CN105048500A - 一种降低光伏变压器损耗的方法以及对应的光伏发电系统 - Google Patents
一种降低光伏变压器损耗的方法以及对应的光伏发电系统 Download PDFInfo
- Publication number
- CN105048500A CN105048500A CN201510478774.XA CN201510478774A CN105048500A CN 105048500 A CN105048500 A CN 105048500A CN 201510478774 A CN201510478774 A CN 201510478774A CN 105048500 A CN105048500 A CN 105048500A
- Authority
- CN
- China
- Prior art keywords
- transformer
- inverter
- circuit breaker
- grid
- power output
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Inverter Devices (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明涉及一种降低光伏变压器损耗的方法以及对应的光伏发电系统,包括以下步骤:(1)判断并网断路器和逆变器状态;(2)若并网断路器和变压器断路器处于合位,计算变压器总损耗;采集并计算逆变器的输出功率;将变压器的总损耗与逆变器的输出功率进行比较,当断逆变器的输出功率小于变压器总损耗时,控制并网断路器和变压器断路器分闸;(3)若并网断路器和变压器断路器处于分位,计算变压器的空载损耗;计算逆变器的预测输出功率;将变压器的空载损耗与逆变器的预测输出功率进行比较,当断逆变器的预测输出功率大于变压器空载损耗时,控制并网断路器和变压器断路器合闸。能够降低变压器有载损耗时间,减少变压器损耗,提高光伏发电效率。
Description
技术领域
本发明属于光伏发电站领域,具体涉及一种降低光伏变压器损耗的方法以及对应的光伏发电系统。
背景技术
近年来,能源供给趋紧和环境破坏成为全球性的重大问题,世界各国正在积极采取措施解决与之相关的问题,开发利用清洁的可再生能源势在必行。光伏发电由于具有安全可靠,无噪声污染,无污染排放,能源质量高、不受资源分布地域的限制的特点,获得了越来越多的青睐。随着光伏发电优惠政策出台和光伏组件成本降低,光伏电站的规模化建设迅速发展。
有效的降低光伏发电站的损耗,对提高光伏电站的经济效益具有很大的影响。光伏电站损耗主要包括:光伏阵列损耗、直流电缆损耗、逆变器损耗、交流电缆损耗和变压器损耗。变压器的损耗包括空载损耗和负载损耗,空载损耗主要是铁损,包括磁滞损耗和涡流损耗;磁滞损耗与频率成正比;与最大磁通密度的磁滞系数的次方成正比。涡流损耗与频率、最大磁通密度、矽钢片的厚度三者的积成正比。负载损耗主要是负载电流通过绕组时在电阻上的损耗,一般称铜损。其大小随负载电流而变化,与负载电流的平方成正比;(并用标准线圈温度换算值来表示)。负载损耗还受变压器温度的影响,同时负载电流引起的漏磁通会在绕组内产生涡流损耗,并在绕组外的金属部分产生杂散损耗。研究表明变压器损耗最大占总体损耗的7%。所以,通过减少光伏变压器损耗来提高光伏电站整体发电效率和经济效益具有很大的实际意义。
根据光伏发电特点,有光照时,光伏电站发电;无光照时,光伏电站不发电。但是,当无光照光伏电站不发电时,变压器仍然空载运行,给光伏变压器带来很大损耗,降级了光伏电站的发电效率。
发明内容
本发明的目的是提供一种降低光伏变压器损耗的方法以及对应的光伏发电系统,用以解决现有技术中的光伏变压器损耗大的问题。
为实现上述目的,本发明的方案包括:
一种降低光伏变压器损耗的方法,包括以下步骤:
(1)判断并网断路器和逆变器状态;
(2)当并网断路器处于结合位置且逆变器处于运行状态时,根据变压器的空载损耗和负载损耗计算变压器的总损耗;采集并计算逆变器的输出功率;将变压器的总损耗与逆变器的输出功率进行比较,当断逆变器的输出功率小于a倍的变压器总损耗,且持续时间大于第一设定时间时,控制并网断路器和变压器断路器分闸;否则不动作;
(3)当并网断路器处于分离位置且逆变器处于停运状态时,计算变压器的空载损耗;采集太阳辐射度并计算逆变器的预测输出功率;将变压器的空载损耗与逆变器的预测输出功率进行比较,当断逆变器的预测输出功率大于b倍的变压器空载损耗,且持续时间大于第二设定时间时,控制并网断路器和变压器断路器合闸;否则不动作。
所述步骤(4)中a为0.9,第一设定时间为10min;所述步骤(7)中b为1.1,第二设定时间为10min。
一种光伏发电系统,包括逆变器、断路器、光伏变压器、并网断路器以及智能控制器和太阳辐射仪;所述逆变器依次通过逆变器、断路器、光伏变压器、网断路器用于连接电网;所述智能控制器分别采样连接逆变器、光伏变压器和太阳辐射仪,所述智能控制器还控制连接并网断路器;通过智能控制器来降低光伏变压器损耗,包括以下步骤:
(1)判断并网断路器和逆变器状态;
(2)当并网断路器处于结合位置且逆变器处于运行状态时,根据变压器的空载损耗和负载损耗计算变压器的总损耗;采集并计算逆变器的输出功率;将变压器的总损耗与逆变器的输出功率进行比较,当断逆变器的输出功率小于a倍的变压器总损耗,且持续时间大于第一设定时间时,控制并网断路器和变压器断路器分闸;否则不动作;
(3)当并网断路器处于分离位置且逆变器处于停运状态时,计算变压器的空载损耗;采集太阳辐射度并计算逆变器的预测输出功率;将变压器的空载损耗与逆变器的预测输出功率进行比较,当断逆变器的预测输出功率大于b倍的变压器空载损耗,且持续时间大于第二设定时间时,控制并网断路器和变压器断路器合闸;否则不动作。
所述步骤(4)中a为0.9,第一设定时间为10min;所述步骤(7)中b为1.1,第二设定时间为10min。
本发明的有益效果是:通过采集光伏变压器的逆变器功率和变压器损耗功率并进行比较,当逆变器实时功率小于a倍的变压器损耗功率且持续第一设定时间时,控制变压器断路器和并网断路器分闸;当逆变器实时功率大于b倍的变压器损耗功率且持续时间大于第二设定时间时,控制变压器断路器和并网断路器合闸。有效地降低变压器的有载损耗时间,减少变压器损耗,提高光伏发电效率。
附图说明
图1是本发明降低光伏变压器损耗方法实施例的流程图;
图2是本发明光伏发电系统实施例的结构示意图。
具体实施方式
降低光伏变压器损耗方法实施例
如图1所示,本发明实施例的降低光伏变压器损耗方法包括以下步骤;
(1)检测并判断并网断路器和逆变器状态。
检测并判断并网断路器和逆变器的运行状态,当并网断路器处于结合位置且逆变器处于运行状态时,进入步骤(2);当并网断路器处于分离位置且逆变器处于停运状态时,进入步骤(5)。
(2)计算变压器的总损耗。
根据变压器的空载损耗和负载损耗计算变压器的总损耗。计算公式如下:
1)有功损耗:ΔP=P0+KTβ2PK
2)无功损耗:ΔQ=Q0+KTβ2QK
3)综合功率损耗:ΔPZ=ΔP+KQΔQ
P0——空载损耗(kW)
PK——额定负载损耗(kW)
SN——变压器额定容量(kVA)
I0%——变压器空载电流百分比
UK%——短路电压百分比
β——平均负载系数
KT——负载波动损耗系数
QK——额定负载漏磁功率(kvar)
KQ——无功经济当量(kW/kvar)
(3)采集并计算逆变器的输出功率;
采集逆变器的实时输出功率并计算逆变器的输出功率;
(4)将变压器的总损耗与逆变器的输出功率进行比较。
通过将变压器的总损耗与逆变器的输出功率进行比较,当判断逆变器的输出功率小于变压器总损耗的90%,且持续时间大于10min时,控制并网断路器和变压器断路器分闸;其他情况下,结束判断并且不进行动作。
(5)计算变压器的空载损耗;
根据变压器的容量、电压等级等固有特性计算变压器的空载损耗。计算方法已在步骤(2)中说明。
(6)计算逆变器的预测输出功率;
通过采集太阳辐射度,计算变压器的预测输出功率。
(7)将变压器的空载损耗与逆变器的预测输出功率进行比较。
通过将变压器的空载损耗与逆变器的预测输出功率进行比较,当判断逆变器的预测输出功率大于变压器空载损耗的110%,且持续时间大于10min时,控制并网断路器和变压器断路器合闸;其他情况下,结束判断并且不进行动作。
在上述实施例中,逆变器的输出功率小于变压器总损耗的90%,所述第一设定值为10min;逆变器的输出功率大于变压器总损耗110%,所述第二设定值为10min。作为其他实施方式,上述比例、时间均与设备的具体情况有关。
光伏发电系统实施例
如图2所示,本发明的光伏发电系统包括逆变器、断路器、光伏变压器、并网断路器、以及智能控制器和太阳辐射仪。逆变器依次通过逆变器、断路器、光伏变压器、网断路器连接电网;智能控制器控制连接并网断路器,智能控制器分别采样连接逆变器、光伏变压器和太阳辐射仪。
通过智能控制器判断并网断路器和逆变器状态;
若并网断路器处于合位且逆变器处于运行状态,智能控制器计算变压器的总损耗,同时,智能控制器采集逆变器的实时输出功率,智能控制器通过模数转换信号对逆变器的输出功率和变压器的总损耗进行逻辑判断,当判断逆变器的输出功率小于变压器总损耗的90%且持续时间大于10min时,智能控制器控制并网断路器和变压器断路器分闸,使得变压器停止工作。其他情况下,结束判断并且不进行动作。
若并网断路器处于分位且逆变器处于停运状态,智能控制器计算变压器的空载损耗,同时,智能控制器通过太阳辐射仪采集太阳的辐射度来预测逆变器的输出功率,智能控制器通过模数转换信号对逆变器的预测输出功率和变压器的空载损耗进行逻辑判断,当判断逆变器的预测输出功率大于变压器空载损耗的110%且持续时间大于10min时,智能控制器控制并网断路器和变压器断路器合闸,使得变压器开始工作。其他情况下,结束判断并且不进行动作。
Claims (4)
1.一种降低光伏变压器损耗的方法,其特征在于:包括以下步骤:
(1)判断并网断路器和逆变器状态;
(2)当并网断路器处于结合位置且逆变器处于运行状态时,根据变压器的空载损耗和负载损耗计算变压器的总损耗;采集并计算逆变器的输出功率;将变压器的总损耗与逆变器的输出功率进行比较,当断逆变器的输出功率小于a倍的变压器总损耗,且持续时间大于第一设定时间时,控制并网断路器和变压器断路器分闸;否则不动作;
(3)当并网断路器处于分离位置且逆变器处于停运状态时,计算变压器的空载损耗;采集太阳辐射度并计算逆变器的预测输出功率;将变压器的空载损耗与逆变器的预测输出功率进行比较,当断逆变器的预测输出功率大于b倍的变压器空载损耗,且持续时间大于第二设定时间时,控制并网断路器和变压器断路器合闸;否则不动作。
2.根据权利要求1所述的降低光伏变压器损耗的方法,其特征在于:所述步骤(4)中a为0.9,第一设定时间为10min;所述步骤(7)中b为1.1,第二设定时间为10min。
3.一种光伏发电系统,包括逆变器、断路器、光伏变压器、并网断路器以及智能控制器和太阳辐射仪;所述逆变器依次通过逆变器、断路器、光伏变压器、网断路器用于连接电网;所述智能控制器分别采样连接逆变器、光伏变压器和太阳辐射仪,所述智能控制器还控制连接并网断路器;其特征在于:通过智能控制器来降低光伏变压器损耗,包括以下步骤:
(1)判断并网断路器和逆变器状态;
(2)当并网断路器处于结合位置且逆变器处于运行状态时,根据变压器的空载损耗和负载损耗计算变压器的总损耗;采集并计算逆变器的输出功率;将变压器的总损耗与逆变器的输出功率进行比较,当断逆变器的输出功率小于a倍的变压器总损耗,且持续时间大于第一设定时间时,控制并网断路器和变压器断路器分闸;否则不动作;
(3)当并网断路器处于分离位置且逆变器处于停运状态时,计算变压器的空载损耗;采集太阳辐射度并计算逆变器的预测输出功率;将变压器的空载损耗与逆变器的预测输出功率进行比较,当断逆变器的预测输出功率大于b倍的变压器空载损耗,且持续时间大于第二设定时间时,控制并网断路器和变压器断路器合闸;否则不动作。
4.根据权利要求3所述的光伏发电系统,其特征在于:所述步骤(4)中a为0.9,第一设定时间为10min;所述步骤(7)中b为1.1,第二设定时间为10min。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510478774.XA CN105048500B (zh) | 2015-08-06 | 2015-08-06 | 一种降低光伏变压器损耗的方法以及对应的光伏发电系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510478774.XA CN105048500B (zh) | 2015-08-06 | 2015-08-06 | 一种降低光伏变压器损耗的方法以及对应的光伏发电系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105048500A true CN105048500A (zh) | 2015-11-11 |
CN105048500B CN105048500B (zh) | 2017-04-19 |
Family
ID=54454822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510478774.XA Expired - Fee Related CN105048500B (zh) | 2015-08-06 | 2015-08-06 | 一种降低光伏变压器损耗的方法以及对应的光伏发电系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105048500B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106159997A (zh) * | 2016-07-13 | 2016-11-23 | 上能电气股份有限公司 | 一种光伏系统中消除变压器空载损耗的控制方法 |
CN108226669A (zh) * | 2017-12-08 | 2018-06-29 | 国网北京市电力公司 | 变压器电量损耗的方法及装置 |
CN110783953A (zh) * | 2019-10-31 | 2020-02-11 | 特变电工西安电气科技有限公司 | 一种组串式逆变器光伏电站快速调频响应通信方法 |
CN113824158A (zh) * | 2021-08-06 | 2021-12-21 | 华翔翔能科技股份有限公司 | 一种光伏电网无功补偿管理方法及系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102055368A (zh) * | 2010-12-20 | 2011-05-11 | 江苏省电力公司南京供电公司 | 100kva微网储能双向变流器 |
JP2011130638A (ja) * | 2009-12-21 | 2011-06-30 | Hitachi Ltd | 自然エネルギを用いた発電システム |
CN103532158A (zh) * | 2013-10-28 | 2014-01-22 | 浙江南都电源动力股份有限公司 | 一种微网新能源混合储能系统 |
CN203415994U (zh) * | 2013-07-30 | 2014-01-29 | 阳光电源股份有限公司 | 一种光伏并网逆变系统及应用其的光伏发电系统 |
CN203933011U (zh) * | 2014-06-03 | 2014-11-05 | 国家电网公司 | 变压器经济运行优化系统 |
US9065298B2 (en) * | 2012-03-22 | 2015-06-23 | Chung Yuan Christian University | Photovoltaic system having power-increment-aided incremental-conductance maximum power point tracking controller using variable-frequency and constant-duty control and method thereof |
-
2015
- 2015-08-06 CN CN201510478774.XA patent/CN105048500B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011130638A (ja) * | 2009-12-21 | 2011-06-30 | Hitachi Ltd | 自然エネルギを用いた発電システム |
CN102055368A (zh) * | 2010-12-20 | 2011-05-11 | 江苏省电力公司南京供电公司 | 100kva微网储能双向变流器 |
US9065298B2 (en) * | 2012-03-22 | 2015-06-23 | Chung Yuan Christian University | Photovoltaic system having power-increment-aided incremental-conductance maximum power point tracking controller using variable-frequency and constant-duty control and method thereof |
CN203415994U (zh) * | 2013-07-30 | 2014-01-29 | 阳光电源股份有限公司 | 一种光伏并网逆变系统及应用其的光伏发电系统 |
CN103532158A (zh) * | 2013-10-28 | 2014-01-22 | 浙江南都电源动力股份有限公司 | 一种微网新能源混合储能系统 |
CN203933011U (zh) * | 2014-06-03 | 2014-11-05 | 国家电网公司 | 变压器经济运行优化系统 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106159997A (zh) * | 2016-07-13 | 2016-11-23 | 上能电气股份有限公司 | 一种光伏系统中消除变压器空载损耗的控制方法 |
CN108226669A (zh) * | 2017-12-08 | 2018-06-29 | 国网北京市电力公司 | 变压器电量损耗的方法及装置 |
CN110783953A (zh) * | 2019-10-31 | 2020-02-11 | 特变电工西安电气科技有限公司 | 一种组串式逆变器光伏电站快速调频响应通信方法 |
CN110783953B (zh) * | 2019-10-31 | 2023-11-14 | 特变电工西安电气科技有限公司 | 一种组串式逆变器光伏电站快速调频响应通信方法 |
CN113824158A (zh) * | 2021-08-06 | 2021-12-21 | 华翔翔能科技股份有限公司 | 一种光伏电网无功补偿管理方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN105048500B (zh) | 2017-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sarkar et al. | Reactive power management in renewable rich power grids: A review of grid-codes, renewable generators, support devices, control strategies and optimization algorithms | |
CN107863778B (zh) | 一种换相储能式三相负荷不平衡治理装置及方法 | |
CN101483346B (zh) | 一种多逆变器太阳能光伏并网发电系统的组群控制方法 | |
CN105048500A (zh) | 一种降低光伏变压器损耗的方法以及对应的光伏发电系统 | |
CN104410091B (zh) | 基于变流器控制的风储能量管理系统及其控制方法 | |
CN104467018A (zh) | 一种保护光伏组件抑制消除pid现象的方法及装置 | |
CN202353232U (zh) | 一种高压级联变频器功率单元并网回馈装置 | |
Chen et al. | Coordinated control of SFCL and SMES for transient performance improvement of microgrid with multiple DG units | |
CN102496950B (zh) | 一种高压级联变频器功率单元并网回馈装置 | |
Tao et al. | Research on the protection coordination of permanent magnet synchronous generator based wind farms with low voltage ride through capability | |
CN103259059B (zh) | 一种液流电池初始充电方法及电路 | |
CN104734165B (zh) | 一种风电机组全功率变流器低电压穿越无功功率控制方法 | |
CN103117555A (zh) | 一种新型太阳能辅助火电站一体化装置 | |
Yu et al. | Design of 3kw wind and solar hybrid independent power supply system for 3g base station | |
CN108233428A (zh) | 一种带弃光控制系统的屋顶太阳能电站 | |
Zhao et al. | An overview on application analysis of power electronic technology in smart grid | |
CN204497753U (zh) | 一种综合能源的发电系统 | |
CN204668986U (zh) | 一种电池充放电装置 | |
Liu et al. | Current Status and Key Issues of HVDC Transmission Research: A Brief Review | |
Abdelkarim et al. | Control of bi-directional DC-DC converter using batteries for wind power generation | |
Dandotia et al. | Loss reduction of 220 kV substation with optimum reactive power management at 33 kV voltage level a case study | |
Nazarpour et al. | Analysing THD and coordinate control for power system and DG based on PI-controller | |
CN202111493U (zh) | 一种三相高功率因数不间断电源 | |
Khurshid et al. | Geomagnetic induced current measurement in hybrid PV-wind system transformers | |
CN202117845U (zh) | 一种大功率风力发电系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170419 |
|
CF01 | Termination of patent right due to non-payment of annual fee |