Novel bathroom intermittent heating device Download PDFInfo
- Publication number
- CN105115022A CN105115022A CN201510590108.5A CN201510590108A CN105115022A CN 105115022 A CN105115022 A CN 105115022A CN 201510590108 A CN201510590108 A CN 201510590108A CN 105115022 A CN105115022 A CN 105115022A
- Authority
- CN
- China
- Prior art keywords
- pipe
- hot water
- heating device
- opening
- shaped hot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
The invention relates to novel bathroom intermittent heating devices and discloses a novel bathroom intermittent heating device which aims at solving the problems that by means of an existing bath heater, the temperature of a bathroom cannot be evenly distributed, energy is wasted and potential safety risks exist. The novel bathroom intermittent heating device comprises gravity type heat pipes, a U-shaped hot water tank, a water inlet pipe, a water returning pipe, a water heater, a shower hot water pipe, a shower nozzle, a hand valve and a pipeline pump. A groove is formed in a wall, a thermal-protective coating is arranged in the groove, and an insulating layer is arranged on the bottom face of the thermal-protective coating. The U-shaped hot water tank is arranged in the groove in parallel with the insulating layer in a horizontal U-shaped mode. An opening is formed in one side of the U-shaped hot water tank, and one side of the opening faces upwards. The lower ends of the gravity type heat pipes are inserted in the opening of the U-shaped hot water tank, and the inserting position is sealed. One pipe opening in the opening side of the U-shaped hot water tank is connected with the water heater, and the other pipe opening in the U-shaped hot water tank is connected with the water heater. The shower hot water pipe is arranged on the side face of the water heater, and the shower nozzle is arranged at the lower end of the shower hot water pipe. The novel bathroom intermittent heating device is used for bathroom heating and showering.
Description
Technical field
The present invention relates to a kind of Novel bathroom intermitting heating device.
Background technology
The comfortableness of bath temperature is extremely important, at present, still selects super bath for most of Household bathroom heating.Although super bath is by the ingenious combination of special waterproof infrared ray and ventilation fan, the several functions such as the heating in bathroom, illumination, ventilation, health care and decoration are integrated in one, but there is a lot of problem, as bath temperature skewness, consumption be secondary energy sources electricity so not energy-conservation, but also there is a lot of potential safety hazard, as high light to eyes have spread effect, super bath be energized after its bulb temperature rise sharply as easy as rolling off a log generations burst etc.
Summary of the invention
The present invention will solve existing super bath to make bath temperature skewness, waste energy and there is the problem of potential safety hazard, and provides a kind of Novel bathroom intermitting heating device.
A kind of Novel bathroom intermitting heating of the present invention device, it comprises gravity type heat pipe, U-shaped hot water storgae, water inlet pipe, return pipe, water heater, hot water for shower pipe, shower nozzle, manually-operated gate and tubing pump composition; The side opening of body of wall is fluted, the inner surface of described groove is provided with thermal insulation layer, the bottom surface of described thermal insulation layer is provided with heat-insulation layer, described U-shaped hot water storgae is parallel to heat-insulation layer and is arranged in groove in sleeping " U " shape, in the side of U-shaped hot water storgae, opening is set, and the side of opening is upwards arranged, the lower end of gravity type heat pipe is inserted the opening of U-shaped hot water storgae and seals in insert division, in gravity type heat pipe bottom, working solution is housed, adopts water inlet pipe to be connected with water heater by the mouth of pipe of the open side of U-shaped hot water storgae; Adopt return pipe to be connected with water heater by another mouth of pipe of U-shaped hot water storgae, described water inlet pipe is provided with manually-operated gate; The side of described water heater is provided with hot water for shower pipe, and the lower end of described hot water for shower pipe is provided with shower nozzle.
The present invention is used for bathroom for warm shower.
Operation principle: open the manually-operated gate 11 on water inlet pipe 6 when heating.Temperature from water heater 8 is that the domestic hot-water of 40 DEG C ~ 60 DEG C enters U-shaped hot water storgae 5 by water inlet pipe 6, it is evaporate after the heat of the hot water of 40 DEG C ~ 60 DEG C that working solution bottom gravity type heat pipe absorbs temperature, steam upwards flows, at condensation segment condensation heat, condensation water flows downward along thermotube wall under gravity, get back to bottom and continue heat absorption evaporation, so constantly circulated heat transmission, in U-shaped hot water storgae 5, water temperature reduces, flow out from return pipe 7, be circulated back to water heater 8 through small pipeline pump 12.Can open the switch of shower nozzle 10 when needing shower, hot water arrives shower nozzle 10 from water heater 8 through hot water for shower pipe 9 and is ejected.When needing for warm shower simultaneously, only the switch of manually-operated gate 11 and shower nozzle 10 need be opened simultaneously.
The invention has the beneficial effects as follows:
1, the present invention both can use as water heater, also can realize bathroom heating function in the region without central heating, play the effect of water heater and radiator heating simultaneously, save floor occupying area again; What utilize during gravity type heat pipe heating is low-temperature heat source, fast response time, and heat can pass very soon, reduces heating system running time, both economize energy, economical again; Heat pipe is laid in body of wall, suitable with the activity space height of people, and the ratio that the heat that human body directly receives from metope accounts for total heat radiation is large, and heat utilization rate is high; And the potential safety hazard avoided human body; Water heater is the thermal source of heating, and be again the thermal source of shower, utilization rate is high, and switch control rule is simple, flexible operation, practical.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of Novel bathroom intermitting heating device;
Fig. 2 is a kind of right view of Novel bathroom intermitting heating device;
Fig. 3 is single gravity type heat pipe thermal cycle schematic diagram; Wherein X represents condensation segment, and Y represents adiabatic section, and Z represents evaporator section.
Detailed description of the invention
Detailed description of the invention one: as shown in Figure 1, Figure 2 and Figure 3, a kind of Novel bathroom intermitting heating of present embodiment device, it comprises gravity type heat pipe 1, U-shaped hot water storgae 5, water inlet pipe 6, return pipe 7, water heater 8, hot water for shower pipe 9, shower nozzle 10, manually-operated gate 11 and tubing pump 12 and forms; The side opening of body of wall 2 is fluted, the inner surface of described groove is provided with thermal insulation layer 4, the bottom surface of described thermal insulation layer 4 is provided with heat-insulation layer 3, described U-shaped hot water storgae 5 is parallel to heat-insulation layer 3 and is arranged in groove in sleeping " U " shape, in the side of U-shaped hot water storgae 5, opening is set, and the side of opening is upwards arranged, the lower end of gravity type heat pipe 1 is inserted the opening of U-shaped hot water storgae 5 and seals in insert division, in gravity type heat pipe 1 bottom, working solution is housed, adopts water inlet pipe 6 to be connected with water heater 8 by the mouth of pipe of the open side of U-shaped hot water storgae; Adopt return pipe 7 to be connected with water heater 8 by another mouth of pipe of U-shaped hot water storgae 5, described water inlet pipe 6 is provided with manually-operated gate 11; The side of described water heater 8 is provided with hot water for shower pipe 9, and the lower end of described hot water for shower pipe 9 is provided with shower nozzle 10.
Operation principle: open the manually-operated gate 11 on water inlet pipe 6 when heating.Temperature from water heater 8 is that the domestic hot-water of 40 DEG C ~ 60 DEG C enters U-shaped hot water storgae 5 by water inlet pipe 6, it is evaporate after the heat of the hot water of 40 DEG C ~ 60 DEG C that working solution bottom gravity type heat pipe absorbs temperature, steam upwards flows, at condensation segment condensation heat, condensation water flows downward along thermotube wall under gravity, get back to bottom and continue heat absorption evaporation, so constantly circulated heat transmission, in U-shaped hot water storgae 5, water temperature reduces, flow out from return pipe 7, be circulated back to water heater 8 through small pipeline pump 12.Can open the switch of shower nozzle 10 when needing shower, hot water arrives shower nozzle 10 from water heater 8 through hot water for shower pipe 9 and is ejected.When needing for warm shower simultaneously, only the switch of manually-operated gate 11 and shower nozzle 10 need be opened simultaneously.
Detailed description of the invention two: present embodiment and detailed description of the invention one unlike: described return pipe 7 is provided with tubing pump 12.Other are identical with detailed description of the invention one.
Detailed description of the invention three: present embodiment and detailed description of the invention one or two unlike: described working solution is water or bromine lithium superconducting fluid.Setting like this, is convenient to heat trnasfer, corresponds to actual needs.Other are identical with detailed description of the invention one or two.
Detailed description of the invention four: present embodiment and detailed description of the invention one to three unlike: the material of described water inlet pipe 6 and return pipe 7 is polypropylene random copolymer pipe.Setting like this, can increase security and service life, correspond to actual needs.Other are identical with detailed description of the invention one to three.
Detailed description of the invention five: one of present embodiment and detailed description of the invention one to four unlike: described gravity type heat pipe 4 by material be carbon steel, copper or stainless many inner vacuum, closed at both ends heat pipe form.Setting like this, is convenient to condensing reflux, corresponds to actual needs.Other are identical with one of detailed description of the invention one to four.
Claims (5)
1. a Novel bathroom intermitting heating device, it is characterized in that Novel bathroom intermitting heating device, it comprises gravity type heat pipe (1), U-shaped hot water storgae (5), water inlet pipe (6), return pipe (7), water heater (8), hot water for shower pipe (9), shower nozzle (10), manually-operated gate (11) and tubing pump (12) composition, the side opening of body of wall (2) is fluted, the inner surface of described groove is provided with thermal insulation layer (4), the bottom surface of described thermal insulation layer (4) is provided with heat-insulation layer (3), described U-shaped hot water storgae (5) is parallel to heat-insulation layer (3) and is arranged in groove in sleeping " U " shape, in the side of U-shaped hot water storgae (5), opening is set, and the side of opening is upwards arranged, the lower end of gravity type heat pipe (1) is inserted the opening of U-shaped hot water storgae (5) and seals in insert division, in gravity type heat pipe (1) bottom, working solution is housed, water inlet pipe (6) is adopted to be connected with water heater (8) by the mouth of pipe of the open side of U-shaped hot water storgae, adopt return pipe (7) to be connected with water heater (8) by another mouth of pipe of U-shaped hot water storgae (5), described water inlet pipe (6) is provided with manually-operated gate (11), the side of described water heater (8) is provided with hot water for shower pipe (9), and the lower end of described hot water for shower pipe (9) is provided with shower nozzle (10).
2. a kind of Novel bathroom intermitting heating device according to claim 1, is characterized in that described return pipe 7 is provided with tubing pump (12).
3. a kind of Novel bathroom intermitting heating device according to claim 1, is characterized in that described working solution is water or bromine lithium superconducting fluid.
4. a kind of Novel bathroom intermitting heating device according to claim 1, is characterized in that the material of described water inlet pipe (6) and return pipe (7) is polypropylene random copolymer pipe.
5. a kind of Novel bathroom intermitting heating device according to claim 1, it is characterized in that described gravity type heat pipe (4) by material be carbon steel, copper or stainless many inner vacuum, closed at both ends heat pipe form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510590108.5A CN105115022A (en) | 2015-09-16 | 2015-09-16 | Novel bathroom intermittent heating device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510590108.5A CN105115022A (en) | 2015-09-16 | 2015-09-16 | Novel bathroom intermittent heating device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105115022A true CN105115022A (en) | 2015-12-02 |
Family
ID=54663070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510590108.5A Pending CN105115022A (en) | 2015-09-16 | 2015-09-16 | Novel bathroom intermittent heating device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105115022A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806661A (en) * | 2017-11-28 | 2018-03-16 | 周波 | A kind of shower system of external heating system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58102053A (en) * | 1981-12-11 | 1983-06-17 | Chiyouyou Kk | Heat pipe type water heater |
CN2181668Y (en) * | 1993-11-22 | 1994-11-02 | 杨彩云 | Energy-saver for heat-pipe heat-exchanger |
CN2357274Y (en) * | 1998-04-14 | 2000-01-05 | 南通热管技术研究所 | Heat pipe type warmer |
CN101726029A (en) * | 2009-12-03 | 2010-06-09 | 大连弋博科技发展有限公司 | New-energy water-heat supply system |
CN104314195A (en) * | 2014-09-30 | 2015-01-28 | 浙江大学 | Wall based on heat pipe and heating system |
-
2015
- 2015-09-16 CN CN201510590108.5A patent/CN105115022A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58102053A (en) * | 1981-12-11 | 1983-06-17 | Chiyouyou Kk | Heat pipe type water heater |
CN2181668Y (en) * | 1993-11-22 | 1994-11-02 | 杨彩云 | Energy-saver for heat-pipe heat-exchanger |
CN2357274Y (en) * | 1998-04-14 | 2000-01-05 | 南通热管技术研究所 | Heat pipe type warmer |
CN101726029A (en) * | 2009-12-03 | 2010-06-09 | 大连弋博科技发展有限公司 | New-energy water-heat supply system |
CN104314195A (en) * | 2014-09-30 | 2015-01-28 | 浙江大学 | Wall based on heat pipe and heating system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806661A (en) * | 2017-11-28 | 2018-03-16 | 周波 | A kind of shower system of external heating system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202653897U (en) | Energy-saving steaming cabinet | |
CN107702327B (en) | Electric water heater and mode realization method thereof | |
CN202392877U (en) | Circulating water floor heating device | |
CN103557548A (en) | Electric-heating heat-supplying and bathing dual-purpose wall-hung furnace | |
CN105115022A (en) | Novel bathroom intermittent heating device | |
CN208804741U (en) | A kind of novel ground heater system | |
CN109519905A (en) | A kind of energy-saving sauna house | |
CN105783243B (en) | Household instant gas-combustion steam boiler and its pipe-line system | |
CN201973792U (en) | Heating and bathing integrating device | |
CN104390493A (en) | Secondary heat exchange water heater | |
CN204944236U (en) | A kind of wall-hung type soap lye heater | |
CN204611930U (en) | A kind of low-temperature radiator heating structure | |
CN204665437U (en) | A kind of heating installation | |
CN208253945U (en) | A kind of dedicated shower heating system in sanitary shower room | |
CN203718901U (en) | Electrothermal type heating and bathing dual-purpose wall hanging stove | |
CN201434450Y (en) | Electrothermic type heating device | |
CN202177166U (en) | Combined type solar energy warmer with cold water tank and heat storage water tank | |
CN205878569U (en) | Instant heating type domestic gas steam oven and pipe -line system thereof | |
CN205747035U (en) | Energy-saving hot water device | |
CN206037755U (en) | Heat supply water energy -saving equipment | |
CN204554966U (en) | A kind of without pipeline no liquid formula electric heater structure | |
CN203385078U (en) | Solar energy and ground source heat integrated type heat supply system | |
CN203719120U (en) | Micro energy consumption shower thermal circulation system | |
CN104048403B (en) | Split type warm braw heat pump water heater | |
CN203413856U (en) | Solar hot water utilization system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151202 |