CN105119746A - RMC-management-based method for intelligently monitoring configuration of SMART RACK whole cabinet server - Google Patents

RMC-management-based method for intelligently monitoring configuration of SMART RACK whole cabinet server Download PDF

Info

Publication number
CN105119746A
CN105119746A CN201510533695.4A CN201510533695A CN105119746A CN 105119746 A CN105119746 A CN 105119746A CN 201510533695 A CN201510533695 A CN 201510533695A CN 105119746 A CN105119746 A CN 105119746A
Authority
CN
China
Prior art keywords
rmc
server
management
configuration information
configuration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510533695.4A
Other languages
Chinese (zh)
Inventor
穆德学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Electronic Information Industry Co Ltd
Original Assignee
Inspur Electronic Information Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Electronic Information Industry Co Ltd filed Critical Inspur Electronic Information Industry Co Ltd
Priority to CN201510533695.4A priority Critical patent/CN105119746A/en
Publication of CN105119746A publication Critical patent/CN105119746A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides an RMC-management-based method for intelligently monitoring configuration of a SMART RACK whole cabinet server. In a configuration management module design of the Smart Rack whole cabinet server, an RMC adopts a first-time power-on self test, the correctness of the configuration information is manually judged, and the configuration information is stored if the configuration information is correct; and then, in the operating process of the Smart Rack whole cabinet server, the RMC monitors the configuration of the Smart Rack whole cabinet server in real time, and compares the configuration with the stored configuration information, finally, the server is operated normally if the information is consistent, and the RMC continues to monitor, and the server is operated abnormally while the information is different, and the RMC sends an alarm to a user. Compared with the prior art, the RMC-management-based method of the invention stores the configuration information of the server via the manner of the power on self test to effectively solve the problem that the RMC needs to be independently developed for different service configurations, and achieves effective monitoring to the operating state of the server by sensing and comparing the configuration information of the server in real time.

Description

A kind of method of the SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management
Technical field
The present invention relates to consumer electronics industry technical field, the method for specifically a kind of SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management.
Background technology
Management mainboard (RMC) is the administrative center of large server SmartRack, is responsible for the management of system interior nodes, power management, fan management.Major design comprises the outband management of node based on IPMB specification, the function managements such as the management of AC/DC power supply based on PMBUS agreement, the adjustment of the rotation speed of the fan based on I2C and air quantity compensated regulation.Have employed the mode of classify management in management design, RMC is first order management, and in node, plate is second level management.Management system realizes the monitoring of system, management, alarm by RMC(), plate (realizing the out of band supervision of all nodes, classify management, alarm report, fan monitoring) in node, Node B MC(is integrated on each node, is responsible for the realtime monitoring, failure diagnosis, consumption detection etc. of subsystem irrespective of size) and the composition such as I2C, IPMB, supervising the network.RMC by board communications in I2C and node, by the monitoring to plate (classify management system) in 10 nodes, the monitoring of control realization whole system, management.In node, plate is interconnected by I2C/IPMB and BMC and the secondary power supply plate of each node, keyset of powering, fan control board, realizes the real-time monitoring outside the band of whole system, management function.BMC is connected by the monitored chip of multipath I 2 C bus and each intra-node, parts, responsible node asset management, monitors in real time, failure diagnosis.
Current SmartRackRMC exploitation, for different servers configuration exploitation separately, causes RMC overlapping development and the larger manpower of cost to go checking, safeguard.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of method of the SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management is provided.
Technical scheme of the present invention realizes in the following manner, and first, RMC is in the design of SmartRack whole machine cabinet server Configuration Manager, and take first time power-on self-test, manual confirmation configuration information correctly stores afterwards; Then, in SmartRack whole machine cabinet server running, RMC detecting real-time SmartRack whole machine cabinet server configure, and with store configuration information comparison; Finally, server normal operation when information is consistent, continue detecting, when information there are differences, server operation exception, sends warning to user.
Above-mentioned RMC design takes the mode of power-on self-test to store SmartRACK server configuration information.
Above-mentioned RMC design can detecting real-time SmartRACK server configuration information, and by information comparison monitoring server running status.
Advantage of the present invention is:
The method of a kind of SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management of the present invention compared to the prior art, by the mode storage server configuration information of power-on self-test, effectively solve the problem developing separately RMC for different service configuration, and realize the effective monitoring to operation condition of server by detecting real-time and comparison server configuration information.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of method of the SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management.
Embodiment
Be described in detail below below in conjunction with the method for accompanying drawing to a kind of SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management of the present invention.
As shown in Figure 1, the method of a kind of SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management of the present invention, first, RMC is in the design of SmartRack whole machine cabinet server Configuration Manager, take first time power-on self-test, manual confirmation configuration information correctly stores afterwards; Then, in SmartRack whole machine cabinet server running, RMC detecting real-time SmartRack whole machine cabinet server configure, and with store configuration information comparison; Finally, server normal operation when information is consistent, continue detecting, when information there are differences, server operation exception, sends warning to user.
RMC design takes the mode of power-on self-test to store SmartRACK server configuration information.
RMC design can detecting real-time SmartRACK server configuration information, and by information comparison monitoring server running status.
Its processing and fabricating of method of a kind of SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management of the present invention is very simple and convenient, can process to specifications shown in accompanying drawing.
Except the technical characteristic described in specification, be the known technology of those skilled in the art.

Claims (3)

1. the method based on the SMARTRACK whole machine cabinet server configuration intelligent monitoring of RMC management, it is characterized in that, first, RMC is in the design of SmartRack whole machine cabinet server Configuration Manager, take first time power-on self-test, manual confirmation configuration information correctly stores afterwards; Then, in SmartRack whole machine cabinet server running, RMC detecting real-time SmartRack whole machine cabinet server configure, and with store configuration information comparison; Finally, server normal operation when information is consistent, continue detecting, when information there are differences, server operation exception, sends warning to user.
2. the method for a kind of SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management according to claim 1, is characterized in that RMC design takes the mode of power-on self-test to store SmartRACK server configuration information.
3. the method for a kind of SMARTRACK whole machine cabinet server configuration intelligent monitoring based on RMC management according to claim 1, it is characterized in that RMC design can detecting real-time SmartRACK server configuration information, and by information comparison monitoring server running status.
CN201510533695.4A 2015-08-27 2015-08-27 RMC-management-based method for intelligently monitoring configuration of SMART RACK whole cabinet server Pending CN105119746A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510533695.4A CN105119746A (en) 2015-08-27 2015-08-27 RMC-management-based method for intelligently monitoring configuration of SMART RACK whole cabinet server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510533695.4A CN105119746A (en) 2015-08-27 2015-08-27 RMC-management-based method for intelligently monitoring configuration of SMART RACK whole cabinet server

Publications (1)

Publication Number Publication Date
CN105119746A true CN105119746A (en) 2015-12-02

Family

ID=54667644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510533695.4A Pending CN105119746A (en) 2015-08-27 2015-08-27 RMC-management-based method for intelligently monitoring configuration of SMART RACK whole cabinet server

Country Status (1)

Country Link
CN (1) CN105119746A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105354129A (en) * 2015-12-15 2016-02-24 山东海量信息技术研究院 Node management and asset management method for high-end fault-tolerant server
CN105487964A (en) * 2015-12-18 2016-04-13 山东海量信息技术研究院 Fan fault recording method of high-end fault-tolerant server
CN105511980A (en) * 2015-12-14 2016-04-20 山东海量信息技术研究院 Power failure recording method of high-end fault-tolerant server
CN106326050A (en) * 2016-08-18 2017-01-11 浪潮电子信息产业股份有限公司 Automatic monitoring and managing method for complete machine cabinet server
CN106371958A (en) * 2016-08-31 2017-02-01 浪潮电子信息产业股份有限公司 Server fault diagnosis system and method
CN110417590A (en) * 2019-07-23 2019-11-05 浪潮电子信息产业股份有限公司 Server configuration method, device, whole machine cabinet server and readable storage medium storing program for executing

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103412815A (en) * 2013-08-12 2013-11-27 浪潮电子信息产业股份有限公司 RMC software automated testing method mainly based on expect tool
US20140115353A1 (en) * 2012-10-19 2014-04-24 Dell Products, Lp System and Method for One-Line Power Mapping of Information Handling Systems in a Datacenter
CN103967823A (en) * 2014-05-27 2014-08-06 浪潮电子信息产业股份有限公司 Method for managing fan rotating speed of Smart Rack cabinet
CN104156292A (en) * 2014-08-04 2014-11-19 浪潮(北京)电子信息产业有限公司 Method for managing board cards in server and server
CN104317714A (en) * 2014-10-29 2015-01-28 浪潮电子信息产业股份有限公司 Method for automatically testing stability of rack based on expect
CN104407680A (en) * 2014-12-02 2015-03-11 浪潮电子信息产业股份有限公司 Management system based on overall cabinet nodes
CN104615447A (en) * 2015-03-12 2015-05-13 浪潮集团有限公司 Method for reusing monitor management software of server of whole-machine cabinet
CN104754035A (en) * 2015-03-06 2015-07-01 浪潮集团有限公司 Method for guaranteeing management mainboard time by virtue of cooperation of NTP and RTC chip
CN104820630A (en) * 2015-05-22 2015-08-05 上海新炬网络信息技术有限公司 System resource monitoring device based on business variable quantity

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140115353A1 (en) * 2012-10-19 2014-04-24 Dell Products, Lp System and Method for One-Line Power Mapping of Information Handling Systems in a Datacenter
CN103412815A (en) * 2013-08-12 2013-11-27 浪潮电子信息产业股份有限公司 RMC software automated testing method mainly based on expect tool
CN103967823A (en) * 2014-05-27 2014-08-06 浪潮电子信息产业股份有限公司 Method for managing fan rotating speed of Smart Rack cabinet
CN104156292A (en) * 2014-08-04 2014-11-19 浪潮(北京)电子信息产业有限公司 Method for managing board cards in server and server
CN104317714A (en) * 2014-10-29 2015-01-28 浪潮电子信息产业股份有限公司 Method for automatically testing stability of rack based on expect
CN104407680A (en) * 2014-12-02 2015-03-11 浪潮电子信息产业股份有限公司 Management system based on overall cabinet nodes
CN104754035A (en) * 2015-03-06 2015-07-01 浪潮集团有限公司 Method for guaranteeing management mainboard time by virtue of cooperation of NTP and RTC chip
CN104615447A (en) * 2015-03-12 2015-05-13 浪潮集团有限公司 Method for reusing monitor management software of server of whole-machine cabinet
CN104820630A (en) * 2015-05-22 2015-08-05 上海新炬网络信息技术有限公司 System resource monitoring device based on business variable quantity

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105511980A (en) * 2015-12-14 2016-04-20 山东海量信息技术研究院 Power failure recording method of high-end fault-tolerant server
CN105354129A (en) * 2015-12-15 2016-02-24 山东海量信息技术研究院 Node management and asset management method for high-end fault-tolerant server
CN105487964A (en) * 2015-12-18 2016-04-13 山东海量信息技术研究院 Fan fault recording method of high-end fault-tolerant server
CN106326050A (en) * 2016-08-18 2017-01-11 浪潮电子信息产业股份有限公司 Automatic monitoring and managing method for complete machine cabinet server
CN106371958A (en) * 2016-08-31 2017-02-01 浪潮电子信息产业股份有限公司 Server fault diagnosis system and method
CN110417590A (en) * 2019-07-23 2019-11-05 浪潮电子信息产业股份有限公司 Server configuration method, device, whole machine cabinet server and readable storage medium storing program for executing

Similar Documents

Publication Publication Date Title
CN105119746A (en) RMC-management-based method for intelligently monitoring configuration of SMART RACK whole cabinet server
Wu et al. Dynamo: Facebook's data center-wide power management system
US10429914B2 (en) Multi-level data center using consolidated power control
US10067523B2 (en) Data center power conversion efficiency management
US9665148B2 (en) PoE power distribution system for PoE-powered port extender having multiple data and power inputs
CN101111981B (en) Mapping power system components
CN108919935A (en) A kind of monitoring method, device and the equipment of the power supply being directed on server master board
CN104598329A (en) Automatic BMC (baseboard management controller) fault solution method based on RMC (rack server management center) management
CN106774752A (en) A kind of Rack servers spare fans control method
CN105867572A (en) Power supply managing method for rack server and rack server
CN104049709A (en) Power management method of server system
US8751847B2 (en) Method and system for detecting whether a computer server has shut down gracefully
CN104216497A (en) Power supply fault detection device and method
CN107632907B (en) BMC chip hosting system and control method thereof
US20180120914A1 (en) Unified power device management and analyzer
CN106445055A (en) Power supply protection mechanism of Rack server
CN105425932A (en) Management method and system for whole cabinet sever power source
CN112667470A (en) System, method and medium for evaluating and detecting server power
US9886082B2 (en) Power protection and remediation
CN106502355A (en) A kind of Rack server power supplies inlet temperature acquisition methods
US11126255B1 (en) Power throttling based on input voltage monitoring
US10481663B2 (en) Managing the operation of power supply units (PSUs)
CN113176982A (en) Device and method for realizing VPX architecture-based chassis management system
CN106095642A (en) A kind of fan failure solution based on RMC management
US11733762B2 (en) Method to allow for higher usable power capacity in a redundant power configuration

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151202

RJ01 Rejection of invention patent application after publication