CN105084155B - Lift facility - Google Patents

Lift facility Download PDF

Info

Publication number
CN105084155B
CN105084155B CN201510259458.3A CN201510259458A CN105084155B CN 105084155 B CN105084155 B CN 105084155B CN 201510259458 A CN201510259458 A CN 201510259458A CN 105084155 B CN105084155 B CN 105084155B
Authority
CN
China
Prior art keywords
supporting member
liftway
long
guard
gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510259458.3A
Other languages
Chinese (zh)
Other versions
CN105084155A (en
Inventor
横沟大树
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN105084155A publication Critical patent/CN105084155A/en
Application granted granted Critical
Publication of CN105084155B publication Critical patent/CN105084155B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/02Cages, i.e. cars

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)

Abstract

The present invention, which provides, to tackle the lift facility for rocking caused by earthquake etc. and preventing long-object from tangling with easy structure.The guide rail (5,6) for the lifting of long-object, lifting body, guiding lifting body in liftway being arranged in outfit in liftway (2);In order to set in the lift facility for the supporting member for being located at equipment in the well in liftway and being arranged on guide rail, in the upright projection of liftway viewed from above, the end of supporting member (7) is configured to have interval between the wall of the liftway on supporting member bearing of trend (1), and guard member (14) is set on the wall of the liftway on the bearing of trend of supporting member, the guard member relative to overlapping with having gap (15) between long-object domain of the existence side of the supporting member in liftway and supporting member, gap between supporting member and guard member is set in below the section shortest length of long-object.

Description

Lift facility
Technical field
The present invention relates to the lift facility that can prevent that the long-object of elevator from being tangled.
Background technology
In the liftway of elevator, multiple supporting members are installed on guide rail, and be provided with position on the supporting Put the components such as detection switch, inductor plate, controlling cable.In addition, there is the main hoist cable of hanging car and counterweight in elevator, be arranged on The long-objects such as the speed regulator hoist cable being equipped with the cable and speed regulator on car, when earthquake etc. occurs, long-object hair be present Raw rock and supported part tangle, the possibility of damaged member and long-object.As prevent background technology that long-object tangles have with Under patent document 1.
Prior art literature
Patent document
Patent document 1:Japanese Unexamined Patent Publication 2011-26021 publications
The content of the invention
The invention problem to be solved
Anti- being mounted prevent from tangling to being closed between lifting channel wall and protruding member described in patent document 1 Put including:Be connected to hollow cylinder and with liftway link first end, be connected in hollow cylinder and slide in the axial direction Slide bar and link with protruding member the second end, between them mutually slidably chimeric sliding gomphosis portion, make slide bar It is inclined to the spring of advanced position and the adjustment spire at the distance between adjustable first end and the second end.
However, in the technology of above-mentioned patent document 1 exist be used for absorb earthquake etc. caused by between first end and the second end Distance and angle change anti-hanging device it is complicated the problem of.
For the present invention in view of above-mentioned show actual conditions in the art and propose, its purpose is that offer can be with easy structure Rocked caused by reply earthquake etc. and the lift facility for the reliability for preventing long-object from tangling can be improved.
For solving the technical scheme of problem
In order to reach above-mentioned purpose, lift facility of the invention is characterised by, including:The length being arranged in liftway Object;The lifting body lifted in the liftway;The guide rail for guiding the lifting body to be lifted in the liftway;With The supporting member on the guide rail is arranged in order to set the well inner member in the liftway, in institute viewed from above In the upright projection for stating liftway, the end of the supporting member is configured to and the liter on the bearing of trend of the supporting member Interval between the wall of drop passage, also, on the wall of the liftway on the bearing of trend of the supporting member Guard member is set, the guard member relative to long-object domain of the existence side of the supporting member in the liftway with it is described Have between supporting member and overlap with gap, the gap between the supporting member and the guard member is set in the length Below the section shortest length of object.
Invention effect
According to the present invention, it is possible to provide can prevent from growing to rock and can improve caused by easy structure reply earthquake etc. The lift facility for the reliability that object tangles.
Brief description of the drawings
Fig. 1 is the top view for the first embodiment for representing the lift facility of the present invention.
Fig. 2 is the major part amplification plan view of Fig. 1 lift facility.
Fig. 3 be the present invention lift facility second embodiment in major part amplification plan view corresponding with Fig. 2.
Embodiment
Illustrate embodiments of the present invention below by way of embodiment shown in the drawings.
【Embodiment 1】
Fig. 1 is the top view for the first embodiment for representing the lift facility of the present invention.As shown in figure 1, the elevator of the present invention Equipment includes:By lifting channel wall 1 be front side wall 1a, horizontal side wall 1b, rear wall 1c surround and formed liftway 2, conduct In the liftway 2 car 3 of the lifting body of lifting and counterweight 4, (not shown) lead via be arranged on lifting channel wall 1 The car guide rail 5 for the pair of right and left that rail supporting member is arranged in liftway 2 in the vertical direction and via be arranged on rise Guide rail support part (not shown) on drop conduit wall 1 is arranged at the counterweight of the pair of right and left in liftway 2 in above-below direction With guide rail 6.Car 3 is guided and lifting moving, also, right in the vertical direction via boots (not shown) of leading by car guide rail 5 4 are weighed via boots (not shown) of leading by guiding and lifting moving in the vertical direction reusing guide rail 6.
At least one prolongs substantially in parallel with lifting channel wall 1 (being horizontal side wall 1b in the present embodiment) in the present embodiment The supporting member 7 for stretching setting is supported on car guide rail 5, and structure in the well in liftway 2 is provided with the supporting member 7 Part such as inductor plate 8, speed regulator hoist cable anti-shaking device 9, controlling cable support 10, wire netting 11, control cabinet 12 and position Detection switch 13.
In addition, in the first embodiment, as long-object, it is provided with liftway 2 and for example hangs car 3 and counterweight 4 Main hoist cable (not shown), the elevator cable (travelling cable) 17, cable and the speed regulator that are arranged on car 3 be with hanging Rope 18.
In this lift facility of the present embodiment, in the upright projection of liftway 2 viewed from above, make supporting member There is interval to configure between 7 end and the wall 1a and wall 1c of the liftway 2 on the bearing of trend of supporting member 7, and And on the wall 1a and wall 1c of the liftway 2 on the bearing of trend of supporting member 7, relative to supporting in liftway 2 There is the region side of long-object in part 7, that is, the side that the grade of car 3 be present overlaps and protection of the supporting member 7 with gap 15 Part 14.The guard member 14, which has, prevents the protrusion in liftway from tangling the function of long-object.In addition, as shown in figure 1, this reality The guard member 14 for applying example is arranged on the both ends of 6 supporting members 7, altogether on 6 positions.
Fig. 2 is the major part amplification plan view of Fig. 1 lift facility.As shown in the drawing, guard member 14 is with relative to branch Bearing member 7 is provided with the gap 15 smaller than the appearance and size of long-object and in the close neighbouring lifting body (sedan-chair compared with the supporting member 7 Railway carriage or compartment 3 and counterweight 4) side bending mode be arranged on supporting member 7 extension direction on lifting channel wall 1 on.Also, support Part 7 and the gap 15 of guard member 14 are set in below the section shortest length of long-object.
Here, the section shortest length of long-object refers to, such as if for main hoist cable and speed regulator hoist cable 18 it is its section Diameter, it is then the length of the square most short part in section if elevator cable 17.Supporting member 7 and the gap 15 of guard member 14 It can be set in below the section shortest length of the long-object nearest from the position set by each guard member 14.Set and also can in this wise Enough prevent long-object supported part 7 from tangling.In addition, gap 15 can be also set in liftway 2 in existing all long-objects Under the section shortest length of long-object with most short cross-sectional length.By setting in this wise, considerably improving prevents The reliability that long-object supported part 7 tangles.
In addition, in the present embodiment, as shown in Fig. 2 guard member 14 is fixed on by fastener 16 (such as foundation bolt) On lifting channel wall 1.In addition, the prominent length L that guard member 14 protrudes from wall 1 is the length for being enough to bend to supporting member 7.
In the first embodiment, supporting member 14 is with close neighbouring car 3 and the grade lifting body of counterweight 4 compared with supporting member 7 Side bending mode be arranged on the lifting channel wall 1 of the bearing of trend of supporting member 7.Thus, even if master as long-object Hoist cable, the elevator cable 17 being arranged on car 3 and cable and speed regulator hoist cable 18 also can because earthquake etc. shakes Prevent it from being tangled around the rear side of supporting member 7.
In addition, the gap 15 of guard member 14 and the supporting member of supporting member 7 is due to smaller than the appearance and size of long-object, therefore surplus Part will not enter the gap and be tangled around the rear side of supporting member 7.
Further, by setting gap 15 between guard member 14 and supporting member 7, even if lifting channel wall 1 is because of earthquake Deng and relative to the displacement of supporting member 7, because the gap 15 between guard member 14 and supporting member 7 can absorb displacement, therefore will not damage Hinder supporting member 7.
So, according to the present embodiment, guard member 14 is due to for relative to appearance and size of the supporting member 7 provided with than long-object Small gap 15 and the close neighbouring side bent as the car 3 of lifting body and the side of counterweight 4 compared with the supporting member 7 Formula is fixed on the structure on the lifting channel wall 1 of the bearing of trend of supporting member 7, turns into simple structure, being capable of cost of implementation reduction. In addition, guard member 14 is formed by using the part of square-section, can without using special material easy to manufacture.
Illustrated in addition, listing the supporting member 7 and horizontal side wall 1b examples extended substantially in parallel in the present embodiment, But the present embodiment is not limited to this.That is, relative to the supporting member 7 extended in various directions, in the bearing of trend of supporting member 7 Liftway 2 wall on set relative to long-object domain of the existence side of the supporting member 7 in liftway 2 and supporting member 7 guard members 14 to overlap while there is space.Branch is provided with car guide rail 5 in addition, having lifted in the present embodiment The example of bearing member 7 illustrates, but also supporting member 7 can be being set on guide rail 6 to reusing.These modes all can be by using this hair Bright structure obtains the effect above.
【Embodiment 2】
Fig. 3 be the present invention lift facility second embodiment in major part amplification plan view corresponding with Fig. 2.This reality The lift facility for applying mode has and same structure described in embodiment 1.Only pair point different from embodiment 1 is carried out below Explanation.
As shown in figure 3, the guard member 24 of the present embodiment is smaller than the appearance and size of long-object to be provided with relative to supporting member 7 Gap 15, and bend close to the side of neighbouring car 3 and the grade lifting body of counterweight 4 compared with the supporting member 7 and further cover The mode of the downside of cover support 7 is arranged on the lifting channel wall 1 on the direction of the extension of supporting member 7.That is, present embodiment Shape of the supporting member 7 into section L words.
According to second embodiment, due to also covers the downside of supporting member 7, protected so long-object can be entirely prevented to enter In the gap 15 of guard 24 and supporting member 7.
Further, since building shrinks because conducting oneself with dignity the influence with aging, lifting channel wall 1 is relative to car guide rail 5 With to reusing guide rail 6 to downside displacement.Therefore, the guard member 24 being fixed on lifting channel wall 1 is downward also relative to supporting member 7 Side displacement, but because the part that guard member 24 covers supporting member 7 is only downside, guard member 24 will not be touched with supporting member 7. In addition, can be reached and identical effect described in embodiment 1 by embodiment 2.
Indicia explanation
1 ... lifting channel wall;2 ... liftways;3 ... cars;4 ... counterweights;5 ... car guide rails;6 ... lead to reuse Rail;7 ... utensil supporting members;14th, 24 ... guard members.

Claims (2)

  1. A kind of 1. lift facility, it is characterised in that including:
    The long-object being arranged in liftway;
    The lifting body lifted in the liftway;
    The guide rail for guiding the lifting body to be lifted in the liftway;With
    The supporting member on the guide rail is arranged in order to set the well inner member in the liftway,
    In the upright projection of the liftway viewed from above, the end of the supporting member is configured to and the supporting member Interval between the wall of the liftway on bearing of trend, also, the institute on the bearing of trend of the supporting member State and guard member is set on the wall of liftway, long-object of the guard member relative to the supporting member in the liftway Have between domain of the existence side and the supporting member and overlap with gap,
    The gap between the supporting member and the guard member is set in below the section shortest length of the long-object,
    The guard member is the shape of section L-shaped, to cover the long-object domain of the existence side of the supporting member and below Mode configure.
  2. 2. lift facility as claimed in claim 1, it is characterised in that:
    The gap between the supporting member and the guard member is set in the long-object with most short cross-sectional length Below the section shortest length of long-object.
CN201510259458.3A 2014-05-20 2015-05-20 Lift facility Active CN105084155B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014103903A JP6258123B2 (en) 2014-05-20 2014-05-20 Elevator equipment
JP2014-103903 2014-05-20

Publications (2)

Publication Number Publication Date
CN105084155A CN105084155A (en) 2015-11-25
CN105084155B true CN105084155B (en) 2018-03-30

Family

ID=54565624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510259458.3A Active CN105084155B (en) 2014-05-20 2015-05-20 Lift facility

Country Status (2)

Country Link
JP (1) JP6258123B2 (en)
CN (1) CN105084155B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11214464B2 (en) 2018-05-16 2022-01-04 Otis Elevator Company Elevator seismic performance apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101412480A (en) * 2007-10-19 2009-04-22 三菱电机株式会社 Elevator apparatus
CN101450764A (en) * 2007-12-06 2009-06-10 三菱电机株式会社 Anti-cable hanging device for elevator
CN103466400A (en) * 2012-06-06 2013-12-25 株式会社日立制作所 Strip-shaped member anti-hooking device for elevator
JP2014047003A (en) * 2012-08-30 2014-03-17 Hitachi Ltd Fixture bracket for elevator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101412480A (en) * 2007-10-19 2009-04-22 三菱电机株式会社 Elevator apparatus
CN101450764A (en) * 2007-12-06 2009-06-10 三菱电机株式会社 Anti-cable hanging device for elevator
CN103466400A (en) * 2012-06-06 2013-12-25 株式会社日立制作所 Strip-shaped member anti-hooking device for elevator
JP2014047003A (en) * 2012-08-30 2014-03-17 Hitachi Ltd Fixture bracket for elevator

Also Published As

Publication number Publication date
CN105084155A (en) 2015-11-25
JP2015218046A (en) 2015-12-07
JP6258123B2 (en) 2018-01-10

Similar Documents

Publication Publication Date Title
FI20125548A (en) Elevator system and procedure
KR101324078B1 (en) Vertical roller of stage equipment
EP3275824B1 (en) Traveling cable sway prevention
MX2018015681A (en) Hoisting arrangement of rope hoist.
CN105026298A (en) Elevator renovation method
CN205855858U (en) A kind of derrick crane hoist rope passes around system
CN103626063B (en) Large-sized gantry crane wire rope winding device and rope-winding method
CN105084155B (en) Lift facility
CN102471023B (en) Elevator device
CN105658562A (en) Elevator installation
CN106219424A (en) A kind of many double crosslinking drums wire line guide
CN103787175A (en) One-to-one-ripe-winding-ratio machine-room-less elevator device
CN104428235A (en) Elevator device
CN107428509A (en) Lift appliance
KR101311873B1 (en) Camera system for monitoring the hook of a tower crane
CN104444778B (en) A kind of coil of strip lifting device
CN105570847A (en) Stage suspender control device
CN205367403U (en) Elevator hauler installation device
JP2017025560A (en) Net lifting device
TWI668177B (en) Lockdown device holding tool and method for adjusting position of compensation device
JP6218158B2 (en) Machine room-less elevator
CN104531176A (en) Coke jar cover of dry quenching lifter
CN202936060U (en) Intermediate guide and traction elevator
JP5996593B2 (en) Elevator tail cord mounting structure
CN103112768B (en) Middle guide and traction elevator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant