CN105113815B - Building flat bed - Google Patents

Building flat bed Download PDF

Info

Publication number
CN105113815B
CN105113815B CN201510496786.5A CN201510496786A CN105113815B CN 105113815 B CN105113815 B CN 105113815B CN 201510496786 A CN201510496786 A CN 201510496786A CN 105113815 B CN105113815 B CN 105113815B
Authority
CN
China
Prior art keywords
corridor
flat bed
outdoor
building flat
lighting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510496786.5A
Other languages
Chinese (zh)
Other versions
CN105113815A (en
Inventor
席鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510496786.5A priority Critical patent/CN105113815B/en
Publication of CN105113815A publication Critical patent/CN105113815A/en
Application granted granted Critical
Publication of CN105113815B publication Critical patent/CN105113815B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of building flat bed, including some separate units, it is provided between at least two adjacent units and is provided with lighting system in corridor, the corridor to introduce outdoor sunlight in the corridor.Compared to prior art, not only lighting performance is excellent for building flat bed of the present invention, and causes dark place to be easy to hire out.

Description

Building flat bed
Technical field
The present invention relates to a kind of building flat layered structures, more particularly to a kind of excellent building flat layered structures of performance of ventilating.
Background technology
Hotel, also known as hotel, hotel, hotel, are the places for providing diet for guests, having a rest.After reform and opening-up, China Productivity has obtained significant progress, and business activity, the commodity transaction of businessman become frequent, so as to promote the hair of hotel industry Exhibition, hotel is built in each national city like the mushrooms after rain, for example:Pudding, 7 days hotel chains, GreenTree Inn, Jin Jiang River it Star, Ru Jia, quick, Chinese front yard etc..
In recent years, China's economy is developed rapidly, and has surmounted Japan, as the world's second-biggest economy.People are in wallet While sticking out, higher requirement is it is also proposed to the living standard of oneself.In the past, whenever festivals or holidays, people are in In watch TV, visit friends and family.Now, whenever festivals or holidays, people are more that selection is travelled outdoors, rather than unemployed It is in.Due to the raising of economic capability, when people travel outdoors, the requirement to the hotel of foot-rest is also uprised.People typically can Room of the selection with Chaoyang window, so can be with Time for Sunshine.But, in the city of an inch of land is an inch of gold, if so that every room All there is the window of Chaoyang, then the utilization rate of building is relatively low, so as to drag down economic benefit.If improving the use of building Rate, then cannot ensure that every room all has the window of Chaoyang, so as to have impact on the reservation in room.
In addition, with expanding economy, being occurred in that in city a kind of is used to concentrate the system into collection, the decision-making of row information The fixed, processing of secretarial work and the office building of the economic activity of other forms management.In order to improve employee operating efficiency, it is necessary to The work comfort degree for the office being located in office building is improved as far as possible, for example:Sunlight, potted plant, landscape corridor etc..But, it is modern Urban building flat bed area, span are all especially big.In general, a building flat bed requires division into some separate Unit is to rent different individual or unit.Therefore, it is difficult to accomplish that every office can be exposed to the sun, the irradiation of Time for Sunshine, Outdoor green landscape is watched, so as to have a strong impact on the external taxi of office building, the income of investor has been dragged down.Also, it is Temperature in regulation office is, it is necessary to install air-conditioning.If whole building flat bed install central air-conditioning, then expense by because For problem can not be turned into by family independent counting.And, each Man's Demands are different, when some people need to turn on the aircondition, some People is without turning on the aircondition, so that the period turned on the aircondition becomes to be difficult to coordinate, it is easy to grow contradiction, influence Zheng Dong buildings Getting along amiably and peacefully between interior clerical workforce.Independent air conditioning is installed if each unit, then the Independent air conditioning will be because of Pipeline is long and can not use.Secondly, the unit in the middle of the building flat bed will be connected because of surrounding is windowless with outdoor And as dark place.Because dark place daylighting is poor, so that the taxi of dark place becomes more difficult.
In view of the above problems, it is necessary to a kind of building flat bed is provided, to solve the above problems.
The content of the invention
It is an object of the invention to provide a kind of excellent building flat bed of lighting performance, to overcome the above-mentioned of prior art presence It is not enough.
The purpose of the present invention is achieved through the following technical solutions:
Corridor is provided between a kind of building flat bed, including some separate units, at least two adjacent units, Lighting system is provided with the corridor to introduce outdoor sunlight in the corridor.
Further, the lighting system is light pipe.
Further, supply air system is provided with the corridor outdoor natural air is sent into the corridor
It is interior, and the waste gas in the corridor is discharged to outdoor.
Further, the supply air system is frequency conversion supply air system.
Further, the unit is provided with Independent air conditioning, and the outer machine of the Independent air conditioning is located in the corridor.
Further, automatic irrigation system is provided with the corridor to irrigate the plant in corridor.
Further, two adjacent units are protruded out into the corridor respectively is formed with window, described adjacent The window of two units mutually staggers.
Further, the lighting system includes light pipe, photometric data collector, lighting device and controls the light According to the control module of data acquisition unit and lighting device;Outdoor solar light is imported the corridor by the light pipe;The illumination number The lumen degree and colour temperature of outdoor illumination immediately are obtained according to collector, and sends the data of acquisition to the control module;It is described Control module controls the light levels of the lighting device according to the lumen degree, colour temperature data that receive, to simulate close to family The lumen degree and colour temperature of outer illumination.
Further, the building flat bed is additionally provided with water-cooling system, and the water-cooling system includes measuring the corridor temperature The temperature sensor of degree, spray the spraying device of water smoke to the fin of the outer machine and control the temperature sensor With the control device of the spraying device.
Beneficial effects of the present invention are:
1) lighting performance is excellent.
2) dark place is caused to be easy to hire out.
Brief description of the drawings
Fig. 1 is the floor map of building flat bed of the present invention;
Fig. 2 is the module diagram of lighting system;
Fig. 3 is the module diagram of water-cooling system;
In figure, 100:Building flat bed;10:Unit;11:Window;12:Outer machine;20:Corridor;21:Lighting system;211:Lead Light pipe;212:Photometric data collector;213:Lighting device;214:Control module;22:Supply air system;23:Water-cooling system; 231:Temperature sensor;232:Spraying device;233:Control device.
Embodiment
Preferred embodiment
In order that the object, technical solutions and advantages of the present invention are clearer, below in conjunction with the accompanying drawings to the specific of the present invention Embodiment is described in detail.The example of these preferred embodiments is illustrated in the accompanying drawings.Shown in accompanying drawing and root What the embodiments of the present invention described according to accompanying drawing were merely exemplary, and the present invention is not limited to these embodiments.
Here, it should also be noted that, in order to avoid having obscured the present invention because of unnecessary details, in the accompanying drawings only Show the structure and/or process step closely related with the solution of the present invention, and eliminate and relation of the present invention less its His details.
In addition, it should also be noted that, term " comprising ", "comprising" or its any other variant be intended to it is non-exclusive Property include so that process, method, article or equipment including a series of key elements not only include those key elements, and Also include other key elements for being not expressly set out, or also include for this process, method, article or equipment inherently Key element.
Refer to shown in Fig. 1, building flat bed 100 of the present invention includes some separate units 10, and at least two is adjacent The unit 10 between be provided with corridor 20.Described at least two adjacent units 10 protrude out shape into the corridor 20 respectively Into there is window 11, the window 11 of two adjacent units 10 mutually staggers.The unit 10, which is provided with Independent air conditioning, (does not scheme Show), the outer machine 12 of the Independent air conditioning is located in the corridor 20.Lighting system 21, air-supply system are provided with the corridor 20 System 22, water-cooling system 23 and automatic irrigation system (not shown).Refer to shown in Fig. 2, the lighting system 21 includes leaded light Pipe 211, photometric data collector 212, lighting device 213 and the control photometric data collector 212 and lighting device 213 control module 214.The light pipe 211 is outdoor Yanguan Pass is imported in the corridor 20, so as to make full use of certainly Right light, saves the energy.The photometric data collector 212 is installed on roof out of doors, the stream to obtain outdoor illumination immediately Lightness and colour temperature, and send the data of acquisition to the control module 214.The control module 214 is according to the stream received Lightness, colour temperature data control the light levels of the lighting device 213, to simulate lumen degree and color close to outdoor lighting Temperature, so that the illumination in the corridor 20 is completely synchronous with open air, reaches the vivid effect of the daily illumination of altitude simulation.Institute Supply air system 22 is stated outdoor natural air is sent into the corridor 20, and the waste gas in the corridor 20 is discharged to room Outside.In the present embodiment, the supply air system 22 is frequency conversion supply air system.The water-cooling system 23 includes measuring the corridor 20 The temperature sensor 231 of temperature, the spraying device 232 for spraying to the fin of the outer machine 12 water smoke and control are described The control device 233 of temperature sensor 231 and the spraying device 232.The temperature measured when the temperature sensor 231 When value exceedes preset value, the control device 233 controls the spraying device 232 to be sprayed to the fin of the outer machine 12 Water smoke, to reduce the temperature of fin.Simultaneously as water smoke can form water droplet on a heat sink, the corridor 20 it is logical Air quantity is larger, so that the water droplet on fin can evaporate quickly, and then reduces fin, the temperature in corridor 20.Institute Irrigation system is stated to irrigate the plant in the corridor 20.Because the plant can not only obtain the water of abundance Divide, and the sunlight of abundance can be obtained and irradiate, so that the luxuriant growth, and then the corridor 20 is become One of landscape corridor.
Compared to prior art, not only lighting performance is excellent for building flat bed 100 of the present invention, and dark place is easy to Hire out.
In summary, building flat bed 100 of the present invention can effectively eliminate dark place so that every room or office all have There is sunlight, and the personnel in room or office can be caused to watch green landscape, alleviate the pressure of user, regulation The body and mind of user so that user can enjoy green in the case of home-confined.

Claims (3)

1. a kind of building flat bed, including some separate units, it is characterised in that:Set between at least two adjacent units It is equipped with and is provided with lighting system in corridor, the corridor to introduce outdoor sunlight in the corridor;The lighting system is Light pipe;Two adjacent units are protruded out into the corridor respectively is formed with window, two adjacent units Window mutually staggers;The lighting system includes light pipe, photometric data collector, lighting device and controls the illumination number According to the control module of collector and lighting device;Outdoor solar light is imported the corridor by the light pipe;The photometric data is adopted Storage obtains the lumen degree and colour temperature of outdoor illumination immediately, and sends the data of acquisition to the control module;The control Module controls the light levels of the lighting device according to the lumen degree, colour temperature data that receive, to simulate close to outdoor photograph Bright lumen degree and colour temperature;
Supply air system is provided with the corridor so that outdoor natural air is sent into the corridor, and by the corridor Waste gas is discharged to outdoor;
The unit is provided with Independent air conditioning, and the outer machine of the Independent air conditioning is located in the corridor;
The building flat bed is additionally provided with water-cooling system, and the water-cooling system includes measuring the TEMP of the corridor temperature Device, spray the spraying device of water smoke to the fin of the outer machine and control the temperature sensor and the water smoke to spray Spill the control device of device.
2. building flat bed as claimed in claim 1, it is characterised in that:The supply air system is frequency conversion supply air system.
3. building flat bed as claimed in claim 1, it is characterised in that:Automatic irrigation system is provided with the corridor so as to right Plant in corridor is irrigated.
CN201510496786.5A 2015-08-13 2015-08-13 Building flat bed Active CN105113815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510496786.5A CN105113815B (en) 2015-08-13 2015-08-13 Building flat bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510496786.5A CN105113815B (en) 2015-08-13 2015-08-13 Building flat bed

Publications (2)

Publication Number Publication Date
CN105113815A CN105113815A (en) 2015-12-02
CN105113815B true CN105113815B (en) 2017-10-17

Family

ID=54661906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510496786.5A Active CN105113815B (en) 2015-08-13 2015-08-13 Building flat bed

Country Status (1)

Country Link
CN (1) CN105113815B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002270015A (en) * 2001-03-14 2002-09-20 Nikken Sekkei Ltd Lighting system effectively utilizing natural light
CN1429961A (en) * 2001-12-31 2003-07-16 赵冰 Combined multifunction stereo ecological building
CN201652153U (en) * 2010-03-26 2010-11-24 上海市建筑科学研究院(集团)有限公司 Active natural light guiding device for building
CN102296838A (en) * 2011-07-05 2011-12-28 罗进南 White corridor for residential building and white corridor residential building thereof
CN202559779U (en) * 2012-05-07 2012-11-28 王正发 Energy-saving house
CN203261868U (en) * 2013-06-19 2013-11-06 曾振均 Ecological greening system for house and indoor ecological greening system
CN103472872A (en) * 2013-09-12 2013-12-25 常州市诚天电子有限公司 Indoor brightness control system
CN103597278A (en) * 2011-06-03 2014-02-19 奥斯兰姆施尔凡尼亚公司 Multimode color tunable light source and daylighting system
CN203880597U (en) * 2014-03-31 2014-10-15 吴砺 Light supplementary device for night-side buildings
CN104676447A (en) * 2015-03-16 2015-06-03 苏州风格机电安装工程有限公司 Integral light guide illumination system with air purifying function

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201297565Y (en) * 2008-08-05 2009-08-26 陈福海 Sunlight system for interior illumination of buildings

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002270015A (en) * 2001-03-14 2002-09-20 Nikken Sekkei Ltd Lighting system effectively utilizing natural light
CN1429961A (en) * 2001-12-31 2003-07-16 赵冰 Combined multifunction stereo ecological building
CN201652153U (en) * 2010-03-26 2010-11-24 上海市建筑科学研究院(集团)有限公司 Active natural light guiding device for building
CN103597278A (en) * 2011-06-03 2014-02-19 奥斯兰姆施尔凡尼亚公司 Multimode color tunable light source and daylighting system
CN102296838A (en) * 2011-07-05 2011-12-28 罗进南 White corridor for residential building and white corridor residential building thereof
CN202559779U (en) * 2012-05-07 2012-11-28 王正发 Energy-saving house
CN203261868U (en) * 2013-06-19 2013-11-06 曾振均 Ecological greening system for house and indoor ecological greening system
CN103472872A (en) * 2013-09-12 2013-12-25 常州市诚天电子有限公司 Indoor brightness control system
CN203880597U (en) * 2014-03-31 2014-10-15 吴砺 Light supplementary device for night-side buildings
CN104676447A (en) * 2015-03-16 2015-06-03 苏州风格机电安装工程有限公司 Integral light guide illumination system with air purifying function

Also Published As

Publication number Publication date
CN105113815A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
Besir et al. Green roofs and facades: A comprehensive review
Al-Kodmany Eco-towers: Sustainable cities in the sky
Hongbing et al. Optimal tree design for daylighting in residential buildings
CN105113815B (en) Building flat bed
CN106569470A (en) Plant greenhouse control system in agriculture sightseeing industry
CN112883660B (en) Functional facility configuration method based on cell microenvironment and outdoor comfort simulation
Taib et al. The cooling effects of plants on the built environment
Al-Kodmany Eco-iconic skyscrapers: review of new design approaches
Pinassang et al. What We Can Learn from Vernacular House and COVID-19 Infection? A Review of Mbaru Niang, Flores, Indonesia
CN201981968U (en) Layer-upon-layer rain curtain wind current window
CN112160620A (en) Safe bus stop suitable for pregnant women
CN202232474U (en) Sunshine hog house
CN205161229U (en) Two spore mushrooms cultivation factory building
Fadzil et al. Energy and Bulding Control Systems in the Tropics (Penerbit USM)
Guo Research on train station architecture design method based on climate response
Marchwinski Role and factors of solar facades shaping in contemporary architecture
Council ZCB Fact Sheet
Fallahi et al. The analysis of the role of green walls in reduction of heat islands in Tehran
Khotbehsara et al. Porch and balcony as sustainable architecture factors in vernacular houses of west of Guilan: Case studies in Khotbehara, Iran
Dai et al. Evaluation of the Front Square of Harbin West Railway Station Based on POE Method
Alabsi et al. Sustainable adaptation climate of traditional buildings technologies in the hot dry regions
Liu et al. A Study of Green and Intelligent Remodeling Methods of Existing Buildings in Lingnan Area: A Case Study of the Design of Global Villa Women’s Health Club in Guangzhou
Jiang et al. Evaluation of the use of Urban Public Space Based on PSPL—Taking the Place as an Example
Bagheri Moghaddam Urban vertical garden: ways to improve living conditions by applying green façades in buildings refurbishment at semi-arid climate
Liu et al. ECOLOGICAL DESIGN OF NATIONAL FOREST PARK SERIVCE CENTER RESEARCH

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant