CN105117834A - A data processing method and apparatus - Google Patents

A data processing method and apparatus Download PDF

Info

Publication number
CN105117834A
CN105117834A CN201510502391.1A CN201510502391A CN105117834A CN 105117834 A CN105117834 A CN 105117834A CN 201510502391 A CN201510502391 A CN 201510502391A CN 105117834 A CN105117834 A CN 105117834A
Authority
CN
China
Prior art keywords
item information
destination item
result data
execution result
monitored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510502391.1A
Other languages
Chinese (zh)
Inventor
陈墨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510502391.1A priority Critical patent/CN105117834A/en
Publication of CN105117834A publication Critical patent/CN105117834A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a data processing method and apparatus The data processing method comprises steps of obtaining target project information of a to-be-monitored object; obtaining execution result data of the to-be-monitored object in execution of the target project information; and carrying out monitoring of the execution result data. Through the invention, technical problems of low working efficiency of enterprises in related technology are solved.

Description

Data processing method and device
Technical field
The present invention relates to data processing field, in particular to a kind of data processing method and device.
Background technology
Along with improving constantly of the level of the productive forces, enterprise is more and more higher to the attention degree promoting work efficiency.The lifting of work efficiency can improve the market competitiveness of enterprise income and enterprise effectively.In order to increase work efficiency, prior art usually adopt lengthen working hours, increase the means such as headcount, but, above-mentioned means of increasing work efficiency are all to sacrifice enterprise's input cost for cost, and work efficiency lifting amplitude fluctuation is larger, the reliability of enterprise work efficiency cannot be ensured, enterprise development is caused to having a strong impact on.
For the inefficient problem of enterprise work in correlation technique, at present effective solution is not yet proposed.
Summary of the invention
Fundamental purpose of the present invention is to provide a kind of data processing method and device, to solve the inefficient technical matters of enterprise work in correlation technique.
To achieve these goals, according to an aspect of the present invention, a kind of data processing method is provided.This data processing method comprises: the destination item information obtaining object to be monitored; Obtain the execution result data of object performance objective project information to be monitored; And execution result data are monitored.
Further, after the destination item information obtaining object to be monitored, before the execution result data obtaining object performance objective project information to be monitored, this data processing method also comprises: judge that destination item information is whether satisfied first pre-conditioned; Judge destination item information meet first pre-conditioned time, performance objective project information; Judge destination item information do not meet first pre-conditioned time, modifying target project information; The execution result data obtaining object performance objective project information to be monitored comprise: obtain the execution result data that object to be monitored performs amended destination item information; Carry out monitoring to execution result data to comprise: treat the execution result data that monitoring target performs amended destination item information and monitor.
Further, destination item information comprises the objective result data that subject anticipates to be monitored completes, after the execution result data obtaining object performance objective project information to be monitored, before monitoring execution result data, this data processing method also comprises: obtain the data difference between execution result data and objective result data; Judge data difference whether within the scope of preset difference value; When decision data difference is not within the scope of preset difference value, adjustment aim project information; And again obtain the execution result data that object to be monitored performs the destination item information after adjusting, until the data difference between execution result data and objective result data is within the scope of preset difference value.
Further, carry out monitoring to execution result data to comprise: judge that whether execution result data meet second pre-conditioned; Predicated execution result data meet second pre-conditioned time, determine that the grade of destination item information is the first estate; Predicated execution result data meet second pre-conditioned time, determine that the grade of destination item information is the second grade, wherein, the grade of the first estate is higher than the second grade.
Further, after determining that the grade of destination item information is the second grade, this data processing method also comprises: destination item information is stored to presetting database; Detect and whether receive the information relevant to destination item information; If the information relevant to destination item information detected, the information that destination item information is relevant is stored to presetting database; And after Preset Time, according to destination item information and the information updating destination item information relevant to destination item information.
To achieve these goals, according to a further aspect in the invention, a kind of data processing equipment is provided.This data processing equipment comprises: the first acquiring unit, for obtaining the destination item information of object to be monitored; Second acquisition unit, for obtaining the execution result data of object performance objective project information to be monitored; And monitoring means, for monitoring execution result data.
Further, this data processing equipment also comprises: the first judging unit, first pre-conditioned for judging that whether destination item information meet; Performance element, for judge destination item information meet first pre-conditioned time, performance objective project information; Amendment unit, for judge destination item information do not meet first pre-conditioned time, modifying target project information; Second acquisition unit also performs the execution result data of amended destination item information for obtaining object to be monitored; Monitoring means also performs amended destination item information execution result data for treating monitoring target are monitored.
Further, destination item information comprises the objective result data that subject anticipates to be monitored completes, and this data processing equipment also comprises: the 3rd acquiring unit, for obtaining the data difference between execution result data and objective result data; Second judging unit, for judging data difference whether within the scope of preset difference value; Adjustment unit, for when decision data difference is not within the scope of preset difference value, adjustment aim project information; And the 4th acquiring unit, perform the execution result data of the destination item information after adjustment for again obtaining object to be monitored, until the data difference between execution result data and objective result data is within the scope of preset difference value.
Further, monitoring means comprises: judge module, second pre-conditioned for judging that whether execution result data meet; First determination module, for Predicated execution result data meet second pre-conditioned time, determine that the grade of destination item information is the first estate; Second determination module, for Predicated execution result data meet second pre-conditioned time, determine that the grade of destination item information is the second grade, wherein, the grade of the first estate is higher than the second grade.
Further, this data processing equipment also comprises: the first storage unit, for destination item information is stored to presetting database; Whether detecting unit, receive the information relevant to destination item information for detecting; Second storage unit, for when the information relevant to destination item information being detected, the information that destination item information is relevant is stored to presetting database; And updating block, for after Preset Time, according to destination item information and the information updating destination item information relevant to destination item information.
By the present invention, adopt following steps: the destination item information obtaining object to be monitored; Obtain the execution result data of object performance objective project information to be monitored; And execution result data are monitored.Be adopted as the mode of object target setting project information to be monitored, data are completed by monitor in object performance objective project information process to be monitored actual, reach promotion Staff activity, promote the object of work efficiency, and then solve the inefficient technical matters of enterprise work in correlation technique, reach the technique effect of enterprise work efficiency.
Accompanying drawing explanation
The accompanying drawing forming a application's part is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the process flow diagram of the data processing method according to the embodiment of the present invention;
Fig. 2 is the application schematic diagram of the data processing method according to the embodiment of the present invention; And
Fig. 3 is the schematic diagram of the data processing equipment according to the embodiment of the present invention.
Embodiment
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
The application's scheme is understood better in order to make those skilled in the art person, below in conjunction with the accompanying drawing in the embodiment of the present application, technical scheme in the embodiment of the present application is clearly and completely described, obviously, described embodiment is only the embodiment of the application's part, instead of whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all should belong to the scope of the application's protection.
It should be noted that, term " first ", " second " etc. in the instructions of the application and claims and above-mentioned accompanying drawing are for distinguishing similar object, and need not be used for describing specific order or precedence.Should be appreciated that the data used like this can be exchanged, in the appropriate case so that the embodiment of the application described herein.In addition, term " comprises " and " having " and their any distortion, intention is to cover not exclusive comprising, such as, contain those steps or unit that the process of series of steps or unit, method, system, product or equipment is not necessarily limited to clearly list, but can comprise clearly do not list or for intrinsic other step of these processes, method, product or equipment or unit.
According to embodiments of the invention, provide a kind of data processing method.
Fig. 1 is the process flow diagram of the data processing method according to the embodiment of the present invention.As shown in Figure 1, this data processing method comprises the following steps:
Step S101, obtains the destination item information of object to be monitored.
Step S102, obtains the execution result data of object performance objective project information to be monitored.
Step S103, monitors execution result data.
Pass through above-mentioned steps, can realize monitoring the data difference between the actual execution result data of object to be monitored in performance objective project information process and the objective result data in destination item information, this data difference of Real-Time Monitoring can promote work efficiency effectively, and then solves the inefficient problem of enterprise work in correlation technique.
Object to be monitored in the embodiment of the present invention can be one or more department in enterprise, also can be one or more employee, and choosing of object to be monitored can set according to enterprise practical demand.In order to the work efficiency of enterprise department or employee, the data processing method of this embodiment is that business enterprice sector or employee are preset with destination item information, wherein, the destination item that business enterprice sector or employee have expected in preset period of time is included in this destination item information, namely, destination item information comprises the objective result data that subject anticipates to be monitored completes, and these objective result data are the data volume that enterprise of department or employee have expected in preset period of time.Preset period of time correspondingly can adjust according to enterprise practical demand.
Alternatively, after step S101 obtains the destination item information of object to be monitored, obtain the execution result data of object performance objective project information to be monitored in step S102 before, the data processing method of this embodiment can also comprise the following steps:
Step S1011, judges that whether destination item information meet first pre-conditioned.
Step S1012, judge destination item information meet first pre-conditioned time, performance objective project information.
Step S1013, judge destination item information do not meet first pre-conditioned time, modifying target project information.
The execution result data that step S102 obtains object performance objective project information to be monitored comprise: obtain the execution result data that object to be monitored performs amended destination item information.
Step S103 carries out monitoring to execution result data and comprises: treat the execution result data that monitoring target performs amended destination item information and monitor.
In step S1011, first pre-conditionedly can carry out adding or adjusting according to enterprise practical demand, such as, first is pre-conditioned for judge that whether destination item information is reasonable, namely whether destination item information conforms to the actual conditions of object to be monitored or virtual rating, when the project implementation in destination item information is far beyond the executive capability of this object to be monitored, then illustrate that this destination item information is unreasonable, can not play and promote that object to be monitored promotes the object of work efficiency, therefore this destination item information is unreasonable.
Judge destination item information meet first pre-conditioned time, monitoring target performs this destination item information; Judge destination item information do not meet first pre-conditioned time, modifying target project information, till knowing that amended destination item information is rationally, then object to be monitored performs this destination item information.Modifying target project information is to ensure that destination item information is relatively more reasonable, and then effectively promotes the work efficiency of object to be monitored.
Alternatively, destination item information comprises the objective result data that subject anticipates to be monitored completes, after step S102 obtains the execution result data of object performance objective project information to be monitored, before step S103 monitors execution result data, the data processing method of this embodiment can also comprise the following steps:
Step S1021, obtains the data difference between execution result data and objective result data.
Step S1022, judges data difference whether within the scope of preset difference value.
Step S1023, when decision data difference is not within the scope of preset difference value, adjustment aim project information.
Step S1024, obtains the execution result data that object to be monitored performs the destination item information after adjusting, again until the data difference between execution result data and objective result data is within the scope of preset difference value.
According to execution result data, destination item information is adjusted, and then obtain the execution result data that object to be monitored performs the destination item information after adjusting, ensure that the rationality of this destination item information, and then effectively promote the work efficiency of object to be monitored.
Alternatively, in the data processing method of the embodiment of the present invention, monitoring is carried out to execution result data and comprises: judge that whether execution result data meet second pre-conditioned; Predicated execution result data meet second pre-conditioned time, determine that the grade of destination item information is the first estate; Predicated execution result data meet second pre-conditioned time, determine that the grade of destination item information is the second grade, wherein, the grade of the first estate is higher than the second grade.
According to the grade of execution result data determination destination item information, thus effectively evaluating is carried out to destination item information.
Alternatively, in the data processing method of the embodiment of the present invention, after determining that the grade of destination item information is the second grade, this data processing method also comprises: destination item information is stored to presetting database; Detect and whether receive the information relevant to destination item information; If the information relevant to destination item information detected, the information that destination item information is relevant is stored to presetting database; And after Preset Time, according to destination item information and the information updating destination item information relevant to destination item information.
By the destination item information of the second grade, put into intra-company's warehouse, summing up experience continues to cultivate.When destination item information is cultivated ripe, can approve and initiate a project again, project implementation information.
Fig. 2 is the application schematic diagram of the data processing method according to the embodiment of the present invention.As shown in Figure 2, this data processing method can be applied in business administration, and the application of this data processing method can be: Qi Xie branch of company of city, company leader group, expert group, company work group and company are correlated with functional department.Data processing method can be divided into three phases: project implementation phase, lifting improvement stage and summary acceptance phase.
In project implementation phase, the notice of Qi Xie branch of company of city release management innovation item plan project verification, transfers to company work group to organize relevant departments to report project verification plan, and reports project verification plan by the functional department that is correlated with of company.Company work group collects, gets one's plan into shape.Expert group's examination & verification management innovation reports plan, and the innovation of examination & approval company management of company leader group reports plan, and the notice of the management innovation project scheduling is assigned by Qi Xie branch of company of city.
In the lifting improvement stage, company work group organizes achievement test and appraisal, expert group is to successfully testing and assessing, proposition improves suggestion, the functional department that is correlated with of company adjusts management method, achievement content according to improvement direction, writes Project Progress Report, and company work group checks, Consolidation Project progress report, expert group's examination & verification Project Progress Report, company leader group examination and approval project progress report, association of enterprise of company of city issues the notice of declaring management innovation achievement.
In summary acceptance phase, company work group organizes successfully writes work, the functional department that is correlated with of company completes management innovation achievement Report, company work group trial inspection, arrangement achievement Report, expert group carries out result acceptance, for prematurity project, put into intra-company's warehouse, summing up experience continues to cultivate.Company leader group examination & approval innovation achievement is finally declared, Qi Xie branch of company of city management innovation assessment of result, and publication year management innovation is won a prize situation, company leader group judges: if achievement is defective, count performance appraisal, if achievement is won a prize, reward.
It should be noted that, the executive agent in Fig. 2 is only citing, and the executive agent of data processing method can also change to other department in enterprise.The application of data processing method can the work incentive of greatly promoting enterprise department or employee, the work efficiency of enterprise department or employee, and then improves enterprise overall work efficiency.
It should be noted that, can perform in the computer system of such as one group of computer executable instructions in the step shown in the process flow diagram of accompanying drawing, and, although show logical order in flow charts, but in some cases, can be different from the step shown or described by order execution herein.
The embodiment of the present invention additionally provides a kind of data processing equipment, it should be noted that, the data processing equipment of the embodiment of the present invention may be used for performing that the embodiment of the present invention provides for data processing method.Below the data processing equipment that the embodiment of the present invention provides is introduced.
Fig. 3 is the schematic diagram of the data processing equipment according to the embodiment of the present invention.As shown in Figure 3, this device comprises: the first acquiring unit 10, second acquisition unit 20 and monitoring means 30.
First acquiring unit 10, for obtaining the destination item information of object to be monitored.
Second acquisition unit 20, for obtaining the execution result data of object performance objective project information to be monitored.
Monitoring means 30, for monitoring execution result data.
The data processing equipment of this embodiment obtains the destination item information of object to be monitored by the first acquiring unit 10; Second acquisition unit 20 obtains the execution result data of object performance objective project information to be monitored; And monitoring means 30 pairs of execution result data are monitored, and solve the inefficient problem of enterprise work in correlation technique, reach the effect of enterprise work efficiency and yield-power.
Alternatively, in the data processing equipment of the embodiment of the present invention, this data processing equipment also comprises: the first judging unit, first pre-conditioned for judging that whether destination item information meet; Performance element, for judge destination item information meet first pre-conditioned time, performance objective project information; Amendment unit, for judge destination item information do not meet first pre-conditioned time, modifying target project information; Second acquisition unit 20 also performs the execution result data of amended destination item information for obtaining object to be monitored; Monitoring means 30 also performs amended destination item information execution result data for treating monitoring target are monitored.
Alternatively, in the data processing equipment of the embodiment of the present invention, destination item information comprises the objective result data that subject anticipates to be monitored completes, and this data processing equipment also comprises: the 3rd acquiring unit, for obtaining the data difference between execution result data and objective result data; Second judging unit, for judging data difference whether within the scope of preset difference value; Adjustment unit, for when decision data difference is not within the scope of preset difference value, adjustment aim project information; And the 4th acquiring unit, perform the execution result data of the destination item information after adjustment for again obtaining object to be monitored, until the data difference between execution result data and objective result data is within the scope of preset difference value.
Alternatively, in the data processing equipment of the embodiment of the present invention, this monitoring means 30 also comprises: judge module, second pre-conditioned for judging that whether execution result data meet; First determination module, for Predicated execution result data meet second pre-conditioned time, determine that the grade of destination item information is the first estate; Second determination module, for Predicated execution result data meet second pre-conditioned time, determine that the grade of destination item information is the second grade, wherein, the grade of the first estate is higher than the second grade.
Alternatively, in the data processing equipment of the embodiment of the present invention, this data processing equipment also comprises: the first storage unit, for destination item information is stored to presetting database; Whether detecting unit, receive the information relevant to destination item information for detecting; Second storage unit, for when the information relevant to destination item information being detected, the information that destination item information is relevant is stored to presetting database; And updating block, for after Preset Time, according to destination item information and the information updating destination item information relevant to destination item information.
It should be noted that, for aforesaid each embodiment of the method, in order to simple description, therefore it is all expressed as a series of combination of actions, but those skilled in the art should know, the present invention is not by the restriction of described sequence of movement, because according to the present invention, some step can adopt other orders or carry out simultaneously.Secondly, those skilled in the art also should know, the embodiment described in instructions all belongs to preferred embodiment, and involved action and module might not be that the present invention is necessary.
In the above-described embodiments, the description of each embodiment is all emphasized particularly on different fields, in certain embodiment, there is no the part described in detail, can see the associated description of other embodiments.
In several embodiments that the application provides, should be understood that, disclosed device, the mode by other realizes.Such as, device embodiment described above is only schematic, the such as division of described unit, be only a kind of logic function to divide, actual can have other dividing mode when realizing, such as multiple unit or assembly can in conjunction with or another system can be integrated into, or some features can be ignored, or do not perform.
The described unit illustrated as separating component or can may not be and physically separates, and the parts as unit display can be or may not be physical location, namely can be positioned at a place, or also can be distributed in multiple network element.Some or all of unit wherein can be selected according to the actual needs to realize the object of the present embodiment scheme.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, also can be that the independent physics of unit exists, also can two or more unit in a unit integrated.Above-mentioned integrated unit both can adopt the form of hardware to realize, and the form of SFU software functional unit also can be adopted to realize.
Obviously, those skilled in the art should be understood that, above-mentioned of the present invention each module or each step can realize with general calculation element, they can concentrate on single calculation element, or be distributed on network that multiple calculation element forms, alternatively, they can realize with the executable program code of calculation element, thus, they can be stored and be performed by calculation element in the storage device, or they are made into each integrated circuit modules respectively, or the multiple module in them or step are made into single integrated circuit module to realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a data processing method, is characterized in that, comprising:
Obtain the destination item information of object to be monitored;
Obtain the execution result data that described object to be monitored performs described destination item information; And
Described execution result data are monitored.
2. data processing method according to claim 1, is characterized in that,
After the destination item information obtaining object to be monitored, before described object to be monitored performs the execution result data of described destination item information in acquisition, described data processing method also comprises: judge whether described destination item information meets first pre-conditioned; Judge described destination item information meet described first pre-conditioned time, perform described destination item information; And judge described destination item information do not meet described first pre-conditioned time, revise described destination item information;
Obtain the execution result data that described object to be monitored performs described destination item information to comprise: obtain the execution result data that described object to be monitored performs amended destination item information;
Carry out monitoring to described execution result data to comprise: the execution result data described object to be monitored being performed to amended destination item information are monitored.
3. data processing method according to claim 1, it is characterized in that, described destination item information comprises the objective result data that described subject anticipates to be monitored completes, after the described object to be monitored of acquisition performs the execution result data of described destination item information, before monitoring described execution result data, described data processing method also comprises:
Obtain the data difference between described execution result data and described objective result data;
Judge described data difference whether within the scope of preset difference value;
When judging that described data difference is not within the scope of described preset difference value, adjust described destination item information; And
Again the execution result data that described object to be monitored performs the described destination item information after adjusting are obtained, until the data difference between described execution result data and described objective result data is within the scope of described preset difference value.
4. data processing method according to claim 1, is characterized in that, carries out monitoring comprise described execution result data:
Judge that whether described execution result data meet second pre-conditioned;
Judge described execution result data meet described second pre-conditioned time, determine that the grade of described destination item information is the first estate; And
Judge described execution result data do not meet described second pre-conditioned time, determine that the grade of described destination item information is the second grade, wherein, the grade of described the first estate is higher than described second grade.
5. data processing method according to claim 4, is characterized in that, after determining that the grade of described destination item information is the second grade, described data processing method also comprises:
Described destination item information is stored to presetting database;
Detect and whether receive the information relevant to described destination item information;
If the information relevant to described destination item information detected, the information that described destination item information is relevant is stored to described presetting database; And
After Preset Time, destination item information according to described destination item information and the information updating relevant to described destination item information.
6. a data processing equipment, is characterized in that, comprising:
First acquiring unit, for obtaining the destination item information of object to be monitored;
Second acquisition unit, performs the execution result data of described destination item information for obtaining described object to be monitored; And
Monitoring means, for monitoring described execution result data.
7. data processing equipment according to claim 6, is characterized in that,
Described data processing equipment also comprises: the first judging unit, first pre-conditioned for judging that whether described destination item information meet; Performance element, for judge described destination item information meet described first pre-conditioned time, perform described destination item information; Amendment unit, for judge described destination item information do not meet described first pre-conditioned time, revise described destination item information;
Described second acquisition unit also performs the execution result data of amended destination item information for obtaining described object to be monitored;
The execution result data of described monitoring means also for performing amended destination item information to described object to be monitored are monitored.
8. data processing equipment according to claim 6, is characterized in that, described destination item information comprises the objective result data that described subject anticipates to be monitored completes, and described data processing equipment also comprises:
3rd acquiring unit, for obtaining the data difference between described execution result data and described objective result data;
Second judging unit, for judging described data difference whether within the scope of preset difference value;
Adjustment unit, for when judging that described data difference is not within the scope of described preset difference value, adjusts described destination item information; And
4th acquiring unit, performs the execution result data of the described destination item information after adjustment, until the data difference between described execution result data and described objective result data is within the scope of described preset difference value for again obtaining described object to be monitored.
9. data processing equipment according to claim 6, is characterized in that, described monitoring means comprises:
Judge module, second pre-conditioned for judging that whether described execution result data meet;
First determination module, for judge described execution result data meet described second pre-conditioned time, determine that the grade of described destination item information is the first estate; And
Second determination module, for judge described execution result data do not meet described second pre-conditioned time, determine that the grade of described destination item information is the second grade, wherein, the grade of described the first estate is higher than described second grade.
10. data processing equipment according to claim 9, is characterized in that, described data processing equipment also comprises:
First storage unit, for being stored to presetting database by described destination item information;
Whether detecting unit, receive the information relevant to described destination item information for detecting;
Second storage unit, for when the information relevant to described destination item information being detected, the information that described destination item information is relevant is stored to described presetting database; And
Updating block, for after Preset Time, destination item information according to described destination item information and the information updating relevant to described destination item information.
CN201510502391.1A 2015-08-14 2015-08-14 A data processing method and apparatus Pending CN105117834A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510502391.1A CN105117834A (en) 2015-08-14 2015-08-14 A data processing method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510502391.1A CN105117834A (en) 2015-08-14 2015-08-14 A data processing method and apparatus

Publications (1)

Publication Number Publication Date
CN105117834A true CN105117834A (en) 2015-12-02

Family

ID=54665816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510502391.1A Pending CN105117834A (en) 2015-08-14 2015-08-14 A data processing method and apparatus

Country Status (1)

Country Link
CN (1) CN105117834A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080300946A1 (en) * 2007-05-31 2008-12-04 International Business Machines Corporation Methods, systems, and computer program products for implementing an end-to-end project management system
CN201812311U (en) * 2010-06-28 2011-04-27 中国烟草总公司湖南省公司 Data management system
CN102592195A (en) * 2011-12-28 2012-07-18 Tcl集团股份有限公司 Project control system and method based on development of products
CN102708466A (en) * 2012-05-21 2012-10-03 苏州汉清投资管理有限公司 Project management system
CN103177310A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Data processing system for cost control
CN104517168A (en) * 2013-09-30 2015-04-15 宁夏先锋软件有限公司 Engineering project construction cost schedule management system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080300946A1 (en) * 2007-05-31 2008-12-04 International Business Machines Corporation Methods, systems, and computer program products for implementing an end-to-end project management system
CN201812311U (en) * 2010-06-28 2011-04-27 中国烟草总公司湖南省公司 Data management system
CN103177310A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Data processing system for cost control
CN102592195A (en) * 2011-12-28 2012-07-18 Tcl集团股份有限公司 Project control system and method based on development of products
CN102708466A (en) * 2012-05-21 2012-10-03 苏州汉清投资管理有限公司 Project management system
CN104517168A (en) * 2013-09-30 2015-04-15 宁夏先锋软件有限公司 Engineering project construction cost schedule management system

Similar Documents

Publication Publication Date Title
Oliveira et al. Environmental Management System ISO 14001 factors for promoting the adoption of Cleaner Production practices
US20060282276A1 (en) Method and system for determining effectiveness of a compliance program
US20110307303A1 (en) Determining employee characteristics using predictive analytics
US20150067648A1 (en) Preparing an optimized test suite for testing an application under test in single or multiple environments
US20110307413A1 (en) Predicting the impact of a personnel action on a worker
KR100755000B1 (en) Security risk management system and method
CN112686482A (en) Supplier evaluation device and supplier evaluation method
Caron et al. A comprehensive investigation of the applicability of process mining techniques for enterprise risk management
US20140100907A1 (en) Project Management System
Wen et al. Modified honey bees mating optimization algorithm for multi-objective uncertain integrated process planning and scheduling problem
US20170270546A1 (en) Service churn model
Toledo et al. Optimal periodic maintenance policy under imperfect repair: A case study on the engines of off-road vehicles
CN111709828A (en) Resource processing method, device, equipment and system
CN112819353A (en) Risk analysis method based on enterprise graph and computer equipment
Ajalli et al. Evaluation and ranking the resilient suppliers with the combination of decision making techniques
US20120053994A1 (en) Organization resource allocation based on forecasted change outcomes
Cai et al. A decision-support system approach to economics-driven modularity evaluation
Cabrita et al. Supplier selection approach: integrating analytic hierarchy process and supplier risk analysis
CN105117834A (en) A data processing method and apparatus
Fazli et al. Investigation of FMEA improvement to present a new framework for an efficient failure risk analysis of the products, considering cost matter
Jeddi et al. A discreet event simulation in an automotive service context
Almeyda et al. Process improvement in software requirements engineering: A systematic mapping study
Nowakowska-Grunt et al. Selected tools of information flow management in logistics
Marsudi et al. The evaluation of production line performance by using ARENA–A case study
Campos Espejo et al. Management Model to increase inventory rotation in SMEs in the Mining Industry

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151202