CN105047436B - Weld fume extractor - Google Patents
Weld fume extractor Download PDFInfo
- Publication number
- CN105047436B CN105047436B CN201410774452.5A CN201410774452A CN105047436B CN 105047436 B CN105047436 B CN 105047436B CN 201410774452 A CN201410774452 A CN 201410774452A CN 105047436 B CN105047436 B CN 105047436B
- Authority
- CN
- China
- Prior art keywords
- pipeline section
- straight length
- discharging pipe
- air intake
- smoke discharging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining Or Joining Of Plastics Or The Like (AREA)
- Incineration Of Waste (AREA)
Abstract
The invention discloses welding fume extractor, and it includes the smoke discharging pipe that one end closing other end is connected with blower fan(1), the bottom surface of smoke discharging pipe is rectangular, and upper surface is curved, and the bottom surface of smoke discharging pipe offers some equally distributed ventilating openings(2), ventilating opening is communicated with flow-guiding channel, and flow-guiding channel includes the straight length connected with ventilating opening(3), condensation pipeline section positioned at straight length end(4)With the taper air intake vent for being fixed in condensation pipeline section end(5), pipeline section is condensed in the contraction of straight length diameter and is connected with straight length and taper air intake vent arc transition, and the inwall coiling for condensing pipeline section has the plastic flexible pipe equipped with condensing agent(6).The beneficial effects of the invention are as follows need that taper air intake vent is directed at into welding source during smoke evacuation, making flue gas caused by welding, pipeline section condenses, straight length accelerates into smoke discharging pipe by condensing, filter screen filtration falls the large granular impurity in flue gas, last flue gas is sent into other devices by blower fan and stores or purify, swift to operate.
Description
Technical field
The present invention relates to fume extractor, more particularly to welding fume extractor.
Background technology
Capacitor, it is electric capacity that generally referred to as it, which accommodates the ability of electric charge, is represented with letter C.Define 1:Capacitor, Gu Mingsi
Justice, it is ' container of dress electricity ', is a kind of device for accommodating electric charge.English name:capacitor.Capacitor is in electronic equipment
One of electronic component largely used, the separated by direct communication being widely used in circuit, couple, bypass, filtering, resonant tank, energy
Amount conversion, control etc..Define 2:Capacitor, any two is insulated from each other and the conductor that is spaced closely together(Including wire)Between all
Form a capacitor.Capacitor will pass through in manufacturing process energizes, welds, arranging three steps of plate, wherein welding can produce
Substantial amounts of flue gas, working environment is polluted, is had a negative impact to the health of operator, if directly being divulged information with air-conditioning or smoke ejector
Speed is slow, ineffective.
The content of the invention
The technical problem to be solved in the present invention is that do not have special fume extractor in existing capacitor welding step, is this
A kind of welding fume extractor is provided.
The technical scheme is that:Fume extractor is welded, it includes the smoke evacuation that one end closing other end is connected with blower fan
Pipeline, the bottom surface of the smoke discharging pipe is rectangular, and upper surface is curved, and the bottom surface of the smoke discharging pipe offers some uniform points
The ventilating opening of cloth, the ventilating opening are communicated with flow-guiding channel, straight length that the flow-guiding channel includes connecting with ventilating opening, are located at
The condensation pipeline section of straight length end and the taper air intake vent for being fixed in condensation pipeline section end, the condensation pipeline section is in straight length diameter
Contraction and connected with straight length and taper air intake vent arc transition, it is described condensation pipeline section inwall coiling have equipped with condensing agent
Plastic flexible pipe.
The improvement of such scheme is that the smoke discharging pipe between the two neighboring ventilating opening is connected with screen pack.
Flow-guiding channel described in such scheme is integrally flexible duct.
Taper air intake vent described in such scheme is quality of rubber materials.
The beneficial effects of the invention are as follows taper air intake vent is directed at into welding source when needing to discharge fume, lead to flue gas caused by welding
Cross condensation pipeline section condensation, straight length accelerate into smoke discharging pipe, filter screen filtration falls the large granular impurity in flue gas, last flue gas
Other device storages or purification are sent into by blower fan, simple and quick, plastic flexible pipe, which runs into heat smoke, can expand increasing and flue gas
Contact area, improve condensation effect, it is simple to operate, firm caused flue gas is directly siphoned away and does not interfere with working environment.
Brief description of the drawings
Fig. 1 is schematic diagram of the present invention;
In figure, 1, smoke discharging pipe, 2, ventilating opening, 3, straight length, 4, condensation pipeline section, 5, taper air intake vent, 6, plastic flexible pipe,
7th, screen pack.
Embodiment
The present invention will be further described below in conjunction with the accompanying drawings.
As shown in figure 1, the present invention includes the smoke discharging pipe 1 that one end closing other end is connected with blower fan, the smoke discharging pipe
Bottom surface it is rectangular, upper surface is curved, and the bottom surface of the smoke discharging pipe offers some equally distributed ventilating openings 2, described
Ventilating opening is communicated with flow-guiding channel, straight length 3 that the flow-guiding channel includes connecting with ventilating opening, positioned at the cold of straight length end
Solidifying pipeline section 4 and the taper air intake vent 5 for being fixed in condensation pipeline section end, the condensation pipeline section is in the contraction of straight length diameter and and straight
Pipeline section and the connection of taper air intake vent arc transition, the inwall coiling of the condensation pipeline section have the plastic flexible pipe 6 equipped with condensing agent.
The curved upper surface of smoke discharging pipe can produce the effect of compression acceleration to the flue gas to circulate wherein, avoid due to row
Smoke pipeline is long to be caused the suction of blower fan not enough and then influences smoke discharging effect.Flue gas heat caused by welding is higher and containing a large amount of
Harmful substance, therefore simple purified treatment is also carried out to it while flue gas is drained, flue gas is by taper inlet air first
Mouth suction enters condensation pipeline section and the plastic flexible pipe contact equipped with condensing agent, due to the easy expanded by heating of plastics, runs into high heat
The surface area of plastic flexible pipe and smoke contacts also can accordingly increase during flue gas, and then improve condensation effect.
Enter straight length by condensed flue gas, due to the thrust that stack effect can be accelerated, accelerate smoke evacuation
Speed, be attracted to after flue gas is entered in smoke discharging pipe and be communicated with blower fan one end, can pass through several screen packs filtering,
The bulky grain debris in flue gas is filtered out, appointed place is finally discharged into and carries out subsequent treatment.
Flow-guiding channel can be arranged as required to 3,4 or more, depending on the welding bench of operation interval length and
It is fixed, it is necessary to using when smoke discharging pipe is fixed on to the bottom of operation interval, flow-guiding channel hangs down naturally, and its length to weld people
Member can get at taper air intake vent and be preferred, and flow-guiding channel is preferably integrally flexible duct, can so be optionally stretched specific
Station, taper air intake vent are preferably quality of rubber materials, can be with compressive deformation, and the effect of so gathering flue gas is more preferable, more targetedly.
Claims (4)
1. fume extractor is welded, it is characterized in that it includes the smoke discharging pipe that one end closing other end is connected with blower fan(1), the row
The bottom surface of smoke pipeline is rectangular, and upper surface is curved, and the bottom surface of the smoke discharging pipe offers some equally distributed ventilating openings
(2), the ventilating opening is communicated with flow-guiding channel, and the flow-guiding channel includes the straight length connected with ventilating opening(3), positioned at straight tube
The condensation pipeline section of section end(4)With the taper air intake vent for being fixed in condensation pipeline section end(5), the condensation pipeline section is in that straight length is straight
The contraction in footpath and connected with straight length and taper air intake vent arc transition, the inwall coiling of the condensation pipeline section has equipped with condensation
The plastic flexible pipe of agent(6), the surface area of plastic flexible pipe and smoke contacts also can accordingly increase when running into the flue gas of high heat.
2. welding fume extractor as claimed in claim 1, it is characterized in that the smoke discharging pipe between two neighboring ventilating opening is affixed
There is screen pack(7).
3. welding fume extractor as claimed in claim 2, it is characterized in that the flow-guiding channel is integrally flexible duct.
4. welding fume extractor as claimed in claim 3, it is characterized in that the taper air intake vent is quality of rubber materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410774452.5A CN105047436B (en) | 2014-12-16 | 2014-12-16 | Weld fume extractor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410774452.5A CN105047436B (en) | 2014-12-16 | 2014-12-16 | Weld fume extractor |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105047436A CN105047436A (en) | 2015-11-11 |
CN105047436B true CN105047436B (en) | 2017-12-29 |
Family
ID=54453899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410774452.5A Active CN105047436B (en) | 2014-12-16 | 2014-12-16 | Weld fume extractor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105047436B (en) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201677146U (en) * | 2010-04-30 | 2010-12-22 | 山东新焦点龙盛汽车配件有限公司 | Ventilating device for welding circuit board |
CN201776575U (en) * | 2010-08-20 | 2011-03-30 | 安徽泰德光伏股份有限公司 | Smoke discharging device of battery plate spot welding platform |
CN102784995A (en) * | 2011-05-19 | 2012-11-21 | 旭达电脑(昆山)有限公司 | Soldering iron smoke suction device |
CN202191818U (en) * | 2011-07-27 | 2012-04-18 | 上海复旦水务工程技术有限公司 | Waste gas treatment device |
CN104165365B (en) * | 2014-02-17 | 2016-04-27 | 歙县绿源环保设备有限公司 | A kind of incinerating and treating device of rubbish |
-
2014
- 2014-12-16 CN CN201410774452.5A patent/CN105047436B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105047436A (en) | 2015-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104841207B (en) | Air purifier equipment with connection mechanical device | |
CN106823612A (en) | Portable welding smoke eliminator and purification method | |
CN104028074A (en) | Dust removing device for welding station | |
CN105047436B (en) | Weld fume extractor | |
CN207755903U (en) | A kind of lithium ion battery separator production line extractor fan | |
CN215823916U (en) | In-situ thermal desorption restoration device for contaminated soil | |
CN211840681U (en) | Automatic welding equipment for aluminum pipes | |
CN210544184U (en) | Extract trade tail gas processing apparatus | |
CN204137822U (en) | A kind of conveyer clean dust collector | |
CN210097187U (en) | Cloth bag type dust collector for waste incineration flue gas treatment | |
CN206604320U (en) | Portable welding smoke eliminator | |
CN206199853U (en) | A kind of new press device dust pelletizing system | |
CN207455674U (en) | Ventilation and Lampblack treatment system suitable for barbecue machine | |
CN204973339U (en) | Molecular sieve air purification device | |
CN110107909A (en) | A kind of smoke multistage processing collection device with UTILIZATION OF VESIDUAL HEAT IN | |
CN208244468U (en) | A kind of PVC production line gas collection processing unit | |
CN107519722A (en) | A kind of multistage environmental protection dust arrester | |
CN213995167U (en) | Smelt gluey workshop flue gas dust treatment device | |
CN210356378U (en) | Secondary recovery workshop for smelting electric furnace | |
CN218915859U (en) | High-efficiency smoke collecting device for electric furnace | |
CN203954978U (en) | A kind of cloth bag cyclone dust collector | |
CN215782505U (en) | Smoke exhaust equipment for casting smelting furnace | |
CN213178685U (en) | Ventilation equipment for paint production workshop | |
CN219462802U (en) | High-efficiency multi-tube cyclone dust collector | |
CN213857518U (en) | Smoke extraction device for welding constant-temperature soldering iron |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171127 Address after: 244000 Anhui city of Tongling province Yi'an District Jinshan Industrial Park Applicant after: Anhui Tongling Keli Valve Co., Ltd. Address before: 244000 Xiyuan County, Anhui province Tongling lake view, building 204, room, 2 Applicant before: TONGLING XIANGYU TRADING CO., LTD. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |