, fixing bolt are provided with described overcoat 9 13, preferably along the radial direction of overcoat 9, fixed effect are played for top pressure pressure adjusting nut 15.
To ensure to seal, the present embodiment also takes following sealing structure:
The upper surface of inner ring 18 is provided with " O " the type sealing ring 11 with piston bottom surface;It is provided with the periphery of piston 10 close Seal.
To ensure the compression of spring and guiding, the present embodiment is provided with corresponding with spring on piston and pressure adjustment block Guide pad, inner ring and pressure adjusting nut 15 directly form spring cavity 14.
In the present embodiment, bleed valve 1 is integral by being threadedly coupled with control valve 3.
Bleed valve is connected with venting control valve by union, union horizontal component in be horizontally mounted or by venting control valve extremely Bleed valve direction is in the tendency gradually reduced, is connected by connector with the discharge connector of bleed valve.
Manifold pressure is normal, i.e., pipeline normal use when, water under high pressure in pipeline by control valve, enter excretion Valve, water under high pressure push down on piston, piston and inner ring seal, and water under high pressure enters excretion after discharge connector, connector Control valve simultaneously finally flows back to pipeline;
When overpressure is reduced, it is necessary to during draining, the low pressure water in pipeline is through controlling bleed valve, connector, discharge to connect Mouth is entered in the chamber below the piston position of venting control valve, and is passed through the emptying through hole on pressure adjusting nut and discharged.
In use, rotational pressure adjusting nut 15 first, it is ensured that the expansion force of the spring 12 after adjustment can be in pipeline Piston 10 is promoted to move upwards when pressure is reduced to required value, be tightened bolt 13.After each part connection in Fig. 1, Venting control valve 2 is opened after opening control valve 3, the device puts into operation.When manifold pressure reaches the value of requirement discharge, Piston 10 moves upwards in the presence of spring 12, the liquid in pipeline 6 flow through convergence piece 5, venting control valve 2, union 4, Connector 16 and discharge connector 8 are finally flowed out to spring cavity 14 by the discharge port 17 above pressure adjusting nut 6.Work as pipeline When interior pressure gradually rises and is more than discharge pressure, piston 10 can move downward in the presence of fluid pressure, and final piston 10 lower surface is in contact and compressed with " O " type sealing ring 11, produces sealing function.The water on the top of piston 10 connects by discharge Mouth 8, connector 16, union 4, control bleed valve 2 and convergence piece 5 enter pipeline 6, form flowing.
Installation method
The connecting pipe 7 that bleed valve 1 adds by control valve 3 and on pipeline couples with pipeline 6.The horizontal part of union 4 Divide in being horizontally mounted or by venting control valve 2 to bleed valve direction in the tendency gradually reduced, pass through connector 16 and discharge company Interface 8 connects bleed valve 1.When the fluid pressure in pipeline 1 is reduced to discharge value, the water in pipeline flows through convergence piece 5, row Control valve 2, union 4 and bleed valve 1 is let out to discharge.When the device is needed installed in the low spot, i.e. service conduits draining of pipeline tendency Low dot location.
Described above is only the preferred embodiment of the application, is made skilled artisans appreciate that or realizing this Shen Please.A variety of modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can be realized in other embodiments in the case where not departing from spirit herein or scope.Therefore, the application The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (8)

1. a kind of freezing prevention tubing water trap, it is characterised in that including bleed valve, described bleed valve includes overcoat;Outer casing inner wall Top coordinates is combined with pressure adjusting nut provided with piston, lower thread, and pressure adjusting nut is provided with the through hole for emptying; Spring is provided between pressure adjusting nut and piston;It is provided with above outer casing inner wall, pressure adjustment bolt and is used to match somebody with somebody with piston bottom surface Conjunction and spacing inner ring;The top of inner ring, overcoat wall are provided with the connection floss hole communicated with overcoat inner chamber;Connect with floss hole It is equipped with connector;Described freezing prevention tubing water trap also includes venting control valve, and one end and the pipeline of venting control valve connect The logical, other end connects with above-mentioned connector;After above-mentioned bleed valve upper end connection control valve with pipeline communication.
2. freezing prevention tubing water trap according to claim 1, it is characterised in that described outer to put provided with a fixed spiral shell Bolt.
3. freezing prevention tubing water trap according to claim 1, it is characterised in that the upper surface of inner ring is provided with and piston bottom surface The sealing ring of cooperation.
4. freezing prevention tubing water trap according to claim 1, it is characterised in that the periphery of piston is provided with sealing ring.
5. freezing prevention tubing water trap according to claim 1, it is characterised in that piston and pressure adjustment block be provided with Guide pad corresponding to spring.
6. freezing prevention tubing water trap according to claim 1, it is characterised in that bleed valve is with control valve by being threadedly coupled into One.
7. freezing prevention tubing water trap according to claim 1, it is characterised in that bleed valve passes through union with venting control valve Connection, union horizontal component are in be horizontally mounted or by venting control valve to bleed valve direction in the tendency gradually reduced, pass through company Joint is connected with the discharge connector of bleed valve.
8. a kind of freezing prevention tubing water discharge method, it is characterised in that after the connected mode of claim 1;
Manifold pressure is normal, i.e., pipeline normal use when, water under high pressure in pipeline by control valve, enter bleed valve, it is high Pressure water pushes down on piston, piston and inner ring seal, and water under high pressure enters venting control valve after discharge connector, connector And finally flow back to pipeline;
When overpressure is reduced, it is necessary to during draining, the low pressure water in pipeline is through controlling bleed valve, connector, discharge connector to enter Enter into the chamber below the piston position of venting control valve, and discharged by the emptying through hole on pressure adjusting nut.
CN201510339653.7A 2015-06-18 2015-06-18 A kind of freezing prevention tubing water trap and its application method Active CN105135143B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510339653.7A CN105135143B (en) 2015-06-18 2015-06-18 A kind of freezing prevention tubing water trap and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510339653.7A CN105135143B (en) 2015-06-18 2015-06-18 A kind of freezing prevention tubing water trap and its application method

Publications (2)

Publication Number Publication Date
CN105135143A CN105135143A (en) 2015-12-09
CN105135143B true CN105135143B (en) 2017-12-05

Family

ID=54720609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510339653.7A Active CN105135143B (en) 2015-06-18 2015-06-18 A kind of freezing prevention tubing water trap and its application method

Country Status (1)

Country Link
CN (1) CN105135143B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909211B (en) * 2016-04-19 2018-02-23 张化庆 Test strobe defroster
CN106193193B (en) * 2016-08-27 2018-06-15 周全 Fire hydrant stagnant water circulator
CN108487376B (en) * 2018-06-19 2023-11-24 芜湖华衍水务有限公司 Pipeline frost crack protection device
CN109826594B (en) * 2019-01-28 2021-05-25 河北宏龙环保科技有限公司 Casing gas collection device and using method
CN112431985B (en) * 2019-08-16 2022-11-22 合肥源康信息科技有限公司 Pipe line fluid turbulence restraining device
CN111486292B (en) * 2020-04-07 2021-12-07 台州市华丰空调阀门有限公司 Anti-freezing pipeline
CN116447759B (en) * 2023-06-16 2023-08-22 雅安市弘利展化工有限公司 Fluid heater and fluid temperature control equipment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2614669B1 (en) * 1987-04-29 1989-07-13 Gratzmuller Claude THREE-WAY HYDRAULIC VALVE
CN2041385U (en) * 1988-08-31 1989-07-19 李建国 Automatic draining valve
DE4442444A1 (en) * 1994-11-29 1996-05-30 Sisto Armaturen Sa Valve for self=activated emptying of pipeline
CN101424465B (en) * 2008-12-11 2011-01-19 浙江春晖智能控制股份有限公司 Self-powering three-way change valve
CN201487533U (en) * 2009-08-05 2010-05-26 深圳市兰科环境技术有限公司 Air passage drain valve

Also Published As

Publication number Publication date
CN105135143A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105135143B (en) A kind of freezing prevention tubing water trap and its application method
CN102679149B (en) Gas cylinder integrated valve for automotive liquefied natural gas
CN104405973B (en) Flange steel-plastic multiple tube regulates short tube
CN105402603A (en) Ground gathering and transferring system applicable to shale gas and tight gas
CN201326870Y (en) Leak-proof hood of operating pressure pipeline
CN210800426U (en) Water seal device for gas pipeline
CN216974798U (en) But remote intelligent control's glib manifold
CN201954259U (en) Water seal drainage sealed can device
CN209130369U (en) A kind of oil pipeline receiving ball tube automatic exhaust device
CN113003011B (en) Rainwater foam liquid diversion device for oil tank sump
CN209293752U (en) Storm valve oil return hazardous gas separator
CN206897163U (en) A kind of desulphurization system absorption tower and the attachment means of the outer stock tank of tower
CN113251319A (en) Coal gas drainage device and use method thereof
CN209196373U (en) A kind of petroleum pipeline valve attachment device
CN208397005U (en) A kind of external pressure inlet of liquid conveying
CN116398109B (en) One-stop type multifunctional skid-mounted natural gas wellhead treatment system
CN220321067U (en) Condensed water drainage system of gas conveying pipeline
CN205824302U (en) A kind of fire-fighting drain valve
CN206112519U (en) Ou ye stove high -pressure gas system water discharge control means
CN208845900U (en) A kind of Lined Pipeline port connecting structure
CN208858622U (en) Power Plant Feedwater pump seal water return water system
CN203297944U (en) Blowdown apparatus for pipelines
CN213979123U (en) Municipal building engineering water saving fixtures
CN218281114U (en) Spraying system for limestone production line
CN108953812A (en) A kind of threeway and preparation method thereof for exhaust-gas treatment air-line system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant