CN105064666A - Wall surface leveling ruler for building - Google Patents

Wall surface leveling ruler for building Download PDF

Info

Publication number
CN105064666A
CN105064666A CN201510459633.3A CN201510459633A CN105064666A CN 105064666 A CN105064666 A CN 105064666A CN 201510459633 A CN201510459633 A CN 201510459633A CN 105064666 A CN105064666 A CN 105064666A
Authority
CN
China
Prior art keywords
gripper shoe
main scale
bracing frame
leveling ruler
building wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510459633.3A
Other languages
Chinese (zh)
Inventor
高峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING YUFA CONSTRUCTION Co Ltd
Original Assignee
CHONGQING YUFA CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING YUFA CONSTRUCTION Co Ltd filed Critical CHONGQING YUFA CONSTRUCTION Co Ltd
Priority to CN201510459633.3A priority Critical patent/CN105064666A/en
Publication of CN105064666A publication Critical patent/CN105064666A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a wall surface leveling ruler for a building. The wall surface leveling ruler for the building comprises a handheld frame, a main ruler and a support plate perpendicular to the main ruler, wherein the main ruler and the support plate are integrally formed; a strip-shaped hole extending in the length direction of the support plate is also formed in a juncture part of the main ruler and the support plate on the support plate; the edge, near the strip-shaped hole, of the main ruler is a sharp edge and forms a cutting part; a first support frame and a second support frame are connected between the main ruler and the support plate; the first support frame is positioned at the two ends of the main ruler; the second support frame is positioned at the two ends of the support plate; the handheld frame is connected between the first support frame and the second support frame; and a spirit lever is arranged on the support plate. The wall surface leveling ruler has the advantages that in the use process, excessive cement can be directly cut off and is discharged out through the strip-shaped hole, so that the moving is convenient, and a labor-saving effect is achieved during the operation; the spirit lever is used, so that whether the wall surface is vertical to the ground or not can be confirmed directly through the indication of the spirit lever, and whether the wall surface is flat and smooth or not can be further and immediately confirmed; the flat smooth and attractive appearance of the wall can be ensured without secondary processing; and the work efficiency is effectively improved.

Description

Building wall leveling ruler
Technical field
The present invention relates to construction engineering technical field, be specifically related to a kind of building wall leveling ruler.
Background technology
At present, the wall of general cement works thing, after the mould unloading that has been in the milk, metope general more coarse and and out-of-flatness, in order to increase comfortableness and the aesthetic property in house, must cover one deck cement more outward at coarse thick embryo metope, but irregular thick embryo metope cannot carry out thin embryo modification, must first by thick embryo wall surface leveling.
Existing leveling ruler for wall surface is only the plank of a long rectangular strip, when carrying out wall surface leveling operation because be difficult to more greatly unnecessary cement to cut off with the contact area of metope, make unnecessary cement in the direction of motion of leveling ruler for wall surface, hinder leveling ruler for wall surface to move always, therefore in use can be more painstaking.Again because this kind of leveling ruler for wall surface only has one piece of plank cannot determine that whether metope is smooth, just can guarantee that wall is smooth attractive in appearance so often need again to process.
Summary of the invention
The object of the present invention is to provide a kind of building wall leveling ruler, so that solve existing leveling ruler for wall surface and metope contact area is larger, cause outstanding cement to be difficult to cut off the motion that unnecessary cement hinders leveling ruler for wall surface, make metope repair problem comparatively laboriously.
The technical scheme adopted to realize object of the present invention is: a kind of building wall leveling ruler, comprises hand-held frame, main scale and the gripper shoe vertical with main scale; Main scale and gripper shoe one-body molded, intersection gripper shoe being positioned at main scale and gripper shoe is also provided with the bar hole extended along gripper shoe length direction, and main scale is sharp edge near the limit of bar hole and forms cutting part; Be connected with the first bracing frame and the second bracing frame between main scale and gripper shoe, the first bracing frame and the second bracing frame lay respectively at the two ends of main scale and gripper shoe, and hand-held frame is connected between the first bracing frame and the second bracing frame, and gripper shoe is provided with spirit lever.
Spirit lever refers to the instrument utilizing the bubble filled in the enclosed construction of water to move to judge spirit lever place plane whether level, and the origin position being positioned at spirit lever when bubble then illustrates spirit lever place planar horizontal.
Operating principle of the present invention is: during use, holds hand-held frame and uses building wall leveling ruler to carry out flattening operation to thick embryo metope, by main scale near metope, look at the laminating direction of spirit lever adjustment main scale.When the bubble instruction of spirit lever is when the origin position of cross graduation mark, illustrate that the gripper shoe at spirit lever place is parallel to ground, and then the main scale vertical with gripper shoe is perpendicular to ground, namely be vertical, main scale slides downward or upward along vertical direction, be discharged in gripper shoe through bar hole after then protruding unnecessary cement will be extruded, get rid of after unnecessary cement can proceed flattening operation from gripper shoe.
Compared with prior art the invention has the beneficial effects as follows: 1. main scale is vertical with gripper shoe, gripper shoe is provided with spirit lever, whether smooth can detect metope by reading spirit lever.2. intersection gripper shoe being positioned at main scale and gripper shoe is also provided with the bar hole extended along gripper shoe length direction, main scale is sharp edge near the limit of bar hole and forms cutting part, conveniently directly unnecessary cement is cut off when carrying out wall surface leveling operation and extrude cement and make it to discharge from bar hole, reduce the unnecessary cement in the building wall leveling ruler direction of motion, reduce the resistance promoting building wall leveling ruler, make operation more laborsaving.3. between main scale and gripper shoe, be connected with the first bracing frame and the second bracing frame, first bracing frame and the second bracing frame lay respectively at the two ends of main scale and gripper shoe, hand-held frame is connected between the first bracing frame and the second bracing frame, facilitate people to hold hand-held frame to operate, and directly need not promote main scale, easy to use laborsaving, the first bracing frame is connected main scale and gripper shoe with the second bracing frame, makes structure more firm.
Further, described spirit lever comprises and is engraved in the cross graduation mark on spirit lever surface and the bubble in spirit lever, spirit lever is a discoid enclosed construction that water is housed, and people is judged accurate and visually, and whether gripper shoe is parallel to ground and then judges that whether vertical metope is smooth.
Further, on the described hand-held center line being erected at the first bracing frame and the second bracing frame, building wall leveling ruler overall structure is balanced, is convenient to when people uses more laborsaving.
Further, described spirit lever to be located in gripper shoe in the heart, and building wall leveling ruler overall structure is balanced, and convenient instruction of reading on spirit lever.
Further, two edge lengths that described main scale and gripper shoe intersect vertically are equal, and the cross section making building wall leveling ruler is isosceles right triangle, and building wall leveling ruler structure is balanced more, more laborsaving during use.
Further, described main scale is provided with main scale scale, the convenient surveying work carrying out being correlated with when flattening metope.
Further, the first gusset plate and the second gusset plate is also connected with between described main scale and gripper shoe, first gusset plate equals the distance of the second gusset plate to the second bracing frame to the distance of the first bracing frame, makes the sound construction of building wall leveling ruler, balance, and handled easily uses.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated:
Fig. 1 is the structural representation of a kind of building wall leveling ruler of the present invention embodiment;
Fig. 2 is the spirit lever structural representation of a kind of building wall leveling ruler of the present invention embodiment.
In figure, Reference numeral is: 1 main scale, 2 gripper shoes, 3 bar holes, 4 first bracing frames, 5 second bracing frames, 6 hand-held framves, 7 spirit levers, 8 main scale scales, 9 cross graduation marks, 10 bubbles, 11 first gusset plates, 12 second gusset plates.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further described, but not as a limitation of the invention.
As shown in Figure 1, a kind of building wall leveling ruler, comprises hand-held frame 6, main scale 1 and the gripper shoe 2 vertical with main scale; Main scale 1 and gripper shoe 2 one-body molded, gripper shoe 2 has bar hole 3, bar hole 3 is positioned at the intersection of main scale 1 and gripper shoe 2, and main scale 1 is sharp edge near the limit of bar hole 3; The first bracing frame 4 and the second bracing frame 5 is welded with between main scale 1 and gripper shoe 2, first bracing frame 4 and the second bracing frame 5 lay respectively at the two ends of main scale 1 and gripper shoe 2, hand-held frame 6 is connected between the first bracing frame 4 and the second bracing frame 5, gripper shoe 2 is pasted with spirit lever 7.
As shown in Figure 2, spirit lever 7 comprises and is engraved in the cross graduation mark 9 on spirit lever 7 surface and the bubble 10 in spirit lever 7, spirit lever 7 is the discoid enclosed constructions that water is housed, and people is judged accurate and visually, and whether gripper shoe 2 is parallel to ground and then judges that whether vertical metope is smooth.Hand-held frame 6, on the center line of the first bracing frame 4 and the second bracing frame 5, makes building wall leveling ruler overall structure balance, is convenient to when people uses more laborsaving.
Spirit lever 7 in the heart, makes building wall leveling ruler overall structure balance in gripper shoe 2, and convenient instruction of reading on spirit lever.Main scale 1 is equal with two edge lengths that gripper shoe 2 intersects vertically, and the cross section making building wall leveling ruler is isosceles right triangle, and building wall leveling ruler structure is balanced more, more laborsaving during use.Main scale 1 is carved with main scale scale 8, the convenient surveying work carrying out being correlated with when flattening metope.The first gusset plate 11 and the second gusset plate 12 is also connected with between main scale 1 and gripper shoe 2, the distance of the first gusset plate 11 to the first bracing frame 4 equals the distance of the second gusset plate 12 to the second bracing frame 5, make the sound construction of building wall leveling ruler, balance, handled easily uses.
During use, hold hand-held frame 6 and use building wall leveling ruler to carry out flattening operation to thick embryo metope, by main scale 1 near metope, look at the laminating direction that spirit lever 7 adjusts main scale 1.When the bubble 10 of spirit lever 7 indicates when the origin position of cross graduation mark 9, illustrate that the gripper shoe 2 at spirit lever 7 place is parallel to ground, and then the main scale 1 vertical with gripper shoe 2 is perpendicular to ground, namely be vertical, main scale 1 slides downward or upward along vertical direction, be discharged in gripper shoe 2 through bar hole 3 after then protruding unnecessary cement will be extruded by main scale 1, get rid of after unnecessary cement can proceed flattening operation from gripper shoe 2.
Compared with prior art, main scale 1 of the present invention is vertical with gripper shoe 2, gripper shoe 2 is pasted and is connected with spirit lever 7, whether smooth can detect metope by reading spirit lever 7.Gripper shoe 2 has bar hole 3, bar hole 3 is positioned at the intersection of main scale 1 and gripper shoe 2, main scale 1 is sharp edge near the limit of bar hole 3 is cutting part, conveniently directly unnecessary cement is cut off when carrying out wall surface leveling operation and extrude cement and make it to discharge from bar hole 3, reduce the resistance promoting building wall leveling ruler, it is time saving and energy saving to operate.The first bracing frame 4 and the second bracing frame 5 is connected with between main scale 1 and gripper shoe 2, first bracing frame 4 and the second bracing frame 5 lay respectively at the two ends of main scale 1 and gripper shoe 2, hand-held frame 6 is welded between the first bracing frame 4 and the second bracing frame 5, facilitate people to hold hand-held frame 6 to operate, and directly need not promote main scale 1, easy to use laborsaving, the first bracing frame 4 is connected main scale 1 and gripper shoe 2 with the second bracing frame 5, makes structure more firm.
Above-described is only the preferred embodiment of the present invention; should be understood that; for a person skilled in the art; under the prerequisite not departing from structure of the present invention; some distortion and improvement can also be made; these also should be considered as protection scope of the present invention, and these all can not affect effect of the invention process and practical applicability.

Claims (7)

1. a building wall leveling ruler, is characterized in that, comprises hand-held frame, main scale and the gripper shoe vertical with main scale; Main scale and gripper shoe one-body molded, intersection gripper shoe being positioned at main scale and gripper shoe is also provided with the bar hole extended along gripper shoe length direction, and main scale is sharp edge near the limit of bar hole and forms cutting part; Be connected with the first bracing frame and the second bracing frame between main scale and gripper shoe, the first bracing frame and the second bracing frame lay respectively at the two ends of main scale and gripper shoe, and hand-held frame is connected between the first bracing frame and the second bracing frame, and gripper shoe is provided with spirit lever.
2. building wall leveling ruler according to claim 1, it is characterized in that, described spirit lever comprises and is engraved in the cross graduation mark on spirit lever surface and the bubble in spirit lever, and spirit lever is a discoid enclosed construction that water is housed.
3. building wall leveling ruler according to claim 2, is characterized in that, on the described hand-held center line being erected at the first bracing frame and the second bracing frame.
4. building wall leveling ruler according to claim 3, is characterized in that, described spirit lever to be located in gripper shoe in the heart.
5. building wall leveling ruler according to claim 4, is characterized in that, two edge lengths that described main scale and gripper shoe intersect vertically are equal.
6. building wall leveling ruler according to claim 1 or 5, it is characterized in that, described main scale is provided with main scale scale.
7. building wall leveling ruler according to claim 1 or 5, it is characterized in that, also be connected with the first gusset plate and the second gusset plate between described main scale and gripper shoe, the first gusset plate equals the distance of the second gusset plate to the second bracing frame to the distance of the first bracing frame.
CN201510459633.3A 2015-07-31 2015-07-31 Wall surface leveling ruler for building Pending CN105064666A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510459633.3A CN105064666A (en) 2015-07-31 2015-07-31 Wall surface leveling ruler for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510459633.3A CN105064666A (en) 2015-07-31 2015-07-31 Wall surface leveling ruler for building

Publications (1)

Publication Number Publication Date
CN105064666A true CN105064666A (en) 2015-11-18

Family

ID=54494151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510459633.3A Pending CN105064666A (en) 2015-07-31 2015-07-31 Wall surface leveling ruler for building

Country Status (1)

Country Link
CN (1) CN105064666A (en)

Similar Documents

Publication Publication Date Title
CN104060825B (en) Adjustable general stair template
CN203772198U (en) Wall template verticality detector
CN103967331B (en) A kind of Liftable type enclosing dividing plate
CN204920161U (en) Wall flattening chi for building
CN206397143U (en) A kind of rapid construction stair template
CN203755655U (en) Shear wall formwork column base leveling device
CN105064666A (en) Wall surface leveling ruler for building
CN204023955U (en) A kind of NEW TYPE OF COMPOSITE keel structure
CN202519998U (en) Rebar banding sample frame for vertical wall surface
CN209025469U (en) A kind of housing construction bar spacing marking device
CN202393389U (en) Wall column template perpendicularity measuring tool
CN205342225U (en) It measures sheet metal cutting device of thickness function to possess fixed panel
CN106320612B (en) A kind of spacer bar calibration soldering appliance and its application method
CN204418670U (en) The sealing concrete pad used in a kind of building operations
CN204007389U (en) A kind of portable supplemental measurement tool
CN202715970U (en) Location bar welding tool
CN203201144U (en) Multi-specification universal adjustable plastic template used for manufacturing square columns and rectangular columns
CN205497647U (en) A gimbal mechanism for two dimensional plane's self -align accurate cutting device
CN203334325U (en) Bottom plate side form system used for basement upstream face construction
CN207215095U (en) A kind of mold plate verticality survey tool
CN204255360U (en) A kind of wrap attachment
CN205976390U (en) Clamp strip
CN204269055U (en) A kind of convenient simple construction construction testing tool
CN103452193A (en) Embedded type point warehouse seam
CN203347208U (en) Basket counterweight

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151118