CN105048473A - 变电站自动电压控制中低压无功设备电压灵敏度统计方法 - Google Patents

变电站自动电压控制中低压无功设备电压灵敏度统计方法 Download PDF

Info

Publication number
CN105048473A
CN105048473A CN201510501580.7A CN201510501580A CN105048473A CN 105048473 A CN105048473 A CN 105048473A CN 201510501580 A CN201510501580 A CN 201510501580A CN 105048473 A CN105048473 A CN 105048473A
Authority
CN
China
Prior art keywords
voltage
reactive
transformer station
sensitivity
low
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510501580.7A
Other languages
English (en)
Other versions
CN105048473B (zh
Inventor
鄂志君
汤磊
刘伟
王鹏
姚维平
龚成虎
李小江
王鑫
魏珍
李振斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Beijing King Star Hi Tech System Control Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Beijing King Star Hi Tech System Control Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd, Beijing King Star Hi Tech System Control Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510501580.7A priority Critical patent/CN105048473B/zh
Publication of CN105048473A publication Critical patent/CN105048473A/zh
Application granted granted Critical
Publication of CN105048473B publication Critical patent/CN105048473B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及一种变电站自动电压控制中低压无功设备电压灵敏度统计方法,属于电力系统自动电压控制技术领域。首先实时监视变电站内主变低压侧无功及变电站高、中、低三侧母线电压值;当变压器低压侧无功设备动作时,统计变压器低压侧无功设备动作后,一段时间内变压器低压侧无功功率变化值,变电站内高、中、低三侧母线电压变化值,计算出变压器低压侧无功设备动作后对无功电压灵敏度结果并保存至数据库。定时统计30天内的灵敏度有效值,根据无功电压灵敏度有效统计次数分别计算出无功电压灵敏度平均值,并对当前AVC系统控制中使用的无功电压灵敏度进行修正。通过对变电站高、中、低三侧母线无功电压灵敏度的不断修正,使得AVC控制更加精准。

Description

变电站自动电压控制中低压无功设备电压灵敏度统计方法
技术领域
本发明涉及一种变电站自动电压控制中低压无功设备电压灵敏度统计方法,属于电力系统自动电压控制技术领域。
背景技术
自动电压控制(以下简称AVC,AutomaticVoltageControl)系统是电力系统最重要的自动控制系统之一。其中变电站的自动电压控制能力与效果直接影响了电力系统自动电压控制的整体控制结果。变电站里均配有一定容量的离散无功设备(电容器,电抗器)来完成自动电压控制的目标。但由于变电站均配有多台电容器,电抗器,且在选择投入或切除具体某台电容器或电抗器时,需考虑投入(切除)不同的电容电抗器对不同母线电压的效果不同,且每台电容器,电抗器都有不同的动作时间,动作次数的限制,以及投入(切除)无功设备的相关顺序约束等。
现有的变电站控制系统中在接到需投入(切除)电容电抗器的控制要求后,利用传统经验来决定具体由哪台无功设备来执行控制任务,缺乏量化,可靠的决策标准,难以满足复杂,特殊情况下的控制要求,并且其固化的评判标准不具备应对在不同控制策略下,对离散无功设备的各项性能指标的不同要求。
变电站内投入(切除)电容电抗器应具有如下原则:设备操作后,通过计算该设备对母线的电压灵敏度,可以算出投入(切除)该设备后,各条母线的电压变化量,所投入(切除)的设备应使母线电压越线数减少或消除电压越线现象;优先选择对受控母线的无功影响大,即灵敏度大的设备;优先投入(切除)越线母线上的无功设备;
在上述变电站控制过程中涉及到控制灵敏度的计算。孙宏斌,张伯明,相年德在《准稳态的灵敏度分析方法》(中国电机工程学报,1999年4月V19N4,pp.9-13)中提出了准稳态灵敏度方法,与常规的静态的灵敏度分析方法不同,准稳态灵敏度方法考虑了电力系统准稳态的物理响应,计及系统控制前后新旧稳态间的总变化,有效提高了灵敏度分析的精度。该方法基于电力系统的PQ解耦模型,当发电机安装有自动电压调节器(AVR)时,可认为该发电机节点为PV节点;而当发电机装有自动无功功率调节(AQR)或自动功率因数调节(APFR)时,可认为该发电机节点与普通负荷节点相同均为PQ节点。此外,将负荷电压静特性考虑成节点电压的一次或二次曲线。这样所建立的潮流模型就自然地将这些准稳态的物理响应加以考虑,从而基于潮流模型计算出的灵敏度即为准稳态的灵敏度。在潮流模型下,设PQ节点和PV节点个数分别为NPQ和NPV,状态量x是PQ节点的电压幅值控制变量u=[QPQVPVTk]T,其中是PQ节点的无功注入,是PV节点的电压幅值,是变压器变比,重要的依从变量h=[QbQPV]T,其中Qb∈Rb是支路无功潮流,是PV节点的无功注入。这时,有无功潮流模型:
QPQ(VPQ,VPV,Tk)=0(1)
Qb=Qb(VPQ,VPV,Tk)(2)
QPV=QPV(VPQ,VPV,Tk)(3)
可得准稳态无功类灵敏度的计算公式见表1。
表1准稳态的无功类灵敏度S(x,h)u的计算公式
其中
上表中的所有量都可以直接对潮流模型(1)-(3)的雅可比矩阵求逆得到。
在AVC控制策略计算过程中,无功电压灵敏度计算目前有两种方法:一种是在B”矩阵中增广PV节点的传统灵敏度矩阵,一种是考虑无功控制设备响应的准稳态灵敏度矩阵。常规的灵敏度分析仅仅依赖于电力网络方程的线性化,不考虑电力设备(如:发电机、负荷等)对各种控制操作和扰动的准稳态的物理响应,这在一般的静态的电力网络分析中是可行的,但要服务于控制决策就无法实用了。基于上述考虑,在AVC的二级电压控制中,采用准稳态控制灵敏度分析方法,重点考虑发电机准稳态的无功电压外特性,在优化计算中考虑安装有AVC机组的准稳态响应,保障控制决策的精度和可靠性。
在AVC的变电站控制中,其控制对象为主变低压侧电容器、电抗器等低压无功设备,与发电机无功的连续调节不同,这些无功设备的投切具有离散特点,其投切后会造成变电站高、中、低三侧母线电压的阶跃性变化。为了保证AVC控制过程中各级母线电压的合格,要求无功设备对变电压高、中、低三侧母线电压的灵敏度非常精确,才能准确地对控制效果进行预估并生成正确的控制策略。在上述准稳态控制灵敏度的分析方法中,受计算方法的限制,靠近电网模型边界等值机的变电站,其通过计算方法得到的低压无功设备对电压的灵敏度准确性较差,难以达到AVC控制的要求。因此,需要基于数据挖掘的统计分析方法,利用AVC中记录的无功设备投切前后电压变化的历史数据,统计和计算无功设备对母线电压的影响,从而得到统计意义的灵敏度数据。这个统计计算的过程自动完成,可以基于大量的长时间的历史数据统计,并且能够适应电网的变化,实际应用表明,这种方法得到的灵敏度数据在精度上能够满足控制的要求。
发明内容
本发明的目的是提出一种变电站自动电压控制中低压无功设备电压灵敏度统计方法,为克服已有技术的不足之处,使变电站无功电压灵敏度值更加精确,变电站无功电压自动控制更加精准。
本发明提出的一种变电站自动电压控制中低压无功设备电压灵敏度统计方法,包括以下步骤:
(1)在每个统计周期,采用如下方法形成变电站无功电压灵敏度统计:
(1-1)每个数据采集周期到来时,采集变电站变压器低压侧无功功率,以及变电站内的高、中、低三侧母线电压值,并保存在缓存中,缓存中保留最近5次采样数据;
(1-2)当检测到变压器低压侧的无功设备动作时,根据缓存中记录的变压器低压侧无功设备动作前变压器低压侧的无功功率值Ql和变压器低压侧无功设备动作后变压器低压侧的无功功率值Qr,计算变压器低压侧的无功功率变化值ΔQ=Qr-Ql
(1-3)根据缓存中记录的变压器低压侧无功设备动作前1分钟和变压器低压侧无功设备动作后3分钟时变电站高、中、低三侧母线电压采样值,计算出变电站高压侧母线电压变化量ΔVh、变电站中压侧母线电压变化量ΔVm、电站低压侧母线电压变化量ΔVl
(1-4)根据记录中的变电站内高、中、低三侧母线电压变化量及主变压器低压侧无功变化量ΔQ,分别计算出无功设备动作后对变电站内高压侧母线无功电压灵敏度Sh=ΔVh÷ΔQ,中压侧母线无功电压灵敏度Sm=ΔVm÷ΔQ,以及低压侧母线的无功电压灵敏度Sl=ΔVl÷ΔQ,并将该无功设备动作后对变电站内高压侧母线无功电压灵敏度、中压侧母线无功电压灵敏度和低压侧母线的无功电压灵敏度作为一条灵敏度记录保存至数据库中;
(2)每个灵敏度统计计算时刻,从数据库中读取最近30天内一个变电站的低压侧无功功率对变电站内高、中、低三侧母线的无功电压灵敏度记录:
(3)从步骤(1)的数据库中获取一条历史记录,得到变电站高压侧母线无功电压灵敏度Sh、中压侧母线无功电压灵敏度Sm和低压侧母线的无功电压灵敏度Sl;
(4)从自动电压控制系统的实时库中,读取该变电站高压侧母线无功电压灵敏度当前值SH、中压侧母线无功电压灵敏度当前值SM、低压侧无功电压灵敏度当前值SL;
(5)将步骤(4)的当前值与步骤(3)的历史记录进行比较,若变电站高压侧母线无功电压灵敏历史记录Sh>SH×1.5或Sh<SH×0.5,则认为Sh无效,进入步骤(6),若变电站高压侧母线无功电压灵敏度历史记录Sh≤SH×1.5且Sh≥SH×0.5,则高压侧母线无功电压灵敏度统计次数Nh等于当前记录数加1,即Nh=Nh+1,高压侧母线无功电压灵敏度总加值Sum(Sh)等于当前值加上Sh,即Sum(Sh)=Sum(Sh)+Sh;
(6)将步骤(4)的当前值与步骤(3)的历史记录进行比较,若变电站中压则母线无功电压灵敏度历史记录Sm>SM×1.5或者Sm<SM×0.5,则认为Sm无效,进入步骤(7),若变电站中压侧母线无功电压灵敏度历史记录Sm≤SM×1.5且Sm≥SM×0.5,则变电站中压侧母线无功电压灵敏度统计次数Nm等于当前记录数加1,即Nm=Nm+1,变电站中压侧母线无功电压灵敏度总加值Sum(Sm)等于当前值加上Sm,即Sum(Sm)=Sum(Sm)+Sm;
(7)将步骤(4)的当前值与步骤(3)的历史记录进行比较,若变电站低压则母线无功电压灵敏度历史记录Sl>SL×1.5或者Sl<SL×0.5,则认为Sl无效,进入步骤(8),若变电站高压侧母线无功电压灵敏度历史记录Sl≤SL×1.5且Sl≥SL×0.5,则变电站低压侧母线无功电压灵敏度统计次数Nl等于当前记录数加1则Nl=Nl+1,变电站低压侧母线无功电压灵敏度总加值Sum(Sl)等于当前值加上Sl则Sum(Sl)=Sum(Sl)+Sl;
(8)重复步骤步骤(3)-步骤(7),完成变电站30天内的高、中、低三侧母线无功电压灵敏度统计完成;
(9)根据上述步骤(8)的统计结果,计算变电站高、中、低三侧母线无功电压灵敏度平均值,高压侧无功电压灵敏度平均值Savg(Sh)=Sum(Sh)/Nh,中压侧无功电压灵敏度平均值Savg(Sm)=Sum(Sm)/Nm,低压侧无功电压灵敏度平均值Savg(Sl)=Sum(Sl)/Nl;
(10)用上述计算得到的变电站高、中、低三侧无功电压灵敏度平均值Savg(Sh)、Savg(Sm)、Savg(Sl)更新自动电压控制系统的相应记录,作为变电站实际控制参数使用。
本发明提出的变电站自动电压控制中低压无功设备电压灵敏度统计方法,其优点是,通过对变电站高、中、低三侧母线无功电压灵敏度的不断修正,使得AVC控制更加精准。
附图说明
图1是本发明方法涉及的实施电网结构示意图。
具体实施方式
本发明提出的变电站自动电压控制中低压无功设备电压灵敏度统计方法,该方法包括以下步骤:
(1)在每个统计周期,采用如下方法形成变电站无功电压灵敏度统计:
(1-1)每个数据采集周期到来时,采集变电站变压器低压侧无功功率,以及变电站内的高、中、低三侧母线电压值,并保存在缓存中,缓存中保留最近5次采样数据;
(1-2)当检测到变压器低压侧的无功设备动作时,根据缓存中记录的变压器低压侧无功设备动作前变压器低压侧的无功功率值Ql和变压器低压侧无功设备动作后变压器低压侧的无功功率值Qr,计算变压器低压侧的无功功率变化值ΔQ=Qr-Ql
(1-3)根据缓存中记录的变压器低压侧无功设备动作前1分钟和变压器低压侧无功设备动作后3分钟时变电站高、中、低三侧母线电压采样值,计算出变电站高压侧母线电压变化量ΔVh、变电站中压侧母线电压变化量ΔVm、电站低压侧母线电压变化量ΔVl
(1-4)根据记录中的变电站内高、中、低三侧母线电压变化量及主变压器低压侧无功变化量ΔQ,分别计算出无功设备动作后对变电站内高压侧母线无功电压灵敏度Sh=ΔVh÷ΔQ,中压侧母线无功电压灵敏度Sm=ΔVm÷ΔQ,以及低压侧母线的无功电压灵敏度Sl=ΔVl÷ΔQ,并将该无功设备动作后对变电站内高压侧母线无功电压灵敏度、中压侧母线无功电压灵敏度和低压侧母线的无功电压灵敏度作为一条灵敏度记录保存至数据库中;
(2)每个灵敏度统计计算时刻,从数据库中读取最近30天内一个变电站的低压侧无功功率对变电站内高、中、低三侧母线的无功电压灵敏度记录:
(3)从步骤(1)的数据库中获取一条历史记录,得到变电站高压侧母线无功电压灵敏度Sh、中压侧母线无功电压灵敏度Sm和低压侧母线的无功电压灵敏度Sl;
(4)从自动电压控制系统的实时库中,读取该变电站高压侧母线无功电压灵敏度当前值SH、中压侧母线无功电压灵敏度当前值SM、低压侧无功电压灵敏度当前值SL;
(5)将步骤(4)的当前值与步骤(3)的历史记录进行比较,若变电站高压侧母线无功电压灵敏历史记录Sh>SH×1.5或Sh<SH×0.5,则认为Sh无效,进入步骤(6),若变电站高压侧母线无功电压灵敏度历史记录Sh≤SH×1.5且Sh≥SH×0.5,则高压侧母线无功电压灵敏度统计次数Nh等于当前记录数加1,即Nh=Nh+1,高压侧母线无功电压灵敏度总加值Sum(Sh)等于当前值加上Sh,即Sum(Sh)=Sum(Sh)+Sh;
(6)将步骤(4)的当前值与步骤(3)的历史记录进行比较,若变电站中压则母线无功电压灵敏度历史记录Sm>SM×1.5或者Sm<SM×0.5,则认为Sm无效,进入步骤(7),若变电站中压侧母线无功电压灵敏度历史记录Sm≤SM×1.5且Sm≥SM×0.5,则变电站中压侧母线无功电压灵敏度统计次数Nm等于当前记录数加1,即Nm=Nm+1,变电站中压侧母线无功电压灵敏度总加值Sum(Sm)等于当前值加上Sm,即Sum(Sm)=Sum(Sm)+Sm;
(7)将步骤(4)的当前值与步骤(3)的历史记录进行比较,若变电站低压则母线无功电压灵敏度历史记录Sl>SL×1.5或者Sl<SL×0.5,则认为Sl无效,进入步骤(8),若变电站高压侧母线无功电压灵敏度历史记录Sl≤SL×1.5且Sl≥SL×0.5,则变电站低压侧母线无功电压灵敏度统计次数Nl等于当前记录数加1则Nl=Nl+1,变电站低压侧母线无功电压灵敏度总加值Sum(Sl)等于当前值加上Sl则Sum(Sl)=Sum(Sl)+Sl;
(8)重复步骤步骤(3)-步骤(7),完成变电站30天内的高、中、低三侧母线无功电压灵敏度统计完成;
(9)根据上述步骤(8)的统计结果,计算变电站高、中、低三侧母线无功电压灵敏度平均值,高压侧无功电压灵敏度平均值Savg(Sh)=Sum(Sh)/Nh,中压侧无功电压灵敏度平均值Savg(Sm)=Sum(Sm)/Nm,低压侧无功电压灵敏度平均值Savg(Sl)=Sum(Sl)/Nl;
(10)用上述计算得到的变电站高、中、低三侧无功电压灵敏度平均值Savg(Sh)、Savg(Sm)、Savg(Sl)更新自动电压控制系统的相应记录,作为变电站实际控制参数使用。
下面以图1图1所示的电网为例,介绍本发明的一个具体实施案例。在说明具体实施案例之前,先简要介绍一下本实施例的基本情况:
图1图1是500kV变电站,1是高压侧500kV的母线,2是中压侧220kV的母线,3是低压侧35kV的母线,T1为主变,Cp1、Cp2为容抗器。
在每个统计周期,采用如下方法形成变电站无功电压灵敏度统计:
(1)数据采集周期到来时,采集变电站主变高、中、低三侧母线电压值并保存在缓存中,其中高压侧母线最近5分钟内电压量测值分别为Vh1=528.3,Vh2=528.3,Vh3=528.2,Vh4=529.0,Vh5=530.08;中压侧母线最近5分钟内电压量测值分别为,Vm1=225.21,Vm2=225.2,Vm3=225.5,Vm4=225.4,Vm5=226.83;低压侧母线最近5分钟内电压量测值为分别为Vl1=36.3,Vl2=36.3,Vl3=36.3,Vl4=36.3,Vl5=37.43;采集变电站主变低压无功值Ql1=59.5,Ql2=59.5,Ql3=59.5,Ql4=59.5,Ql5=108.8并保存在缓存中,缓存中保留最近5分钟。
(2)当检测到低压侧无功设备功动作时,主变低压侧无功设备量测变化值ΔQ=Ql5-Ql4=59.3变化较大,,将无功变化值ΔQ以及无功设备动作前1分钟三侧母线电压值高压侧母线电压值Vh4=529.0,中压侧母线电压值Vm4=225.4,低压侧母线电压值Vl4=36.3;设备动作后3分钟的变电站高压侧母线电压采样值Vh3′=530.11、中压侧母线电压采样值Vm3'=226.78,低压侧母线电压采样值Vl3'=37.41。
(3)根据记录中的站内高、中、低三侧母线电压变化及主变低压侧无功变化情况,根据灵敏度公式计算:
高压侧母线无功电压灵敏度Sh=ΔVh÷ΔQ=(530.11-529.0)÷59.3=0.0187;
中压侧母线无功电压灵敏度Sm=ΔVm÷ΔQ=(226.78-225.4)÷59.3=0.0232;
低压侧母线无功电压灵敏度Sl=ΔVl÷ΔQ=(37.41-36.4)÷59.3=0.017;将该灵敏度结果作为一条记录保存至数据库中。
(4)灵敏度统计计算时刻到来时,从数据库中读取最近30天内某一个变电站的低压侧无功对变电站内高、中、低压母线的无功电压灵敏度。
(5)从数据库读取一条历史记录,高压侧母线无功电压灵敏度Sh=0.0187、中压侧母线无功电压灵敏度Sm=0.0232、低压侧母线的无功电压灵敏度Sl=0.017。
(6)从AVC实时库中读取该变电站高压侧母线无功电压灵敏度当前值SH=0.02,中压侧母线无功电压灵敏度当前值SM=0.021,低压侧无功电压灵敏度当前值SL=0.015。
(7)根据与SH、SM、SL的对比计算,Sh、Sm、Sl为有效值。
例如统计30天内高压侧无功电压灵敏度有效统计次数Nh=18次,高压侧无功电压灵敏度总加Sum(Sh)=0.414;中压侧无功电压灵敏度有效统计次数Nm=15次,中高压侧无功电压灵敏度总加Sum(Sm)=0.332;低压侧无功电压灵敏度有效统计次数Nl=13次,低压侧无功电压灵敏度总加Sum(Sl)=0.182;
(8)计算变电站高、中、低三侧母线无功电压灵敏度平均值,高压侧无功电压灵敏度平均值Savg(Sh)=Sum(Sh)÷Nh=0.023,中压侧无功电压灵敏度平均值Savg(Sm)=Sum(Sm)÷Nm=0.022,低压侧无功电压灵敏度平均值Savg(Sl)=Sum(Sl)÷Nl=0.014;
(9)将计算得到的变电站高、中、低三侧无功电压灵敏度平均值Savg(Sh)、Savg(Sm)、Savg(Sl)更新至AVC系统做为变电站实际控制参数使用。

Claims (1)

1.一种变电站自动电压控制中低压无功设备电压灵敏度统计方法,其特征在于,该方法包括以下步骤:
(1)在每个统计周期,采用如下方法形成变电站无功电压灵敏度统计:
(1-1)每个数据采集周期到来时,采集变电站变压器低压侧无功功率,以及变电站内的高、中、低三侧母线电压值,并保存在缓存中,缓存中保留最近5次采样数据;
(1-2)当检测到变压器低压侧的无功设备动作时,根据缓存中记录的变压器低压侧无功设备动作前变压器低压侧的无功功率值Ql和变压器低压侧无功设备动作后变压器低压侧的无功功率值Qr,计算变压器低压侧的无功功率变化值ΔQ=Qr-Ql
(1-3)根据缓存中记录的变压器低压侧无功设备动作前1分钟和变压器低压侧无功设备动作后3分钟时变电站高、中、低三侧母线电压采样值,计算出变电站高压侧母线电压变化量ΔVh、变电站中压侧母线电压变化量ΔVm、电站低压侧母线电压变化量ΔVl
(1-4)根据记录中的变电站内高、中、低三侧母线电压变化量及主变压器低压侧无功变化量ΔQ,分别计算出无功设备动作后对变电站内高压侧母线无功电压灵敏度Sh=ΔVh÷ΔQ,中压侧母线无功电压灵敏度Sm=ΔVm÷ΔQ,以及低压侧母线的无功电压灵敏度Sl=ΔVl÷ΔQ,并将该无功设备动作后对变电站内高压侧母线无功电压灵敏度、中压侧母线无功电压灵敏度和低压侧母线的无功电压灵敏度作为一条灵敏度记录保存至数据库中;
(2)每个灵敏度统计计算时刻,从数据库中读取最近30天内一个变电站的低压侧无功功率对变电站内高、中、低三侧母线的无功电压灵敏度记录:
(3)从步骤(1)的数据库中获取一条历史记录,得到变电站高压侧母线无功电压灵敏度Sh、中压侧母线无功电压灵敏度Sm和低压侧母线的无功电压灵敏度Sl;
(4)从自动电压控制系统的实时库中,读取该变电站高压侧母线无功电压灵敏度当前值SH、中压侧母线无功电压灵敏度当前值SM、低压侧无功电压灵敏度当前值SL;
(5)将步骤(4)的当前值与步骤(3)的历史记录进行比较,若变电站高压侧母线无功电压灵敏历史记录Sh>SH×1.5或Sh<SH×0.5,则认为Sh无效,进入步骤(6),若变电站高压侧母线无功电压灵敏度历史记录Sh≤SH×1.5且Sh≥SH×0.5,则高压侧母线无功电压灵敏度统计次数Nh等于当前记录数加1,即Nh=Nh+1,高压侧母线无功电压灵敏度总加值Sum(Sh)等于当前值加上Sh,即Sum(Sh)=Sum(Sh)+Sh;
(6)将步骤(4)的当前值与步骤(3)的历史记录进行比较,若变电站中压则母线无功电压灵敏度历史记录Sm>SM×1.5或者Sm<SM×0.5,则认为Sm无效,进入步骤(7),若变电站中压侧母线无功电压灵敏度历史记录Sm≤SM×1.5且Sm≥SM×0.5,则变电站中压侧母线无功电压灵敏度统计次数Nm等于当前记录数加1,即Nm=Nm+1,变电站中压侧母线无功电压灵敏度总加值Sum(Sm)等于当前值加上Sm,即Sum(Sm)=Sum(Sm)+Sm;
(7)将步骤(4)的当前值与步骤(3)的历史记录进行比较,若变电站低压则母线无功电压灵敏度历史记录Sl>SL×1.5或者Sl<SL×0.5,则认为Sl无效,进入步骤(8),若变电站高压侧母线无功电压灵敏度历史记录Sl≤SL×1.5且Sl≥SL×0.5,则变电站低压侧母线无功电压灵敏度统计次数Nl等于当前记录数加1则Nl=Nl+1,变电站低压侧母线无功电压灵敏度总加值Sum(Sl)等于当前值加上Sl则Sum(Sl)=Sum(Sl)+Sl;
(8)重复步骤步骤(3)-步骤(7),完成变电站30天内的高、中、低三侧母线无功电压灵敏度统计完成;
(9)根据上述步骤(8)的统计结果,计算变电站高、中、低三侧母线无功电压灵敏度平均值,高压侧无功电压灵敏度平均值Savg(Sh)=Sum(Sh)/Nh,中压侧无功电压灵敏度平均值Savg(Sm)=Sum(Sm)/Nm,低压侧无功电压灵敏度平均值Savg(Sl)=Sum(Sl)/Nl;
(10)用上述计算得到的变电站高、中、低三侧无功电压灵敏度平均值Savg(Sh)、Savg(Sm)、Savg(Sl)更新自动电压控制系统的相应记录,作为变电站实际控制参数使用。
CN201510501580.7A 2015-08-14 2015-08-14 变电站自动电压控制中低压无功设备电压灵敏度统计方法 Expired - Fee Related CN105048473B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510501580.7A CN105048473B (zh) 2015-08-14 2015-08-14 变电站自动电压控制中低压无功设备电压灵敏度统计方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510501580.7A CN105048473B (zh) 2015-08-14 2015-08-14 变电站自动电压控制中低压无功设备电压灵敏度统计方法

Publications (2)

Publication Number Publication Date
CN105048473A true CN105048473A (zh) 2015-11-11
CN105048473B CN105048473B (zh) 2017-04-05

Family

ID=54454796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510501580.7A Expired - Fee Related CN105048473B (zh) 2015-08-14 2015-08-14 变电站自动电压控制中低压无功设备电压灵敏度统计方法

Country Status (1)

Country Link
CN (1) CN105048473B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106353625A (zh) * 2016-11-02 2017-01-25 广东电网有限责任公司佛山供电局 变电站的电压无功调节效果检测方法和系统
CN106602572A (zh) * 2016-12-23 2017-04-26 安徽立卓智能电网科技有限公司 一种自动电压控制系统电压灵敏度的计算方法
CN109713680A (zh) * 2019-03-11 2019-05-03 云南电网有限责任公司电力科学研究院 基于改进灵敏度法的地区电网电压快速调节方法
CN111799849A (zh) * 2020-06-05 2020-10-20 国网冀北电力有限公司电力科学研究院 一种风电场无功电压灵敏度计算方法及装置
CN112531722A (zh) * 2020-12-01 2021-03-19 中国电力科学研究院有限公司 一种无功电压控制方法及系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102403724A (zh) * 2011-11-09 2012-04-04 深圳大学 交直流混联电力网中节点电压灵敏度的对称获取方法
JP2012165559A (ja) * 2011-02-07 2012-08-30 Tokyo Electric Power Co Inc:The 母線電圧監視装置
CN102769300A (zh) * 2012-07-02 2012-11-07 清华大学 基于摄动法的风电场无功功率对电压的灵敏度计算方法
CN103746377A (zh) * 2014-01-29 2014-04-23 广东电网公司电力科学研究院 基于积分映射的电压无功灵敏度的检测方法
CN104538968A (zh) * 2014-12-05 2015-04-22 广东电网有限责任公司汕头供电局 自动电压控制系统电压无功灵敏度确定方法及装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012165559A (ja) * 2011-02-07 2012-08-30 Tokyo Electric Power Co Inc:The 母線電圧監視装置
CN102403724A (zh) * 2011-11-09 2012-04-04 深圳大学 交直流混联电力网中节点电压灵敏度的对称获取方法
CN102769300A (zh) * 2012-07-02 2012-11-07 清华大学 基于摄动法的风电场无功功率对电压的灵敏度计算方法
CN103746377A (zh) * 2014-01-29 2014-04-23 广东电网公司电力科学研究院 基于积分映射的电压无功灵敏度的检测方法
CN104538968A (zh) * 2014-12-05 2015-04-22 广东电网有限责任公司汕头供电局 自动电压控制系统电压无功灵敏度确定方法及装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
曾纪添: "电力系统无功补偿及电压稳定性研究综述", 《南方电网技术》 *
胡迪: "基于BX型潮流算法的无功电压灵敏度校正方法研究", 《陕西电力》 *
黄辉: "几种AVC 系统电压无功灵敏度计算方法比较", 《科技创新与应》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106353625A (zh) * 2016-11-02 2017-01-25 广东电网有限责任公司佛山供电局 变电站的电压无功调节效果检测方法和系统
CN106353625B (zh) * 2016-11-02 2019-06-11 广东电网有限责任公司佛山供电局 变电站的电压无功调节效果检测方法和系统
CN106602572A (zh) * 2016-12-23 2017-04-26 安徽立卓智能电网科技有限公司 一种自动电压控制系统电压灵敏度的计算方法
CN106602572B (zh) * 2016-12-23 2019-05-17 安徽立卓智能电网科技有限公司 一种自动电压控制系统电压灵敏度的计算方法
CN109713680A (zh) * 2019-03-11 2019-05-03 云南电网有限责任公司电力科学研究院 基于改进灵敏度法的地区电网电压快速调节方法
CN109713680B (zh) * 2019-03-11 2022-05-20 云南电网有限责任公司电力科学研究院 基于改进灵敏度法的地区电网电压快速调节方法
CN111799849A (zh) * 2020-06-05 2020-10-20 国网冀北电力有限公司电力科学研究院 一种风电场无功电压灵敏度计算方法及装置
CN112531722A (zh) * 2020-12-01 2021-03-19 中国电力科学研究院有限公司 一种无功电压控制方法及系统

Also Published As

Publication number Publication date
CN105048473B (zh) 2017-04-05

Similar Documents

Publication Publication Date Title
CN101714234B (zh) 一种电网线损监测分析系统
KR101132107B1 (ko) 분산전원이 연계된 전력계통의 전압/무효전력 제어 시스템 및 이를 위한 방법
CN105048473A (zh) 变电站自动电压控制中低压无功设备电压灵敏度统计方法
CN105243254A (zh) 一种综合线损分析方法
CN103914741A (zh) 一种配电网的线损智能评价及辅助决策系统
CN103532136A (zh) 省地县一体化网损在线计算与辅助决策系统及方法
CN104037776A (zh) 随机惯性因子粒子群优化算法的电网无功容量配置方法
CN104158199A (zh) 对电力系统实时状态进行无功电压优化控制的系统和方法
CN103986193B (zh) 一种最大风电并网容量获取的方法
Savasci et al. Distribution grid optimal power flow with adaptive volt-var droop of smart inverters
CN104392397A (zh) 一种基于熵权法的短路电流抑制方案评价方法
CN109659934B (zh) 基于短路电流裕度的新能源并网规划优选方法
CN113131517B (zh) 一种分布式储能的光伏并网监测方法及系统
CN111651878B (zh) 计及态势评估的大电网静态电压稳定优化决策方法及系统
CN111555293B (zh) 一种基于数据模型分析的无功设备选型系统及方法
CN109193820B (zh) 用于对光伏发电站进行无功优化的方法、系统及存储介质
Ivanov et al. Intelligent monitoring and control in transmission and distribution networks
Montenegro et al. Coordinating control devices and smart inverter functionalities in the presence of variable weather conditions
US10985561B2 (en) Method for monitoring and controlling an electrical network
DSouza et al. Maximizing the benefits of dynamic VAR compensators on distribution systems with high penetration PV
Wang et al. A novel approach to improve model generalization ability in dynamic equivalent of active distribution network
Leak et al. Forecasting peak daily load in distribution feeders
Giannitrapani et al. Coordinated control of on-load tap changer and energy storage systems for voltage support in distribution networks
Quang Analyzing the TVS Influenced by IOSS to Assess the Power Load Buses in Power Systems
Salah Mohammed et al. Technical impacts of solar photovoltaic systems integration into malaysian medium voltage reference networks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170405

Termination date: 20180814

CF01 Termination of patent right due to non-payment of annual fee