CN105048341B - One-line operation trolley for power transmission line - Google Patents

One-line operation trolley for power transmission line Download PDF

Info

Publication number
CN105048341B
CN105048341B CN201510440208.XA CN201510440208A CN105048341B CN 105048341 B CN105048341 B CN 105048341B CN 201510440208 A CN201510440208 A CN 201510440208A CN 105048341 B CN105048341 B CN 105048341B
Authority
CN
China
Prior art keywords
support bars
pulley
plate body
transmission line
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510440208.XA
Other languages
Chinese (zh)
Other versions
CN105048341A (en
Inventor
崔奎祥
孙丽山
韩峰
刘功庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510440208.XA priority Critical patent/CN105048341B/en
Publication of CN105048341A publication Critical patent/CN105048341A/en
Application granted granted Critical
Publication of CN105048341B publication Critical patent/CN105048341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a one-line operation trolley for a power transmission line. The one-line operation trolley comprises two support rods, wherein the two support rods are connected through a plurality of connecting rods which are arranged at intervals; the upper parts of the two support rods are movably connected with head pulleys respectively; the two head pulleys are arranged in a straight line; a plate body is arranged on the upper parts of the two support rods; the top ends of the two support rods are fixedly connected with the middle part of the plate body; and spanning auxiliary devices are respectively arranged on two sides of the plate body. The one-line operation trolley for the power transmission line is reasonable in structural design, and is capable of spanning obstacles; continuous operation within the same transmission line segment is realized; and the work efficiency is improved.

Description

A kind of transmission line of electricity single line operation driving
Technical field
The present invention relates to a kind of transmission line of electricity single line operation driving.
Background technology
Transmission line of electricity especially high voltage power transmission and transforming circuit is all that high-altitude sets up, and when overhauling to which, is needed using winged Car carries out outlet operation.The traveling of existing driving is to hang the drop for producing manually to catch wire to draw while coordinating by wire Move to realize.When maintainer takes driving runs into barrier (splicing sleeve or finishing strips), due to the office by roller design Limit, driving cannot break the barriers (splicing sleeve or finishing strips) continue to move ahead, many subjobs must be carried out, it is impossible to realize with connecting in shelves Continuous operation, brings trouble to the service work of transmission line of electricity, and extends the repair time of transmission line of electricity.
The content of the invention
The invention provides a kind of transmission line of electricity single line operation driving, its reasonable in design, can across obstacle, it is real Now with working continuously in shelves, work efficiency is improve, solve problems of the prior art.
The present invention for the solution technical scheme that adopts of above-mentioned technical problem is:It includes two support bars, and two support bars lead to Some connecting rods that super-interval is arranged are connected, and are movably connected with a head pulley, two head pulley Cheng Zhi on the top of two support bars Line is arranged, and is provided with a plate body above two support bars, and the top of two support bars is connected with the middle part of plate body, in the both sides of plate body It is respectively equipped with one and crosses over auxiliary device.
The leap auxiliary device includes the adjustment hole for being located at plate body side, and adjustment hole is arranged along plate body length direction, one Screw rod passes through adjustment hole, is flexibly connected an adjusting nut on the screw rod above adjustment hole, living on the screw rod below adjustment hole One locking nut of dynamic connection, the lower end of screw rod are connected with a connecting plate, are provided with two installing plates be arrangeding in parallel in connecting plate bottom, An auxiliary pulley is flexibly connected between two installing plates, and auxiliary pulley projects aligned with head pulley.
The first operation handle of two eccentric settings is arranged with adjusting nut, is arranged with two inclined on locking nut The second operation handle that the heart is arranged.
The lower end of two installing plates is extended downwardly beyond auxiliary pulley.
The top side of every support bar is provided with a mounting rod in parallel, and top and the plate body of mounting rod are connected, The side of head pulley is flexibly connected with support bar, and the opposite side of head pulley is flexibly connected with mounting rod, and the lower end of mounting rod exceeds Head pulley is extended downwardly.
The top of two support bars and two mounting rods are located at the different side of two head pulleys respectively.
Connecting rod between two support bars positioned at the top is U-shaped bar.
Suspension ring are provided with the connecting rod of the top between two support bars.
One end of two first poles is hinged with two support bars, one end hinge of the other end of two first poles and two second poles Connect, the other end of two second poles is connected by operation plate.
A link is respectively equipped with the lower end of two support bars.
The present invention adopts such scheme, with advantages below:
1st, by the cooperation across auxiliary device and two head pulleys, the present invention can across obstacle, realize with connecting in shelves Continuous operation, improves work efficiency.When running into barrier(Splicing sleeve or finishing strips)When, the leap for adjusting positioned at front side first is auxiliary Help device.Specifically, locking nut is unscrewed by instrument, front and back position of the adjusting screw rod in adjustment hole makes auxiliary pulley With the distance between the head pulley positioned at front side more than the length of barrier, locking nut is screwed by instrument then, to maintain The distance between auxiliary pulley and the head pulley positioned at front side.Then the leap auxiliary device positioned at rear side is adjusted, rear side is made Length of the distance between the head pulley of auxiliary pulley and rear side more than barrier, concrete control method is ibid.The present invention is forward Slide, when barrier is located between the auxiliary pulley and the head pulley of front side of front side, adjusting screw rod is moved down.Specifically, lead to The instrument of mistake unscrews locking nut, then rotates adjusting nut by instrument, moves down screw rod, so that auxiliary pulley and conductive contact Load, and then make the head pulley of front side unload power disengaging wire, locking nut is screwed by instrument then.Adjusted positioned at rear side again Across auxiliary device, adjust its screw rod and move down, make the auxiliary pulley and conductive contact load of rear side, and then make the head pulley of rear side Unload power and depart from wire, concrete control method is ibid.Now, the present invention relies on two auxiliary pulley loads, two head pulleys to unload power and take off From wire.The present invention continues to slide forward, when barrier is located between the auxiliary pulley and the head pulley of rear side of rear side, adjusts Two cross over auxiliary device(Control method ibid, will not be described here), making to move on two screw rods, two auxiliary pulleys unload power and disengaging is led Line, two head pulley loads now just may span across barrier.
2nd, the first operation handle of two eccentric settings is arranged with adjusting nut, is arranged with two on locking nut Second operation handle of eccentric setting.Due to two first operation handles and two second operation handle eccentric settings, therefore need not borrow With instrument just rotatable adjusting nut and locking nut, the convenience of maintainer's operation is improve.
3rd, the lower end of two installing plates is extended downwardly beyond auxiliary pulley.By this structure design, auxiliary pulley load, In the case that head pulley unloads power and departs from wire, when auxiliary pulley departs from wire accidentally, driving can also be hung on wire, protected The personal safety of maintainer is demonstrate,proved.
4th, the top side of every support bar is provided with a mounting rod in parallel, and the top of mounting rod is solid with plate body Even, the side of head pulley is flexibly connected with support bar, and the opposite side of head pulley is flexibly connected with mounting rod, and the lower end of mounting rod surpasses Go out head pulley to extend downwardly.By this structure design, power is unloaded in head pulley load, auxiliary pulley and depart from the situation of wire Under, when head pulley departs from wire accidentally, driving can be still hung on wire, it is ensured that the personal safety of maintainer.
5th, the top of two support bars and two mounting rods are located at the different side of two head pulleys respectively.This structure design, tool There are following two advantages:(1)The balance of the present invention is improve, makes the operation center of gravity of maintainer be more nearly the lead of hanging wire point Vertical line;(2)In the case where head pulley load, auxiliary pulley unload power and depart from wire, when head pulley departs from wire accidentally, fly Car still can be hung on wire, further ensure the personal safety of maintainer.
6th, the connecting rod between two support bars positioned at the top is U-shaped bar.This structure design can avoid two support bars Between it is close to each other because deforming upon.
7th, suspension ring are provided with the connecting rod of the top between two support bars.Can be by driving quick and stable by suspension ring Pull to overhead transmission line.
8th, one end of two first poles is hinged with two support bars, one end of the other end of two first poles and two second poles It is hinged, the other end of two second poles is connected by operation plate.This structure design, with three below advantage:(1)During operation Maintainer opens operation plate, and foot is placed in connecting rod, and buttocks is sitting in or leans against on operation plate carries out operation, can adapt to difference The maintainer of build so as to find the angle of the most comfortable, improves the operation comfortableness of maintainer;(2)Make operation center of gravity The plumb line of hanging wire point is more nearly, the balance of driving is enhanced;(3)Can fold, be easy to carry.
9th, a link is respectively equipped with the lower end of two support bars, is easy to fix rope ladder, so that maintainer is along rope ladder Climb up driving.
Description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the mplifying structure schematic diagram at A in Fig. 1.
Fig. 3 is the use state of the present invention with reference to figure(One).
Fig. 4 is the use state of the present invention with reference to figure(Two).
In figure, 1, support bar, 2, connecting rod, 3, head pulley, 4, plate body, 5, cross over auxiliary device, the 6, first operation handle, 7th, the second operation handle, 8, mounting rod, 9, suspension ring, the 10, first pole, the 11, second pole, 12, operation plate, 13, link, 14, Wire, 15, barrier, 16, U-shaped bar;501st, adjustment hole, 502, screw rod, 503, adjusting nut, 504, locking nut, 505, even Fishplate bar, 506 installing plates, 507, auxiliary pulley.
Specific embodiment
For can clearly illustrate the technical characterstic of this programme, below by specific embodiment, and its accompanying drawing is combined, to this It is bright to be described in detail.
As shown in Figure 1 to 4, the present invention includes two support bars 1, and two support bars 1 are by spaced three connecting rods 2 It is connected, the connecting rod 2 between two support bars 1 positioned at the top is U-shaped bar 16.It is movably connected with the top of two support bars 1 One head pulley 3, two head pulleys 3 are aligned, are provided with a plate body 4 in the top of two support bars 1, the top of two support bars 1 with The middle part of plate body 4 is connected, and is respectively provided on two sides with one across auxiliary device 5 in plate body 4.Include being located at plate across auxiliary device 5 The adjustment hole 501 of 4 side of body, adjustment hole 501 are arranged along 4 length direction of plate body, and a screw rod 502 passes through adjustment hole 501, is adjusting An adjusting nut 503 is flexibly connected on screw rod 502 above hole 501, is flexibly connected on the screw rod 502 below adjustment hole 501 One locking nut 504, the lower end of screw rod 502 be connected with a connecting plate 505, is provided with two in 505 bottom of connecting plate and is be arranged in parallel Installing plate 506, is flexibly connected an auxiliary pulley 507 between two installing plates 506, auxiliary pulley 507 is in line with the projection of head pulley 3 Arrangement.The lower end of two installing plates 506 is extended downwardly beyond auxiliary pulley 507.It is arranged with two bias on adjusting nut 503 to set The first operation handle 6 put, is arranged with the second operation handle 7 of two eccentric settings on locking nut 504.Every support bar 1 top side is provided with a mounting rod 8 in parallel, and top and the plate body 4 of mounting rod 8 are connected, the side of head pulley 3 with Support bar 1 is flexibly connected, and the opposite side of head pulley 3 is flexibly connected with mounting rod 8, and the lower end of mounting rod 8 is downward beyond head pulley 3 Extend.The top of two support bars 1 and two mounting rods 8 are located at the different side of two head pulleys 3 respectively.One end of two first poles 10 Be hinged with two support bars 1, the other end of two first poles 10 is hinged with one end of two second poles 11, two second poles 11 it is another One end is connected by operation plate 12.Suspension ring 9 are provided with the connecting rod 2 of the top between two support bars 1.In two support bars 1 Lower end is respectively equipped with a link 13.
During operation, driving is hung to into destination locations by suspension ring 9 first, make the slip of head pulley 3 is placed on overhead power transmission On circuit, then maintainer climbs up driving along the rope ladder on link 13, and foot is placed in connecting rod 2, and buttocks is sitting in or leans on Operation can be carried out on operation plate 12.
By the cooperation across auxiliary device 5 and two head pulleys 3, the present invention can across obstacle 15, realize with shelves Work continuously, improve work efficiency.When running into barrier 15(Splicing sleeve or finishing strips)When, adjust first positioned at front side across More auxiliary device 5.Specifically, locking nut 504, anteroposterior position of the adjusting screw rod 502 in adjustment hole 501 are unscrewed by instrument Put, make auxiliary pulley 507 and be located at length of the distance between the head pulley 3 of front side more than barrier 15, then by instrument Locking nut 504 is screwed, to maintain auxiliary pulley 507 and be located at the distance between head pulley 3 of front side.Then adjust after being located at The leap auxiliary device 5 of side, makes the distance between head pulley 3 of auxiliary pulley 507 and rear side of rear side more than barrier 15 Length, concrete control method is ibid.The present invention is slided forward, when barrier 15 is located at the auxiliary pulley 507 of front side and front side When between head pulley 3, adjusting screw rod 502 is moved down.Specifically, locking nut 504 is unscrewed by instrument, then is rotated by instrument Adjusting nut 503, moves down screw rod 502, so that auxiliary pulley 507 contacts load with wire 14, and then makes the main cunning of front side Wheel 3 unloads power and departs from wire 14, then screws locking nut 504 by instrument.The leap auxiliary device 5 positioned at rear side is adjusted again, Adjust its screw rod 502 to move down, make the auxiliary pulley 507 of rear side contact load with wire 14, and then make the head pulley 3 of rear side unload power Depart from wire 14, concrete control method is ibid.Now, the present invention relies on two auxiliary pulleys, 507 load, two head pulleys 3 to unload power simultaneously Depart from wire 14.The present invention continues to slide forward, is located at the auxiliary pulley 507 of rear side and the head pulley 3 of rear side when barrier 15 Between when, adjust two cross over auxiliary device 5(Control method ibid, will not be described here), make to move on two screw rods 502, two auxiliary Pulley 507 unloads power and departs from wire 14, and two head pulleys, 3 load now just may span across barrier 15.
The first operation handle 6 of two eccentric settings is arranged with adjusting nut 503, it is symmetrical on locking nut 504 It is provided with the second operation handle 7 of two eccentric settings.Due to 7 handle eccentric setting of two first operation handles 6 and two second manipulators, because This need not borrow instrument just rotatable adjusting nut 503 and locking nut 504, improve the convenience of maintainer's operation.
The lower end of two installing plates 506 is extended downwardly beyond auxiliary pulley 507.By this structure design, in auxiliary pulley In the case that 507 loads, head pulley 3 unload power and depart from wire 14, when auxiliary pulley 507 departs from wire 14 accidentally, driving is also Can hang on wire 14, it is ensured that the personal safety of maintainer.
The top side of every support bar 1 is provided with a mounting rod 8 in parallel, and the top of mounting rod 8 is solid with plate body 4 Even, the side of head pulley 3 is flexibly connected with support bar 1, and the opposite side of head pulley 3 is flexibly connected with mounting rod 8, mounting rod 8 Lower end is extended downwardly beyond head pulley 3.By this structure design, unload power and depart from 3 load of head pulley, auxiliary pulley 507 In the case of wire 14, when head pulley 3 departs from wire 14 accidentally, driving can be still hung on wire 14, it is ensured that maintenance The personal safety of personnel.
The top of two support bars 1 and two mounting rods 8 are located at the different side of two head pulleys 3 respectively.This structure design, tool There are following two advantages:(1)The balance of the present invention is improve, makes the operation center of gravity of maintainer be more nearly the lead of hanging wire point Vertical line;(2)In the case where 3 load of head pulley, auxiliary pulley 507 unload power and depart from wire 14, lead when head pulley 3 departs from accidentally During line, driving still can be hung on wire 14, further ensure the personal safety of maintainer.
Connecting rod 2 between two support bars 1 positioned at the top is U-shaped bar 16.This structure design can avoid two supports It is close to each other because deforming upon between bar 1.
Suspension ring 9 are provided with the connecting rod 2 of the top between two support bars 1.Can be by driving quick and stable by suspension ring 9 Pull to overhead transmission line.
One end of two first poles 10 is hinged with two support bars 1, the other end of two first poles 10 and two second poles 11 One end be hinged, the other end of two second poles 11 is connected by operation plate 12.This structure design, it is excellent with three below Point:(1)During operation, maintainer opens operation plate, and foot is placed in connecting rod 2, and buttocks is sitting in or leans against to be made on operation plate 12 Industry, can adapt to the maintainer of different building shape so as to find the angle of the most comfortable, and the operation that improve maintainer is comfortable Property;(2)Make operation center of gravity be more nearly the plumb line of hanging wire point, enhance the balance of driving;(3)Can fold, be easy to take Band.
A link 13 is respectively equipped with the lower end of two support bars 1, is easy to fix rope ladder, so that maintainer is along rope ladder Climb up driving.
Above-mentioned specific embodiment cannot function as limiting the scope of the invention, for the technology people of the art For member, any alternate modification or conversion made to embodiment of the present invention is all fallen within protection scope of the present invention.
The present invention does not describe part in detail, is the known technology of those skilled in the art of the present technique.

Claims (5)

1. a kind of transmission line of electricity single line operation driving, it is characterised in that:Including two support bars, two support bars are by spaced Some connecting rods are connected, and are movably connected with a head pulley on the top of two support bars, and two head pulleys are aligned, at two Be provided with a plate body above strut, the top of two support bars is connected with the middle part of plate body, plate body be respectively provided on two sides with one across More auxiliary device;The leap auxiliary device includes the adjustment hole for being located at plate body side, and adjustment hole is arranged along plate body length direction, One screw rod passes through adjustment hole, is flexibly connected an adjusting nut, on the screw rod below adjustment hole on the screw rod above adjustment hole A locking nut is flexibly connected, and the lower end of screw rod is connected with a connecting plate, two installations be arrangeding in parallel is provided with connecting plate bottom Plate, is flexibly connected an auxiliary pulley between two installing plates, auxiliary pulley projects aligned with head pulley;On adjusting nut The first operation handle of two eccentric settings is arranged with, the second manipulator of two eccentric settings is arranged with locking nut Handle;The lower end of two installing plates is extended downwardly beyond auxiliary pulley;It is in parallel that the top side of every support bar is provided with one Mounting rod, the top of mounting rod are connected with plate body, and the side of head pulley is flexibly connected with support bar, the opposite side of head pulley and peace Dress bar is flexibly connected, and the lower end of mounting rod is extended downwardly beyond head pulley;The top of two support bars and two mounting rods are located at respectively The different side of two head pulleys.
2. a kind of transmission line of electricity single line operation driving according to claim 1, it is characterised in that:It is located between two support bars The connecting rod of the top is U-shaped bar.
3. a kind of transmission line of electricity single line operation driving according to claim 2, it is characterised in that:Between two support bars most The connecting rod of top is provided with suspension ring.
4. a kind of transmission line of electricity single line operation driving according to claim 1, it is characterised in that:One end of two first poles It is hinged with two support bars, the other end of two first poles is hinged with one end of two second poles, the other end of two second poles leads to Cross operation plate to be connected.
5. a kind of transmission line of electricity single line operation driving according to claim 1, it is characterised in that:In the lower end of two support bars It is respectively equipped with a link.
CN201510440208.XA 2015-07-24 2015-07-24 One-line operation trolley for power transmission line Active CN105048341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510440208.XA CN105048341B (en) 2015-07-24 2015-07-24 One-line operation trolley for power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510440208.XA CN105048341B (en) 2015-07-24 2015-07-24 One-line operation trolley for power transmission line

Publications (2)

Publication Number Publication Date
CN105048341A CN105048341A (en) 2015-11-11
CN105048341B true CN105048341B (en) 2017-03-22

Family

ID=54454670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510440208.XA Active CN105048341B (en) 2015-07-24 2015-07-24 One-line operation trolley for power transmission line

Country Status (1)

Country Link
CN (1) CN105048341B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106571598A (en) * 2016-11-12 2017-04-19 国网山东省电力公司聊城供电公司 Non-dismantle stockbridge damper type wire stringing cart
CN106602458A (en) * 2016-11-28 2017-04-26 国家电网公司 Portable obstacle-crossing high-voltage transmission line ground wire outlet device
CN106711855B (en) * 2017-02-17 2019-03-05 国网浙江省电力公司杭州供电公司 The manned driving of multiple division electricity transmission line
CN109510110B (en) * 2018-12-29 2024-04-30 国家电网有限公司 Ground wire repairing galloping
CN114069485B (en) * 2021-12-03 2023-10-24 国网新疆电力有限公司阿勒泰供电公司 Adjustable outgoing line galloping specialized tool

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5150854B2 (en) * 2008-03-31 2013-02-27 東亞電気工事株式会社 Protective net for airborne aircraft
CN202178552U (en) * 2011-07-16 2012-03-28 河南省电力公司平顶山供电公司 Double split conductor alternated conductor spacer installation aerodyne
CN203577185U (en) * 2013-12-10 2014-05-07 国家电网公司 Shifting mechanism in times of power transmission and distribution line repair
CN204243623U (en) * 2014-12-11 2015-04-01 国家电网公司 A kind of active obstacle type maintenance property-line driving

Also Published As

Publication number Publication date
CN105048341A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105048341B (en) One-line operation trolley for power transmission line
CN106112993A (en) A kind of alternative expression climbing level robot
CN106744539A (en) Automatic rod rising device and electric power maintenance vehicle
CN207974504U (en) Climbing type hanging basket system for tilting decoration of exterior wall construction
CN201802298U (en) Overhead power transmission line electrified ladder head locking device
CN105350901B (en) A kind of electric power overhaul multistage climbing ladder
CN115609563A (en) Modular live working robot body capable of mounting end platform
CN105846351A (en) Line patrol robot mechanical structure and obstacle surmounting method therefor
CN203674627U (en) Adjustable rope ladder head of transmission line
CN212176505U (en) Novel adjustable safety fixing type hanging basket for construction
CN203334941U (en) Overhaul ladder with function of supporting cable wires
CN205081399U (en) Transmission line is with overhauing driving
CN209200516U (en) Unmanned plane hang take flexible ladder arrangement
CN203301060U (en) Adjustable lift platform on strain insulator string of UHV power transmission line
CN208955555U (en) A kind of Phase of Electric Power Projects cable classification support device
CN209038922U (en) Large-span glass hanging device
CN203007831U (en) Bridge maintenance vehicle
CN206769527U (en) Portable laborsaving leading screw electric pole erection device
CN205840755U (en) A kind of transmission line of electricity novel livewire work Self-closing lock rope ladder head
CN210326725U (en) Overhead line paying out device for high-voltage transmission line
CN208939454U (en) A kind of transmitting coaster hanging point raising formula job platform
CN203833575U (en) Vertical rod hoisting multifunctional tool of substation high-altitude device
CN102979036B (en) bridge inspection car
CN207259106U (en) A kind of safeguard device for high overhead operation
CN105281254A (en) Dirigible chair on over head line for maintenance of power transmission line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant