CN105065782A - Supporting frame for installation of smelting furnace pipe - Google Patents
Supporting frame for installation of smelting furnace pipe Download PDFInfo
- Publication number
- CN105065782A CN105065782A CN201510494926.5A CN201510494926A CN105065782A CN 105065782 A CN105065782 A CN 105065782A CN 201510494926 A CN201510494926 A CN 201510494926A CN 105065782 A CN105065782 A CN 105065782A
- Authority
- CN
- China
- Prior art keywords
- supporting frame
- type supporting
- semicircle
- groove
- clamping groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/02—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Manufacture And Refinement Of Metals (AREA)
Abstract
The invention belongs to the technical field of smelting device furnace pipe installation, and particularly discloses a sectional bar supporting frame for installation of a smelting furnace pipe. The supporting frame comprises a semicircular supporting frame, a first V-shaped supporting frame, a second V-shaped supporting frame, a connecting strip, a dovetailed supporting frame, a U-shaped clamping groove, a first semicircular clamping groove, a second semicircular clamping groove and a strip-shaped strengthening rib. The sectional bar supporting frame used for installation of the smelting furnace pipe has the beneficial effects that firstly, the structure is simple, compact and light, and safety and practicability are achieved; and secondly, the sectional bar supporting frame is clamped in pipelines through the first semicircular clamping groove and the second semicircular clamping groove, the dovetailed supporting frame is provided with the U-shaped clamping groove and carries out limiting through the cooperative usage of a limiting rod and the U-shaped clamping groove, and installing is rapid and easy; and meanwhile, moving and adjusting are convenient, and the sectional bar supporting frame can be moved left and right by loosening and tightening the limiting rod. Meanwhile, the sectional bar supporting frame is high in stability, low in production cost and easy to popularize.
Description
Technical field
The present invention relates to smelting device boiler tube mounting technique field, being specifically related to a kind of for smelting the section brace frame that boiler tube is installed.
Background technique
Current, metal smelt industry adopts large-scale smelting mechanical equipment such as smelting furnace etc. to carry out processing operation usually, its assembling uses numerous connection pipe fittings, and the connection between pipe fitting is except using bolt, also uses connection supporting bracket for some particular interface positions.Existing its complex structure of pipe fitting link press span, causes installation cycle length, inefficiency and there is potential safety hazard; Simultaneously complex structure also makes that cost of production is high, raw materials consumption is large.
Therefore, based on the problems referred to above, the invention provides a kind of for smelting the section brace frame that boiler tube is installed.
Summary of the invention
Goal of the invention: object of the present invention provides a kind of for smelting the section brace frame that boiler tube is installed, solve that existing pipe fitting section brace frame cost of production is high, the installation cycle be long, inefficiency and there is the problem of potential safety hazard, improve installment work efficiency and repair and maintenance.
Technological scheme: a kind of for smelting the section brace frame that boiler tube is installed, comprises semicircle supporting frame, the first V-type supporting frame, the second V-type supporting frame, connection strap, " swallow-tail form " supporting frame, U-shaped draw-in groove, the first semicircle draw-in groove, the second semicircle draw-in groove and bar shaped stiffening rib; Described first V-type supporting frame, the second V-type supporting frame connect semicircle supporting frame on one side respectively; Described bar shaped stiffening rib two ends connect the first V-type supporting frame, the second V-type supporting frame another side respectively; Described connection strap two ends connect bottom the V-type of the first V-type supporting frame, the second V-type supporting frame respectively; Described " swallow-tail form " supporting frame is arranged on outside semicircle supporting frame, wherein " swallow-tail form " supporting frame arranges U-shaped draw-in groove; Be separately positioned on one side of the first V-type supporting frame, the second V-type supporting frame bottom described first semicircle draw-in groove, the second semicircle draw-in groove, two ends connect semicircle supporting frame and the first V-type supporting frame, the second V-type supporting frame another side respectively.
Further one side of described first V-type supporting frame, the second V-type supporting frame connects semicircle supporting frame 1/4th position respectively.
Further an edge lengths of described first V-type supporting frame, the second V-type supporting frame is greater than another side length.
Further described bar shaped stiffening rib two ends connect the first V-type supporting frame, the second V-type supporting frame 1/2nd positions on one side respectively.
Compared with prior art, a kind of beneficial effect for smelting the section brace frame that boiler tube is installed of the present invention is: 1, structure is simple, compact, light and handy, safe and practical; 2, the first semicircle draw-in groove and the second semicircle draw-in groove is utilized to snap on pipeline, " swallow-tail form " supporting frame is arranged U-shaped draw-in groove to be mated use by position-limited lever and to carry out spacing, install fast, simply, move simultaneously, debug conveniently, degree of tightness position-limited lever can move left and right this section brace frame.Simultaneously cost of production of the present invention low, easily promote.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation for smelting the section brace frame that boiler tube is installed of the present invention;
Wherein in figure, sequence number is as follows: 1-semicircle supporting frame, 2-first V-type supporting frame, 3-second V-type supporting frame, 4-connection strap, 5-" swallow-tail form " supporting frame, 6-U type draw-in groove, the semicircle draw-in groove of 7-first, the semicircle draw-in groove of 8-second, 9-bar shaped stiffening rib.
Embodiment
Below in conjunction with the drawings and specific embodiments, illustrate the present invention further.
A kind of section brace frame for smelting boiler tube installation as shown in Figure 1, comprises semicircle supporting frame 1, first V-type supporting frame 2, second V-type supporting frame 3, connection strap 4, " swallow-tail form " supporting frame 5, U-shaped draw-in groove 6, first semicircle draw-in groove 7, second semicircle draw-in groove 8 and bar shaped stiffening rib 9; First V-type supporting frame 2, second V-type supporting frame 3 connects semicircle supporting frame 1 on one side respectively; Bar shaped stiffening rib 9 two ends connect the first V-type supporting frame 2, second V-type supporting frame 3 another side respectively; Connection strap 4 two ends connect bottom the V-type of the first V-type supporting frame 2, second V-type supporting frame 3 respectively; " swallow-tail form " supporting frame 5 is arranged on outside semicircle supporting frame 1, wherein " swallow-tail form " supporting frame 5 arranges U-shaped draw-in groove 6; Be separately positioned on one side of the first V-type supporting frame 2, second V-type supporting frame 3 bottom the semicircle draw-in groove 8 of first semicircle draw-in groove 7, second, two ends connect semicircle supporting frame 1 and the first V-type supporting frame 2, second V-type supporting frame 3 another side respectively.
Wherein, the edge lengths that one side of first V-type supporting frame 2, second V-type supporting frame 3 connects semicircle supporting frame 1/1st four position and the first V-type supporting frame 2, second V-type supporting frame 3 is respectively greater than 1/2nd positions that another side length and bar shaped stiffening rib 9 two ends connect the first V-type supporting frame 2, second V-type supporting frame 3 respectively, this kind of structure ensures that section brace frame is easy for installation, simple, in support process, overall uniform force, stability are by force, long service life.
Wherein, semicircle supporting frame 1, first V-type supporting frame 2, second V-type supporting frame 3, connection strap 4, " swallow-tail form " supporting frame 5, U-shaped draw-in groove 6, the first semicircle draw-in groove 8 of semicircle draw-in groove 7, second and bar shaped stiffening rib 9 adopt alloyed steel one-body molded obtained, low easy processing, cost of production.
Embodiment
Further as shown in Figure 1, utilizing the first semicircle draw-in groove 7 and the second semicircle draw-in groove 8 to snap in during use is mounted on the pipeline of both sides, wherein position-limiting action is played in semicircle supporting frame 1 end, first V-type supporting frame 2, second V-type supporting frame 3 is played a supporting role, the stiffening rib of bar shaped simultaneously 9 plays enhancing first V-type supporting frame 2, the effect of the second V-type supporting frame 3 support force, the U-shaped draw-in groove 6 arranged by " swallow-tail form " supporting frame 5 inside above semicircle supporting frame 1 is again fixed, wherein after degree of tightness position-limited lever, section bar supporting frame is undertaken moving debugging by U-shaped draw-in groove 6 track.
The above is only the preferred embodiment of the present invention, it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also make some improvement, and these improvement also should be considered as protection scope of the present invention.
Claims (4)
1., for smelting the section brace frame that boiler tube is installed, it is characterized in that: comprise semicircle supporting frame (1), the
One V-type supporting frame (2), the second V-type supporting frame (3), connection strap (4), " swallow-tail form " supporting frame (5), U-shaped draw-in groove (6), the first semicircle draw-in groove (7), the second semicircle draw-in groove (8) and bar shaped stiffening rib (9); Described first V-type supporting frame (2), the second V-type supporting frame (3) connect semicircle supporting frame (1) on one side respectively; Described bar shaped stiffening rib (9) two ends connect the first V-type supporting frame (2), the second V-type supporting frame (3) another side respectively; Described connection strap (4) two ends connect bottom the V-type of the first V-type supporting frame (2), the second V-type supporting frame (3) respectively; Described " swallow-tail form " supporting frame (5) are arranged on semicircle supporting frame (1) outside, wherein " swallow-tail form " supporting frame (5) arrange U-shaped draw-in groove (6); Described first semicircle draw-in groove (7), the second semicircle draw-in groove (8) bottom are separately positioned on one side of the first V-type supporting frame (2), the second V-type supporting frame (3), and two ends connect semicircle supporting frame (1) and the first V-type supporting frame (2), the second V-type supporting frame (3) another side respectively.
2. according to claim 1 a kind of for smelt boiler tube install section brace frame, it is characterized in that: described first V-type supporting frame (2), the second V-type supporting frame (3) connect semicircle supporting frame (1) 1/4th position respectively.
3. according to claim 1 a kind of for smelting the section brace frame that boiler tube is installed, it is characterized in that: described in
One edge lengths of the first V-type supporting frame (2), the second V-type supporting frame (3) is greater than another side length.
4. according to claim 1 a kind of for smelting the section brace frame that boiler tube is installed, it is characterized in that: described bar shaped stiffening rib (9) two ends connect 1/2nd positions of the first V-type supporting frame (2), the second V-type supporting frame (3) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510494926.5A CN105065782A (en) | 2015-08-13 | 2015-08-13 | Supporting frame for installation of smelting furnace pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510494926.5A CN105065782A (en) | 2015-08-13 | 2015-08-13 | Supporting frame for installation of smelting furnace pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105065782A true CN105065782A (en) | 2015-11-18 |
Family
ID=54495231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510494926.5A Pending CN105065782A (en) | 2015-08-13 | 2015-08-13 | Supporting frame for installation of smelting furnace pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105065782A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3002031C2 (en) * | 1980-01-21 | 1982-07-15 | United-Carr Gmbh, 6000 Frankfurt | Retaining element for at least one pipeline, in particular a gasoline line in a motor vehicle |
CN2291549Y (en) * | 1997-05-29 | 1998-09-16 | 周吉祥 | Cross pipe support connecting piece |
CN2722006Y (en) * | 2004-07-30 | 2005-08-31 | 波伦北克有限公司 | Double tube clamp |
CA2488946A1 (en) * | 2004-12-03 | 2006-06-03 | Edward Schafer | Pipeline support system |
CN200955628Y (en) * | 2006-09-15 | 2007-10-03 | 奇瑞汽车有限公司 | Plastic pipe-clamp |
CN201772146U (en) * | 2010-09-15 | 2011-03-23 | 重庆长安汽车股份有限公司 | Pipe clamp |
US8083432B2 (en) * | 2008-04-01 | 2011-12-27 | Itw Automotive Products Gmbh & Co., Kg | Connection element |
CN103542178A (en) * | 2013-10-31 | 2014-01-29 | 重庆长安汽车股份有限公司 | Pipe clamp for automotive chassis hydraulic braking system |
CN204879049U (en) * | 2015-08-13 | 2015-12-16 | 太仓市高泰机械有限公司 | A support frame for smelt boiler tube installation |
-
2015
- 2015-08-13 CN CN201510494926.5A patent/CN105065782A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3002031C2 (en) * | 1980-01-21 | 1982-07-15 | United-Carr Gmbh, 6000 Frankfurt | Retaining element for at least one pipeline, in particular a gasoline line in a motor vehicle |
CN2291549Y (en) * | 1997-05-29 | 1998-09-16 | 周吉祥 | Cross pipe support connecting piece |
CN2722006Y (en) * | 2004-07-30 | 2005-08-31 | 波伦北克有限公司 | Double tube clamp |
CA2488946A1 (en) * | 2004-12-03 | 2006-06-03 | Edward Schafer | Pipeline support system |
CN200955628Y (en) * | 2006-09-15 | 2007-10-03 | 奇瑞汽车有限公司 | Plastic pipe-clamp |
US8083432B2 (en) * | 2008-04-01 | 2011-12-27 | Itw Automotive Products Gmbh & Co., Kg | Connection element |
CN201772146U (en) * | 2010-09-15 | 2011-03-23 | 重庆长安汽车股份有限公司 | Pipe clamp |
CN103542178A (en) * | 2013-10-31 | 2014-01-29 | 重庆长安汽车股份有限公司 | Pipe clamp for automotive chassis hydraulic braking system |
CN204879049U (en) * | 2015-08-13 | 2015-12-16 | 太仓市高泰机械有限公司 | A support frame for smelt boiler tube installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204879049U (en) | A support frame for smelt boiler tube installation | |
CN105065782A (en) | Supporting frame for installation of smelting furnace pipe | |
CN203254145U (en) | Full-automatic flexible pipe assembly machine | |
CN105149926A (en) | Device for detaching hydraulic cylinder end cover | |
CN204673064U (en) | Pipe is sawed | |
CN203678963U (en) | Hydraulic pipe bending device | |
CN105020477A (en) | Section bar hoisting and supporting frame | |
CN102909287A (en) | Pipe fitting clamping mechanism | |
CN202741492U (en) | Steel pipe straightening machine | |
CN202824296U (en) | Processing device for U-shaped tube | |
CN201315520Y (en) | Adjustable motor cabinet device | |
CN203156379U (en) | Process unit for drilling of three-way elbow | |
CN203236427U (en) | Wheel pusher for installation of bearing of coal mining machine | |
CN204053935U (en) | A kind of bicycle front handlebar handle installation auxiliary fixing device | |
CN103736802B (en) | A kind of thin-wall cylinder casing spinning flanging fixture | |
CN201437876U (en) | Telescopic-type pipeline connection device | |
CN203877747U (en) | Smelting furnace tube lifting frame | |
CN218066102U (en) | Water collector of cooling tower convenient to disassemble | |
CN209117888U (en) | A kind of plug testing agency | |
CN205551326U (en) | Insert winding displacement binding machine's tightening means that bends | |
CN204497633U (en) | Isolating switch fingertip dismantling device | |
CN204449878U (en) | The iron cover of automobile condenser iron cover assembly machine is separated inversion mechanism | |
CN203743626U (en) | Pipe clamp convenient to installation | |
CN204438478U (en) | There is the surface cooler coil pipe installing rack of Z-type clamp | |
CN204278035U (en) | The quick-replaceable easy device of mechanical arm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151118 |