CN105065899A - Multi-purpose compressed air supply system - Google Patents
Multi-purpose compressed air supply system Download PDFInfo
- Publication number
- CN105065899A CN105065899A CN201510478865.3A CN201510478865A CN105065899A CN 105065899 A CN105065899 A CN 105065899A CN 201510478865 A CN201510478865 A CN 201510478865A CN 105065899 A CN105065899 A CN 105065899A
- Authority
- CN
- China
- Prior art keywords
- air
- supercharging
- cylinder diesel
- gate valve
- supply system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention provides a multi-purpose compressed air supply system which comprises a plurality of simulated supercharging air intake systems, wherein each simulated supercharging air intake system comprises an air compressor, a pressure-stabilized tank and an air filtering and drying machine, which are successively connected in series through pipelines; each simulated supercharging air intake system is provided with two air outtake pipelines, one air outtake pipeline is communicated with a laboratory air inlet of a single-cylinder diesel engine, and the other air outtake pipeline is communicated with testing equipment, namely a compressed-air pipe network. The multi-purpose compressed air supply system has the following advantages that an air compressor system which has no a test mission of the single-cylinder diesel engine and is in a free state can be utilized to supply compressed air for other testing equipment in an entire park, the testing equipment in the testing park does not need to be matched with the air compressor alone, and meanwhile the development of testing work of other single-cylinder diesel engines is not influenced; the equipment investment is reduced, and the use rate of equipment is increased.
Description
Technical field
The invention belongs to diesel engine test pressurized air air feed application, especially relate to a kind of multipurpose pressurized air air supply system.
Background technique
Single cylinder diesel, when testing, owing to not being equipped with pressurized machine, needing special equipment and exports high-pressure air simulation pressurized machine for single cylinder diesel and provide air inlet.This equipment comprises air compressor, surge tank, air filter, dryer etc., and is commonly called supercharging simulation gas handling system.Each single cylinder diesel test room all needs to be equipped with a set of independently supercharging simulation gas handling system.
But, at a garden or on-site, when single cylinder diesel test room quantity is more (three or more), the situation that all test rooies run simultaneously can not occur substantially, causes the equipment such as air compressor to there is idle situation; On the other hand, whole test garden has many testing installations to need pressurized air to play the effects such as protection, driving, purging, although pressurized air consumption is little, must have, and this just needs to be equipped with air compressor provides pressurized air.While be that air compressor leaves unused, another side is again need to be equipped with air compressor, will increase investment in fixed assets cost, cause the waste of resource if do not fully not utilized.
Summary of the invention
In view of this, the present invention is intended to propose a kind of multipurpose pressurized air air supply system, to reach cost-saving object of making rational use of resources.
For achieving the above object, technological scheme of the present invention is achieved in that
A kind of multipurpose pressurized air air supply system, comprises multiple supercharging simulation gas handling system, and each described supercharging simulation gas handling system comprises air compressor, surge tank, air filter and the dryer of being connected successively by pipeline,
The outlet pipe of each described supercharging simulation gas handling system is divided into two, and wherein an outlet pipe is communicated with a single cylinder diesel test room suction port, another outlet pipe connection test equipment compressed air pipe network.
Further, the connecting pipe between described air compressor and surge tank is provided with safety check and gate valve.
Further, the bottom outlet place of described surge tank is provided with gate valve.
Further, the outlet pipe of described dryer is divided into two, often props up outlet pipe and is provided with a gate valve.
Relative to prior art, the present invention has following advantage:
The present invention can utilize does not have single cylinder diesel test mission and the air compressor system that is in idle state is whole garden other testing installation supply pressurized air, air compressor need not be equipped with separately for test garden testing installation, also not affect carrying out of other single cylinder diesel experiment work simultaneously; Namely save equipment investment, turn improve capacity utilization.
Accompanying drawing explanation
The accompanying drawing forming a part of the present invention is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is structural representation of the present invention.
Embodiment
It should be noted that, when not conflicting, the embodiment in the present invention and the feature in embodiment can combine mutually.
Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
A kind of multipurpose pressurized air air supply system, comprise multiple supercharging simulation gas handling system, each described supercharging simulation gas handling system comprises the air compressor of being connected successively by pipeline, surge tank, air filter and dryer, connecting pipe between described air compressor and surge tank is provided with safety check and gate valve, the bottom outlet place of described surge tank is provided with gate valve, the outlet pipe of each described dryer is divided into two, wherein an outlet pipe is communicated with a single cylinder diesel test room suction port by a gate valve, another outlet pipe is by the suction port of a gate valve connection test equipment compressed air pipe network.
As shown in Figure 1, the present embodiment multipurpose pressurized air air supply system comprises 3 supercharging simulation gas handling systems, first supercharging simulation gas handling system comprises successively by the first air compressor 1, first safety check 2, first gate valve 3, first surge tank 4, first air filter 6 and the first dryer 7 that placed in series connects, the outlet pipe of the first dryer 7 is divided into two, one connects the first single cylinder diesel test room suction port a through the 4th gate valve 9, and another is through the 3rd gate valve 8 joint test equipment compressed air pipe network import d; Second supercharging simulation gas handling system comprises the second air compressor 10, second safety check 11, the 5th gate valve 12, second surge tank 13, second air filter 15 and the second dryer 16 that are connected by placed in series successively, the outlet pipe of the second dryer 16 is divided into two, one connects the second single cylinder diesel test room suction port b through the 8th gate valve 18, and another is through the 7th gate valve 17 joint test equipment compressed air pipe network import d; 3rd supercharging simulation gas handling system comprises the 3rd air compressor 19, the 3rd safety check 20, the 9th gate valve 21, the 3rd surge tank 22, the 3rd air filter 24 and the 3rd dryer 25 that are connected by placed in series successively, the outlet pipe of the 3rd dryer 25 is divided into two, one connects the second single cylinder diesel test room suction port c through the 12 gate valve 27, and another is through the 11 gate valve 26 joint test equipment compressed air pipe network import d.Also have the second gate valve 5, the 6th gate valve 14, the tenth gate valve 23 to be respectively the discharging valve of the first surge tank 4, second surge tank 13, the 3rd surge tank 22, close at ordinary times, after work a period of time, when having ponding in tank, open the ponding in gate valve releasing tank.
When arbitrary single cylinder diesel test room does not have test mission, for the first single cylinder diesel test room, first air compressor 1 does not need to be the diesel engine air feed in the first single cylinder diesel test room, 4th gate valve 9 is closed, and the 3rd gate valve 8 is opened, after the first air compressor 1 works, the pressurized air produced is through the first surge tank 4 voltage stabilizing, first air filter 6 filters, after the first dryer 7 drying, by conduit air inlet d to testing installation compressed air pipe network air feed; 7th gate valve 17 is closed, and the 8th gate valve 18 is opened, after the second air compressor 10 works, the pressurized air produced is through the second surge tank 13 voltage stabilizing, second air filter 15 filters, after the second dryer 16 drying, by conduit air inlet b to the diesel engine air feed in the second single cylinder diesel test room; 11 gate valve 26 is closed, and the 12 gate valve 27 is opened, after the 3rd air compressor 19 works, the pressurized air produced is through the 3rd surge tank 22 voltage stabilizing, 3rd air filter 24 filters, after the 3rd dryer 25 drying, by conduit air inlet c to the diesel engine air feed in the 3rd single cylinder diesel test room.First safety check 2, second safety check 11 and the 3rd safety check 20 are respectively used to prevent the pressurized air in pipeline from flowing back to the first air compressor 1, second air compressor 10 and the 3rd air compressor 19 thus producing adverse influence.To blind off a line when first gate valve 3, the 5th gate valve 12 and the 9th gate valve 21 are respectively used to maintenance first air compressor 1, second air compressor 10 and the 3rd air compressor 19 use.
The present invention is exactly the field condition utilizing to test in garden three or more single cylinder diesel test rooies and seldom drive simultaneously, one of them be there is no the air compressor system of test mission, by the connection of pipeline and the switching of valve switch state, be testing installation compressed air pipe network supply pressurized air in garden.After using the present invention, air compressor need not be equipped with separately for test garden testing installation, but utilize the existing air compressor be in idle state single cylinder diesel test supercharging simulation gas handling system to be garden testing installation supply pressurized air, also do not affect carrying out of other single cylinder diesel experiment work simultaneously.Namely save equipment investment, turn improve capacity utilization.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (3)
1. a multipurpose pressurized air air supply system, is characterized in that: comprise multiple supercharging simulation gas handling system, and each described supercharging simulation gas handling system comprises air compressor, surge tank, air filter and the dryer of being connected successively by pipeline,
The outlet pipe of each described supercharging simulation gas handling system is divided into two, and wherein an outlet pipe is communicated with a single cylinder diesel test room suction port, another outlet pipe connection test equipment compressed air pipe network.
2. multipurpose pressurized air air supply system according to claim 1, is characterized in that: the connecting pipe between described air compressor and surge tank is provided with safety check and gate valve.
3. multipurpose pressurized air air supply system according to claim 1, is characterized in that: the outlet pipe of described dryer is divided into two, often props up outlet pipe and be provided with a gate valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510478865.3A CN105065899B (en) | 2015-08-06 | 2015-08-06 | A kind of multipurpose compressed air air supply system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510478865.3A CN105065899B (en) | 2015-08-06 | 2015-08-06 | A kind of multipurpose compressed air air supply system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105065899A true CN105065899A (en) | 2015-11-18 |
CN105065899B CN105065899B (en) | 2017-10-24 |
Family
ID=54495344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510478865.3A Active CN105065899B (en) | 2015-08-06 | 2015-08-06 | A kind of multipurpose compressed air air supply system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105065899B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106704832A (en) * | 2016-12-21 | 2017-05-24 | 中国北方发动机研究所(天津) | Pressure and flow stabilizing device of pipeline gas |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202349595U (en) * | 2011-11-25 | 2012-07-25 | 鸿圣(江西)彩印包装实业有限公司 | Compressed air concentrated supply device |
CN202992636U (en) * | 2012-12-18 | 2013-06-12 | 郑州荣奇热电能源有限公司 | Compressed air supply device |
CN203585803U (en) * | 2013-11-15 | 2014-05-07 | 福建省源威涤锦科技有限公司 | Air supply device for polyester low stretch yarn equipment |
CN103808516A (en) * | 2014-01-27 | 2014-05-21 | 中国北方发动机研究所(天津) | Simulated supercharged air intake system |
CN204284922U (en) * | 2014-11-25 | 2015-04-22 | 山东力牌石油化学有限公司 | A kind of air compressor air feed is put from repacking |
-
2015
- 2015-08-06 CN CN201510478865.3A patent/CN105065899B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202349595U (en) * | 2011-11-25 | 2012-07-25 | 鸿圣(江西)彩印包装实业有限公司 | Compressed air concentrated supply device |
CN202992636U (en) * | 2012-12-18 | 2013-06-12 | 郑州荣奇热电能源有限公司 | Compressed air supply device |
CN203585803U (en) * | 2013-11-15 | 2014-05-07 | 福建省源威涤锦科技有限公司 | Air supply device for polyester low stretch yarn equipment |
CN103808516A (en) * | 2014-01-27 | 2014-05-21 | 中国北方发动机研究所(天津) | Simulated supercharged air intake system |
CN204284922U (en) * | 2014-11-25 | 2015-04-22 | 山东力牌石油化学有限公司 | A kind of air compressor air feed is put from repacking |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106704832A (en) * | 2016-12-21 | 2017-05-24 | 中国北方发动机研究所(天津) | Pressure and flow stabilizing device of pipeline gas |
CN106704832B (en) * | 2016-12-21 | 2019-02-01 | 中国北方发动机研究所(天津) | A kind of pipeline gas voltage stabilization and current stabilization device |
Also Published As
Publication number | Publication date |
---|---|
CN105065899B (en) | 2017-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201586653U (en) | Multifunctional combination device with pipeline flushing, pressure test and load test functions | |
CN202911729U (en) | Integrated type brake control unit | |
CN202621515U (en) | Efficient circulating flushing device for hydraulic pipeline | |
CN202993668U (en) | Multi-coupled air conditioner, outdoor unit and oil return device | |
CN102538304A (en) | Oil balancing device for multi-compressor parallel unit | |
CN202330180U (en) | Pressure test device | |
CN105065899A (en) | Multi-purpose compressed air supply system | |
CN102380824A (en) | Air source device | |
CN103334902B (en) | The non-emptying no-load starting system of compressor and method thereof | |
CN104729152B (en) | Oil balancing system for parallel units | |
CN207489630U (en) | A kind of novel transformer oil filling pipeline connection structure | |
CN210788398U (en) | Cylinder hydraulic unit oil feeding tool | |
CN203534912U (en) | Pipeline pressure test device | |
CN203384007U (en) | Non-evacuation unloading starting system of compressor | |
CN210599334U (en) | Oil remover of reciprocating compressor | |
CN203797343U (en) | Conveying device for nitrogen used for replacing instrument air | |
CN203744604U (en) | Oil balancing system of parallel units | |
CN202185245U (en) | Novel air compressor unit | |
CN202441674U (en) | Automatic back washing filter station | |
CN220802367U (en) | Compressed air pretreatment system before powder spraying | |
CN110743854A (en) | Cylinder hydraulic unit oil feeding tool and cleaning process thereof | |
CN205424409U (en) | Efficient air compressor machine air feed control system | |
CN202336798U (en) | Air source device | |
CN204344549U (en) | Can be used for the oil hydraulic pump load system of two kinds of type aeroengines ground run simultaneously | |
CN103364194A (en) | Diesel engine test station air starting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |