CN105043013B - The uninterrupted back-up system of air separation plant - Google Patents

The uninterrupted back-up system of air separation plant Download PDF

Info

Publication number
CN105043013B
CN105043013B CN201510546913.8A CN201510546913A CN105043013B CN 105043013 B CN105043013 B CN 105043013B CN 201510546913 A CN201510546913 A CN 201510546913A CN 105043013 B CN105043013 B CN 105043013B
Authority
CN
China
Prior art keywords
direct
regulating valve
air separation
pipeline
operated regulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510546913.8A
Other languages
Chinese (zh)
Other versions
CN105043013A (en
Inventor
庞颢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Haige Jingu Industrial Technology Co.,Ltd.
Original Assignee
Shenzhen Haige Jingu Industry Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Haige Jingu Industry Science And Technology Co Ltd filed Critical Shenzhen Haige Jingu Industry Science And Technology Co Ltd
Priority to CN201510546913.8A priority Critical patent/CN105043013B/en
Publication of CN105043013A publication Critical patent/CN105043013A/en
Application granted granted Critical
Publication of CN105043013B publication Critical patent/CN105043013B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the uninterrupted back-up systems of air separation plant, including direct-operated regulator, pressure regulation device, pressure transmitter, electrical regulating valve, control system, the gas incoming end after gasification and the gas output end after pressure regulation, gas incoming end is connected to gas output end with pipeline through direct-operated regulator all the way, gas incoming end another way is connected to through electrical regulating valve on the pipeline between direct-operated regulator and pressure transmitter with pipeline, and pressure regulation device is connected to direct-operated regulator;Control system is electrically connected electrical regulating valve and pressure transmitter.The present invention can be supplied to user incessantly, ensure the security and stability operation of back-up system.

Description

The uninterrupted back-up system of air separation plant
Technical field
The present invention relates to air separation plant more particularly to the uninterrupted back-up systems of air separation plant.
Background technology
Air separation plant is the abbreviation of air separation equipment, also referred to as space division, is by air liquefaction, rectifying, final separation As the gas separation equipment of oxygen, nitrogen and other valuable gases.Since some industries mating with air separation plant supply gas Continuity require it is relatively high, once disastershutdown occurs in air separation plant, mating equipment can be had a huge impact, even Cause prodigious economic loss.But current air separation plant is the system of a set of complexity, is easy because a small failure is made Forming apparatus is shut down, so, reliability, the stability of the back-up system of current air separation plant are insufficient, it is difficult to go out in air separation plant When existing problem is shut down, back-up system is allowed to be supplied incessantly to user.
Invention content
For overcome the deficiencies in the prior art, the purpose of the present invention is to provide the uninterrupted back-up system of air separation plant, energy It is supplied incessantly to user, ensures the security and stability operation of back-up system.
The purpose of the present invention is realized using following technical scheme:
The uninterrupted back-up system of air separation plant, including it is direct-operated regulator, pressure regulation device, pressure transmitter, electrical Regulating valve, control system, the gas incoming end after gasification and the gas output end after pressure regulation, gas incoming end is all the way with pipeline It is connected to gas output end through direct-operated regulator, gas incoming end another way is connected to self-operated type with pipeline through electrical regulating valve On pipeline between regulating valve and pressure transmitter, pressure regulation device is connected to direct-operated regulator;Control system is electric respectively Connect electrical regulating valve and pressure transmitter.
Preferably, it is connected separately with the first shut-off valve on the arrival end of direct-operated regulator and the pipeline of outlet end.
Preferably, it is connected separately with the second shut-off valve on the arrival end of electrical regulating valve and the pipeline of outlet end.
Preferably, there is electrical regulating valve blind controller system, one tracheae of outlet end of direct-operated regulator to connect instrument Table control system.
Preferably, control system is PLC system or DCS system.
Compared with prior art, the beneficial effects of the present invention are:
The present invention can devote oneself to work after air separation plant is shut down or is had a power failure, and liquid after gasifier gasification through gas by accessing End enters the two-way voltage-regulating system of the present invention, and Self-driven pressure-adjusting valve and electrical regulating valve are opened at this time, and gas passes through two pressure regulation User is given after valve decompression, the back-up system of double insurance is formed, ensure that the safe and reliable continuous operation of back-up system;And from Power formula regulating valve is adjusted according to the pressure of setting from motion tracking, can when direct-operated regulator or the failure of electrical regulating valve Front and back the first shut-off valve or the second shut-off valve are corresponded to close it, is maintained, makes whole system can online more It changes and repairs, avoiding the back-up system caused by single failure can not work.
Description of the drawings
Fig. 1 is the connection diagram of the uninterrupted back-up system of air separation plant of the present invention.
In figure:1, direct-operated regulator;2, pressure regulation device;3, pressure transmitter;4, electrical regulating valve;41, instrument Control system;5, control system;6, gas incoming end;7, gas output end;8, tracheae;9, the first shut-off valve;10, the second cut-off Valve.
Specific implementation mode
In the following, in conjunction with attached drawing and specific implementation mode, the present invention is described further:
Such as the uninterrupted back-up system of air separation plant that Fig. 1 shows, including direct-operated regulator 1, pressure regulation device 2, pressure Transmitter 3, electrical regulating valve 4, control system 5, the gas incoming end 6 after gasification and the gas output end 7 after pressure regulation, gas 6 one tunnel of incoming end is connected to gas output end 7 with pipeline through direct-operated regulator 1, and 6 another way of gas incoming end is with pipeline through electricity Gas regulating valve 4 is connected on the pipeline between direct-operated regulator 1 and pressure transmitter 3, and pressure regulation device 2, which is connected to, relies on oneself Formula regulating valve 1;Control system 5 is electrically connected electrical regulating valve 4 and pressure transmitter 3.
It devotes oneself to work after air separation plant is shut down or is had a power failure, the liquid of wet tank after gasifier gasification through gas by connecing Enter the two-way voltage-regulating system that end 6 enters the present invention, Self-driven pressure-adjusting valve and electrical regulating valve 4 are opened at this time, and gas passes through two After pressure regulator valve decompression, preferably through pressure transmitter 3, then by gas output end 7 user is given, form the standby system of double insurance System, ensure that the safe and reliable continuous operation of back-up system.
Wherein, control system 5 is PLC system or DCS system.Specifically control mode is:When space division system once shut down or Have a power failure, this back-up system is started to work, this back-up system is that two-way is adjusted:It is the electrical regulating valve 4 for having electric signal to control all the way, The control of electrical regulating valve 4 is controlled according to the pressure after valve by DCS/PLC systems, and control principle is using conventional PID controls Principle processed.Another way is commander's type direct-operated regulator 1 of gas signal control, which is not necessarily to external control instrument, profit It is adjusted with itself pipeline pressure.That is, this back-up system normal work is to carry out PID by the electrical regulating valve 4 that electric signal controls Adjusting control, when system blackout, stop the supple of gas or steam when, the regulating loop where electrical regulating valve 4 is ineffective, at this moment another routing command Type direct-operated regulator 1 carry out it is continual give user gas supply, ensure back-up system security and stability operation.
As preferred embodiment, the electrical regulating valve 4 of this example has blind controller system 41, direct-operated regulator 1 Outlet end one tracheae 8 connect blind controller system 41 so that the control air source of instrument 41 is after wet tank gasifies Gas ensure that in equipment downtime as 41 air source of blind controller system, still have the supply of 41 gas of blind controller system, keep away Exempt from space division shutdown and caused 41 gas cut-off of instrument, influences the adjusting of electrical regulating valve 4.
For convenience of online replacement and repair, divide on the arrival end of direct-operated regulator 1 and the pipeline of outlet end of this example It is not connected with the first shut-off valve 9.It is connected separately with the second shut-off valve on the arrival end of electrical regulating valve 4 and the pipeline of outlet end 10.When direct-operated regulator 1 or electrical 4 any failure of regulating valve, it can be closed and correspond to the first front and back shut-off valve 9 Or second shut-off valve 10, it is maintained, makes whole system that can replace and repair online, avoid because single failure is made It can not work at back-up system.
It will be apparent to those skilled in the art that technical solution that can be as described above and design, make various other Corresponding change and deformation, and all these changes and deformation should all belong to the protection domain of the claims in the present invention Within.

Claims (5)

1. the uninterrupted back-up system of air separation plant, which is characterized in that become including direct-operated regulator, pressure regulation device, pressure Send device, electrical regulating valve, control system, the gas incoming end after gasification and the gas output end after pressure regulation, gas incoming end Gas output end is connected to through direct-operated regulator with pipeline all the way, gas incoming end another way is connected with pipeline through electrical regulating valve It is connected on the pipeline between direct-operated regulator and pressure transmitter, pressure regulation device is connected to direct-operated regulator;Control System is electrically connected electrical regulating valve and pressure transmitter.
2. the uninterrupted back-up system of air separation plant according to claim 1, which is characterized in that the entrance of direct-operated regulator It is connected separately with the first shut-off valve on the pipeline of end and outlet end.
3. the uninterrupted back-up system of air separation plant according to claim 2, which is characterized in that the arrival end of electrical regulating valve With the second shut-off valve is connected separately on the pipeline of outlet end.
4. the uninterrupted back-up system of air separation plant according to claim 1, which is characterized in that electrical regulating valve has instrument One tracheae of outlet end of control system, direct-operated regulator connects blind controller system.
5. according to the uninterrupted back-up system of Claims 1 to 4 any one of them air separation plant, which is characterized in that control system For PLC system or DCS system.
CN201510546913.8A 2015-08-31 2015-08-31 The uninterrupted back-up system of air separation plant Active CN105043013B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510546913.8A CN105043013B (en) 2015-08-31 2015-08-31 The uninterrupted back-up system of air separation plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510546913.8A CN105043013B (en) 2015-08-31 2015-08-31 The uninterrupted back-up system of air separation plant

Publications (2)

Publication Number Publication Date
CN105043013A CN105043013A (en) 2015-11-11
CN105043013B true CN105043013B (en) 2018-09-28

Family

ID=54449763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510546913.8A Active CN105043013B (en) 2015-08-31 2015-08-31 The uninterrupted back-up system of air separation plant

Country Status (1)

Country Link
CN (1) CN105043013B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106989274B (en) * 2017-03-17 2023-03-31 湘西族兴科技有限公司 Automatic air supply system of air pressure balancing tank
US20200333070A1 (en) * 2017-12-26 2020-10-22 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude System and method for supplying backup production in air separation device
CN108954001A (en) * 2018-07-24 2018-12-07 杭州杭氧股份有限公司 A kind of zero gap air supply system of space division cluster to downstream process system
CN113898426A (en) * 2021-09-28 2022-01-07 广东韶钢松山股份有限公司 Hydrophobic flash tank

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006275436A (en) * 2005-03-30 2006-10-12 Taiyo Nippon Sanso Corp Seal gas or instrumentation air supply method and its device
CN203052202U (en) * 2013-01-30 2013-07-10 廊坊黎明气体有限公司 Continuous nitrogen supply device
CN203836598U (en) * 2014-05-09 2014-09-17 沈阳洪生气体有限公司 Safety hydrogen supply device
CN203857270U (en) * 2014-03-25 2014-10-01 重庆国际复合材料有限公司 Oxygen supply device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4886386B2 (en) * 2006-06-28 2012-02-29 大陽日酸株式会社 High pressure gas supply method
CN204569401U (en) * 2015-04-28 2015-08-19 正星科技有限公司 A kind of train charging machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006275436A (en) * 2005-03-30 2006-10-12 Taiyo Nippon Sanso Corp Seal gas or instrumentation air supply method and its device
CN203052202U (en) * 2013-01-30 2013-07-10 廊坊黎明气体有限公司 Continuous nitrogen supply device
CN203857270U (en) * 2014-03-25 2014-10-01 重庆国际复合材料有限公司 Oxygen supply device
CN203836598U (en) * 2014-05-09 2014-09-17 沈阳洪生气体有限公司 Safety hydrogen supply device

Also Published As

Publication number Publication date
CN105043013A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105043013B (en) The uninterrupted back-up system of air separation plant
CN203285493U (en) Steam turbine multi-steam source automatic switching control system
CN106014514A (en) Heat and power joint debugging control system and method
CN104989459A (en) Intelligent natural gas pipe network pressure energy power generating device and control method thereof
CN104153830A (en) Control method and control system for water feed pump turbine
CN103437400A (en) Pressure control system for water supply pipe network
JP2015151912A (en) Gas supply apparatus, power generation plant, and power generation plant control method
CN104712904A (en) Emergent LNG supply device
CN212510491U (en) Liquid carbon dioxide constant temperature gasification device for coal mine
CN203750996U (en) Turbid circulating water supply system for rolling mill in hot-rolling rod and wire production line
CN206535212U (en) Liquid ammonia evaporation system
RU2579301C1 (en) Turbo-expander control device
CN208669360U (en) A kind of power generator using pressure energy of natural gas
CN105013599B (en) Fired power generating unit coal pulverizer Load Regulation control system and method
CN103320569A (en) Oxygen pressure adjustment apparatus and adjustment method for electric furnace
CN102974015A (en) Medical oxygen supply device with automatic oxygen source switching function
CN106208087B (en) A kind of industrial enterprise's self power generation method for controlling power balance
CN206002939U (en) A kind of control device of 300MW unit boiler steam soot blowing
CN203791034U (en) Coal mill load adjusting and control system for thermal power generating unit
CN204459761U (en) LNG meets an urgent need air feeder
CN207227044U (en) A kind of hot method sea water desalination is accurately controlled into main body steam and interlocking protective system
CN212617637U (en) Pressure stabilizing system for gas supply pipeline of gas transmission station
CN204530859U (en) Nuclear power plant's emergency feedwater supply system flow control device
CN202430240U (en) Automatic startup control system for differential pressure power generation
CN111963901B (en) Control system for providing steam for PTA device without self-produced steam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 518000 Shenzhen center business building, Futian central street, Futian, Shenzhen, Guangdong 2114-2115, China, Futian District

Applicant after: SHENZHEN THRESHOLD INDUSTRIAL TECHNOLOGY CO.,LTD.

Address before: 518000 Guangdong city of Shenzhen province Futian District Tairan Industrial Zone Tairan cedar building B, 12B industry

Applicant before: SHENZHEN HAIGE JINGU CHEMICAL TECHNOLOGY CO.,LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 27-28, 7th floor, building 12, Shenzhen Bay science and technology ecological park, No. 18, South Keji Road, high tech community, Yuehai street, Nanshan District, Shenzhen, Guangdong 518000

Patentee after: Shenzhen Haige Jingu Industrial Technology Co.,Ltd.

Address before: 518000 Guangdong Shenzhen, Shenzhen Futian District Futian Street Central Business Center building 2114-2115

Patentee before: SHENZHEN THRESHOLD INDUSTRIAL TECHNOLOGY CO.,LTD.

CP03 Change of name, title or address