CN105048521A - Method for calculating direct current access capability of receiving end power grid with consideration of multiple constraints - Google Patents

Method for calculating direct current access capability of receiving end power grid with consideration of multiple constraints Download PDF

Info

Publication number
CN105048521A
CN105048521A CN201510164904.2A CN201510164904A CN105048521A CN 105048521 A CN105048521 A CN 105048521A CN 201510164904 A CN201510164904 A CN 201510164904A CN 105048521 A CN105048521 A CN 105048521A
Authority
CN
China
Prior art keywords
direct current
capacity
drop point
new
short circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510164904.2A
Other languages
Chinese (zh)
Other versions
CN105048521B (en
Inventor
李兆伟
翟海宝
刘福锁
李建华
李威
黄志龙
李碧君
周霞
崔晓丹
侯玉强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Grid Co Ltd
Nari Technology Co Ltd
Original Assignee
East China Grid Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Grid Co Ltd, Nari Technology Co Ltd filed Critical East China Grid Co Ltd
Priority to CN201510164904.2A priority Critical patent/CN105048521B/en
Publication of CN105048521A publication Critical patent/CN105048521A/en
Application granted granted Critical
Publication of CN105048521B publication Critical patent/CN105048521B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a method for calculating direct current access capability of a receiving end power grid with consideration of multiple constraints, belonging to the technical field of electric power system and automation thereof. The method for calculating direct current access capability of a receiving end power grid with consideration of multiple constraints comprises: determining an alternative direct current drop point set according to the station address condition of a transformer station, electric power balance and the like; determining newly increased direct current access drop points according to the short circuit capacity of each alternative direct current drop point in the typical mode and the interaction degree between each direct current in the typical mode; and giving the direct current access capability of a receiving end power grid through iteration after integrated consideration of multiple constraints comprising the direct current multi-infeed short circuit ratio, the power grid low ebb peak load regulation capacity, the relative moment of inertia index, the N-1 transient stability and the like. The method for calculating direct current access capability of a receiving end power grid with consideration of multiple constraints is beneficial to guidance of a power grid planning department about reasonable planning of the direct current drop points of the receiving end power grid, and can give the reasonable level for the direct current access capability of the receiving end power grid and reduce the blindness for direct current construction, and can improve the power grid operation control level.

Description

A kind of receiving end electrical network direct current access capability computational methods considering multiple constraint
Technical field
The invention belongs to Power System and its Automation technical field, more precisely, the present invention relates to a kind of receiving end electrical network direct current access capability computational methods considering multiple constraint.
Background technology
High voltage direct current (HVDC) transmission of electricity has become the important form of the interconnected and long-distance and large-capacity power transmission of domestic great Qu with the advantage of its uniqueness, for the large-scale most optimum distribution of resources of China has played important function.Along with the development construction of electrical network, multiple-circuit line transmission line drop point same interchange receiving end electrical network is inevitable, and south electric network and East China Power Grid have developed into typical direct current many feed-ins receiving end electrical network all, and direct current feed-in capacity constantly increases.
In order to instruct power grid construction better and safeguard receiving end electricity net safety stable, a key issue must be researched and solved, namely the ability that receiving end electrical network accepts direct current feed-in power how is assessed, what comprise electrical network to allow the power total amount of feed-in and maximum single feedback of permission to enter capacity how to determine, principle should be followed and select direct current drop point effectively could improve the direct current of receiving end electrical network by power etc.These problems have become key technical problem urgently to be resolved hurrily in bulk power grid planning and design.Affect electrical network direct current a lot of by the factor of power, in the production run of actual electric power, the transient state dynamic stability characteristic, many direct currents alternating current-direct current reciprocal effect characteristic etc. of the voltage stabilization of the low ebb peak modulation capacity of electrical network, the trend evacuation capacity of direct current near region, partial electric grid, system frequency safety, electrical network, all can cause restriction to the direct current access capability of electrical network.
At present about the research of the maximum powered scale of receiving end electrical network direct current is less, mostly Patents is the optimum choice about direct current drop point, and considers that constraint is relatively less.Patent " a kind of system of selection of receiving end electrical network direct current drop point " (application number CN201410239756.1) discloses the system of selection of a kind of direct current drop point, main considers short circuit ratio and steady characteristic two stability indicators and power grid construction cost and via net loss cost two economic indexs temporarily.Different direct current access scheme is considered on the impact in direct-current commutation failure region in the optimization direct current drop point method that patent " a kind of direct current of optimizing concentrates the method for feed-in receiving-end system direct current drop point " (application number CN201310545965.4) proposes.Patent " a kind of multi-feed HVDC system of selection based on many feed-ins short circuit ratio " (authorizing, CN201210081310.1) selects preferably direct current synchronizing point by the calculating to different direct current synchronizing point many feed-ins short circuit ratio, process, analysis.Patent " a kind of computational methods exchanging the powered scale of receiving end electrical network direct current " (application number CN201410104305.7) proposes a kind of computational methods exchanging the powered scale of receiving end electrical network direct current, the method only considers that direct current many feed-ins short circuit ratio retrains, and can not meet operation of power networks control overflow completely.
Summary of the invention
The object of the invention is: the ability accepting direct current feed-in in order to assess receiving end electrical network, improving alternating current-direct current series-parallel connection bulk power grid operation and management level, providing a kind of receiving end electrical network direct current access capability computational methods considering multiple constraint.The method determines alternative direct current drop point set according to substation location condition, power balance etc., according to the reciprocation degree between the capacity of short circuit of alternative direct current drop point each under typical way and each direct current, determine newly-increased direct current access drop point, consider direct current many feed-ins short circuit ratio, electrical network low ebb peak modulation capacity, relatively rotate the multi-constraint condition such as inertia index, N-1 transient stability, iteration provides the direct current access capability of receiving end electrical network.
Specifically, the present invention adopts following technical scheme to realize, and comprises the following steps:
1, consider receiving end electrical network direct current access capability computational methods for multiple constraint, comprise the steps:
1-1) determine rack based on a certain, note has wherein accessed M bar direct current, and the capacity of every bar direct current is respectively P d,i(i=1,2 ..., M), form typical operation modes, the equal full capacity power transmission of M bar direct current wherein accessed, determines alternative direct current drop point set according to substation location condition, power balance etc., supposes total N number of alternative direct current drop point;
1-2) according to the reciprocation degree between the capacity of short circuit of alternative direct current drop point each under typical way and each direct current, determine newly-increased direct current access drop point, the initial capacity of new access direct current is designated as P new(P newrelevant with DC voltage level, ± 500kV is generally 3000MW, and ± 800kV is generally 8000MW, and ± 1000kV is generally 10000MW, and giving tacit consent to initial access capacity in this step is 8000MW).
1-3) utilize 1-2) in obtained direct current drop point, set up new power system operating mode data, original access direct current transmission power remains unchanged, newly-increased D.C. capacity P new;
1-4) calculate the effective short circuit ratio MESCR of many feed-ins of all M+1 bar direct currents i(i=1,2 ..., M+1), if the effective short circuit ratio of many feed-ins of all direct currents is all greater than a certain threshold value R ref(according to pertinent literature, R refgenerally get 2-2.5), carry out 1-5), otherwise carry out 1-6);
1-5) check electrical network low ebb peak modulation capacity, relatively rotate inertia index, N-1 transient stability, if all satisfy condition, make M=M+1, return 1-1), otherwise carry out 1-8);
1-6) reduce the direct current transmission power P of new access ad(P adfor the direct current power adjustment step-length set according to acceptable error, as desirable 100MW), make P new=P new-P ad, form new operational mode, calculate the effective short circuit ratio of many feed-ins of all direct currents, if the effective short circuit ratio of many feed-ins that still there is direct current is less than R ref, return 1-6), otherwise carry out 1-7);
1-7) check electrical network low ebb peak modulation capacity, relatively rotate inertia index, N-1 transient stability, if meet institute's Constrained, then carry out 1-9), otherwise carry out 1-8)
1-8) reduce the direct current transmission power P of new access ad, make P new=P new-P ad, form new operational mode, check electrical network low ebb peak modulation capacity, relatively rotate inertia index, N-1 transient stability, if meet institute's Constrained, carry out 1-9), otherwise return 1-8);
Direct current access capability 1-9) calculating receiving end electrical network is
Technique scheme is further characterized in that, described step 1-2) according to the reciprocation degree between the capacity of short circuit of alternative direct current drop point each under typical way and each direct current, determine newly-increased direct current access drop point, its concrete grammar and step as follows:
The effective short circuit ratio MSCR of many feed-ins of the M bar direct current accessed under 2-1) calculating typical way i(i=1,2 ..., M), remember that the minimum direct current of the effective short circuit ratio of many feed-ins is numbered NUM;
The capacity of short circuit S of N number of alternative direct current drop point under 2-2) calculating typical way ac, j(j=1,2 ..., N), remember that wherein capacity of short circuit maximum is S acmax, capacity of short circuit minimum value is S acmin, obtain the capacity of short circuit index S of a jth alternative direct current drop point j,
S j = S ac , j - S ac min S ac max - S ac min , j = 1,2 , . . . , N - - - ( 1 ) ;
2-3) to jth alternative direct current drop point, the equivalent impedance Z between the drop point calculating itself and original access direct current eq, mn(m, n=1,2 ..., M, M+1; M+1 represents in the jth direct current that direct current drop point newly an accesses numbering), calculate new access direct current to the influence degree index A of original access direct current according to equivalent impedance and direct current access capacity j, new access direct current is to the influence degree index B of the weakest direct current j, all direct currents that accessed are to the new influence degree index C accessing direct current j, shown in it is calculated as follows,
A j , eq = Σ i = 1 M | Z eq , i ( M + 1 ) | P new | Z eq , ii | P d , i B j , eq = | Z eq , ( NUM ) ( M + 1 ) | P new | Z eq , ( NUM ) ( NUM ) | P d , i C j , eq = Σ i = 1 M | Z eq , ( M + 1 ) i | P d , i | Z eq , ( M + 1 ) ( M + 1 ) | P new - - - ( 2 )
To all N number of alternative direct current drop points, note
A max=max{A 1,eq,A 2,eq,...,A N,eq,},A min=min{A 1,eq,A 2,eq,...,A N,eq,}
B max=max{B 1,eq,B 2,eq,...,B N,eq,},B min=min{B 1,eq,B 2,eq,...,B N,eq,}
C max=max{C 1,eq,C 2,eq,...,C N,eq,},C min=min{C 1,eq,C 2,eq,...,C N,eq,}
Carry out standardization to index can obtain,
A j = A max - A j , eq A max - A j , min B j = B max - B j , eq B max - B j , min C j = C max - C j , eq C max - C j , min - - - ( 3 )
2-4) calculate and obtain when selecting jth alternative direct current drop point, influence each other between new access direct current and each direct current of original access level index
I j = 1 3 ( A j + B j + C j ) - - - ( 4 )
Direct current drop point selective goal under 2-5) adopting linear weighted function summation approach to obtain a jth alternative direct current drop point,
LD j=λ 1S j2I j(5)
Wherein weight coefficient meets λ 1+ λ 2the constraint of=1, can adopt the method such as capacitive equipments, ranking method to obtain, and for the purpose of simple, can make λ 12=0.5, the maximum drop point of selective goal value is as newly-increased direct current drop point.
Technique scheme is further characterized in that, described step 1-5) lieutenant colonel's nuclear power net low ebb peak modulation capacity, relatively rotate inertia index, N-1 transient stability, its concrete grammar and step as follows:
5-1) check electrical network low ebb peak modulation capacity and adopt following index,
η tr=P Ltr-P Gmin-P Gfc+P Gps-P Dtr-P Grn(6)
Wherein η trfor electrical network low ebb peak regulation nargin, if η tr>=0 illustrates that electrical network low ebb peak modulation capacity meets constraint, η tr< 0 illustrates that electrical network low ebb peak modulation capacity does not meet constraint, P ltrfor the low ebb load of electrical network, P gminfor the conventional thermoelectricity of the whole network, water power consider that the minimum start of peak modulation capacity is exerted oneself, P gfcthe situation of exerting oneself (mainly comprising the nuclear power, water power etc. that do not participate in peak regulation to exert oneself) is forced, P for the whole network gpsthe peak regulation that can provide for hydroenergy storage station supports, P dtrfor the power transmission power of direct current under base load (is considered the practical operation situation of current electrical network direct current, can be made P Dtr = P new + &Sigma; i = 1 M P Di )。
5-2) check that to relatively rotate inertia index as follows,
H dc = H actotal P dctotal - - - ( 7 )
Wherein H actotalrepresent total moment of inertia of AC system, P dctotalrepresent total transmission capacity of all direct currents, namely work as H dc>=C hthink that relatively rotating inertia meets constraint, H dc< C hthink that relatively rotating inertia does not meet constraint, C hbe the threshold value provided safely according to system frequency, generally get 2-3s.
Beneficial effect of the present invention is as follows: along with the development of electrical network scale, and the capacity of receiving end electrical network feed-in direct current is increasing, and direct current, while transmitting electric power for electrical network, solving shortage of electric power situation, also controls the new challenge brought to operation of power networks.Electrical production run unit more and more pays close attention to electrical network, and maximum that the ability of direct current can be received to have is much, electrical network receives how many DC operation comparatively economical, the present invention considers the multiple constraints in operation of power networks, solution for this problem provides a kind of method, contribute to fully realizing direct current and access the impact that electrical network is caused, make rational planning for, reduce direct current unchecked construction, improve operation of power networks economic benefit, reduce operation risk.
Accompanying drawing explanation
Fig. 1 is the flow chart of the inventive method;
Fig. 2 is the flow chart that in Fig. 1, step 2 selects direct current drop point.
Embodiment
With reference to the accompanying drawings the present invention is described in further detail.
What in Fig. 1, step 1 described is determine rack based on a certain, and note has wherein accessed M bar direct current, and the capacity of every bar direct current is respectively P d,i(i=1,2 ..., M), form typical operation modes, the equal full capacity power transmission of M bar direct current wherein accessed, determines alternative direct current drop point set according to substation location condition, power balance etc., supposes total N number of alternative direct current drop point;
What in Fig. 1, step 2 described is according to the reciprocation degree between the capacity of short circuit of alternative direct current drop point each under typical way and each direct current, determines newly-increased direct current access drop point, and the initial capacity of new access direct current is designated as P new(P newrelevant with DC voltage level, ± 500kV is generally 3000MW, and ± 800kV is generally 8000MW, and ± 1000kV is generally 10000MW, and giving tacit consent to initial access capacity in this step is 8000MW).
What in Fig. 1, step 3 described is utilize in step 2 to have obtained direct current drop point, sets up new power system operating mode data, has accessed direct current transmission power and remained unchanged, newly-increased D.C. capacity P new;
That in Fig. 1, step 4 describes is the effective short circuit ratio MESCR of many feed-ins calculating all M+1 bar direct currents i(i=1,2 ..., M+1), if the effective short circuit ratio of many feed-ins of all direct currents is all greater than a certain threshold value R ref(according to pertinent literature, R refgenerally get 2-2.5), carry out step 5, otherwise carry out step 6;
What in Fig. 1, step 5 described is check electrical network low ebb peak modulation capacity, relatively rotates inertia index, N-1 transient stability, if all satisfy condition, makes M=M+1, returns step 1, otherwise carry out step 8;
That in Fig. 1, step 6 describes is the direct current transmission power P reducing new access ad(P adfor the direct current power adjustment step-length set according to acceptable error, as desirable 100MW), make P new=P new-P ad, form new operational mode, calculate the effective short circuit ratio of many feed-ins of all direct currents, if the effective short circuit ratio of many feed-ins that still there is direct current is less than R ref, return step 6, otherwise carry out step 7;
What in Fig. 1, step 7 described is check electrical network low ebb peak modulation capacity, relatively rotates inertia index, N-1 transient stability, if meet institute's Constrained, then carry out step 9, otherwise carry out step 8;
That in Fig. 1, step 8 describes is the direct current transmission power P reducing new access ad, make P new=P new-P ad, form new operational mode, check electrical network low ebb peak modulation capacity, relatively rotate inertia index, N-1 transient stability, if meet institute's Constrained, carry out step 9, otherwise return step 8;
What in Fig. 1, step 9 described is the direct current access capability calculating receiving end electrical network is P inGrid = P new + &Sigma; i = 1 M P Di .
In Fig. 1, step 2 is according to the reciprocation degree between the capacity of short circuit of alternative direct current drop point each under typical way and each direct current, and determine newly-increased direct current access drop point, its concrete grammar and step composition graphs 2 are described:
That in Fig. 2, step 2-1 describes is the effective short circuit ratio MSCR of many feed-ins calculating the M bar direct current accessed under typical way i(i=1,2 ..., M), remember that the minimum direct current of the effective short circuit ratio of many feed-ins is numbered NUM;
That in Fig. 2, step 2-2 describes is the capacity of short circuit S calculating N number of alternative direct current drop point under typical way ac, j(j=1,2 ..., N), remember that wherein capacity of short circuit maximum is S acmax, capacity of short circuit minimum value is S acmin, obtain the capacity of short circuit index S of a jth alternative direct current drop point j,
S j = S ac , j - S ac min S ac max - S ac min , j = 1,2 , . . . , N - - - ( 1 ) ;
What in Fig. 2, step 2-3 described is to jth alternative direct current drop point, calculate itself and accessed direct current drop point between equivalent impedance Z eq, mn(m, n=1,2 ..., M, M+1; M+1 represents in the jth direct current that direct current drop point newly an accesses numbering), calculate new access direct current to all influence degree index A having accessed direct current according to equivalent impedance and direct current access capacity j, new access direct current is to the influence degree index B of the weakest direct current j, all direct currents that accessed are to the new influence degree index C accessing direct current j, shown in it is calculated as follows,
A j , eq = &Sigma; i = 1 M | Z eq , i ( M + 1 ) | P new | Z eq , ii | P d , i B j , eq = | Z eq , ( NUM ) ( M + 1 ) | P new | Z eq , ( NUM ) ( NUM ) | P d , i C j , eq = &Sigma; i = 1 M | Z eq , ( M + 1 ) i | P d , i | Z eq , ( M + 1 ) ( M + 1 ) | P new - - - ( 2 )
To all N number of alternative direct current drop points, note
A max=max{A 1,eq,A 2,eq,...,A N,eq,},A min=min{A 1,eq,A 2,eq,...,A N,eq,}
B max=max{B 1,eq,B 2,eq,...,B N,eq,},B min=min{B 1,eq,B 2,eq,...,B N,eq,}
C max=max{C 1,eq,C 2,eq,...,C N,eq,},C min=min{C 1,eq,C 2,eq,...,C N,eq,}
Carry out standardization to index can obtain,
A j = A max - A j , eq A max - A j , min B j = B max - B j , eq B max - B j , min C j = C max - C j , eq C max - C j , min - - - ( 3 )
What in Fig. 2, step 2-4 described is calculates and obtains when selecting jth alternative direct current drop point, new access direct current and accessed the level index that to influence each other between each direct current
I j = 1 3 ( A j + B j + C j ) - - - ( 4 )
The direct current drop point selective goal that what in Fig. 2, step 2-5 described is under adopting linear weighted function summation approach to obtain a jth alternative direct current drop point,
LD j=λ 1S j2I j(5)
Wherein weight coefficient meets λ 1+ λ 2the constraint of=1, can adopt the method such as capacitive equipments, ranking method to obtain, and for the purpose of simple, can make λ 12=0.5, the maximum drop point of selective goal value is as newly-increased direct current drop point.
Although the present invention with preferred embodiment openly as above, embodiment is not of the present invention for limiting.Without departing from the spirit and scope of the invention, any equivalence change done or retouching, belong to the protection range of the present invention equally.Therefore the content that protection scope of the present invention should define with the claim of the application is standard.

Claims (3)

1. consider receiving end electrical network direct current access capability computational methods for multiple constraint, it is characterized in that, comprise the steps:
Step one: determine rack based on a certain, note has wherein accessed M bar direct current, and the capacity of every bar direct current is respectively P d,i, wherein, i=1,2 ..., M, form typical operation modes, the equal full capacity power transmission of M bar direct current wherein accessed, determines alternative direct current drop point set according to substation location condition, power balance etc., supposes total N number of alternative direct current drop point;
Step 2: according to the reciprocation degree between the capacity of short circuit of alternative direct current drop point each under typical way and each direct current, determines newly-increased direct current access drop point, and the initial capacity of new access direct current is designated as P new.
Step 3: utilize in step 2 and obtained direct current drop point, sets up new power system operating mode data, and original direct current transmission power remains unchanged, newly-increased D.C. capacity P new;
Step 4: the effective short circuit ratio MESCR of many feed-ins calculating all M+1 bar direct currents i, wherein, i=1,2 ..., M+1, if the effective short circuit ratio of many feed-ins of all direct currents is all greater than a certain threshold value R ref, carry out step 5, otherwise carry out step 6;
Step 5: check electrical network low ebb peak modulation capacity, relatively rotate inertia index, N-1 transient stability, if all satisfy condition, make M=M+1, return step one, otherwise carry out step 8;
Step 6: the direct current transmission power P reducing new access ad, P adfor the direct current power adjustment step-length set according to acceptable error, make P new=P new-P ad, form new operational mode, calculate the effective short circuit ratio of many feed-ins of all direct currents, if the effective short circuit ratio of many feed-ins that still there is direct current is less than R ref, return step 6, otherwise carry out step 7;
Step 7: check electrical network low ebb peak modulation capacity, relatively rotate inertia index, N-1 transient stability, if meet institute's Constrained, then carry out step 9, otherwise carry out step 8;
Step 8: the direct current transmission power P reducing new access ad, make P new=P new-P ad, form new operational mode, check electrical network low ebb peak modulation capacity, relatively rotate inertia index, N-1 transient stability, if meet institute's Constrained, carry out step 9, otherwise return step 8;
Step 9: the direct current access capability calculating receiving end electrical network is
2. a kind of receiving end electrical network direct current access capability computational methods considering multiple constraint according to claim 1, it is characterized in that, according to the reciprocation degree between the capacity of short circuit of alternative direct current drop point each under typical way and each direct current in described step 2, determine newly-increased direct current access drop point, its concrete grammar and step as follows:
Step 2-1: the effective short circuit ratio MESCR of many feed-ins of the M bar direct current accessed under calculating typical way i, wherein, i=1,2 ..., M, remembers that the minimum direct current of the effective short circuit ratio of many feed-ins is numbered NUM;
Step 2-2: the capacity of short circuit S of N number of alternative direct current drop point under calculating typical way ac, j, wherein, j=1,2 ..., N, remembers that wherein capacity of short circuit maximum is S acmax, capacity of short circuit minimum value is S acmin, obtain the capacity of short circuit index S of a jth alternative direct current drop point j,
S j = S ac , j - S ac min S ac max - S ac min , ( j = 1,2 , . . . , N ) - - - ( 1 ) ;
Step 2-3: to jth alternative direct current drop point, the equivalent impedance Z between the drop point calculating itself and original access direct current eq, mn, wherein, m, n=1,2 ..., M, M+1, M+1 represent in the jth direct current that direct current drop point newly an accesses numbering, calculate new access direct current to all influence degree index A having accessed direct current according to equivalent impedance and direct current access capacity j, new access direct current is to the influence degree index B of the weakest direct current j, all direct currents that accessed are to the new influence degree index C accessing direct current j, shown in it is calculated as follows,
A j , eq = &Sigma; i = 1 M | Z eq , i ( M + 1 ) | P new | Z eq , ii | P d , i B j , eq = | Z eq , ( NUM ) ( M + 1 ) | P new | Z eq , ( NUM ) ( NUM ) | P d , i C j , eq = &Sigma; i = 1 M | Z eq , ( M + 1 ) i | P d , i | Z eq , ( M + 1 ) ( M + 1 ) | P new - - - ( 2 )
To all N number of alternative direct current drop points, note
A max=max{A 1,eq,A 2,eq,...,A N,eq,},A min=min{A 1,eq,A 2,eq,...,A N,eq,}
B max=max{B 1,eq,B 2,eq,...,B N,eq,},B min=min{B 1,eq,B 2,eq,...,B N,eq,}
C max=max{C 1,eq,C 2,eq,...,C N,eq,},C min=min{C 1,eq,C 2,eq,...,C N,eq,}
Carry out standardization to index can obtain,
A j = A max - A j , eq A max - A j , min B j = B max - B j , eq B max - B j , min C j = C max - C j , eq C max - C j , min - - - ( 3 )
Step 2-4: calculate and obtain when selecting jth alternative direct current drop point, influence each other between new access direct current and each direct current of original access level index
I j = 1 3 ( A j + B j + C j ) - - - ( 4 )
Step 2-5: the direct current drop point selective goal under adopting linear weighted function summation approach to obtain a jth alternative direct current drop point,
LD j=λ 1S j2I j(5)
Wherein weight coefficient meets λ 1+ λ 2the constraint of=1, can adopt the method such as capacitive equipments, ranking method to obtain, and the maximum drop point of selective goal value is as newly-increased direct current drop point.
3. a kind of receiving end electrical network direct current access capability computational methods considering multiple constraint according to claim 1, is characterized in that, described step 5 lieutenant colonel nuclear power net low ebb peak modulation capacity, relatively rotate inertia index, and its concrete grammar is as follows:
Step 5-1: check electrical network low ebb peak modulation capacity and adopt following index,
η tr=P Ltr-P Gmin-P Gfc+P Gps-P Dtr-P Grn(6)
Wherein η trfor electrical network low ebb peak regulation nargin, if η tr>=0 illustrates that electrical network low ebb peak modulation capacity meets constraint, η tr< 0 illustrates that electrical network low ebb peak modulation capacity does not meet constraint, P ltrfor the low ebb load of electrical network, P gminfor the conventional thermoelectricity of the whole network, water power consider that the minimum start of peak modulation capacity is exerted oneself, P gfcthe situation of exerting oneself is forced, P for the whole network gpsthe peak regulation that can provide for hydroenergy storage station supports, P dtrfor the power transmission power of direct current under base load;
Step 5-2: it is as follows that check relatively rotates inertia index,
H dc = H actotal P dctotal - - - ( 7 )
Wherein H actotalrepresent total moment of inertia of AC system, P dctotalrepresent total transmission capacity of all direct currents, namely work as H dc>=C hthink that relatively rotating inertia meets constraint, H dc< C hthink that relatively rotating inertia does not meet constraint, C hit is the threshold value provided safely according to system frequency.
CN201510164904.2A 2015-04-08 2015-04-08 A kind of receiving end power grid direct current access capability computational methods for considering multiple constraint Active CN105048521B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510164904.2A CN105048521B (en) 2015-04-08 2015-04-08 A kind of receiving end power grid direct current access capability computational methods for considering multiple constraint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510164904.2A CN105048521B (en) 2015-04-08 2015-04-08 A kind of receiving end power grid direct current access capability computational methods for considering multiple constraint

Publications (2)

Publication Number Publication Date
CN105048521A true CN105048521A (en) 2015-11-11
CN105048521B CN105048521B (en) 2018-05-25

Family

ID=54454842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510164904.2A Active CN105048521B (en) 2015-04-08 2015-04-08 A kind of receiving end power grid direct current access capability computational methods for considering multiple constraint

Country Status (1)

Country Link
CN (1) CN105048521B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105515064A (en) * 2015-12-04 2016-04-20 华中电网有限公司 Receiving-end power grid DC power emergency control measures quantification method
CN105743135A (en) * 2016-04-26 2016-07-06 国家电网公司 Extra-high voltage AC/DC optimal power receiving proportion evaluation method for receiving-end power grid
CN106549409A (en) * 2016-12-20 2017-03-29 国家电网公司 Consider the receiving end electric network source planing method that extra-high voltage direct-current is accessed
CN106786557A (en) * 2017-01-23 2017-05-31 中国电力科学研究院 A kind of extra-high voltage is layered D.C. capacity and drop point system of selection and system
CN108512219A (en) * 2018-03-14 2018-09-07 国家电网公司华中分部 A kind of multichannel receiving-end system under Voltage Stability Constraints is by electric energy power comprehensive estimation method
CN109713730A (en) * 2018-12-05 2019-05-03 中国电力科学研究院有限公司 A kind of calculation method for most receiving electric scale greatly of network system
CN109888847A (en) * 2019-03-11 2019-06-14 广东电网有限责任公司 Optimizing operation method, the apparatus and system of more feed-in AC-DC hybrid power grids
CN112054515A (en) * 2020-08-28 2020-12-08 武汉大学 Receiving-end power grid DC receiving capacity detection method based on multi-objective optimization

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102623987A (en) * 2012-03-26 2012-08-01 中国电力科学研究院 Multiple-DC (direct current)-droppoint selection method based on multiple feed-in short circuit ratios
CN103617556A (en) * 2013-11-06 2014-03-05 南方电网科学研究院有限责任公司 Method for optimizing direct-current point setting for centralizedly feeding direct current into receiving end system
CN103986151A (en) * 2014-03-20 2014-08-13 国家电网公司 Alternating-current receiving end grid direct-current receiving scale calculation method
CN103986180A (en) * 2014-05-30 2014-08-13 国家电网公司 Receiving end power grid direct current drop point selecting method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102623987A (en) * 2012-03-26 2012-08-01 中国电力科学研究院 Multiple-DC (direct current)-droppoint selection method based on multiple feed-in short circuit ratios
CN103617556A (en) * 2013-11-06 2014-03-05 南方电网科学研究院有限责任公司 Method for optimizing direct-current point setting for centralizedly feeding direct current into receiving end system
CN103986151A (en) * 2014-03-20 2014-08-13 国家电网公司 Alternating-current receiving end grid direct-current receiving scale calculation method
CN103986180A (en) * 2014-05-30 2014-08-13 国家电网公司 Receiving end power grid direct current drop point selecting method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
林伟芳 等: "多馈入交直流系统短路比的定义和应用", 《中国电机工程学报》 *
黄弘扬 等: "多馈入直流输电系统短路比指标的有效性分析", 《电力自动化设备》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105515064A (en) * 2015-12-04 2016-04-20 华中电网有限公司 Receiving-end power grid DC power emergency control measures quantification method
CN105515064B (en) * 2015-12-04 2018-02-23 华中电网有限公司 Receiving end power network dc power emergent control measure quantization method
CN105743135A (en) * 2016-04-26 2016-07-06 国家电网公司 Extra-high voltage AC/DC optimal power receiving proportion evaluation method for receiving-end power grid
CN105743135B (en) * 2016-04-26 2018-02-13 国家电网公司 A kind of receiving end power network extra-high voltage alternating current-direct current is optimal by electric ratio appraisal procedure
CN106549409A (en) * 2016-12-20 2017-03-29 国家电网公司 Consider the receiving end electric network source planing method that extra-high voltage direct-current is accessed
CN106786557A (en) * 2017-01-23 2017-05-31 中国电力科学研究院 A kind of extra-high voltage is layered D.C. capacity and drop point system of selection and system
CN106786557B (en) * 2017-01-23 2023-08-18 中国电力科学研究院 Extra-high voltage layered direct current capacity and drop point selection method and system
CN108512219A (en) * 2018-03-14 2018-09-07 国家电网公司华中分部 A kind of multichannel receiving-end system under Voltage Stability Constraints is by electric energy power comprehensive estimation method
CN108512219B (en) * 2018-03-14 2020-08-28 国家电网公司华中分部 Method for evaluating power receiving capacity of multi-channel receiving end system under voltage stability constraint
CN109713730A (en) * 2018-12-05 2019-05-03 中国电力科学研究院有限公司 A kind of calculation method for most receiving electric scale greatly of network system
CN109888847A (en) * 2019-03-11 2019-06-14 广东电网有限责任公司 Optimizing operation method, the apparatus and system of more feed-in AC-DC hybrid power grids
CN112054515A (en) * 2020-08-28 2020-12-08 武汉大学 Receiving-end power grid DC receiving capacity detection method based on multi-objective optimization

Also Published As

Publication number Publication date
CN105048521B (en) 2018-05-25

Similar Documents

Publication Publication Date Title
CN105048521A (en) Method for calculating direct current access capability of receiving end power grid with consideration of multiple constraints
CN108418255B (en) Planning method and system suitable for extra-high voltage direct current outgoing power grid containing high-permeability new energy
Negra et al. Loss evaluation of HVAC and HVDC transmission solutions for large offshore wind farms
Sadeghkhani et al. Low‐voltage ride‐through of a droop‐based three‐phase four‐wire grid‐connected microgrid
Craciun et al. Improved voltage regulation strategies by PV inverters in LV rural networks
WO2016141683A1 (en) Implementation method for energy internet absorbing large-scale distributed power supply
CN102403716A (en) Dynamic equalizing method for multi-infeed alternating/direct-current power grid
CN110896231B (en) Distributed photovoltaic capacity receiving calculation method and system for power distribution network in poverty alleviation area
CN104659797A (en) Intelligent power load three-phase unbalance handling method at distribution network low voltage side
CN109378830A (en) A kind of synchronous capacitor site selecting method based on long distance power transmission
Thukaram et al. Optimal reactive power dispatch in a large power system with AC–DC and FACTS controllers
CN102664422A (en) Method for smoothing output power of wind power station by utilizing energy storage system
CN106099979B (en) A kind of unit under-excitation ability analysis method for considering stabilization of power grids limitation
CN103078329B (en) Output reactive compensation analysis method for long-distance 200kV submarine cable of offshore wind plant
CN109873498A (en) A kind of low-voltage network comprehensive power quality monitoring method containing distributed photovoltaic
CN103248125B (en) The urgent power modulation system of a kind of multiple-circuit line based on PMU and method
CN104392287A (en) 500 kV/220 kV receiving end power grid partitioning method
CN113191675B (en) Multi-direct-current-sending-end power grid planning scheme adaptability evaluation method and system
CN103904645B (en) Phase shifting transformer site selecting method
CN105629168B (en) A kind of Wind turbines flickering based on power interval determines method
Miu et al. Impact studies of unbalanced multi-phase distribution system component models
Yang et al. Dynamic performance of series multiterminal HVDC during AC faults at inverter stations
CN115714404A (en) Commutation soft switching system for governing current unbalance of power distribution network and evaluation method
CN104348180B (en) Distributed power supply grid-connected point and access mode selection method
Paulinder Operation and control of HVDC links embedded in AC systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant