- CN105116189A CN105116189A CN201510643099.1A CN201510643099A CN105116189A CN 105116189 A CN105116189 A CN 105116189A CN 201510643099 A CN201510643099 A CN 201510643099A CN 105116189 A CN105116189 A CN 105116189A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- base
- backboard
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Pivots And Pivotal Connections (AREA)
Abstract
The invention discloses a rapid installation and fixing frame for an electric energy meter. The rapid installation and fixing frame is characterized by comprising a back board and a base, wherein a fixed hole is formed in the back board, the lower end of the back board is provided with the base, a wire inlet hole which is adaptive to a wire connection hole of the electric energy meter is formed in the base, the upper end of a front panel of the back board is fixedly provided with a hook which is adaptive to a suspension hole of the electric energy meter, and an upper panel of the base is fixedly provided with a positioning frame which is adaptive to a protrusion chuck of a transparent turning cover of the electric energy meter. The rapid installation and fixing frame is simple in structure, convenient for installing and replacing the electric energy meter, capable of facilitating tidiness and attractiveness of the arrangement of the electric energy meter in a meter box, firm in fixation, convenient, rapid and capable of improving the working efficiency and alleviating the working intensity.
Description
Technical field
The present invention relates to the installing area of electric energy meter, specifically a kind of electric energy meter Fast Installation fixed mount.
Background technology
Current electric energy meter, see Fig. 1 and Fig. 2, comprise electric energy meter casing 1 and transparent pivoted cover 4, the rear wall of electric energy meter casing 1 is provided with projection 3 and hanging hole 2, hanging hole 2 is positioned at the upper center of electric energy meter casing 1 rear wall, and projection 3 is provided with two, is positioned at the both sides of hanging hole 2, transparent pivoted cover 4 is hinged is arranged on electric energy meter casing 1 front side wall lower end, and the edge, the end of transparent pivoted cover 4 is fixed with outstanding dop 5.For the installation of this kind of electric energy meter, all be fixed with screw on the inwall of table case, again the hanging hole 2 on electric energy meter casing 1 is enclosed within the end of screw, thus make electric energy meter be suspended on screw, its weak point is: in installation Renewal process, often occur the phenomenon that screw comes off or electric energy meter comes off, installation rate is slow, and safety coefficient is low.
Summary of the invention
The object of the present invention is to provide a kind of structure simple, be convenient to installation and the replacing of electric energy meter, make electric energy meter marshalling in table case attractive in appearance, and the electric energy meter Fast Installation fixed mount of fixation.
In order to reach above object, the technical solution adopted in the present invention is: this electric energy meter Fast Installation fixed mount, it is characterized in that: it comprises backboard and base, backboard is provided with fixed orifice, the lower end of backboard is provided with base, base is provided with the entrance hole suitable with the wiring hole of electric energy meter, and the front panel upper end of backboard is fixed with the hook suitable with the hanging hole of electric energy meter, and the top panel of base is fixed with the posting suitable with the outstanding dop of the transparent pivoted cover of electric energy meter.
The both sides of described base are fixed with side plate, and rear end and the backboard of side plate are fixed as one.
The front panel of described backboard is provided with chute, and chute is provided with two, and is symmetricly set on the both sides of hook, and the projection on chute and electric energy meter casing rear wall is suitable.
Described base is made up of firm banking and mobile base, be located at bottom mobile base in the groove of firm banking, the lower end of backboard is provided with firm banking, firm banking and mobile base are all provided with the entrance hole suitable with the wiring hole of electric energy meter, the top panel of mobile base is fixed with the posting suitable with the outstanding dop of the transparent pivoted cover of electric energy meter.
The both sides of described firm banking are fixed with side plate, and rear end and the backboard of side plate are fixed as one.
Described firm banking is provided with through hole, and the base surface of mobile base is provided with the screw suitable with through hole.
Beneficial effect of the present invention is: structure is simple, is convenient to installation and the replacing of electric energy meter, makes electric energy meter marshalling in table case attractive in appearance, and fixation, convenient and swift, improve work efficiency, reduce working strength.
Accompanying drawing explanation
Fig. 1 is the structure rear view of existing electric energy meter.
Fig. 2 is the structure front view of existing electric energy meter.
Fig. 3 is structure front-view schematic diagram of the present invention.
Fig. 4 is structure schematic rear view of the present invention.
Fig. 5 is that schematic diagram is looked on the structure right side of the present invention.
Fig. 6 is structure schematic top plan view of the present invention.
The structure schematic top plan view that Fig. 7 is base of the present invention when being split type.
Fig. 8 is the structure schematic top plan view of mobile base of the present invention.
Fig. 9 is the structure elevational schematic view of mobile base of the present invention.
In figure: 1, electric energy meter casing; 2, hanging hole; 3, projection; 4, transparent pivoted cover; 5, outstanding dop; 6, backboard; 7, base; 8, side plate; 9, fixed orifice; 10, link up with; 11, chute; 12, posting; 13, entrance hole; 71, firm banking; 72, mobile base; 73, through hole; 74, screw.
Embodiment
Embodiment 1:
The present invention is made with reference to Fig. 3, Fig. 4, Fig. 5, Fig. 6.This electric energy meter Fast Installation fixed mount, it is characterized in that: it comprises backboard 6 and base 7, backboard 6 is provided with fixed orifice 9, the lower end of backboard 6 is provided with base 7, base 7 is provided with the entrance hole 13 suitable with the wiring hole of electric energy meter, the front panel upper end of backboard 6 is fixed with the hook 10 suitable with the hanging hole 2 of electric energy meter, the top panel of base 7 is fixed with the posting 12 suitable with the outstanding dop 5 of the transparent pivoted cover 4 of electric energy meter.
The both sides of described base 7 are fixed with side plate 8, and rear end and the backboard 6 of side plate 8 are fixed as one.
The front panel of described backboard 6 is provided with chute 11, and chute 11 is provided with two, and is symmetricly set on the both sides of hook 10, and chute 11 is suitable with the projection 3 on electric energy meter casing 1 rear wall.
When using of the present invention, with screw through the fixed orifice 9 on backboard 6, backboard 6 is fixed on the inwall of table case, and by all electric energy meter Fast Installation fixed mount marshallings, the hanging hole 2 of electric energy meter rear wall upper end is set on hook 10, two projections 3 lay respectively in chute 11, again electric energy meter lower end is pushed between two side plates 8, four wires are upward through entrance hole 13 respectively below base 7, insert the wiring hole internal fixtion of electric energy meter, finally cover transparent pivoted cover 4, outstanding dop 5 is made to insert in posting 12, complete the installment work of whole electric energy meter, convenient and swift, improve work efficiency, reduce working strength.
Embodiment 2:
The present invention is made with reference to Fig. 3, Fig. 4, Fig. 5, Fig. 7, Fig. 8, Fig. 9.Improve as one, base 7 is split type, and it is made up of firm banking 71 and mobile base 72.
This electric energy meter Fast Installation fixed mount, it is characterized in that: it comprises backboard 6 and base 7, base 7 is made up of firm banking 71 and mobile base 72, be located in the groove of firm banking 71 bottom mobile base 72, backboard 6 is provided with fixed orifice 9, the lower end of backboard 6 is provided with firm banking 71, firm banking 71 and mobile base 72 are all provided with the entrance hole 13 suitable with the wiring hole of electric energy meter, the front panel upper end of backboard 6 is fixed with the hook 10 suitable with the hanging hole 2 of electric energy meter, the top panel of mobile base 72 is fixed with the posting 12 suitable with the outstanding dop 5 of the transparent pivoted cover 4 of electric energy meter.
The both sides of described firm banking 71 are fixed with side plate 8, and rear end and the backboard 6 of side plate 8 are fixed as one.
Described firm banking 71 is provided with through hole 73, the base surface of mobile base 72 is provided with the screw 74 suitable with through hole 73, during installation, can insert in screw 74 through through hole 73 with screw, thus mobile base 72 and firm banking 71 are fixed as one, this design is the needs in order to Mould Machining.
The front panel of described backboard 6 is provided with chute 11, and chute 11 is provided with two, and is symmetricly set on the both sides of hook 10, and chute 11 is suitable with the projection 3 on electric energy meter casing 1 rear wall.
Claims (6)
1. electric energy meter Fast Installation fixed mount, it is characterized in that: it comprises backboard (6) and base (7), backboard (6) is provided with fixed orifice (9), the lower end of backboard (6) is provided with base (7), base (7) is provided with the entrance hole (13) suitable with the wiring hole of electric energy meter, the front panel upper end of backboard (6) is fixed with the hook (10) suitable with the hanging hole of electric energy meter (2), the top panel of base (7) is fixed with the posting (12) suitable with the outstanding dop (5) of the transparent pivoted cover of electric energy meter (4).
2. electric energy meter Fast Installation fixed mount according to claim 1, is characterized in that: the both sides of described base (7) are fixed with side plate (8), and rear end and the backboard (6) of side plate (8) are fixed as one.
3. electric energy meter Fast Installation fixed mount according to claim 1, it is characterized in that: the front panel of described backboard (6) is provided with chute (11), chute (11) is provided with two, and being symmetricly set on the both sides of hook (10), chute (11) is suitable with the projection (3) on electric energy meter casing (1) rear wall.
4. electric energy meter Fast Installation fixed mount according to claim 1, it is characterized in that: described base (7) is made up of firm banking (71) and mobile base (72), mobile base (72) bottom is located in the groove of firm banking (71), the lower end of backboard (6) is provided with firm banking (71), firm banking (71) and mobile base (72) are all provided with the entrance hole (13) suitable with the wiring hole of electric energy meter, the top panel of mobile base (72) is fixed with the posting (12) suitable with the outstanding dop (5) of the transparent pivoted cover of electric energy meter (4).
5. electric energy meter Fast Installation fixed mount according to claim 4, is characterized in that: the both sides of described firm banking (71) are fixed with side plate (8), and rear end and the backboard (6) of side plate (8) are fixed as one.
6. electric energy meter Fast Installation fixed mount according to claim 4, is characterized in that: described firm banking (71) is provided with through hole (73), and the base surface of mobile base (72) is provided with the screw (74) suitable with through hole (73).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510643099.1A CN105116189A (en) | 2015-10-08 | 2015-10-08 | Rapid installation and fixing frame for electric energy meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510643099.1A CN105116189A (en) | 2015-10-08 | 2015-10-08 | Rapid installation and fixing frame for electric energy meter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105116189A true CN105116189A (en) | 2015-12-02 |
Family
ID=54664225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510643099.1A Pending CN105116189A (en) | 2015-10-08 | 2015-10-08 | Rapid installation and fixing frame for electric energy meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105116189A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106066414A (en) * | 2016-06-18 | 2016-11-02 | 合肥松雷信息科技有限公司 | A kind of suspension type electricity meter bracket |
CN113092839A (en) * | 2021-03-04 | 2021-07-09 | 张军 | Fixing device of electric energy meter |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000314749A (en) * | 1999-04-28 | 2000-11-14 | Kinden Corp | Working cover device for watt-hour meter |
CN201203641Y (en) * | 2008-03-14 | 2009-03-04 | 福建省福州电业局 | Electronic type electric energy meter capable of avoiding fraudulent use of electricity |
CN201242556Y (en) * | 2008-05-28 | 2009-05-20 | 陶齐雄 | Novel electric-theft protection single-phase electric energy meter box |
CN201897608U (en) * | 2010-12-08 | 2011-07-13 | 深圳华立南方电子技术有限公司 | Anti-dismounting mechanism for plug-in type electricity meter |
CN201935942U (en) * | 2011-01-18 | 2011-08-17 | 浙江亿诚电器有限公司 | Electric meter box positioning structure |
CN202494708U (en) * | 2012-03-08 | 2012-10-17 | 广西电网公司 | Connection structure of pluggable electric energy meter auxiliary terminal |
CN103454468A (en) * | 2013-09-18 | 2013-12-18 | 杭州凯雅捷科技有限公司 | Three-phase multi-station electric energy meter plug-in |
CN103454471A (en) * | 2013-09-18 | 2013-12-18 | 杭州凯雅捷科技有限公司 | Single-phase multiple-meter position plug-in of electric energy meter |
CN203798877U (en) * | 2014-05-04 | 2014-08-27 | 温州悦动智能电器有限公司 | Modularized electric energy meter signal connecting plug-in |
CN205027797U (en) * | 2015-10-08 | 2016-02-10 | 莱芜鲁能开源集团电器有限公司 | Mount is installed fast to electric energy meter |
-
2015
- 2015-10-08 CN CN201510643099.1A patent/CN105116189A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000314749A (en) * | 1999-04-28 | 2000-11-14 | Kinden Corp | Working cover device for watt-hour meter |
CN201203641Y (en) * | 2008-03-14 | 2009-03-04 | 福建省福州电业局 | Electronic type electric energy meter capable of avoiding fraudulent use of electricity |
CN201242556Y (en) * | 2008-05-28 | 2009-05-20 | 陶齐雄 | Novel electric-theft protection single-phase electric energy meter box |
CN201897608U (en) * | 2010-12-08 | 2011-07-13 | 深圳华立南方电子技术有限公司 | Anti-dismounting mechanism for plug-in type electricity meter |
CN201935942U (en) * | 2011-01-18 | 2011-08-17 | 浙江亿诚电器有限公司 | Electric meter box positioning structure |
CN202494708U (en) * | 2012-03-08 | 2012-10-17 | 广西电网公司 | Connection structure of pluggable electric energy meter auxiliary terminal |
CN103454468A (en) * | 2013-09-18 | 2013-12-18 | 杭州凯雅捷科技有限公司 | Three-phase multi-station electric energy meter plug-in |
CN103454471A (en) * | 2013-09-18 | 2013-12-18 | 杭州凯雅捷科技有限公司 | Single-phase multiple-meter position plug-in of electric energy meter |
CN203798877U (en) * | 2014-05-04 | 2014-08-27 | 温州悦动智能电器有限公司 | Modularized electric energy meter signal connecting plug-in |
CN205027797U (en) * | 2015-10-08 | 2016-02-10 | 莱芜鲁能开源集团电器有限公司 | Mount is installed fast to electric energy meter |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106066414A (en) * | 2016-06-18 | 2016-11-02 | 合肥松雷信息科技有限公司 | A kind of suspension type electricity meter bracket |
CN113092839A (en) * | 2021-03-04 | 2021-07-09 | 张军 | Fixing device of electric energy meter |
CN113092839B (en) * | 2021-03-04 | 2023-10-17 | 保定市兆微软件科技有限公司 | Fixing device of electric energy meter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105116189A (en) | Rapid installation and fixing frame for electric energy meter | |
CN203491581U (en) | Draw-out type switch cabinet interlocking device | |
CN205027797U (en) | Mount is installed fast to electric energy meter | |
CN204855604U (en) | Ammeter is installing support for case | |
CN204970541U (en) | Set up bathroom glass mirror of ornament lamp | |
CN210716778U (en) | Display screen support that stability is good | |
CN202678864U (en) | Wire slot structure for control panel | |
CN104348119A (en) | Control console routing structure | |
CN203231261U (en) | Movable lamp support | |
CN103153015A (en) | Door plank with slots | |
CN206908617U (en) | A kind of novel computer network router device | |
CN203884971U (en) | Office table with electrical box | |
CN204144843U (en) | There is the control desk Wiring structure that strong and weak electricity is separated | |
CN204809672U (en) | Novel door plant | |
CN102960266A (en) | Multifunctional nest honey production frame | |
CN203388656U (en) | Wall hanging component and wall hanging | |
CN205380913U (en) | Underdrive type numerical control bender with light | |
CN203134848U (en) | Adhesive removing apparatus for backboard of photovoltaic module | |
CN203367060U (en) | 86 switch box | |
CN210040708U (en) | Switch socket fixed mounting device | |
CN204879715U (en) | Integrative LED lamp shell | |
CN205184278U (en) | Brill is attacked central tool magazine and is adjusted structure | |
CN208094360U (en) | The fixture of its roof of connection box for motor and milling | |
CN202193502U (en) | Elevator control cabinet body in machine room | |
CN206695079U (en) | A kind of LED reflector brackets |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151202 |
|
RJ01 | Rejection of invention patent application after publication |