CN105116757A - 一种多装置并发信号的iec61850/mms仿真方法 - Google Patents

一种多装置并发信号的iec61850/mms仿真方法 Download PDF

Info

Publication number
CN105116757A
CN105116757A CN201510437236.6A CN201510437236A CN105116757A CN 105116757 A CN105116757 A CN 105116757A CN 201510437236 A CN201510437236 A CN 201510437236A CN 105116757 A CN105116757 A CN 105116757A
Authority
CN
China
Prior art keywords
signal
signals
devices
mms
commands
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510437236.6A
Other languages
English (en)
Inventor
郑永康
姚辉昌
常晓青
刘明忠
廖小君
黄忠胜
王婷婷
杨建伟
李梓玮
童晓阳
韩花荣
蔡骥然
丁宣文
陈进
孟雷
陈迟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heze Power Supply Company, State Grid Shandong Electric Power Co., Ltd.
State Grid Corp of China SGCC
Southwest Jiaotong University
State Grid Sichuan Electric Power Co Ltd
Sichuan Electric Power Research Institute
Original Assignee
State Grid Corp of China SGCC
Southwest Jiaotong University
State Grid Sichuan Electric Power Co Ltd
Sichuan Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Southwest Jiaotong University, State Grid Sichuan Electric Power Co Ltd, Sichuan Electric Power Research Institute filed Critical State Grid Corp of China SGCC
Priority to CN201510437236.6A priority Critical patent/CN105116757A/zh
Publication of CN105116757A publication Critical patent/CN105116757A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种多装置并发信号的IEC61850/MMS仿真方法,包括:导入SCD文件,解析出装置及其信号库;启动各装置通讯服务;完成信号上送初始化;构建用于存放命令的共享内存,进而建立命令总线;各装置从各自的信号库中提取出需要上送的信号,并建立与该信号关联的映射表;通过本地服务器界面程序发送命令到命令总线;各装置同时从命令总线上接收命令,根据接收到的命令通过所述映射表提取相应的信号,并立即发送出去。本发明通过建立命令总线,使各装置能在同一时间接收到命令;把报告巡检机制改为指定信号的立即发送,具有较高的实时性,发送信号的效率提高很多倍;为所有发送信号建立数据映射,在需要发送时,信号不需要检索,大大提高了通讯效率。

Description

一种多装置并发信号的IEC61850/MMS仿真方法
技术领域
[0001] 本发明涉及智能变电站通讯技术领域,具体为一种多装置并发信号的IEC61850/丽S仿真方法。
背景技术
[0002] 随着智能化变电站的大量投入使用,IEC61850(电力系统自动化领域唯一的全球通用标准)/MMS(制造报文规范)通讯被广泛应用于变电站自动系统中,后台、保信子站等系统都是采用交换机接入各种智能设备,但如果交换机、后台或者保信子站等设备在类似雪崩数据处理能力不足,会导致数据丢帧或延迟传送,给整个系统的运行带来严重后果,因此要求高实时性的仿真变电站里多装置信号同时发送的情况来检查站控层数据能否正常运行。
[0003] 传统模拟多装置信号同时发送,在各种装置接收到命令需要的时间也是比较长,也很难做到真正的同时发送。并且国内开发的MMS都是基于SISC0(思科)公司的开发包,在非实时操作系统下,给每个装置发送命令,需要的时间比较长的,各装置也不能同时接收到信号发送命;开发包的信号发送都是基于巡检机制,设备对所有的信号按照巡检时间间隔检测到信号变化,才会把所变化信号发送出去,这样就很难做到实时发送,故信号发送延时也比较大;对所发的信号都是基于数据搜索方式,故耗时比较长。
发明内容
[0004] 针对上述问题本发明的目的在于提供一种高实时性高效率的多装置并发信号的IEC61850/MMS仿真方法,技术方案如下:
一种多装置并发信号的IEC61850/MMS仿真方法,包括:
导入SCD文件,解析出装置及其信号库;
启动各装置通讯服务;
收到远方客户端的通信连接后,各装置根据接收到的命令上送数据模型,并接收远方客户端的报告使能信号,进而使能本地相应的报告,完成信号上送初始化;
构建用于存放命令的共享内存,进而建立命令总线;
各装置从各自的信号库中提取出需要上送的信号,并建立与该信号关联的映射表; 通过本地服务器界面程序发送命令到命令总线;
各装置同时从命令总线上接收命令,根据接收到的命令通过所述映射表提取相应的信号,并立即发送出去。
[0005] 进一步的,所述启动各装置通讯服务的方法包括:各装置从各自的信号库中读取信号,并构建信号内存库,完成数据初始化,进而启动各自的通讯线程。
[0006] 本发明的有益效果是:本发明通过建立命令总线,使各装置能在同一时间接收到命令;把报告巡检机制改为指定信号的立即发送,具有较高的实时性,发送信号的效率提高很多倍;为所有发送信号建立数据映射,在需要发送时,信号不需要检索,大大提高了通讯效率。
附图说明
[0007] 图1为本发明多装置并发信号的IEC61850/MMS仿真方法的步骤流程图。
具体实施方式
[0008] 下面结合具体实施例和附图对本发明做进一步说明:一种多装置并发信号的IEC61850/MMS仿真方法,包括:
I)导入SCD (变电站系统配置描述文件)文件,解析出装置及其信号库。
[0009] 2)启动各装置通讯服务:各装置从各自的信号库中读取信号,并构建信号内存库,完成数据初始化,进而启动各自的通讯线程,等待远方客户端的通信连接。
[0010] 3)收到远方客户端的通信连接后,各装置根据接收到的命令上送数据模型,并接收远方客户端的报告使能信号,进而使能本地相应的报告,完成信号上送初始化。
[0011] 4)构建用于存放命令的共享内存,所有装置可共同访问该内存,从而形成命令总线。命令总线能使各装置同时接收到操作命令,本实施例中,可以实现同时仿真600个以上(根据仿真机的配置而定)的MMS服务器端的2000个并发信号,最早和最晚信号的触发时间差在100-600ms之间。
[0012] 5)各装置从各自的信号库中提取出需要上送的信号,并建立与该信号关联的映射表。同时组织信号发送的一切准备工作,构成快速映射机制,数据发送时,就可以直接访问相应的信号,从而达到快速映射的目的。建立数据的快速映射,不需要对所发送的信号执行检索,可大大提高通讯效率。
[0013] 6)通过本地的服务器界面程序发送命令到命令总线。
[0014] 7)各装置同时从命令总线上接收命令,根据接收到的命令通过所述映射表提取相应的信号,并立即发送出去。
[0015] 再次发送信号时,重复步骤5 ) -7 )。

Claims (2)

1.一种多装置并发信号的IEC61850/MMS仿真方法,其特征在于,包括: 导入SCD文件,解析出装置及其信号库; 启动各装置通讯服务; 收到远方客户端的通信连接后,各装置根据接收到的命令上送数据模型,并接收远方客户端的报告使能信号,进而使能本地相应的报告,完成信号上送初始化; 构建用于存放命令的共享内存,进而建立命令总线; 各装置从各自的信号库中提取出需要上送的信号,并建立与该信号关联的映射表; 通过本地服务器界面程序发送命令到命令总线; 各装置同时从命令总线上接收命令,根据接收到的命令通过所述映射表提取相应的信号,并立即发送出去。
2.根据权利要求1所述的多装置并发信号的IEC61850/MMS仿真方法,其特征在于,所述启动各装置通讯服务的方法包括:各装置从各自的信号库中读取信号,并构建信号内存库,完成数据初始化,进而启动各自的通讯线程。
CN201510437236.6A 2015-07-23 2015-07-23 一种多装置并发信号的iec61850/mms仿真方法 Pending CN105116757A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510437236.6A CN105116757A (zh) 2015-07-23 2015-07-23 一种多装置并发信号的iec61850/mms仿真方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510437236.6A CN105116757A (zh) 2015-07-23 2015-07-23 一种多装置并发信号的iec61850/mms仿真方法

Publications (1)

Publication Number Publication Date
CN105116757A true CN105116757A (zh) 2015-12-02

Family

ID=54664776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510437236.6A Pending CN105116757A (zh) 2015-07-23 2015-07-23 一种多装置并发信号的iec61850/mms仿真方法

Country Status (1)

Country Link
CN (1) CN105116757A (zh)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2350522A1 (en) * 1999-09-24 2001-03-29 Geoff Butland Utilities communications architecture compliant power management control system
KR20080100295A (ko) * 2007-05-12 2008-11-17 현대중공업 주식회사 변전소 자동화를 위한 게이트웨이 구조
CN102033798A (zh) * 2010-10-20 2011-04-27 国电南瑞科技股份有限公司 智能电子设备iec61850/mms服务器的仿真方法
CN103593326A (zh) * 2013-11-07 2014-02-19 国家电网公司 一种用于网络处理器芯片的iec61850软件库组件及其实现方法
CN103731320A (zh) * 2013-12-31 2014-04-16 中国科学院电工研究所 基于iec61850总线的电力设备、二次装置及系统的仿真测试平台
CN103778212A (zh) * 2014-01-16 2014-05-07 国网山东省电力公司青岛供电公司 基于数据节点的并行海量数据处理方法
CN104300676A (zh) * 2014-09-02 2015-01-21 国网安徽省电力公司阜阳供电公司 一种适用于智能变电站电容性设备的在线监测系统
CN104348254A (zh) * 2014-11-04 2015-02-11 国电南瑞科技股份有限公司 面向服务的变电站监控系统架构

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2350522A1 (en) * 1999-09-24 2001-03-29 Geoff Butland Utilities communications architecture compliant power management control system
KR20080100295A (ko) * 2007-05-12 2008-11-17 현대중공업 주식회사 변전소 자동화를 위한 게이트웨이 구조
CN102033798A (zh) * 2010-10-20 2011-04-27 国电南瑞科技股份有限公司 智能电子设备iec61850/mms服务器的仿真方法
CN103593326A (zh) * 2013-11-07 2014-02-19 国家电网公司 一种用于网络处理器芯片的iec61850软件库组件及其实现方法
CN103731320A (zh) * 2013-12-31 2014-04-16 中国科学院电工研究所 基于iec61850总线的电力设备、二次装置及系统的仿真测试平台
CN103778212A (zh) * 2014-01-16 2014-05-07 国网山东省电力公司青岛供电公司 基于数据节点的并行海量数据处理方法
CN104300676A (zh) * 2014-09-02 2015-01-21 国网安徽省电力公司阜阳供电公司 一种适用于智能变电站电容性设备的在线监测系统
CN104348254A (zh) * 2014-11-04 2015-02-11 国电南瑞科技股份有限公司 面向服务的变电站监控系统架构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨新民 等: "《电力系统综合自动化 第三版》", 28 February 2014, 中国电力出版社 *

Similar Documents

Publication Publication Date Title
CN107483082A (zh) 一种基于工频载波通信技术的低压配网拓扑自动识别方法及系统
CN103337142B (zh) 电能表管理系统的无线组网方法
CN204305072U (zh) 一种多协议转换器
CN101751761B (zh) 一种网络自动路由的无线抄表方法
RU2670786C9 (ru) Система, способ и аппарат для управления группировкой устройств
CN103941686B (zh) 语音控制方法和系统
CN104318750A (zh) 一种抄表的方法、装置和系统
CN103326465B (zh) 一种基于iec61850标准的配电网终端接入方法
CN102637352B (zh) 远程抄表方法和系统、电能主表和电能副表
CN103280894B (zh) 一种配电网控制应用网络拓扑自动识别方法
CN102255389B (zh) 基于智能电网体系的集约型智能子站的实现方法
CN104135068A (zh) 一种基于iec61850标准的配电终端即插即用方法
CN105356604B (zh) 用户侧需求响应方法
CN103595717A (zh) 家电控制协议转换方法和控制终端
CN102142863A (zh) 数据上报方法及系统
CN103516541A (zh) 基于智能化变电站的配置信息自动管理方法
CN104052766A (zh) 基于云计算的异构网络的综合智能通信方法及系统
CN102608962B (zh) 一种自下而上的用电信息采集设备自动维护方法
CN103139012B (zh) 一种以太网口测试方法及网络设备
CN107146395B (zh) 基于宽带载波通信的抄表系统及抄表方法
CN105530672A (zh) 一种移动终端与智能家居通信网络的切换方法和切换系统
CN103825883A (zh) 基于无线ZigBee、CAN总线和MODBUS/TCP的多协议转换设备及其实现方法
CN103123484A (zh) 变电站状态监测数据标准化接入系统及方法
CN104865835A (zh) 一种基于ZigBee的智能家居系统
CN103874291A (zh) 基于电力线载波的智能组网控制系统和方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
CB03 Change of inventor or designer information

Inventor after: Zheng Yongkang

Inventor after: Yang Jianwei

Inventor after: Li Ziwei

Inventor after: Tong Xiaoyang

Inventor after: Han Huarong

Inventor after: Cai Jiran

Inventor after: Ding Xuanwen

Inventor after: Chen Jin

Inventor after: Meng Lei

Inventor after: Chen Chi

Inventor after: Zhang Wei

Inventor after: Yao Huichang

Inventor after: Chang Xiaoqing

Inventor after: Liu Mingzhong

Inventor after: Liu Hongling

Inventor after: Liao Xiaojun

Inventor after: Wang Weiling

Inventor after: Huang Zhongsheng

Inventor after: Wang Tingting

Inventor before: Zheng Yongkang

Inventor before: Tong Xiaoyang

Inventor before: Han Huarong

Inventor before: Cai Jiran

Inventor before: Ding Xuanwen

Inventor before: Chen Jin

Inventor before: Meng Lei

Inventor before: Chen Chi

Inventor before: Yao Huichang

Inventor before: Chang Xiaoqing

Inventor before: Liu Mingzhong

Inventor before: Liao Xiaojun

Inventor before: Huang Zhongsheng

Inventor before: Wang Tingting

Inventor before: Yang Jianwei

Inventor before: Li Ziwei

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161125

Address after: Tsing Hua Road Qingyang District of Chengdu City, Sichuan Province, No. 24 610072

Applicant after: Electric Power Sciences Research Institute of Sichuan Electric Power Corporation

Applicant after: Skills Training Center, State Grid Sichuan Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Southwest Jiaotong University

Applicant after: Heze Power Supply Company, State Grid Shandong Electric Power Co., Ltd.

Address before: Tsing Hua Road Qingyang District of Chengdu City, Sichuan Province, No. 24 610072

Applicant before: Electric Power Sciences Research Institute of Sichuan Electric Power Corporation

Applicant before: Skills Training Center, State Grid Sichuan Electric Power Corporation

Applicant before: State Grid Corporation of China

Applicant before: Southwest Jiaotong University

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication

Application publication date: 20151202

RJ01 Rejection of invention patent application after publication