CN105089029B - Double-deck water conservancy diversion dams the oil fence - Google Patents
Double-deck water conservancy diversion dams the oil fence Download PDFInfo
- Publication number
- CN105089029B CN105089029B CN201510219085.7A CN201510219085A CN105089029B CN 105089029 B CN105089029 B CN 105089029B CN 201510219085 A CN201510219085 A CN 201510219085A CN 105089029 B CN105089029 B CN 105089029B
- Authority
- CN
- China
- Prior art keywords
- freeboard
- double
- short
- float
- oil fence
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 53
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 238000007789 sealing Methods 0.000 claims description 10
- 230000000694 effects Effects 0.000 description 4
- 230000005484 gravity Effects 0.000 description 3
- 239000007788 liquid Substances 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 239000013536 elastomeric material Substances 0.000 description 1
- 239000000383 hazardous chemical Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/20—Controlling water pollution; Waste water treatment
- Y02A20/204—Keeping clear the surface of open water from oil spills
Landscapes
- Cleaning Or Clearing Of The Surface Of Open Water (AREA)
Abstract
The oil fence the invention provides a kind of double-deck water conservancy diversion dams, including:Short freeboard, high freeboard and double floats of trapezoid cross section, short freeboard and high freeboard are arranged on double floats, short freeboard and high freeboard are arranged along the direction perpendicular to the trapezoid cross section of double floats, short freeboard and high freeboard protrude from the top surface of double floats and bottom surface, short freeboard protrudes from the length that the length of the top surface of double floats protrudes from the top surface of double floats less than high freeboard, short freeboard protrudes from the length that the length of the bottom surface of double floats protrudes from the bottom surface of double floats less than high freeboard, short freeboard, high freeboard and double floats surround oil-collecting groove with outer side bottom surface on the outside of the top surface of double floats.Using technical scheme, trapezoidal pair of float design not only considerably increases buoyancy, and increased the stability of oil fence system, improve the anti-sinking of the oil fence, it is anti-it is flat fall ability, it is ensured that the smooth development of the oil fence and emergency management and rescue work.
Description
Technical field
The present invention relates to technical field of petroleum industry, dam the oil fence in particular to a kind of double-deck water conservancy diversion.
Background technology
In oil product and hazardous chemical liquid leakage (unifying abbreviation oil spilling below) emergence technology field, the oil fence is the most
Spill containment equipment that is important, being most widely used.Whether oil fence effect is played by this body structure, water volume flow rate, wind speed, ripple
The multi-party factor such as wave affects.
The almost all of oil fence adopts single float or single airbag design to originate as main buoyancy at present, adopts
Go alone side of a ship design and escaped with oil spilling under water with preventing water surface oil spilling from splashing.Design this first cannot provide the buoyancy of abundance,
And hurdle center and freeboard are in same plane, in the larger water body of flow velocity or stormy waves, as buoyancy deficiency is easily submerged to water
Below face, as crank is susceptible to put down, cannot be floated by oil film gravity and tension force effect and be failed.Secondly in oil spilling
When measuring larger, oil film thickness can increase sharply, and under wind wave action, oil spilling is easy to splash or even break through the oil fence and surround continue
Diffusion;Moreover, the turbulent flow that being continuously increased with oil film thickness, especially high flow rate are produced, can make oil spilling in oil
Sheared below film and escaped under freeboard.In addition the almost all of oil fence can only be realized containing the work of oil spilling at present
With, the removing of oil product also needs to the realization of the equipment such as supporting oil skimmer or oil scavenge pump, does not only make full use of resource, once and
Being removed without of oil product is carried out in time, as the continuous accumulation of oil is easy to oil fence failure and oil spilling is escaped, is occurred tight
Weight consequence.
Therefore, invention one kind can provide powerful buoyancy and overstable center of gravity, and can effectively prevent oil spilling from waterborne
Escape under water, the oil fence for being provided simultaneously with oil pumping oil absorptive function is extremely necessary.Not yet there is the report of such device the country at present
Road.
The content of the invention
Present invention is primarily targeted at provide a kind of double-deck water conservancy diversion dam the oil fence, to solve of the prior art to enclose oil
Hurdle is easily submerged to below the water surface due to buoyancy deficiency, as crank is susceptible to put down, is made by oil film gravity and tension force
With the problem that cannot float and fail.
To achieve these goals, the oil fence according to an aspect of the invention, there is provided a kind of double-deck water conservancy diversion dams, bag
Include:Double floats of short freeboard, high freeboard and trapezoid cross section, short freeboard and high freeboard are arranged on double floats, short freeboard and height
Freeboard is arranged along the direction perpendicular to the trapezoid cross section of double floats, short freeboard and high freeboard protrude from the top surface of double floats and
Bottom surface, short freeboard protrude from the length that the length of the top surface of double floats protrudes from the top surface of double floats less than high freeboard, short freeboard
The length for protruding from the bottom surface of double floats is less than the length that high freeboard protrudes from the bottom surface of double floats, and short freeboard, high freeboard are double
Oil-collecting groove is surrounded with outer side bottom surface on the outside of the top surface of float.
Further, the trapezoid cross section of double floats is isosceles trapezoid.
Further, the distance of the middle section of short freeboard and the double floats of high freeboard distance is equal.
Further, double floats include two prismatoids being connected, and the bottom of two prismatoids connects as one, two
The upper end of the connecting portion of prismatoid forms the kerve of circular arc, and short freeboard and high freeboard are arranged on different two prismatoid
On.
Further, short freeboard and overrisen freeboard plane are overlapped with the middle section of two prismatoids respectively.
Alternatively, the top surface of double floats offers the kerve of circular arc, and kerve is along perpendicular to the trapezoid cross section of double floats
Direction arrange, short freeboard and high freeboard are separately positioned on the both sides of kerve.
Further, double-deck water conservancy diversion dams the oil fence also including stream guiding tube, and stream guiding tube is interposed in the kerve of double floats
In, stream guiding tube is open design, and upward, the shape of stream guiding tube is adapted opening direction with the shape of kerve.
Further, double-deck water conservancy diversion dams the oil fence also including many steel rib plates, and many steel rib plates are set at intervals
Put in kerve, the two ends of steel rib plate are fixed on double floats.
Further, double-deck water conservancy diversion dams the oil fence also including sealing side of a ship blanket, seals the bottom surface that side of a ship blanket is arranged on double floats
Go up and be located between short freeboard and high freeboard.
Further, sluicing is offered with repeated hole on the part of the overrisen bottom surface for protruding from double floats.
Using technical scheme, trapezoidal pair of float design not only considerably increases buoyancy, and increased and enclose oil
The stability of hurdle system, improves the anti-sinking of the oil fence, anti-flat ability, it is ensured that it is smooth that the oil fence and emergency management and rescue work
Carry out.
Description of the drawings
The Figure of description for constituting the part of the application is used for providing a further understanding of the present invention, and the present invention's shows
Meaning property embodiment and its illustrated for explaining the present invention, does not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 show double-deck water conservancy diversion of the invention dam the oil fence embodiment front view;
Fig. 2 show double-deck water conservancy diversion of the invention dam the oil fence embodiment side view;And
Fig. 3 show double-deck water conservancy diversion of the invention dam the oil fence embodiment top view.
Wherein, above-mentioned accompanying drawing includes the following drawings labelling:
1st, short freeboard;2nd, high freeboard;
3rd, double floats;4th, steel rib plate;
5th, seal side of a ship blanket;6th, stream guiding tube;
7th, freeboard is connected hole;8th, side of a ship blanket is connected hole;
9th, sluice with repeated hole;10th, oil-collecting groove.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase
Mutually combine.Below with reference to the accompanying drawings and in conjunction with the embodiments describing the present invention in detail.
The device is the paralleling two beds oil fence, and main body is made up of three parts, and respectively double floats 3, double-deck freeboard, oil-collecting are recessed
Groove.Specifically by short freeboard 1, high freeboard 2, double floats 3, steel rib plate 4, freeboard be connected hole 7, side of a ship blanket be connected hole 8, let out
Water matches somebody with somebody repeated hole 9 and oil-collecting groove 10 is constituted.Two freeboards of double-deck freeboard are different, and short freeboard 1 is placed in and comes oily direction, high freeboard
2 are placed in direction of deoiling;Surround a semi-enclosed space i.e. oil-collecting groove 10 between two freeboards respectively on the water under water;Freeboard is put down
Face is passed through from the trapezoidal middle section of two floats, and 2 liang of ends of short freeboard 1 and high freeboard have one and drain the side of a ship and are connected hole 7;It is many
The section oil fence couples together the oil fence to form random length by the hole that is connected.
The float adopts solid double-layer trapezoid section float, is formed in parallel by two trapezoid floats, under two is trapezoidal
Portion is connected as a single entity, and length is identical, and two trapezoidal float connecting portion upper ends are that circular sliding slopes form a circular arc kerve;Or regard as
One trapezoid takes the kerve to form that bottom is circular arc from upper end, and forms oil-collecting groove 10;
Two freeboards of the double-deck freeboard are different, wherein a freeboard is waterborne, underwater portion height is higher for height
Freeboard 2, another is short freeboard 1, and short freeboard 1 is placed in and comes oily direction, and high freeboard 2 is placed in direction of deoiling;Between two freeboards respectively
Surround a semi-enclosed space i.e. oil-collecting groove 10 on the water under water;Freeboard plane is heavy with the trapezoidal middle section of two floats respectively
Close, i.e., pass through from the trapezoidal middle section of two floats, two freeboard lengths are longer than float length, freeboard two end point symmetrical with regard to float
It is not provided with one and drains the side of a ship and is connected hole 7;The more piece oil fence is coupled together by the hole that is connected and can form random length
The oil fence.
It is in order to the liquid drains such as the oil product for collecting to two sides are reclaimed, sandwiched with long stream guiding tube 6 with freeboard by one
In the circular arc kerve of buoy upper, its shape is identical with circular arc kerve shape, is tightly affixed with kerve wall, is highly less than
Circular arc kerve depth, using the material with some strength and elasticity;Stream guiding tube 6 be open design, opening direction upward,
Oil and water can be pooled in stream guiding tube 6 by opening.
To increase the bonding strength of double floats 3,3 top of double floats is that, above stream guiding tube 6, three steel rib plates 4 are inserted
Among double floats 3, and filter larger debris and prevent into stream guiding tube 6;4 main body section of steel rib plate is rectangle, equidistantly
Arrangement, the sectional area at plate two ends are accumulated more than plate main body section, form the end of step, increase bonding strength.
To prevent oil product from permeating, between two freeboards, float two ends, sealing side of a ship blanket 5 is provided with below stream guiding tube;The sealing side of a ship
5 length of blanket is stopped to freeboard end from float end, and width is with the spacing between two freeboards with wide;Sealing side of a ship blanket 5 and freeboard and
Float is seamlessly connected to form an entirety;5 end of sealing side of a ship blanket is provided with side of a ship blanket and is connected hole 8, and diameter is solid with the connection of freeboard
Determine the sealing of hole is identical, for the more piece oil fence connection and connecting portion.
To release, segment fluid flow reduces impulsive force of the fluid to the oil fence, and 2 underwater portion bottom of the high freeboard is provided with one
Drain water matches somebody with somebody repeated hole 9.
As can be seen from the above description, the above embodiments of the present invention realize following technique effect:Ladder of the invention
The double float design of shape not only considerably increases buoyancy, and increased the stability of oil fence system, improves the oil fence anti-heavy
Not, resist flat ability, it is ensured that the smooth development of the oil fence and emergency management and rescue work;Double freeboard designs of the invention combine mozzle
Can effectively prevent oil spilling from escaping with guiding gutter, the function of oil suction Oil Guide can also be realized while oil spilling is contained, work is greatly increased
Make efficiency, economize on resources;The present invention adopts segmented design, and the hole connection that is connected is provided with by every section end, can be according to reality
Border situation adjustment oil fence length, easy to use and flexible.
Embodiment 1 as shown in Fig. 1 to Fig. 3, the example are the paralleling two beds oil fence, and main body is made up of three parts, respectively
Double floats 3 in trapezoid section, double-deck freeboard, oil-collecting groove 10.Specifically by short freeboard 1, high freeboard 2, double floats 3, steel rib
Be connected hole 8, the sluicing of hole 7, side of a ship blanket that is connected of plate 4, sealing side of a ship blanket 5, stream guiding tube 6, freeboard is constituted with repeated hole 9.
Described overstable double-deck water conservancy diversion dams the oil fence, and float is formed in parallel by two trapezoids, and two trapezoidal lowers connect
It is integrated, connecting portion upper end is that circular sliding slopes form a circular arc kerve;Or a trapezoid can be regarded as take from upper end
Form kerve of the bottom for circular arc.After the parallel connection of wherein two floats, high 330mm, go to the bottom long 1000mm, the long 800mm in upper bottom, upper bottom
Middle opening part width 300mm, circular arc kerve diameter 240mm, two go to the bottom rounding of angle angular diameter 20mm, and on two, base angle rounding is straight
Footpath 60mm, two rounding of angle angular diameter 30mm of upper bottom middle opening part.
Described overstable double-deck water conservancy diversion dams the oil fence, is interposed in float with long stream guiding tube 6 with freeboard by one
Circular arc kerve in, stream guiding tube is open design, and its shape is identical with circular arc kerve shape, using with some strength
And elastomeric material.Wherein thickness of soft tube 6mm, external diameter 248mm, internal diameter 242mm.
Described overstable double-deck water conservancy diversion dams the oil fence, and float guiding gutter top is three steel rib plates 4, and plate main body is cut
Face is rectangle, is equidistantly arranged, and two end cross-sectional areas of plate are accumulated more than plate main body section, forms the end of step, and plate two ends are inserted
Enter in the middle of float.Wherein steel rib plate size of main body length × width x thickness is 600mm × 200mm × 100mm, and end size is 10mm
×220mm×120mm
Described overstable double-deck water conservancy diversion dams the oil fence, and, using double-deck freeboard, two freeboards are different for the oil fence, wherein
One freeboard is waterborne, underwater portion height is higher for high freeboard 2, and another is short freeboard 1, and short freeboard 1 is placed in and comes oily direction,
High freeboard 2 is as direction of deoiling.Distinguish between two freeboards.Wherein short freeboard 1 is high
660mm, part 240mm in water line, 2 high 920mm of high freeboard, part 360mm in water line.
Described overstable double-deck water conservancy diversion dams the oil fence, and freeboard plane is overlapped with the trapezoidal middle section of two floats respectively, and two
Freeboard length is longer than float length symmetrical with regard to float, and two end of freeboard has a row and is connected hole 7.It is connected
Bore dia 12mm.
Described overstable double-deck water conservancy diversion dams the oil fence, is provided between two freeboards, outside float, below stream guiding tube
Sealing side of a ship blanket 5.Side of a ship blanket length is stopped to freeboard end from float end, and width is with the oil guide groove between two freeboards with wide.Side of a ship blanket
End is provided with side of a ship blanket and is connected hole 8, and the diameter and freeboard hole that is connected is identical.
Described overstable double-deck water conservancy diversion dams the oil fence, and high freeboard underwater portion bottom is provided with a drain water with repeated hole 9.
Wherein sluice with 9 diameter 40mm of repeated hole.
In the present embodiment, the overstable double-deck water conservancy diversion of the two long 1.8m of the section oil fence that dams is connected by the hole that is connected
It is horizontally placed in the simulating riverway of wide 3m afterwards, simulation flow velocity is 0.3m/s, and the depth of water is 1.5m.As a result show, when water gets over too short freeboard
Afterwards, high freeboard can carry out further effectively intercepting, in water concentration and stream guiding tube, by absorption pump, effectively by the water for collecting
Siphon away, while the suction pipe of pump is placed in guiding gutter under water, can effectively aspirate the liquid in guiding gutter, application effect is good.
The preferred embodiments of the present invention are the foregoing is only, the present invention is not limited to, for the skill of this area
For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair
Change, equivalent, improvement etc., should be included within the scope of the present invention.
Claims (10)
1. a kind of double-deck water conservancy diversion dams the oil fence, it is characterised in that include:Short freeboard (1), high freeboard (2) and trapezoid cross section
Double floats (3), the short freeboard (1) and the high freeboard (2) are arranged on described pair of float (3), the short freeboard (1) and
The high freeboard (2) is arranged along the direction perpendicular to the trapezoid cross section of described pair of float (3), the short freeboard (1) and described
High freeboard (2) protrudes from top surface and the bottom surface of described pair of float (3), and the short freeboard (1) protrudes from described pair of float (3)
The length of top surface protrudes from the length of the top surface of described pair of float (3) less than the high freeboard (2), and the short freeboard (1) is prominent
Length in the bottom surface of described pair of float (3) protrudes from the length of the bottom surface of described pair of float (3) less than the high freeboard (2),
The short freeboard (1), high freeboard (2) are on the outside of the top surface of described pair of float (3) and outer side bottom surface surrounds oil-collecting groove (10).
2. double-deck water conservancy diversion according to claim 1 dams the oil fence, it is characterised in that trapezoidal section of described pair of float (3)
Face is isosceles trapezoid.
3. double-deck water conservancy diversion according to claim 1 dams the oil fence, it is characterised in that the short freeboard (1) and the height
Distance of the freeboard (2) apart from the middle section of described pair of float (3) is equal.
4. double-deck water conservancy diversion according to claim 1 dams the oil fence, it is characterised in that described pair of float (3) is including two
The prismatoid being connected, the bottom of described two prismatoids are connected as one, the upper end of the connecting portion of described two prismatoids
The kerve of circular arc is formed, the short freeboard (1) and the high freeboard (2) are arranged on different described two prismatoids.
5. double-deck water conservancy diversion according to claim 4 dams the oil fence, it is characterised in that the short freeboard (1) and the height
The freeboard plane of freeboard (2) is overlapped with the middle section of described two prismatoids respectively.
6. double-deck water conservancy diversion according to claim 1 dams the oil fence, it is characterised in that the top surface of described pair of float (3) is opened
The kerve of circular arc is provided with, the kerve is arranged along the direction perpendicular to the trapezoid cross section of described pair of float (3), the short freeboard
And the high freeboard (2) is separately positioned on the both sides of the kerve (1).
7. the double-deck water conservancy diversion according to any one of claim 4 to 6 dams the oil fence, it is characterised in that the bilayer is led
Stream dams the oil fence also including stream guiding tube (6), and the stream guiding tube (6) is interposed in the kerve of described pair of float (3),
The stream guiding tube (6) is open design, opening direction upward, the shape of the stream guiding tube (6) and the shape of the kerve
It is adapted.
8. the double-deck water conservancy diversion according to any one of claim 4 to 6 dams the oil fence, it is characterised in that the bilayer is led
Stream dams the oil fence also including many steel rib plate (4), and many steel rib plate (4) are arranged on the kerve at intervals
Interior, the two ends of the steel rib plate (4) are fixed on described pair of float (3).
9. double-deck water conservancy diversion according to claim 1 dams the oil fence, it is characterised in that the double-deck water conservancy diversion dams the oil fence
Also include sealing side of a ship blanket (5), sealing side of a ship blanket (5) is arranged on the bottom surface of described pair of float (3) and is located at the short freeboard
(1) and the high freeboard (2) between.
10. double-deck water conservancy diversion according to claim 1 dams the oil fence, it is characterised in that high freeboard (2) protrude from
Sluicing is offered on the part of the bottom surface of described pair of float (3) with repeated hole (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510219085.7A CN105089029B (en) | 2014-05-14 | 2015-05-01 | Double-deck water conservancy diversion dams the oil fence |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2014102034290 | 2014-05-14 | ||
CN201410203429 | 2014-05-14 | ||
CN201510219085.7A CN105089029B (en) | 2014-05-14 | 2015-05-01 | Double-deck water conservancy diversion dams the oil fence |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105089029A CN105089029A (en) | 2015-11-25 |
CN105089029B true CN105089029B (en) | 2017-04-05 |
Family
ID=54570289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510219085.7A Active CN105089029B (en) | 2014-05-14 | 2015-05-01 | Double-deck water conservancy diversion dams the oil fence |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105089029B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989009A (en) * | 2017-12-19 | 2018-05-04 | 高邮市恒昌泡沫制品有限公司 | A kind of floating ball for the oil fence |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10337571A (en) * | 1997-06-05 | 1998-12-22 | Kyowa Kiko Kk | Oil collecting container |
JP2004204594A (en) * | 2002-12-26 | 2004-07-22 | Nippon Tansan Gas Co Ltd | Automatic inflatable fence and automatic inflatable fence unit |
CN201258474Y (en) * | 2008-09-02 | 2009-06-17 | 何光海 | Raking equipment |
CN201263902Y (en) * | 2008-09-12 | 2009-07-01 | 侯新华 | Light-duty float oil recovery machine |
CN101871206A (en) * | 2009-04-27 | 2010-10-27 | 黄海峰 | Floating oil collecting device |
CN205077471U (en) * | 2014-05-14 | 2016-03-09 | 中国石油天然气股份有限公司 | Double -deck water conservancy diversion railing for oil that dams |
-
2015
- 2015-05-01 CN CN201510219085.7A patent/CN105089029B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105089029A (en) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101761060B (en) | Water area dirt-removing interception and absorption dam and assembly component thereof | |
CN103079667A (en) | Oil-water separation device | |
KR101450732B1 (en) | A PE Floating Pier with Complex Multi-function | |
CN105089029B (en) | Double-deck water conservancy diversion dams the oil fence | |
CN103649416B (en) | Suction float and gathering-device and collecting ship | |
CN109881648A (en) | A kind of unpowered separation and collection device flowing oil slick and dross | |
CN205077471U (en) | Double -deck water conservancy diversion railing for oil that dams | |
CN112726534A (en) | Blue algae collecting floating dam enclosure device | |
CN111498945B (en) | Device structure for treating leaked petroleum in water body | |
JP5893643B2 (en) | Underwater sediment suction and flow equipment and foreign matter trapping method | |
CN203741799U (en) | Oil recovery system | |
KR20090128651A (en) | Double oil fence | |
CN112156561A (en) | Effluent water sump that industrial sewage treatment used | |
RU2298065C1 (en) | Method and device for oil product gathering from water surface | |
CN217399543U (en) | Anti-leakage aqueduct | |
CN211596891U (en) | A cleaning device for water conservancy construction | |
RU106263U1 (en) | BOON BOOM | |
JP5274633B2 (en) | Oil storage facility with breakwater | |
CN207031114U (en) | A kind for the treatment of tank being convenient to clean | |
KR20110135677A (en) | Device of preventing oil-leaks | |
CN212295368U (en) | Partition blocking and guiding type waterproof system | |
KR20110086115A (en) | Drain pipe | |
CN209619834U (en) | A kind of bridge drip construction | |
JPS6241947B2 (en) | ||
JP2004033862A (en) | Oil separating apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211117 Address after: Room 08-10, 6 / F, block a, No. 5, Dongtucheng Road, Chaoyang District, Beijing 100013 Patentee after: National Petroleum and natural gas pipeline network Group Co.,Ltd. Address before: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen Patentee before: PetroChina Company Limited |