CN105115162B - The water temperature establishing method and device of Teat pump boiler - Google Patents
The water temperature establishing method and device of Teat pump boiler Download PDFInfo
- Publication number
- CN105115162B CN105115162B CN201510395535.8A CN201510395535A CN105115162B CN 105115162 B CN105115162 B CN 105115162B CN 201510395535 A CN201510395535 A CN 201510395535A CN 105115162 B CN105115162 B CN 105115162B
- Authority
- CN
- China
- Prior art keywords
- water
- cycle
- temperature
- amendment
- water cycle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
The invention discloses the water temperature establishing method and device of a kind of Teat pump boiler, the water temperature establishing method comprises the following steps:Obtain top n with the water cycle each with the water consumption in water cycle or it is each use water end cycle when delayed heat water;The amendment temperature in water cycle each each according to each water consumption with the water cycle or is each used in the top n water cycle to obtain with the water tank design temperature in water cycle with delayed heat water amendment during water end cycle;The water tank design temperature that the water cycle is currently used with each being obtained in the water cycle with the amendment temperature in water cycle according to top n.This method can carry out Intelligent adjustment according to user's water consumption or the delayed heat water of water tank to water tank design temperature.
Description
Technical field
The present invention relates to technical field of water heaters, the water temperature establishing method and one kind of more particularly to a kind of Teat pump boiler
The water temperature setting device of Teat pump boiler.
Background technology
At present, the water temperature setting of Teat pump boiler is fairly simple.Teat pump boiler one setting of acquiescence when electric first
Water temperature, if user is not adjusted manually, the set water temperature always with acquiescence is controlled by Teat pump boiler.But with
The change in season, user also change to the demand of hot water amount, now need user to adjust set water temperature manually, otherwise, if
Determine the too low hot water amount of water temperature not enough to use, comfortableness is poor, or the too high hot water residue of set water temperature is relatively more, and works as water
It is when the temperature difference of temperature and environment temperature is bigger, the heat dissipation of water tank for causing Teat pump boiler is serious, so as to cause the wasting of resources.
The content of the invention
It is contemplated that at least solves one of technical problem in correlation technique to a certain extent.Therefore, the present invention
One purpose is to propose a kind of to carry out intelligence to water tank design temperature according to user's water consumption or the delayed heat water of water tank
The water temperature establishing method for the Teat pump boiler that can be adjusted.
It is another object of the present invention to the water temperature setting device for proposing a kind of Teat pump boiler.
To reach above-mentioned purpose, one aspect of the present invention embodiment proposes a kind of water temperature establishing method of Teat pump boiler,
Comprise the following steps:Top n is obtained with the water consumption that the water cycle is each used in the water cycle or each uses remaining during water end cycle
Waste heat water, wherein, N is the integer more than or equal to 1;According to each water consumption with the water cycle or it is each use water end cycle when
The amendment of delayed heat water each with the water tank design temperature in water cycle to obtain in the top n water cycle each with the water cycle
Correct temperature;The water tank that the water cycle is currently used with each being obtained in the water cycle with the amendment temperature in water cycle according to the top n
Design temperature.
The water temperature establishing method of Teat pump boiler according to embodiments of the present invention, top n is obtained first with every in the water cycle
Individual water consumption with the water cycle or each delayed heat water when use water end cycle, then basis each use water with the water cycle
Amount is each each used with delayed heat water amendment during water end cycle with the water tank design temperature in water cycle with obtaining top n
The amendment temperature in water cycle is each used in the water cycle, finally according to the top n amendment temperature that the water cycle is each used in the water cycle
Obtain currently use the water cycle water tank design temperature, so as to according to the delayed heat water of user's water consumption or water tank to water tank
Design temperature carries out Intelligent adjustment, meets user's actual need, effectively avoids hot when water consumption increase caused by seasonal variations
Water is not enough or water tank set water temperature higher the problem of causing more heat dissipation of water tank, energy waste.
According to one embodiment of present invention, the water tank in water cycle is each used according to each water consumption amendment with the water cycle
During design temperature, wherein, if k-th is more than the first preset value with the water consumption in water cycle, by k-th of the water with the water cycle
Case design temperature tunes up so that k-th of water tank design temperature for being more than k-th of use water cycle with the amendment temperature in water cycle, its
In, k=1,2,3 ..., N;It is all with water by k-th if k-th is less than first preset value with the water consumption in water cycle
The water tank design temperature of phase is turned down so that k-th of amendment temperature with the water cycle is less than k-th of water tank setting temperature with the water cycle
Degree.
According to another embodiment of the invention, each used according to delayed heat water amendment during each end cycle with water
During the water tank design temperature in water cycle, wherein, if being more than second with delayed heat water during water end cycle and presetting for k-th
Value, then k-th is turned down with the water tank design temperature in water cycle so that k-th of amendment temperature with the water cycle is less than k-th of use
The water tank design temperature in water cycle, wherein, k=1,2,3 ..., N;If k-th small with delayed heat water during water end cycle
In second preset value, then k-th is tuned up with the water tank design temperature in water cycle so that k-th of amendment temperature with the water cycle
Degree is more than k-th of water tank design temperature with the water cycle.
According to one embodiment of present invention, the water tank design temperature for currently using the water cycle is obtained according to below equation:
TsN+1=F (aTsx1, bTsx2 ..., nTsxn)
Wherein, TsN+1 is the current water tank design temperature for using the water cycle, Tsx1, Tsx2 ... Tsxn is the preceding N
The individual amendment temperature with the water cycle, a, b ..., the weighting system that n is each amendment temperature with the water cycle in the top n water cycle
Number.
Preferably, weight coefficient a < b < ... the < n of the amendment temperature in water cycle are each used with the water cycle in top n.
In some embodiments of the invention, it is described with the water cycle when a length of 1 day or 1 week.
To reach above-mentioned purpose, another aspect of the present invention embodiment proposes a kind of water temperature setting dress of Teat pump boiler
Put, including:Acquisition module, for obtaining in the top n water cycle each with the water consumption in water cycle or each with water cycle knot
Delayed heat water during beam, wherein, N is the integer more than or equal to 1;Correcting module, each water is used with the water cycle for basis
Amount is each each used with delayed heat water amendment during water end cycle with the water tank design temperature in water cycle with obtaining top n
The amendment temperature in water cycle is each used in the water cycle;Setup module, for all with each water in the water cycle according to the top n
The amendment temperature of phase obtains the water tank design temperature for currently using the water cycle.
The water temperature setting device of Teat pump boiler according to embodiments of the present invention, acquisition module obtain top n with the water cycle
In each water consumption with the water cycle or each delayed heat water when use water end cycle, correcting module is according to each using water all
The water consumption of phase or each with delayed heat water amendment during water end cycle each with the water tank design temperature in water cycle to obtain
The top n amendment temperature that the water cycle is each used in the water cycle is obtained, setup module is all with each water in the water cycle according to top n
The amendment temperature of phase obtains the water tank design temperature for currently using the water cycle, so as to the residue according to user's water consumption or water tank
Hot water amount carries out Intelligent adjustment to water tank design temperature, meets user's actual need, effectively avoids using caused by seasonal variations
Hot water is not enough or water tank set water temperature higher the problem of causing more heat dissipation of water tank, energy waste during water increase.
According to one embodiment of present invention, according to each with the water consumption amendment in water cycle each with the water in water cycle
During case design temperature, wherein, if k-th is more than the first preset value with the water consumption in water cycle, the correcting module is then by kth
It is individual to be tuned up with the water tank design temperature in water cycle so that k-th of amendment temperature with the water cycle is more than k-th of the water with the water cycle
Case design temperature, wherein, k=1,2,3 ..., N;If k-th is less than first preset value, institute with the water consumption in water cycle
Correcting module is stated then to turn k-th so that k-th is less than with the amendment temperature in water cycle with the water tank design temperature in water cycle down
K-th of water tank design temperature with the water cycle.
According to another embodiment of the invention, each use delayed heat water amendment during water end cycle each in basis
During with the water tank design temperature in water cycle, wherein, if it is default with delayed heat water during water end cycle to be more than second k-th
Value, the correcting module then k-th is turned with the water tank design temperature in water cycle down so that k-th of amendment temperature with the water cycle
Less than k-th with the water tank design temperature in water cycle, wherein, k=1,2,3 ..., N;If during k-th of use water end cycle
Delayed heat water is less than second preset value, and the correcting module then tunes up k-th with the water tank design temperature in water cycle
So that k-th of amendment temperature with the water cycle is more than k-th of water tank design temperature with the water cycle.
According to one embodiment of present invention, the setup module obtains the water tank for currently using the water cycle according to below equation
Design temperature:
TsN+1=F (aTsx1, bTsx2 ..., nTsxn)
Wherein, TsN+1 is the current water tank design temperature for using the water cycle, Tsx1, Tsx2 ... Tsxn is the preceding N
The individual amendment temperature with the water cycle, a, b ..., the weighting system that n is each amendment temperature with the water cycle in the top n water cycle
Number.
Preferably, weight coefficient a < b < ... the < n of the amendment temperature in water cycle are each used with the water cycle in top n.
In some embodiments of the invention, it is described with the water cycle when a length of 1 day or 1 week.
Brief description of the drawings
Fig. 1 is the flow chart of the water temperature establishing method of Teat pump boiler according to embodiments of the present invention.
Fig. 2 is the block diagram of the water temperature setting device of Teat pump boiler according to embodiments of the present invention.
Reference:Acquisition module 10, correcting module 20 and setup module 30.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end
Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached
The embodiment of figure description is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
Due to the use of press-bearing water tank so that Teat pump boiler has good heat-insulating property.When user uses hot water,
Cold water enters water tank bottom and hot water is extruded into water tank so that user uses, wherein, the cold water of bottom and the hot water on top have
Preferable water temperature delamination.In order to used to make the best, after user wishes that the water demand on the day of terminates, the hot water in water tank is just used
It is complete or leave fraction hot water, made with avoiding making because of overlong time remaining small part hot water from becoming cold water with cold water mix
Situation about being wasted into hot water, therefore, embodiments of the invention propose water temperature establishing method and the water temperature setting of Teat pump boiler
Device.
Fig. 1 is the flow chart of the water temperature establishing method of Teat pump boiler according to embodiments of the present invention.As shown in figure 1, should
The water temperature establishing method of Teat pump boiler comprises the following steps:
S1, obtain top n with the water cycle each with the water consumption in water cycle or it is each use water end cycle when residue
Hot water amount, wherein, N is the integer more than or equal to 1.
For example, can each it be used with the water cycle by the multiple temperature sensors being arranged in water tank to obtain top n
The water consumption in water cycle or each delayed heat water when using water end cycle, multiple temperature sensors are from water tank bottom to water tank
Top is arranged in order, and to gather the water temperature of each height in water tank, and is calculated each with the water cycle according to the water temperature of collection
Water consumption or each delayed heat water when using water end cycle, wherein, the temperature sensor at top can also enter to current water temperature
Row display.Each used with the water cycle alternatively, it is also possible to obtain top n by the flow sensor being arranged at water tank inlet
The water consumption in water cycle or each delayed heat water when using water end cycle.
In some embodiments of the invention, with the water cycle when a length of 1 day or 1 week.For example, it is 1 day when using the water cycle
And N be 7 when, by water consumption daily in before acquisition 7 days or it is first 7 days in daily at the end of delayed heat water.
S2, each used with delayed heat water amendment during water end cycle according to each water consumption with the water cycle or each
The water tank design temperature in water cycle each uses the amendment temperature in water cycle to obtain in the top n water cycle.
According to one embodiment of present invention, the water tank in water cycle is each used according to each water consumption amendment with the water cycle
During design temperature, wherein, if k-th is more than the first preset value with the water consumption in water cycle, by k-th of the water with the water cycle
Case design temperature tunes up so that k-th of water tank design temperature for being more than k-th of use water cycle with the amendment temperature in water cycle, its
In, k=1,2,3 ..., N;If k-th is less than the first preset value with the water consumption in water cycle, the water cycle is used by k-th
Water tank design temperature is turned down so that k-th of amendment temperature with the water cycle is less than k-th of water tank design temperature with the water cycle.The
One preset value can be demarcated according to actual conditions.
According to another embodiment of the invention, each used according to delayed heat water amendment during each end cycle with water
During the water tank design temperature in water cycle, wherein, if being more than second with delayed heat water during water end cycle and presetting for k-th
Value, then k-th is turned down with the water tank design temperature in water cycle so that k-th of amendment temperature with the water cycle is less than k-th of use
The water tank design temperature in water cycle, wherein, k=1,2,3 ..., N;If k-th small with delayed heat water during water end cycle
In the second preset value, then k-th is tuned up with the water tank design temperature in water cycle so that k-th big with the amendment temperature in water cycle
In k-th of water tank design temperature with the water cycle.Second preset value can be demarcated according to actual conditions.
S3, currently set according to top n with the water tank in water cycle with each being obtained in the water cycle with the amendment temperature in water cycle
Constant temperature degree.
According to one embodiment of present invention, the water tank design temperature for currently using the water cycle is obtained according to following formula (1):
TsN+1=F (aTsx1, bTsx2 ..., nTsxn) (1)
Wherein, TsN+1 is the current water tank design temperature for using the water cycle, Tsx1, Tsx2 ... Tsxn is top n water week
The amendment temperature of phase, a, b ..., the weight coefficient that n is each amendment temperature with the water cycle in the top n water cycle.It is preferred that
Ground, a < b < ... < n.
Specifically, when being 1 day with the water cycle, before obtaining first in N days once a day under heating state user with water knot
Delayed heat water during beam, then the water tank set water temperature Ts on the same day is modified according to the delayed heat water on the same day.For example,
When the delayed heat water of water tank is more, water tank design temperature can be turned down suitably, i.e. the correction value of the water tank design temperature on the same day
(amendment temperature) Tsx is less than the water tank design temperature Ts on the same day;When the delayed heat water of water tank is smaller or without when, water tank is set
Constant temperature degree can be heightened suitably, i.e., the correction value Tsx of the water tank design temperature on the same day is more than the water tank design temperature Ts on the same day.It is preferred that
Ground, the correction value Tsx of the water tank design temperature on the same day can be obtained by function Tsx=F (L, Lr), wherein, L is water tank
Volume, Lr be water tank in delayed heat water volume.
It is understood that in order to improve user's comfortableness, can be protected always in tank top after user is terminated with water
A part of hot water is stayed to ensure that user uses at any time, it is assumed that the volume of the part hot water is Ls1, then using Lr-Ls1 as water tank
Delayed heat water, now, the correction value Tsx of water tank design temperature can be obtained by function Tsx=F (L, Lr-Ls1).
After Teat pump boiler enters automatic setting water tank design temperature pattern, according to preceding N days inner water tanks design temperature
Correction value, and by the water tank design temperature of above-mentioned formula (1) acquisition the N+1 days, so as to realize the intelligence of water tank design temperature
Regulation, avoid water tank design temperature too high or too low and cause user without hot water is available or delayed heat water is more and causes hot water
The situation of waste occurs, and water tank design temperature is met user's actual need.If it should be noted that unused water on the day of user
Or being only less than pre-set value Ls2 with water or same day water consumption on a small quantity, i.e. delayed heat water is full water or delayed heat water Lr
> L-Ls2, then the information of the delayed heat water of this day can be shielded, i.e., the information of the delayed heat water of this day is not as N+1
It water tank design temperature TsN+1 acquisition.
In summary, the water temperature establishing method of Teat pump boiler according to embodiments of the present invention, top n water is obtained first
Delayed heat water when the water consumption in water cycle is each used in the cycle or each using water end cycle, then according to each all with water
The water consumption of phase or each with delayed heat water amendment during water end cycle each with the water tank design temperature in water cycle to obtain
The top n amendment temperature that the water cycle is each used in the water cycle, finally according to top n with the water cycle each with the water cycle
Correct temperature and obtain the water tank design temperature for currently using the water cycle, so as to the surplus hot water according to user's water consumption or water tank
Amount carries out Intelligent adjustment to water tank design temperature, meets user's actual need, effectively avoids the water consumption caused by seasonal variations
Hot water is not enough or water tank set water temperature higher the problem of causing more heat dissipation of water tank, energy waste during increase.
Fig. 2 is the block diagram of the water temperature setting device of Teat pump boiler according to embodiments of the present invention.Such as Fig. 2 institutes
Show, the water temperature setting device of the Teat pump boiler includes:Acquisition module 10, correcting module 20 and setup module 30.
Wherein, acquisition module 10 is used to obtaining top n with each using with the water consumption in water cycle or each water in the water cycle
Delayed heat water during end cycle, wherein, N is the integer more than or equal to 1.Correcting module 20 is used for basis and each uses the water cycle
Water consumption or each with delayed heat water amendment during water end cycle each with the water tank design temperature in water cycle to obtain
The top n amendment temperature that the water cycle is each used in the water cycle.Setup module 30 is used to each be used with the water cycle according to top n
The amendment temperature in water cycle obtains the water tank design temperature for currently using the water cycle.
For example, acquisition module 10 can include multiple temperature sensors, multiple temperature sensors are from water tank bottom to water tank
Top is arranged in order, and to gather the water temperature of each height in water tank, and is calculated each with the water cycle according to the water temperature of collection
Water consumption or each delayed heat water when using water end cycle, wherein, the temperature sensor at top can also enter to current water temperature
Row display.In addition, acquisition module 10 can also include flow sensor, flow sensor is arranged on the water inlet of water tank, with
Just top n is obtained with the water consumption that the water cycle is each used in the water cycle according to the flow information of detection or each uses water end cycle
When delayed heat water.
In some embodiments of the invention, with the water cycle when a length of 1 day or 1 week.For example, it is 1 day when using the water cycle
And N be 7 when, acquisition module 10 by water consumption daily in before acquisition 7 days or it is first 7 days in daily at the end of surplus hot water
Amount.
According to one embodiment of present invention, according to each with the water consumption amendment in water cycle each with the water in water cycle
During case design temperature, wherein, if k-th is more than the first preset value with the water consumption in water cycle, correcting module 20 is then by k-th
Tuned up with the water tank design temperature in water cycle so that k-th of amendment temperature with the water cycle is more than k-th of water tank with the water cycle
Design temperature, wherein, k=1,2,3 ..., N;If k-th is less than the first preset value, correcting module with the water consumption in water cycle
20 are turned k-th so that k-th is used water with the amendment temperature in water cycle less than k-th down with the water tank design temperature in water cycle
The water tank design temperature in cycle.
According to another embodiment of the invention, each use delayed heat water amendment during water end cycle each in basis
During with the water tank design temperature in water cycle, wherein, if it is default with delayed heat water during water end cycle to be more than second k-th
Value, correcting module 20 then turns k-th with the water tank design temperature in water cycle down so that k-th small with the amendment temperature in water cycle
In k-th with the water tank design temperature in water cycle, wherein, k=1,2,3 ..., N;If k-th is used remaining during water end cycle
Waste heat water is less than the second preset value, and correcting module 20 then tunes up k-th so that k-th with the water tank design temperature in water cycle
It is more than k-th of water tank design temperature with the water cycle with the amendment temperature in water cycle.
According to one embodiment of present invention, setup module 30 obtains the water for currently using the water cycle according to above-mentioned formula (1)
Case design temperature.Preferably, in above-mentioned formula (1), a < b < ... < n.
Specifically, when being 1 day with the water cycle, first acquisition module 10 obtain before in N days once a day under heating state
Delayed heat water at the end of user's water, then correcting module 20 is according to water tank setting of the delayed heat water on the same day to the same day
Water temperature T s is modified.For example, when the delayed heat water of water tank is more, water tank design temperature can be turned down suitably, i.e., the same day
The correction value Tsx of water tank design temperature is less than the water tank design temperature Ts on the same day;When the delayed heat water of water tank is smaller or does not have
Sometimes, water tank design temperature can be heightened suitably, i.e. the water tank that the correction value Tsx of the water tank design temperature on the same day is more than the same day is set
Temperature Ts.Preferably, the correction value Tsx of the water tank design temperature on the same day can be obtained by function Tsx=F (L, Lr),
Wherein, L is the volume of water tank, and Lr is the volume of delayed heat water in water tank.
It is understood that in order to improve user's comfortableness, can be protected always in tank top after user is terminated with water
A part of hot water is stayed to ensure that user uses at any time, it is assumed that the volume of the part hot water is Ls1, then using Lr-Ls1 as water tank
Delayed heat water, now, the correction value Tsx of water tank design temperature can be obtained by function Tsx=F (L, Lr-Ls1).
After Teat pump boiler enters automatic setting water tank design temperature pattern, setup module 30 is according to preceding N days inner water tanks
The correction value of design temperature, and by the water tank design temperature of above-mentioned formula (1) acquisition the N+1 days, so as to realize that water tank is set
The Intelligent adjustment of temperature, avoid water tank design temperature too high or too low and cause user available or delayed heat water is more without hot water
And the situation for causing hot water to waste occurs, water tank design temperature is set to meet user's actual need.If it should be noted that user
The same day unused water is only less than pre-set value Ls2 with water or same day water consumption on a small quantity, i.e. delayed heat water is full water or remained
Waste heat water Lr > L-Ls2, then it can shield the information of the delayed heat water of this day, the i.e. information of the delayed heat water of this day not
Acquisition as the water tank design temperature TsN+1 of the N+1 days.
The water temperature setting device of Teat pump boiler according to embodiments of the present invention, acquisition module obtain top n with the water cycle
In each water consumption with the water cycle or each delayed heat water when use water end cycle, correcting module is according to each using water all
The water consumption of phase or each with delayed heat water amendment during water end cycle each with the water tank design temperature in water cycle to obtain
The top n amendment temperature that the water cycle is each used in the water cycle is obtained, setup module is all with each water in the water cycle according to top n
The amendment temperature of phase obtains the water tank design temperature for currently using the water cycle, so as to the residue according to user's water consumption or water tank
Hot water amount carries out Intelligent adjustment to water tank design temperature, meets user's actual need, effectively avoids using caused by seasonal variations
Hot water is not enough or water tank set water temperature higher the problem of causing more heat dissipation of water tank, energy waste during water increase.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ",
" thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " up time
The orientation or position relationship of the instruction such as pin ", " counterclockwise ", " axial direction ", " radial direction ", " circumference " be based on orientation shown in the drawings or
Position relationship, it is for only for ease of and describes the present invention and simplify description, rather than indicates or imply that signified device or element must
There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relative importance
Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can be expressed or
Implicitly include at least one this feature.In the description of the invention, " multiple " are meant that at least two, such as two, three
It is individual etc., unless otherwise specifically defined.
In the present invention, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " fixation " etc.
Term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be that machinery connects
Connect or electrically connect;Can be joined directly together, can also be indirectly connected by intermediary, can be in two elements
The connection in portion or the interaction relationship of two elements, limited unless otherwise clear and definite.For one of ordinary skill in the art
For, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
In the present invention, unless otherwise clearly defined and limited, fisrt feature can be with "above" or "below" second feature
It is that the first and second features directly contact, or the first and second features pass through intermediary mediate contact.Moreover, fisrt feature exists
Second feature " on ", " top " and " above " but fisrt feature are directly over second feature or oblique upper, or be merely representative of
Fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be
One feature is immediately below second feature or obliquely downward, or is merely representative of fisrt feature level height and is less than second feature.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description
Point is contained at least one embodiment or example of the present invention.In this manual, to the schematic representation of above-mentioned term not
Identical embodiment or example must be directed to.Moreover, specific features, structure, material or the feature of description can be with office
Combined in an appropriate manner in one or more embodiments or example.In addition, in the case of not conflicting, the skill of this area
Art personnel can be tied the different embodiments or example and the feature of different embodiments or example described in this specification
Close and combine.
Although embodiments of the invention have been shown and described above, it is to be understood that above-described embodiment is example
Property, it is impossible to limitation of the present invention is interpreted as, one of ordinary skill in the art within the scope of the invention can be to above-mentioned
Embodiment is changed, changed, replacing and modification.
Claims (10)
1. the water temperature establishing method of a kind of Teat pump boiler, it is characterised in that comprise the following steps:
Obtain top n with the water cycle each with the water consumption in water cycle or it is each use water end cycle when delayed heat water,
Wherein, N is the integer more than or equal to 1;
According to each water consumption with the water cycle or each delayed heat water amendment during water end cycle is used each to use the water cycle
Water tank design temperature each use the amendment temperature in water cycle to obtain in the top n water cycle;
Obtained currently with the water tank setting temperature in water cycle with each amendment temperature with the water cycle in the water cycle according to the top n
Degree, wherein, the water tank design temperature for currently using the water cycle is obtained according to below equation:
TsN+1=F (aTsx1, bTsx2 ..., nTsxn)
Wherein, TsN+1 is the current water tank design temperature for using the water cycle, Tsx1, Tsx2 ... Tsxn is top n use
The amendment temperature in water cycle, a, b ..., the weight coefficient that n is each amendment temperature with the water cycle in the top n water cycle.
2. the water temperature establishing method of Teat pump boiler according to claim 1, it is characterised in that use the water cycle according to each
Water consumption amendment each use the water cycle water tank design temperature when, wherein,
If k-th is more than the first preset value with the water consumption in water cycle, k-th of water tank design temperature with the water cycle is adjusted
It is big so that k-th of amendment temperature with the water cycle is more than the water tank design temperature in k-th of use water cycle, wherein, k=1,2,
3、…、N;
If k-th is less than first preset value with the water consumption in water cycle, k-th of water tank with the water cycle is set into temperature
Degree is turned down so that k-th of amendment temperature with the water cycle is less than k-th of water tank design temperature with the water cycle.
3. the water temperature establishing method of Teat pump boiler according to claim 1, it is characterised in that use the water cycle according to each
At the end of the amendment of delayed heat water each use the water cycle water tank design temperature when, wherein,
If k-th is more than the second preset value with delayed heat water during water end cycle, by k-th of water tank with the water cycle
Design temperature is turned down so that k-th of water tank design temperature for being less than k-th of use water cycle with the amendment temperature in water cycle, wherein, k
=1,2,3 ..., N;
If k-th is less than second preset value with delayed heat water during water end cycle, the water cycle is used by k-th
Water tank design temperature tunes up so that k-th of amendment temperature with the water cycle is more than k-th of water tank design temperature with the water cycle.
4. the water temperature establishing method of Teat pump boiler according to claim 1, it is characterised in that wherein, a < b < ... <
n。
5. the water temperature establishing method of the Teat pump boiler according to any one of claim 1-4, it is characterised in that the use
The water cycle when a length of 1 day or 1 week.
A kind of 6. water temperature setting device of Teat pump boiler, it is characterised in that including:
Acquisition module, when each using the water consumption in water cycle in the top n water cycle for obtaining or each using water end cycle
Delayed heat water, wherein, N is integer more than or equal to 1;
Correcting module, the delayed heat water amendment when water consumption in water cycle is each used for basis or each using water end cycle
Each the amendment temperature in water cycle is each used with the water tank design temperature in water cycle to obtain in the top n water cycle;
Setup module, for the amendment temperature acquisition in water cycle is current to use water week with each being used in the water cycle according to the top n
The water tank design temperature of phase, wherein, the setup module obtains the water tank design temperature for currently using the water cycle according to below equation:
TsN+1=F (aTsx1, bTsx2 ..., nTsxn)
Wherein, TsN+1 is the current water tank design temperature for using the water cycle, Tsx1, Tsx2 ... Tsxn is top n use
The amendment temperature in water cycle, a, b ..., the weight coefficient that n is each amendment temperature with the water cycle in the top n water cycle.
7. the water temperature setting device of Teat pump boiler according to claim 6, it is characterised in that according to each with water week
When the water tank design temperature in water cycle is each used in the water consumption amendment of phase, wherein,
If k-th is more than the first preset value with the water consumption in water cycle, the correcting module is then by k-th of the water with the water cycle
Case design temperature tunes up so that k-th of water tank design temperature for being more than k-th of use water cycle with the amendment temperature in water cycle, its
In, k=1,2,3 ..., N;
If k-th is less than first preset value with the water consumption in water cycle, the correcting module then uses the water cycle by k-th
Water tank design temperature turn down so that k-th of water tank design temperature for being less than k-th of use water cycle with the amendment temperature in water cycle.
8. the water temperature setting device of Teat pump boiler according to claim 6, it is characterised in that according to each with water week
When the water tank design temperature in water cycle is each used in delayed heat water amendment at the end of phase, wherein,
If k-th is more than the second preset value with delayed heat water during water end cycle, the correcting module is then by k-th of use
The water tank design temperature in water cycle is turned down so that k-th of amendment temperature with the water cycle is set less than k-th of water tank with the water cycle
Constant temperature degree, wherein, k=1,2,3 ..., N;
If k-th is less than second preset value with delayed heat water during water end cycle, the correcting module is then by kth
It is individual to be tuned up with the water tank design temperature in water cycle so that k-th of amendment temperature with the water cycle is more than k-th of the water with the water cycle
Case design temperature.
9. the water temperature setting device of Teat pump boiler according to claim 6, it is characterised in that wherein, a < b < ... <
n。
10. the water temperature setting device of the Teat pump boiler according to any one of claim 6-9, it is characterised in that described
With the water cycle when a length of 1 day or 1 week.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510395535.8A CN105115162B (en) | 2015-07-06 | 2015-07-06 | The water temperature establishing method and device of Teat pump boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510395535.8A CN105115162B (en) | 2015-07-06 | 2015-07-06 | The water temperature establishing method and device of Teat pump boiler |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105115162A CN105115162A (en) | 2015-12-02 |
CN105115162B true CN105115162B (en) | 2018-04-03 |
Family
ID=54663210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510395535.8A Active CN105115162B (en) | 2015-07-06 | 2015-07-06 | The water temperature establishing method and device of Teat pump boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105115162B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106052141B (en) * | 2016-06-28 | 2019-09-03 | 广东美的暖通设备有限公司 | Device is arranged in water heater and its water temperature setting method and water temperature |
CN106225246B (en) * | 2016-07-20 | 2019-07-26 | 合肥美的暖通设备有限公司 | Air energy water heater and its method for heating and controlling and device |
CN106403281B (en) * | 2016-11-15 | 2019-05-28 | 广东美的暖通设备有限公司 | Water heater control method, water heater controller and water heater |
CN106322776B (en) * | 2016-11-15 | 2019-03-22 | 广东美的暖通设备有限公司 | Water heater control method, controller and water heater |
CN108662783B (en) * | 2017-03-30 | 2020-08-07 | 芜湖美的厨卫电器制造有限公司 | Energy-saving control method and device for water heater and server |
CN114413472A (en) * | 2022-01-24 | 2022-04-29 | 青岛海信日立空调系统有限公司 | Multi-split system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103925701A (en) * | 2013-01-10 | 2014-07-16 | 广东美的暖通设备有限公司 | Heat-pump water heater and control method thereof |
CN104006539A (en) * | 2013-02-27 | 2014-08-27 | 美的集团股份有限公司 | Electric water heater and control method thereof |
CN104596115A (en) * | 2015-01-16 | 2015-05-06 | 芜湖美的厨卫电器制造有限公司 | Device for detecting residual amount of hot water in electric water heater and time correcting method |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0387562A (en) * | 1989-08-29 | 1991-04-12 | Kyocera Corp | Storage type hot-water supply apparatus |
JP2858359B2 (en) * | 1990-07-02 | 1999-02-17 | 松下電器産業株式会社 | Electric water heater |
-
2015
- 2015-07-06 CN CN201510395535.8A patent/CN105115162B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103925701A (en) * | 2013-01-10 | 2014-07-16 | 广东美的暖通设备有限公司 | Heat-pump water heater and control method thereof |
CN104006539A (en) * | 2013-02-27 | 2014-08-27 | 美的集团股份有限公司 | Electric water heater and control method thereof |
CN104596115A (en) * | 2015-01-16 | 2015-05-06 | 芜湖美的厨卫电器制造有限公司 | Device for detecting residual amount of hot water in electric water heater and time correcting method |
Also Published As
Publication number | Publication date |
---|---|
CN105115162A (en) | 2015-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105115162B (en) | The water temperature establishing method and device of Teat pump boiler | |
CN106213999B (en) | Water dispenser and its water outlet control method and device | |
CN106322776A (en) | Water heater, controller and water heater control method | |
CN105768894B (en) | Heat wetting system and its leaving water temperature calibration method, device | |
CN101871043A (en) | Steam generator of annealing furnace and control method thereof | |
CN205018842U (en) | Quick accurate accuse temperature liquid heating device | |
CN106766230A (en) | Water heater, water heater return water system and its control method and device | |
CN105091329B (en) | The control method of heat pump hot-water system and heat pump hot-water system | |
CN105928209B (en) | Heat pump water-heating machine and its defrosting control method and device | |
CN105865024A (en) | Heat pump water heaters and defrosting control method and device thereof | |
CN104879909A (en) | Gas water heater | |
CN205014631U (en) | Water heater | |
CN106034987A (en) | Internet of things technique based intelligent drip system | |
CN207022716U (en) | A kind of agricultural cultivation planter box based on Internet of Things | |
CN106500345A (en) | Heat-pump hot-water unit and its control method and device | |
CN207125027U (en) | One plant growth miniclimate model establishes device | |
CN105928199B (en) | Heat pump water-heating machine and its defrosting control method and device | |
CN207335154U (en) | More warming electric heaters | |
CN204902203U (en) | Gas water heater | |
CN206303681U (en) | A kind of electric cooker | |
CN106820989B (en) | Milk maker | |
CN205447928U (en) | Intelligence heat supply pipe network secondary network linkage regulation and control system | |
CN206424916U (en) | A kind of fused salt salt dissolving system | |
CN104956964A (en) | Thermal spring water soil heating system for saline and alkaline land greenhouse | |
CN207022725U (en) | A kind of warmhouse booth automatic temperature controlling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |