CN105078236A - Device for brewing beverage and brewing machine - Google Patents

Device for brewing beverage and brewing machine Download PDF

Info

Publication number
CN105078236A
CN105078236A CN201410166773.7A CN201410166773A CN105078236A CN 105078236 A CN105078236 A CN 105078236A CN 201410166773 A CN201410166773 A CN 201410166773A CN 105078236 A CN105078236 A CN 105078236A
Authority
CN
China
Prior art keywords
cold water
water storage
storage cistern
boiler
lower floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410166773.7A
Other languages
Chinese (zh)
Other versions
CN105078236B (en
Inventor
郭建刚
文灵丹
林锦如
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xinbao Electrical Appliances Holdings Co Ltd
Original Assignee
Guangdong Xinbao Electrical Appliances Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Xinbao Electrical Appliances Holdings Co Ltd filed Critical Guangdong Xinbao Electrical Appliances Holdings Co Ltd
Priority to CN201410166773.7A priority Critical patent/CN105078236B/en
Publication of CN105078236A publication Critical patent/CN105078236A/en
Application granted granted Critical
Publication of CN105078236B publication Critical patent/CN105078236B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Dispensing Beverages (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The present invention relates to an apparatus for beverage brewing, which includes a cold water tank, a hot water tank having a first water outlet for supplying hot water to the outside, a heating member disposed in a pipe communicating the cold water tank and the hot water tank to heat water, and a gas passage communicating a non-water head space of the cold water tank, the hot water tank, and ambient atmosphere with each other to achieve air pressure equilibrium of the cold water tank and the hot water tank, so that water heated by the heating member can be delivered into the hot water tank by the pressure of generated water vapor. The device has simple structure, low manufacturing cost and convenient operation. The invention also relates to a brewer using the device for brewing beverages.

Description

A kind of device for beverage brewing and machine for brewing
Technical field
The present invention relates to a kind of device for beverage brewing.The invention still further relates to a kind of machine for brewing comprising this device for beverage brewing.
Background technology
With the quickening pace of modern life, the beverage machine of quick brewing beverage liking of people can be subject to.In the process using this beverage machine, by the high thermal element in beverage machine, water is heated, be stored in water tank by the water heated.Then just the hot water be stored in water tank introducing can be brewed parts place to brew beverage.
But, in beverage machine of the prior art, pump is installed, utilizes pump to make water can pump to high thermal element, complete heating in high thermal element after, then send in water tank.Therefore this beverage machine not only complex structure, manufacturing cost is high, and installs loaded down with trivial details, uses also inconvenient.
Summary of the invention
For above-mentioned problem, the present invention proposes a kind of device for beverage brewing.This apparatus structure is simple, low cost of manufacture, uses also more for convenience.The invention allows for the machine for brewing of the device comprised for beverage brewing.
According to a first aspect of the invention, propose a kind of device for beverage brewing, comprise cold water storage cistern, there is boiler, the heater block of the first delivery port for outside supplying hot water, and gas passage, wherein heater block is arranged in the pipeline being communicated with cold water storage cistern and boiler to heat water, the anhydrous headroom of cold water storage cistern, boiler and ambient air are interconnected the air pressure balance realizing cold water storage cistern and boiler by gas passage, and the water through heater block heating is transported in boiler by the pressure of produced steam.
By the device for beverage brewing of the present invention, by arranging gas passage, the anhydrous headroom of cold water storage cistern, boiler and ambient air being interconnected, making the air pressure of cold water storage cistern and boiler keep balance.Thus carrying out in the process heated, cold water successfully can flow into heating element heater from cold water storage cistern, and is successfully delivered in boiler by hot water and steam by the pressure that steam produces.Thus avoid the special water pump for drawing water is set in device.Thereby simplify structure, reduce manufacturing cost, facilitate operation simultaneously.
In one embodiment, boiler comprises open top and is sealedly arranged on open-topped hot water case lid, and gas passage is connected to boiler and covers.Thus, gas passage is connected with hot water case lid, achieves being communicated with of the anhydrous headroom of gas passage and boiler.It is easy to realize, and is convenient to processing.
In one embodiment, cold water storage cistern is provided with upper strata cold water storage cistern, lower floor's cold water storage cistern, and only allows the first seal of water flowing from upper strata cold water storage cistern to lower floor cold water storage cistern, and wherein gas passage is communicated with lower floor cold water storage cistern.By this set, when upper strata cold water storage cistern has water, under gravity, water can be flowed in lower floor's cold water storage cistern by the first seal.When not having water in the cold water storage cistern of upper strata, and be communicated with the anhydrous headroom of boiler by gas passage due to lower floor's cold water storage cistern, thus lower floor's cold water storage cistern air pressure along with the air pressure of boiler increase time, the first seal serves the effect of sealing lower floor cold water storage cistern.
In one embodiment, gas passage comprises three-way pipe, and the first end of three-way pipe is connected with the anhydrous headroom of boiler, and the second end of three-way pipe is connected with lower floor cold water storage cistern, and the 3rd end of three-way pipe is communicated with ambient air.Boiler, air pressure balance between cold water storage cistern and ambient air is achieved by above-mentioned setting.This simple structure simultaneously, is easy to realize.
In one embodiment, 3rd end of three-way pipe is provided with control valve, control valve is configured in first course of work, the 3rd end of three-way pipe is kept to be communicated with, boiler and lower floor's cold water storage cistern and ambient air air pressure are balanced each other, in second course of work, make the 3rd end cut-off of three-way pipe, the pressure of boiler is increased.Preferably, control valve is magnetic valve.Further preferably, magnetic valve is closed type.Magnetic part is set in lower floor's cold water storage cistern, and this magnetic part can float in water.Thus, by the switch of the change Controlling solenoid valve of the liquid level of water in lower floor's cold water storage cistern.Thus keep connection or the cut-off of the 3rd end of three-way pipe.
In one embodiment, in boiler, arrange conduit, one end of conduit is communicated with the first delivery port, and the other end is arranged on the interior diapire place of boiler.Because the first delivery port is not necessarily arranged on the least significant end of boiler, but be arranged on the sidewall of boiler.All by above-mentioned setting, can ensure that hot water can flow out from the first delivery port of any position being arranged on boiler.This set makes device rationally distributed, compact overall structure.
In one embodiment, check valve is set in conduit.Prevent hot water via the backflow of conduit by this kind of setting, hot water can only be flowed out from boiler.
In one embodiment, cover at boiler relief valve is set.When the air pressure in boiler is too high, by relief valve pressure release.Therefore serve protective effect by this set, increase the safety in utilization of device.
In one embodiment, in the described pipeline between cold water storage cistern and heater block, check valve is set.This set is used for anti-sealing and refluxes towards cold water storage cistern.
According to a further aspect in the invention, provide a kind of machine for brewing, machine for brewing comprises above-mentioned device.Comprise the machine for brewing of said apparatus, structure is simple.Successfully brewing of beverage can be carried out safely in use procedure.
In the application, described " first course of work " refers to that cold water storage cistern and boiler are all communicated with ambient environment air, the process of three place's air pressure balances.Described " second course of work " refers to that lower floor's cold water storage cistern and boiler all end with ambient air, but lower floor's cold water storage cistern and boiler are communicated with between the two and keep the process of air pressure balance.
Compared with prior art, the present invention includes following advantage.Being communicated with the anhydrous headroom of boiler, cold water storage cistern and ambient air by arranging gas passage, make the two ends air pressure balance of heat generating components, thus the pressure that hot water is produced by steam being fed in boiler.Thus avoid and arrange for the pump to pumping hot water in boiler, simplify overall structure, reduce manufacturing cost.In second course of work, boiler air pressure increases, and makes hot water to be extruded boiler to machine for brewing from the first delivery port, carries out brewageing of beverage.Thus avoid and set up the special air pump for being extruded by hot water in a device, simplify the structure.Therefore, this apparatus structure is simple and compact, and dependability is high.
Accompanying drawing explanation
Also will be described in more detail the present invention with reference to accompanying drawing based on embodiment hereinafter.Wherein:
Fig. 1 is the exploded view according to the device for beverage brewing of the present invention;
Fig. 2 is the stereogram according to the device for beverage brewing of the present invention;
Fig. 3 is the water pneumatic diagram according to the device for beverage brewing of the present invention;
Fig. 4 is the stereogram of the device for beverage brewing according to the present invention when opening gas lid;
Fig. 5 is the stereogram of the device for beverage brewing according to the present invention when opening hot water case lid;
Fig. 6 is according to the profile of device in first course of work for beverage brewing of the present invention; With
Fig. 7 is according to the profile of device in second course of work for beverage brewing of the present invention.
In the drawings, identical component is indicated by identical Reference numeral.Accompanying drawing is not according to the scale of reality.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention will be further described.
Fig. 1 show schematically show according to the device 100 for beverage brewing of the present invention in the mode of 3-D view.As shown in Figure 1, device 100 comprise cold water storage cistern 15, boiler 30, be arranged on be communicated with cold water storage cistern 15 and boiler 30 pipeline 24 in the heater block 26 heated water, and gas passage 50 (finding out by knowing in Fig. 2).Wherein cold water storage cistern 15 is heater block 26 feeding cold water, and cold water, after heater block 26 heats, is stored in boiler 30.Be stored in hot water in boiler 30 by the first delivery port 31 bleeder 100 in machine for brewing (not shown), carry out brewing of beverage.
As shown in Figure 2, just the anhydrous headroom of cold water storage cistern 15, boiler 30 and ambient air are interconnected in gas passage 50.Thus realize the air pressure balance of cold water storage cistern 15 and boiler 30.Thus in the process heated water, water can successfully be flow in heater block 26 by cold water storage cistern 15, and is delivered in boiler 30 by heater block 26 by hot water and steam by the pressure that steam produces.Not be used in this device 100 and special water pump is set, just can realize the flowing of water.This device 100 structure is simple, and low cost of manufacture is easy to operate.
Preferably, pipe 24 is utilized to be connected to one end of heater block 26 from the bottom of cold water storage cistern 15, for being supplied water to heater block 26 by cold water storage cistern 15.Utilize pipe 24 that the other end of heater block 26 is connected to the bottom of boiler 30, for being supplied water to boiler 30 by heater block 26.Preferably, pipe 24 is silicone tube.
In order to ensure integrally-built compactedness, simplifying processing and manufacturing process simultaneously, reducing production cost.As shown in Figure 5, boiler 30 and the manufacture of cold water storage cistern 15 integral type.Boiler 30 is positioned at the side of cold water storage cistern 15.As shown in Figure 1, boiler 30 comprises open top 32 and the sealed hot water case lid 7 being arranged on described open top 32.Gas passage 50 comprises the second outlet 71 being arranged on and hot water case lid 7 can being communicated with inside and outside boiler 30.Gas lid 1 is also provided with in the upper end of hot water case lid 7.Space 4 (not shown) that can be communicated with ambient air is formed between gas lid 1 and hot water case lid 7.
Cold water storage cistern 15 is provided with upper strata cold water storage cistern 151 and lower floor's cold water storage cistern 152.First seal 16 of energy unidirectional water inflow is set between upper strata cold water storage cistern 151 and lower floor's cold water storage cistern 152, as shown in Figure 6.The water of upper strata cold water storage cistern 151 flows in lower floor's cold water storage cistern 152 by the first seal 16, and the first seal 16 is configured to ensure the sealing of lower floor's cold water storage cistern 152 relative to upper strata cold water storage cistern 151.
As shown in Figure 2, gas passage 50 comprises three-way pipe 23, and wherein the first end of three-way pipe 23 export 71 with second of hot water case lid 7 be connected by pipe 24, and the second end of three-way pipe 23 passes through pipe 24 and is connected with lower floor cold water storage cistern 152.Pipe 24 JA(junction ambient) air is passed through at the 3rd end of three-way pipe 23.In order to the compactedness of implement device, the three-terminal link of three-way pipe 23 is on exhaust outlet 72.Wherein exhaust outlet 72 is arranged on the sidewall of hot water case lid 7, for connected space 4 and pipe 24.Arrow in Fig. 2 indicates the gas flow direction in gas passage 50, and the steam in boiler 30 can be entered the first end of three-way pipe 23 through pipe 24 by the second outlet 71.Lower floor's cold water storage cistern 152 can be entered by the second end of three-way pipe 23 through pipe 24, by the 3rd end of three-way pipe 23, can be entered in space 4 by exhaust outlet 72 through pipe 24 simultaneously.Thus achieve the air pressure balance between boiler 15 and lower floor's cold water storage cistern 152 and ambient air three.
As shown in Figure 2, the pipe 24 between the 3rd end and exhaust outlet 72 of three-way pipe 23 is provided with the control valve 20 ended for connected sum.Preferably, this control valve 20 is magnetic valve.Further preferably, magnetic valve 20 is closed type.For making compact overall structure, and magnetic valve 20 is installed reliably, by solenoid valve bracket 19, magnetic valve 20 is fixedly mounted on the side of boiler 30.As shown in Figure 6, the diapire of lower floor's cold water storage cistern 152 is provided with the magnetic switch 21 opened or closed for Controlling solenoid valve 20.Position corresponding with magnetic switch 21 in the inner chamber of lower floor's cold water storage cistern 152 arranges the magnet 13 handling magnetic switch 21.Magnet 13 is placed in box float 14, and is provided with floating head 12 the opening part of float 14 is sealed.Thus, magnet 13 is positioned at the space that float 14 forms with floating head 12, and can float under buoyancy of water effect along with float 14 and floating head 12.
When having water in the inner chamber of lower floor's cold water storage cistern 152, under water buoyancy, float 14, floating head 12 float together with magnet 13, as shown in Figure 7.Now, magnetic switch 21 is not applied, place and off-state.After power-on, magnetic valve 20 is energized, conducting between the two-port of magnetic valve 20.To be heated at heater block 26 when water and flowed in boiler 30.While hot water flows into, the gas in boiler 30 by the second outlet 71, successively through three-way pipe 23, magnetic valve 20, discharged by exhaust outlet 72.And because the gas in boiler 30 is connected through three-way pipe 23 and lower floor's cold water storage cistern 152 and ambient air, can make the air pressure balance at heater block 26 two ends, make cold water can flow into heater block 26 smoothly, hot water can flow out heater block 26 smoothly.When the hot water of boiler 30 is when slowly filling it up with, the water of lower floor's cold water storage cistern 152 is also slowly reducing, and float 14, floating head 12 and magnet 13 are slowly declining.When the water of lower floor's cold water storage cistern 152 is boiled dry, float 14, floating head 12 and magnet 13 have dropped to the bottom of lower floor's cold water storage cistern 152, close to magnetic switch 21, as shown in Figure 6.At this moment magnetic switch 21 conducting under the magneticaction of magnet 13, thus magnetic valve 20 power-off is closed.Thus ended the connection of three-way pipe 23 to ambient air.
After magnetic valve 20 power-off is closed, heater block 26 is also working on, and also has last part water to be heated to form steam in heater block 26.Due to the closedown of magnetic valve 20, end being communicated with of boiler 30 and cold water storage cistern 15 and ambient air, do not had gas to discharge.Meanwhile, the air pressure of the air pressure high pressure upper strata cold water storage cistern 151 of lower floor's cold water storage cistern 152, now the first seal 16 pairs of lower floor's cold water storage cisterns 152 serve sealing function.Thus, the air pressure in boiler 30 can rise rapidly.Thus by conduit 9, hot water is extruded the first delivery port 31, carry out brewing of beverage.
As shown in Figure 1, in order to make device rationally distributed, compact overall structure, the first delivery port 31 is not necessarily arranged on the least significant end of boiler 30, but is arranged on the sidewall of boiler 30.In boiler 30, arrange conduit 9 thus, one end of conduit 9 is communicated with the first delivery port 31, and the interior diapire that the other end closes on boiler 30 is arranged, and makes the water in boiler 30 can be delivered to the first delivery port 31 by conduit 9.
In order to prevent hot water to be refluxed by the direction in export-oriented boiler 30, hot water outwards can only be flowed out from boiler 30.Check valve 10 is set in conduit 9.Preferably, check valve 10 is ball valve.Its structure is simple, easily realizes.
In order to prevent hot water from refluxing to the direction of cold water storage cistern 15, in the pipe 24 between cold water storage cistern 15 and heater block 26, check valve 10 is set.Preferably, check valve 10 is ball valve.Its structure is simple, easily realizes.
The position in the space 4 on hot water case lid 7 arranges relief valve 3.When the air pressure in boiler 30 is too high, by relief valve 3 pressure release.Serve protective effect by this set, increase the safety in utilization of device 100.
Below by the operating process according to Fig. 1-7 come detailed device 100.
Add water in cold water storage cistern 15, under gravity, water can be entered in lower floor's cold water storage cistern 152 by upper strata cold water storage cistern 151 through the first seal 16.And flowed in heater block 26 by pipe 24 and the ball valve 3 be arranged in pipe 24.Now, under water buoyancy, float 14, floating head 12 float together with magnet 13.Magnetic switch 21 is not applied thus, place and off-state.After power-on, water, after heater block 26 is heated, flows in boiler 30 through silicone tube 24.Now magnetic valve 20 is energized, conducting between the two-port of magnetic valve 20.Because gas passage 50 makes the gas in boiler 30 all connect through three-way pipe 23 and lower floor's cold water storage cistern 152 and ambient air, the air pressure balance at heater block 26 two ends can be made, make cold water can flow into heater block 26 smoothly, under the pressure that steam produces, hot water and steam is delivered in boiler 30.When the hot water of boiler 30 is when slowly filling it up with, the water of cold water storage cistern 15 is also slowly reducing, and float 14, floating head 12 and magnet 13 are slowly declining.When the water of lower floor's cold water storage cistern 152 is boiled dry, float 14, floating head 12 and magnet 13 have dropped to the bottom of lower floor's cold water storage cistern 152, close to magnetic switch 21.At this moment magnetic switch 21 conducting under the magneticaction of magnet 13, thus magnetic valve 20 power-off is closed.The above-mentioned course of work is first course of work.After magnetic valve 20 power-off is closed, device 100 enters second course of work by first course of work.In second course of work, heater block 26 is also working on, and also has last part water to be heated to form steam in heater block 26.Due to the closedown of magnetic valve 20, ended in gas passage 50 with being communicated with of ambient air, do not have gas to discharge to ambient air.Meanwhile, the first seal 16 pairs of lower floor's cold water storage cisterns 152 serve sealing function.Now, the air pressure in boiler 30 can rise rapidly.Thus by conduit 9, hot water is extruded the first delivery port 31, carry out brewing of beverage.If the air pressure in boiler 30 is excessive, air pressure can be leaked out by relief valve 3.
Although do not demonstrate, device 100 of the present invention may be used for machine for brewing.Also therefore structure is simple, easy to use for this machine for brewing.
Although invention has been described with reference to preferred embodiment, without departing from the scope of the invention, various improvement can be carried out to it and parts wherein can be replaced with equivalent.The present invention is not limited to specific embodiment disclosed in literary composition, but comprises all technical schemes fallen in the scope of claim.

Claims (10)

1. for a device for beverage brewing, it is characterized in that, comprising:
Cold water storage cistern,
Boiler, it has the first delivery port for outside supplying hot water,
Heater block, it is arranged on to heat water in the pipeline being communicated with described cold water storage cistern and described boiler,
Gas passage, the anhydrous headroom of described cold water storage cistern, described boiler and ambient air are interconnected the air pressure balance realizing described cold water storage cistern and described boiler by it, and the water heated through described heater block is transported in described boiler by the pressure of produced steam.
2. device according to claim 1, is characterized in that, described boiler comprises open top and is sealedly arranged on described open-topped hot water case lid, and described gas passage is connected to described boiler and covers.
3. device according to claim 1 and 2, it is characterized in that, described cold water storage cistern is provided with upper strata cold water storage cistern, lower floor's cold water storage cistern, and only allows the first seal of water flowing from described upper strata cold water storage cistern to described lower floor cold water storage cistern, and wherein said gas passage is communicated with described lower floor cold water storage cistern.
4. device according to claim 3, it is characterized in that, described gas passage comprises three-way pipe, the first end of described three-way pipe is connected with the anhydrous headroom of described boiler, second end of described three-way pipe is connected with described lower floor cold water storage cistern, and the 3rd end of described three-way pipe is communicated with described ambient air.
5. device according to claim 4, it is characterized in that, 3rd end of described three-way pipe is provided with control valve, described control valve is configured to keep the 3rd end of described three-way pipe to be communicated with in first course of work, described boiler and described lower floor cold water storage cistern and ambient air air pressure are balanced each other, and in second course of work, keep the 3rd end cut-off of described three-way pipe, the pressure of described boiler is increased.
6. the device according to any one of claim 1 to 5, is characterized in that, in described boiler, arrange conduit, and one end of described conduit is communicated with described first delivery port, and the other end is arranged on the interior diapire place of described boiler.
7. device according to claim 6, is characterized in that, in described conduit, arrange check valve.
8. device according to claim 2, is characterized in that, covers arrange relief valve at described boiler.
9. the device according to any one of claim 1 to 9, is characterized in that, arranges check valve in the described pipeline between described cold water storage cistern and described heater block.
10. a machine for brewing, is characterized in that, described machine for brewing comprises the device according to any one of claim 1 to 9.
CN201410166773.7A 2014-04-23 2014-04-23 Device for brewing beverage and brewing machine Active CN105078236B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410166773.7A CN105078236B (en) 2014-04-23 2014-04-23 Device for brewing beverage and brewing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410166773.7A CN105078236B (en) 2014-04-23 2014-04-23 Device for brewing beverage and brewing machine

Publications (2)

Publication Number Publication Date
CN105078236A true CN105078236A (en) 2015-11-25
CN105078236B CN105078236B (en) 2017-12-12

Family

ID=54560248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410166773.7A Active CN105078236B (en) 2014-04-23 2014-04-23 Device for brewing beverage and brewing machine

Country Status (1)

Country Link
CN (1) CN105078236B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110840257A (en) * 2018-08-20 2020-02-28 广东美的生活电器制造有限公司 Beverage machine and beverage brewing method
CN114158927A (en) * 2021-08-31 2022-03-11 佛山市顺德区美的饮水机制造有限公司 Multifunctional drinking machine
US11369227B2 (en) 2018-08-20 2022-06-28 Guangdong Midea Consumer Electrics Manufacturing Co., Ltd. Beverage dispenser and beverage brewing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002030250A1 (en) * 2000-10-11 2002-04-18 Electrical & Electronics Limited A hot beverage prepare machine
US20080148959A1 (en) * 2006-12-22 2008-06-26 Bockbrader Robert H Device for producing small batches of coffee from liquid coffee concentrate
CN202312855U (en) * 2011-06-27 2012-07-11 梁锦欢 Directly-heated type water dispenser
CN202960141U (en) * 2012-10-31 2013-06-05 沁园集团股份有限公司 Water inlet/outlet control system for water dispenser
CN203852210U (en) * 2014-04-23 2014-10-01 广东新宝电器股份有限公司 Device for brewing beverage and brewing machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002030250A1 (en) * 2000-10-11 2002-04-18 Electrical & Electronics Limited A hot beverage prepare machine
US20080148959A1 (en) * 2006-12-22 2008-06-26 Bockbrader Robert H Device for producing small batches of coffee from liquid coffee concentrate
CN202312855U (en) * 2011-06-27 2012-07-11 梁锦欢 Directly-heated type water dispenser
CN202960141U (en) * 2012-10-31 2013-06-05 沁园集团股份有限公司 Water inlet/outlet control system for water dispenser
CN203852210U (en) * 2014-04-23 2014-10-01 广东新宝电器股份有限公司 Device for brewing beverage and brewing machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110840257A (en) * 2018-08-20 2020-02-28 广东美的生活电器制造有限公司 Beverage machine and beverage brewing method
US11369227B2 (en) 2018-08-20 2022-06-28 Guangdong Midea Consumer Electrics Manufacturing Co., Ltd. Beverage dispenser and beverage brewing method
CN114158927A (en) * 2021-08-31 2022-03-11 佛山市顺德区美的饮水机制造有限公司 Multifunctional drinking machine

Also Published As

Publication number Publication date
CN105078236B (en) 2017-12-12

Similar Documents

Publication Publication Date Title
CN102112026A (en) Beverage forming apparatus with centrifugal pump
KR100861167B1 (en) hot water circulation system
CN204169656U (en) Capsule beverage brewing apparatus
CN105078236A (en) Device for brewing beverage and brewing machine
CN103225871A (en) Hot water circulating system
CN203852210U (en) Device for brewing beverage and brewing machine
CN103815789B (en) Capsule beverage brewing apparatus
CN104105433B (en) Stress reduction system for espresso coffee machine
RU2013130030A (en) ELECTRIC HOUSEHOLD KITCHEN APPLIANCE WITH TWO RESERVOIRS FOR PREPARING DRINKS BASED ON HOT WATER
TWI526658B (en) Storage water heater with instant hot water supply and control method thereof
KR20080031714A (en) Heater make use of hot-water
WO2017005076A1 (en) Beverage machine and liquid supply device thereof
CN104879910B (en) The hot-water heating system that can be automatically replenished
CN216875992U (en) Water heating device for American coffee machine
GB0911314D0 (en) Water heating device
JP4889014B2 (en) coffee maker
WO2011114235A2 (en) Hot water system with solar field
CN203852211U (en) Coffee brewing device
CN103932593B (en) Coffee brewing device
CN100491855C (en) New style rapid heating drinking machine
CN202254222U (en) Instant heating device
KR101487085B1 (en) Warm water mat boiler
CN203203265U (en) Solar water heater
CN205119439U (en) Foot bath tub
KR20130004230U (en) Power saving electric steam boiler with feed water preheating apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant