CN105046401A CN201510347697.4A CN201510347697A CN105046401A CN 105046401 A CN105046401 A CN 105046401A CN 201510347697 A CN201510347697 A CN 201510347697A CN 105046401 A CN105046401 A CN 105046401A
Authority
CN
China
Prior art keywords
project
sub
target power
needed
tables
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510347697.4A
Other languages
Chinese (zh)
Inventor
赵磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510347697.4A priority Critical patent/CN105046401A/en
Publication of CN105046401A publication Critical patent/CN105046401A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a material statistic method and device for power projects. The method comprises: determining the name of a power project; searching a data sheet corresponding to a target power project according to the name of the power project; performing statistic on material required by the target power project according to the data sheet, wherein the material required by the target power project comprises the name, the specification and model, and the amount of the material required by the target power project. The method and the device solve a technical problem of low statistic efficiency of the material required by the power project in prior art.

Description

For Material Takeoff method and the device of Power Project
Technical field
The present invention relates to power domain, in particular to a kind of Material Takeoff method for Power Project and device.
Background technology
Before Power Project is implemented, usually need equipment and materials required in statistical item in advance, such as, need to fill how many transformers, fill how many cross-arms, Anduo County processed lacks horizontal guy etc., filling a transformer needs again how many bolts, how many fuses etc.A Power Project can relate to a large amount of equipment and materialss usually, and inventor finds to be at present added up the equipment and materials needed for each Power Project by artificial, and complex operation, efficiency are low and easily make mistakes.
For above-mentioned problem, at present effective solution is not yet proposed.
Summary of the invention
Embodiments provide a kind of Material Takeoff method for Power Project and device, at least to solve in correlation technique the low technical matters of the material ages rate needed for Power Project of adding up.
According to an aspect of the embodiment of the present invention, provide a kind of Material Takeoff method for Power Project, comprising: the title determining target power project; The tables of data corresponding according to the name lookup target power project of target power project; And the material needed for tables of data statistics target power project, wherein, the material needed for target power project comprises title material, specifications and models and quantity needed for target power project.
Further, target power project comprises the first sub-project and the second sub-project, the tables of data corresponding according to the name lookup target power project of target power project comprises: respectively according to the title of the first sub-project and tables of data corresponding to name lookup first sub-project of the second sub-project and tables of data corresponding to the second sub-project, obtain the first tables of data and the second tables of data, the material needed for tables of data statistics target power project comprises: add up the material needed for the first sub-project and the material needed for the second sub-project according to the first tables of data and the second tables of data respectively; Material needed for the first sub-project and the material needed for Material Takeoff target power project needed for the second sub-project.
Further, material needed for the first sub-project and the material needed for Material Takeoff target power project needed for the second sub-project comprise: the material needed for the first sub-project and the material needed for the second sub-project are merged, obtain the material needed for target power project.
Further, material needed for first sub-project and the material needed for the second sub-project are merged, the material obtained needed for target power project comprises: the material needed for the first sub-project and the material needed for the second sub-project are gathered, obtain summary of materials; Judge in summary of materials, whether to there is the title material material identical with specifications and models; And judging to there is the title material material identical with specifications and models in summary of materials, material identical with specifications and models for title material being merged, obtains the material needed for target power project.
Further, after the material needed for tables of data statistics target power project, method also comprises: be stored in the 3rd tables of data by the material needed for target power project.
According to the another aspect of the embodiment of the present invention, additionally provide a kind of Material Takeoff device for Power Project, comprising: determining unit, for determining the title of target power project; Search unit, for the tables of data that the name lookup target power project according to target power project is corresponding; And statistic unit, for the material needed for tables of data statistics target power project, wherein, the material needed for target power project comprises title material, specifications and models and quantity needed for target power project.
Further, target power project comprises the first sub-project and the second sub-project, search unit also for respectively according to the title of the first sub-project and tables of data corresponding to name lookup first sub-project of the second sub-project and tables of data corresponding to the second sub-project, obtain the first tables of data and the second tables of data, statistic unit comprises: the first statistics subelement, for adding up the material needed for the first sub-project and the material needed for the second sub-project according to the first tables of data and the second tables of data respectively; And second adds up subelement, for the material needed for the material needed for the first sub-project and the Material Takeoff target power project needed for the second sub-project.
Further, the second statistics subelement comprises: merging module, for the material needed for the first sub-project and the material needed for the second sub-project being merged, obtaining the material needed for target power project.
Further, merge module to comprise: gathering submodule, for the material needed for the first sub-project and the material needed for the second sub-project being gathered, obtaining summary of materials; Judging submodule, whether there is the title material material identical with specifications and models in summary of materials for judging; And merging submodule, for judging to there is the title material material identical with specifications and models in summary of materials, material identical with specifications and models for title material being merged, obtains the material needed for target power project.
Further, after the material needed for tables of data statistics target power project, device also comprises: storage unit, for being stored in the 3rd tables of data by the material needed for target power project.
In embodiments of the present invention, the title determining target power project is adopted; The tables of data corresponding according to the name lookup target power project of target power project; And the material needed for tables of data statistics target power project, wherein, material needed for target power project comprises title material, specifications and models and quantity needed for target power project, by the material needed for tables of data statistics target power project, improve the efficiency of the equipment and materials of statistics needed for Power Project, and then solve in correlation technique the low technical matters of the material ages rate needed for Power Project of adding up.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide a further understanding of the present invention, and form a application's part, schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the process flow diagram of the Material Takeoff method for Power Project according to the embodiment of the present invention; And
Fig. 2 is the schematic diagram of the Material Takeoff device for Power Project according to the embodiment of the present invention.
Embodiment
The present invention program is understood better in order to make those skilled in the art person, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the embodiment of a part of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, should belong to the scope of protection of the invention.
It should be noted that, term " first ", " second " etc. in instructions of the present invention and claims and above-mentioned accompanying drawing are for distinguishing similar object, and need not be used for describing specific order or precedence.Should be appreciated that the data used like this can be exchanged in the appropriate case, so as embodiments of the invention described herein can with except here diagram or describe those except order implement.In addition, term " comprises " and " having " and their any distortion, intention is to cover not exclusive comprising, such as, contain those steps or unit that the process of series of steps or unit, method, system, product or equipment is not necessarily limited to clearly list, but can comprise clearly do not list or for intrinsic other step of these processes, method, product or equipment or unit.
According to the embodiment of the present invention, provide a kind of Material Takeoff method for Power Project, it should be noted that, can perform in the computer system of such as one group of computer executable instructions in the step shown in the process flow diagram of accompanying drawing, and, although show logical order in flow charts, in some cases, can be different from the step shown or described by order execution herein.
Fig. 1 is the process flow diagram of the Material Takeoff method for Power Project according to the embodiment of the present invention, and as shown in Figure 1, the method comprises the steps that S102 is to step S106:
Step S102, determines the title of target power project.
The target power project of the embodiment of the present invention can be install transformer separately, or installs cross-arm etc. separately, also can be the combination of installing transformer, installing cross-arm, making the common bracing wire of peace etc.The title of target power project is used for identifying this target power project uniquely, and such as, target power project is for installing transformer, then the title of target power project can be 1.
Step S104, the tables of data corresponding according to the name lookup target power project of target power project.
The embodiment of the present invention is before the tables of data that the name lookup target power project according to target power project is corresponding, in advance tables of data corresponding with target power project for the title of target power project is associated, alternatively, the title of tables of data corresponding to described target power project can be referred to as by the name of target power project.It should be noted that, in Power Project, the material install a transformer, installing a set of cross-arm etc. required is usually identical, therefore, prestored target power project material requested inventory under normal conditions in the tables of data that the target power project of the embodiment of the present invention is corresponding, user can modify to the data stored in tables of data according to the actual conditions of target power project, such as, increase material type, the quantity etc. of adjustment material.Table 1 is the bill of materials installing transformer, list title material, specification and the quantity of installing needed for transformer in Table 1, in table 1, material type, material quantity can adjust according to actual conditions, such as, the quantity on first chassis of specification 0.5M can be revised as 5, also can increase material in Table 1, such as, increasing by 2 specifications is the disconnecting link etc. of 600A.It should be noted that, table 1 is only a kind of Alternative Form of tables of data corresponding to target power project, and the field of the tables of data that target power project is corresponding can be arranged according to actual conditions, such as, can increase unit field, unit price field etc.
The bill of materials of transformer installed by table 1
Step S106, according to the material needed for tables of data statistics target power project, wherein, the material needed for target power project comprises title material, specifications and models and quantity needed for target power project.
The embodiment of the present invention is described for installing transformer for target power project, wherein, the bill of materials installed needed for transformer is as shown in table 1, from table 1, only can obtain quantity be greater than the material of 0 as the material needed for current dress transformer, such as, only have specification to be that the quantity of the transformer of 315KVA is greater than 0, therefore only needing to obtain specification is the voltage device of 315KV.
The embodiment of the present invention is by determining the title of target power project; The tables of data corresponding according to the name lookup target power project of target power project; And the material needed for tables of data statistics target power project, wherein, the material needed for target power project comprises title material, specifications and models and quantity needed for target power project.The embodiment of the present invention only need determine that target power project can go out material needed for target power project by programming count, compared to the mode of the material needed for complicate statistics Power Project, simple to operation, and the result of statistics is more accurate, solve in correlation technique the technical matters that the material ages rate needed for Power Project of adding up is low.
Alternatively, target power project comprises the first sub-project and the second sub-project, the tables of data corresponding according to the name lookup target power project of target power project comprises: respectively according to the title of the first sub-project and tables of data corresponding to name lookup first sub-project of the second sub-project and tables of data corresponding to the second sub-project, obtain the first tables of data and the second tables of data, the material needed for tables of data statistics target power project comprises: add up the material needed for the first sub-project and the material needed for the second sub-project according to the first tables of data and the second tables of data respectively; Material needed for the first sub-project and the material needed for Material Takeoff target power project needed for the second sub-project.
First sub-project and the second sub-project can be any two different Power Projects, and such as, the first sub-project is system peace horizontal guy, and the second sub-project is the common bracing wire of system peace, then target power project comprises system peace horizontal guy and the common bracing wire of system peace.First sub-project and second sub-project of the embodiment of the present invention correspond respectively to different tables of data, i.e. the first tables of data and the second tables of data, wherein, first tables of data is previously stored with the bill of materials needed for the first sub-project, and the second tables of data is previously stored with the bill of materials needed for the second sub-project.Particularly, the embodiment of the present invention is respectively according to the title of the first sub-project and tables of data corresponding to name lookup first sub-project of the second sub-project and tables of data corresponding to the second sub-project, after obtaining the first tables of data and the second tables of data, the material needed for the first sub-project and the material needed for the second sub-project is added up respectively according to the first tables of data and the second tables of data, alternatively, the material that quantity is greater than zero can be obtained respectively from the first tables of data and the second tables of data, obtain the first material list and the second material list, wherein, first material list is for storing the material needed for the first sub-project, second material list is for storing the material needed for the second sub-project, the material needed for target power project just can be obtained according to the first material list and the second material list, such as, first material list and the second material list are merged the material obtained needed for target power project.Particularly, material needed for the first sub-project and the material needed for Material Takeoff target power project needed for the second sub-project comprise: the material needed for the first sub-project and the material needed for the second sub-project are merged, obtain the material needed for target power project.
Such as, can the material needed for the first sub-project and the material needed for the second sub-project be stored with the first material list and the second material list respectively, from the first material list and the second material list, search whether there is the title material material all identical with specifications and models, if existed, then obtain the first material list material all identical with specifications and models with title material in the second material list and merged and be stored in the 3rd material list, namely the quantity of the material that the first material list is all identical with specifications and models with title material in the second material list is stored in the 3rd material list after being added, and the material stored in remaining material in the first material list and the second material list and the 3rd material list is gathered, obtain the material needed for target power project.
Alternatively, material needed for first sub-project and the material needed for the second sub-project are merged, the material obtained needed for target power project comprises: the material needed for the first sub-project and the material needed for the second sub-project are gathered, obtain summary of materials; Judge in summary of materials, whether to there is the title material material identical with specifications and models; And judging to there is the title material material identical with specifications and models in summary of materials, material identical with specifications and models for title material being merged, obtains the material needed for target power project.
Alternatively, check for the ease of follow-up, the embodiment of the present invention is after the material needed for tables of data statistics target power project, and the method also comprises: be stored in the 3rd tables of data by the material needed for target power project.
The embodiment of the present invention additionally provides a kind of Material Takeoff device for Power Project.Fig. 2 is the schematic diagram of the Material Takeoff device for Power Project according to the embodiment of the present invention.As shown in Figure 2, this device comprises: determining unit 20, search unit 22 and statistic unit 24.
Determining unit 20, for determining the title of target power project.
The target power project of the embodiment of the present invention can be install transformer separately, or installs cross-arm etc. separately, also can be the combination of installing transformer, installing cross-arm, making the common bracing wire of peace etc.The title of target power project is used for identifying this target power project uniquely, and such as, target power project is for installing transformer, then the title of target power project can be 1.
Search unit 22, for the tables of data that the name lookup target power project according to target power project is corresponding.
The embodiment of the present invention is before the tables of data that the name lookup target power project according to target power project is corresponding, in advance tables of data corresponding with target power project for the title of target power project is associated, alternatively, the title of tables of data corresponding to described target power project can be referred to as by the name of target power project.It should be noted that, in Power Project, the material install a transformer, installing a set of cross-arm etc. required is usually identical, therefore, prestored target power project material requested inventory under normal conditions in the tables of data that the target power project of the embodiment of the present invention is corresponding, user can modify to the data stored in tables of data according to the actual conditions of target power project, such as, increase material type, the quantity etc. of adjustment material.
Statistic unit 24, for the material needed for tables of data statistics target power project, wherein, the material needed for target power project comprises title material, specifications and models and quantity needed for target power project.
The embodiment of the present invention determines the title of target power project by determining unit 20; Search the tables of data that unit 22 is corresponding according to the name lookup target power project of target power project; And the material of statistic unit 24 needed for tables of data statistics target power project, wherein, the material needed for target power project comprises title material, specifications and models and quantity needed for target power project.The embodiment of the present invention only need determine that target power project can go out material needed for target power project by programming count, compared to the mode of the material needed for complicate statistics Power Project, simple to operation, and the result of statistics is more accurate, solve in correlation technique the technical matters that the material ages rate needed for Power Project of adding up is low.
Alternatively, target power project comprises the first sub-project and the second sub-project, search unit also for respectively according to the title of the first sub-project and tables of data corresponding to name lookup first sub-project of the second sub-project and tables of data corresponding to the second sub-project, obtain the first tables of data and the second tables of data, statistic unit comprises: the first statistics subelement, for adding up the material needed for the first sub-project and the material needed for the second sub-project according to the first tables of data and the second tables of data respectively; And second adds up subelement, for the material needed for the material needed for the first sub-project and the Material Takeoff target power project needed for the second sub-project.
First sub-project and the second sub-project can be any two different Power Projects, and such as, the first sub-project is system peace horizontal guy, and the second sub-project is the common bracing wire of system peace.
Alternatively, the second statistics subelement comprises: merging module, for the material needed for the first sub-project and the material needed for the second sub-project being merged, obtaining the material needed for target power project.
Alternatively, merge module to comprise: gathering submodule, for the material needed for the first sub-project and the material needed for the second sub-project being gathered, obtaining summary of materials; Judging submodule, whether there is the title material material identical with specifications and models in summary of materials for judging; And merging submodule, for judging to there is the title material material identical with specifications and models in summary of materials, material identical with specifications and models for title material being merged, obtains the material needed for target power project.
Alternatively, after the material needed for tables of data statistics target power project, device also comprises: storage unit, for being stored in the 3rd tables of data by the material needed for target power project.
The invention described above embodiment sequence number, just to describing, does not represent the quality of embodiment.
In the above embodiment of the present invention, the description of each embodiment is all emphasized particularly on different fields, in certain embodiment, there is no the part described in detail, can see the associated description of other embodiments.
In several embodiments that the application provides, should be understood that, disclosed technology contents, the mode by other realizes.Wherein, device embodiment described above is only schematic, the such as division of described unit, can be that a kind of logic function divides, actual can have other dividing mode when realizing, such as multiple unit or assembly can in conjunction with or another system can be integrated into, or some features can be ignored, or do not perform.Another point, shown or discussed coupling each other or direct-coupling or communication connection can be by some interfaces, and the indirect coupling of unit or module or communication connection can be electrical or other form.
The described unit illustrated as separating component or can may not be and physically separates, and the parts as unit display can be or may not be physical location, namely can be positioned at a place, or also can be distributed on multiple unit.Some or all of unit wherein can be selected according to the actual needs to realize the object of the present embodiment scheme.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, also can be that the independent physics of unit exists, also can two or more unit in a unit integrated.Above-mentioned integrated unit both can adopt the form of hardware to realize, and the form of SFU software functional unit also can be adopted to realize.
If described integrated unit using the form of SFU software functional unit realize and as independently production marketing or use time, can be stored in a computer read/write memory medium.Based on such understanding, the part that technical scheme of the present invention contributes to prior art in essence in other words or all or part of of this technical scheme can embody with the form of software product, this computer software product is stored in a storage medium, comprises all or part of step of some instructions in order to make a computer equipment (can be personal computer, server or the network equipment etc.) perform method described in each embodiment of the present invention.And aforesaid storage medium comprises: USB flash disk, ROM (read-only memory) (ROM, Read-OnlyMemory), random access memory (RAM, RandomAccessMemory), portable hard drive, magnetic disc or CD etc. various can be program code stored medium.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (10)

1., for a Material Takeoff method for Power Project, it is characterized in that, comprising:
Determine the title of target power project;
The tables of data that target power project is corresponding according to the name lookup of described target power project; And
Add up the material needed for described target power project according to described tables of data, wherein, the material needed for described target power project comprises title material, specifications and models and quantity needed for described target power project.
2. method according to claim 1, is characterized in that, described target power project comprises the first sub-project and the second sub-project,
The tables of data that target power project is corresponding according to the name lookup of described target power project comprises: the tables of data that the first sub-project is corresponding according to the title of described first sub-project and the name lookup of described second sub-project respectively and tables of data corresponding to described second sub-project, obtain the first tables of data and the second tables of data
Comprise according to the material that described tables of data is added up needed for described target power project:
Material respectively needed for described first tables of data and described first sub-project of described second tables of data statistics and the material needed for described second sub-project;
Material described in material needed for described first sub-project and the Material Takeoff needed for described second sub-project needed for target power project.
3. method according to claim 2, it is characterized in that, material described in material needed for described first sub-project and the Material Takeoff needed for described second sub-project needed for target power project comprises: the material needed for described first sub-project and the material needed for described second sub-project are merged, obtain the material needed for described target power project.
4. method according to claim 3, is characterized in that, the material needed for described first sub-project and the material needed for described second sub-project are merged, the material obtained needed for described target power project comprises:
Material needed for described first sub-project and the material needed for described second sub-project are gathered, obtains summary of materials;
Judge in described summary of materials, whether to there is the title material material identical with specifications and models; And
Judging to there is the title material material identical with specifications and models in described summary of materials, material identical with specifications and models for title material being merged, obtaining the material needed for described target power project.
5. method according to claim 1, is characterized in that, after add up the material needed for described target power project according to described tables of data, described method also comprises: be stored in the 3rd tables of data by the material needed for described target power project.
6., for a Material Takeoff device for Power Project, it is characterized in that, comprising:
Determining unit, for determining the title of target power project;
Search unit, for the tables of data that target power project according to the name lookup of described target power project is corresponding; And
Statistic unit, for adding up the material needed for described target power project according to described tables of data, wherein, the material needed for described target power project comprises title material, specifications and models and quantity needed for described target power project.
7. device according to claim 6, it is characterized in that, described target power project comprises the first sub-project and the second sub-project, describedly search unit also for the first sub-project is corresponding according to the title of described first sub-project and the name lookup of described second sub-project respectively tables of data and tables of data corresponding to described second sub-project, obtain the first tables of data and the second tables of data
Described statistic unit comprises: the first statistics subelement, for the material respectively needed for described first tables of data and described first sub-project of described second tables of data statistics and the material needed for described second sub-project; And
Second statistics subelement, for the material needed for target power project described in the material needed for described first sub-project and the Material Takeoff needed for described second sub-project.
8. device according to claim 7, it is characterized in that, described second statistics subelement comprises: merging module, for the material needed for described first sub-project and the material needed for described second sub-project being merged, obtaining the material needed for described target power project.
9. device according to claim 8, is characterized in that, described merging module comprises:
Gathering submodule, for the material needed for described first sub-project and the material needed for described second sub-project being gathered, obtaining summary of materials;
Judging submodule, whether there is the title material material identical with specifications and models in described summary of materials for judging; And
Merge submodule, for judging to there is the title material material identical with specifications and models in described summary of materials, material identical with specifications and models for title material being merged, obtaining the material needed for described target power project.
10. device according to claim 6, it is characterized in that, after add up the material needed for described target power project according to described tables of data, described device also comprises: storage unit, for being stored in the 3rd tables of data by the material needed for described target power project.
CN201510347697.4A 2015-06-19 2015-06-19 Material statistic method and device for power projects Pending CN105046401A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510347697.4A CN105046401A (en) 2015-06-19 2015-06-19 Material statistic method and device for power projects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510347697.4A CN105046401A (en) 2015-06-19 2015-06-19 Material statistic method and device for power projects

Publications (1)

Publication Number Publication Date
CN105046401A true CN105046401A (en) 2015-11-11

Family

ID=54452928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510347697.4A Pending CN105046401A (en) 2015-06-19 2015-06-19 Material statistic method and device for power projects

Country Status (1)

Country Link
CN (1) CN105046401A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799807A (en) * 2009-02-10 2010-08-11 中国移动通信集团公司 Heterogeneous data table merging method and system thereof
CN103020750A (en) * 2012-11-19 2013-04-03 北京数码大方科技股份有限公司 Process report generation method and device
CN103164760A (en) * 2011-12-13 2013-06-19 华东电网有限公司 Power grid increment planning method and system
US20140300316A1 (en) * 2011-10-18 2014-10-09 Toyota Jidosha Kabushiki Kaisha Power supply device and power supply method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799807A (en) * 2009-02-10 2010-08-11 中国移动通信集团公司 Heterogeneous data table merging method and system thereof
US20140300316A1 (en) * 2011-10-18 2014-10-09 Toyota Jidosha Kabushiki Kaisha Power supply device and power supply method
CN103164760A (en) * 2011-12-13 2013-06-19 华东电网有限公司 Power grid increment planning method and system
CN103020750A (en) * 2012-11-19 2013-04-03 北京数码大方科技股份有限公司 Process report generation method and device

Similar Documents

Publication Publication Date Title
CN105354314A (en) Data migration method and device
CN102866954B (en) The method of Memory Allocation and device
CN112380213A (en) Information acquisition method and device, computer equipment and storage medium
CN105653508A (en) Document template management method, document calling method and related device
CN105095059A (en) Method and device for automated testing
CN104978195A (en) Interface configuration device and method
CN106204285A (en) Insurance rules process method based on cloud computing and system
CN104991151A (en) Method and device for analyzing wrong wiring of three-phase four-wire electric energy metering device
CN110728123A (en) Report generation method, system and related equipment
CN104461649A (en) Chip compatible method and device
CN109086090A (en) A kind of method, apparatus, equipment and the storage medium of server B MC configuration
CN105574032A (en) Rule matching operation method and device
CN104123298B (en) The analysis method and equipment of product defects
CN108694108A (en) A kind of method and apparatus of iOS crash datas classification and statistics
CN104991152A (en) Method and device for analyzing wrong wiring of three-phase three-wire electric energy metering device
CN104536998A (en) Data import method and device
CN105046401A (en) Material statistic method and device for power projects
CN102662962A (en) Dynamic display method based on webpage elements
CN205003618U (en) Circuit and computer motherboard circuit are listened to temperature
CN105357579B (en) A kind of set-top box online upgrading method, relevant apparatus and set-top box
CN104298570A (en) Data processing method and device
CN104536887A (en) Communication data detection method and device
CN105468637A (en) Database updating method and apparatus
CN105468575A (en) Multi-type-based form loading method and system
CN106205484A (en) LED display band carries collocation method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151111

RJ01 Rejection of invention patent application after publication