CN105042186B - Crude oil of offshore platform standpipe repairs more changing device and crude oil standpipe maintenance replacing options - Google Patents

Crude oil of offshore platform standpipe repairs more changing device and crude oil standpipe maintenance replacing options Download PDF

Info

Publication number
CN105042186B
CN105042186B CN201510386074.8A CN201510386074A CN105042186B CN 105042186 B CN105042186 B CN 105042186B CN 201510386074 A CN201510386074 A CN 201510386074A CN 105042186 B CN105042186 B CN 105042186B
Authority
CN
China
Prior art keywords
crude oil
standpipe
waterproof cabin
cabin
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510386074.8A
Other languages
Chinese (zh)
Other versions
CN105042186A (en
Inventor
王英
何杰
谢树军
叶冠群
林良柳
金伟
黄敢
吴星东
李春祥
张伟强
王冠
毛登峰
文凤娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNOOC Energy Technology and Services Ltd
CNOOC Energy Development of Equipment and Technology Co Ltd
CNOOC Energy Development of Equipment and Technology Co Ltd Zhanjiang Branch
Original Assignee
ZHANJIANG NANHAI WEST PETROLEUM HEZHONG OFFSHORE CONSTRUCTION CO Ltd
CNOOC Energy Technology and Services Ltd
CNOOC Energy Development of Equipment and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHANJIANG NANHAI WEST PETROLEUM HEZHONG OFFSHORE CONSTRUCTION CO Ltd, CNOOC Energy Technology and Services Ltd, CNOOC Energy Development of Equipment and Technology Co Ltd filed Critical ZHANJIANG NANHAI WEST PETROLEUM HEZHONG OFFSHORE CONSTRUCTION CO Ltd
Priority to CN201510386074.8A priority Critical patent/CN105042186B/en
Publication of CN105042186A publication Critical patent/CN105042186A/en
Application granted granted Critical
Publication of CN105042186B publication Critical patent/CN105042186B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/26Repairing or joining pipes on or under water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of new crude oil of offshore platform standpipe maintenance more changing device, including waterproof cabin and the connection component of some groups of connection waterproof cabins and offshore platform spud leg, the bottom of the waterproof cabin are provided with a through hole run through for crude oil standpipe;Also include seal, the seal includes the rubber seal cylinder and rubber seal frustum set gradually, and the diameter of the upper bottom surface of the rubber seal frustum is less than the diameter of bottom surface;The rubber seal cylinder connects with the less upper bottom surface of the diameter of rubber seal frustum, and the seal is provided with through the inner chamber of axial both ends of the surface;The bottom surface of the rubber seal frustum is connected with through hole.The present invention also provides a kind of maintenance replacing options of crude oil of offshore platform standpipe.New crude oil of offshore platform standpipe maintenance more changing device of the present invention, can make with seawater to isolate inside waterproof cabin, prevent waterproof cabin from intaking;Below waterproof cabin and when being fixedly mounted, construction safety that is easy to operate and can guarantee that staff.

Description

Crude oil of offshore platform standpipe repairs more changing device and crude oil standpipe maintenance replacing options
Technical field
The present invention relates to the maintenance field of crude oil standpipe, more particularly to a kind of new crude oil of offshore platform standpipe maintenance is changed The maintenance replacing options of device and crude oil standpipe.
Background technology
The existing maintenance replacing technology of crude oil of offshore platform standpipe is divided into maintenance waterborne according to damage location difference and changes skill Art and underwater maintenance change technology, and above water standpipe maintenance replacing is cut replacing crude oil using conventional method more than the water surface and stood Pipe, can only repair the standpipe section more than water surface.The maintenance of underwater portion standpipe is changed, and is tieed up using a kind of crude oil of offshore platform standpipe Repair the maintenance replacing that device carries out crude oil standpipe;Above-mentioned maintenance unit includes:Waterproof cabin, waterproof cabin are the cavity volume of an opening upwards Structure, its bottom are provided with a through hole run through for crude oil standpipe;Suction pump, it is connected to waterproof cabin bottom by pipeline and extracts cabin Interior ponding discharge is out of my cabin;Connection component, connect waterproof cabin and offshore platform spud leg.But also there is following ask in this maintenance unit Topic:1st, after being drawn water inside waterproof cabin, sealing effectiveness is not that might have seawater entrance very well;2nd, by waterproof cabin be put into seawater and The operation inconvenience of fixation procedure, and have potential safety hazard;3rd, waterproof cabin sealed bottom needs diver's underwater operation, by weather wave Influence big.
The content of the invention
The invention aims to overcome the deficiencies in the prior art, there is provided a kind of new crude oil of offshore platform standpipe maintenance is more Changing device, it can make with seawater to isolate inside waterproof cabin, prevent waterproof cabin from intaking.
Another object of the present invention is to provide for a kind of maintenance replacing options of crude oil of offshore platform standpipe.
In order to achieve the above object, the present invention uses following technical scheme:
A kind of new crude oil of offshore platform standpipe maintenance more changing device, including waterproof cabin and some groups of connection waterproof cabins and sea The connection component of upper mounting plate spud leg, the bottom of the waterproof cabin are provided with a through hole run through for crude oil standpipe;Also include seal, The seal includes the rubber seal cylinder and rubber seal frustum that set gradually, the upper bottom surface of the rubber seal frustum it is straight Footpath is less than the diameter of bottom surface;The rubber seal cylinder connects with the upper bottom surface of rubber seal frustum, and the seal is provided with and passed through Wear the inner chamber of rubber seal cylinder, rubber seal frustum and axial both ends of the surface;The bottom surface of the rubber seal frustum connects with through hole Connect.
Preferably, the connection component includes two arc pipe clamps, for waterproof cabin to be fixed on into offshore platform spud leg Steel wire rope and shackle;Described two arc pipe clamps connect waterproof cabin, and one end of the steel wire rope is arranged on the first arc pipe clamp On, the other end of the steel wire rope is provided with the shackle.
Preferably, also including hanging component, the component that hangs includes hand hoist and chain sling;The first of the chain sling End connects with arc pipe clamp, and the second end and the hand hoist of the chain sling coordinate.
Preferably, be also easy to the temporary structure for hanging waterproof cabin to float platform including one, the temporary structure stand that floats is located at On offshore platform spud leg, the temporary structure platform that floats corresponds to crude oil standpipe and surrounds mouth provided with an indent, and the indent surrounds mouth bag Enclose crude oil standpipe.
Preferably, the position that the rubber seal frustum connects with rubber seal cylinder is the first circular hole, first circle A diameter of 560mm in hole;The bottom surface opening of the rubber seal frustum is the second circular hole, second circular hole it is a diameter of 800mm。
Preferably, the edge of the bottom surface opening of the rubber seal frustum encloses the caulking gum for water proof provided with one Piece.
Preferably, the making material of the rubber seal frustum and rubber seal cylinder be IR fiber cloth make it is compound Strengthen rubber.
It is the main nacelle, secondary preferably, the waterproof cabin includes the main nacelle, secondary nacelle and the manger board that are sequentially connected Nacelle forms by two symmetrical half nacelles or whole cabin.
A kind of maintenance replacing options of crude oil of offshore platform standpipe, comprise the following steps:
Step 1:The position that based on crude standpipe needs to safeguard or change determines the design parameter of waterproof cabin;
Step 2:Waterproof cabin is made according to above-mentioned design parameter, the outside wall surface for being included in waterproof cabin sets connection component;Every Water tank manufacturing process is divided to two kinds of processing modes:1st, waterproof cabin is applied to crude oil standpipe cut-off before waterproof cabin decentralization, water proof The main nacelle in cabin, secondary nacelle form by whole cabin, and seal is directly installed on the through hole of waterproof cabin bottom;2nd, waterproof cabin is applied to The crude oil standpipe that is not cut off before waterproof cabin decentralization, the main nacelle of waterproof cabin, secondary nacelle form by half nacelle, the water surface with On crude oil standpipe on the outside of shaping one seal, then by waterproof cabin be arranged on outside set outside the crude oil standpipe of seal, Seal is now fixed on to the through hole of waterproof cabin bottom again;
Step 3:Water ballast is injected in waterproof cabin, now the water surface is higher than the seawater water surface in cabin;Staff is by waterproof cabin It is put under water along the float transportation route of platform of temporary structure;
Step 4:The crude oil standpipe position that water need to extremely be changed under waterproof cabin;According to step 2, now in two kinds of situation Carry out:1st, waterproof cabin is applied to crude oil standpipe cut-off before waterproof cabin decentralization, and waterproof cabin is transferred to crude oil standpipe and is cut The port gone out, crude oil standpipe enter seal through the through hole of waterproof cabin bottom from bottom to top;2nd, waterproof cabin is applied to waterproof cabin The crude oil standpipe being not cut off before decentralization, waterproof cabin are displaced downwardly to the position that crude oil standpipe need to be changed;
Step 5:Waterproof cabin is fixedly mounted on offshore platform spud leg;
Step 6:Start suction pump to extract the water in waterproof cabin out;
Step 7:Safeguard or change crude oil standpipe.
Preferably,
Step 2:The connection component includes two arc pipe clamps, and described two arc pipe clamps connect waterproof cabin;
Waterproof cabin is put under water by staff along the float transportation route of platform of temporary structure in step 3, and concrete mode is: The first end of one chain sling is connected with arc pipe clamp, the second end of each chain sling connects a chain block, then staff By controlling chain sling to be put into waterproof cabin under water.
Preferably,
Step 2:The connection component includes two arc pipe clamps, for waterproof cabin to be fixed on into offshore platform spud leg Steel wire rope and shackle;Described two arc pipe clamps connect waterproof cabin, and one end of the steel wire rope is arranged on the first arc pipe clamp, The other end of the steel wire rope is provided with the shackle;
Step 5 is specially:Waterproof cabin is close to offshore platform spud leg, and steel wire rope is taken up and at sea on platform leg and led to Shackle is crossed to interfix with the second arc pipe clamp.
Compared with prior art, the invention has the advantages that:
By setting seal, water proof cavity space is kept apart with seawater, prevents there is seawater entrance inside waterproof cabin;It is logical The connection component of steel wire rope, arc pipe clamp and shackle composition is crossed, makes the operation of the fixation procedure of waterproof cabin more convenient;Steel wire Rope, flexible material, pulling force is big, and weight is light, easy to operate and do not limited by confining space, tighten up and loosen all easily, every Optional position in water tank decentralization process can tighten up steel wire rope and fix waterproof cabin;Waterproof cabin is transferred and waterproof cabin is close under water Envelope operation all can complete these work on the water without water operation under diver, personnel, can guarantee that the construction peace of staff Entirely.Setting hangs component, controls the decentralization and lifting of waterproof cabin, operates easily and quick.By above-mentioned steps, ensure former The job safety for being smoothed out and ensureing staff that oily standpipe is changed.
Brief description of the drawings
Fig. 1 is the structural representation of new crude oil of offshore platform standpipe maintenance more changing device of the present invention;
Fig. 2 is the structural representation of seal of the present invention;
Fig. 3 is the structural representation that seal of the present invention omits rubber seal cylinder;
Fig. 4 is that temporary structure of the present invention floats the structural representation of platform.
In figure:
1-waterproof cabin;2-seal;21-rubber seal frustum;211-upper bottom surface;212-bottom surface;22-rubber Sealing drum;31-arc pipe clamp;32-steel wire rope;41-chain sling;42-hand hoist;5-temporary structure floats platform;51-indent Surround mouth;52-work top;6-crude oil standpipe.
Embodiment
In conjunction with accompanying drawing, the invention will be further described with specific embodiment, in the exemplary embodiment and description of the present invention For explaining the present invention, but it is not as a limitation of the invention.
Referring to Fig. 1, repair more changing device for a kind of new crude oil of offshore platform standpipe of the present invention.Including water proof The connection component and seal 2 in cabin 1, some groups of connection waterproof cabins 1 and offshore platform spud leg.
Waterproof cabin 1 is the holding cavity structure of an opening upwards, and its bottom is provided with a through hole run through for crude oil standpipe 6.It is corresponding Waterproof cabin 1 is configured with suction pump, and suction pump is connected to the bottom of waterproof cabin 1 by pipeline, from the bottom of waterproof cabin 1 by waterproof cabin 1 Ponding is extracted out out of my cabin.Waterproof cabin 1 includes main nacelle, secondary nacelle and the manger board being sequentially connected.By the quantity for increasing and decreasing time nacelle The different design height of water proof can be realized.Main nacelle, secondary nacelle form by two symmetrical half nacelles or whole cabin.Such as in water proof Crude oil standpipe 6 is cut off on the water before water under cabin, and main nacelle, secondary nacelle form by whole cabin;The crude oil such as before water under waterproof cabin What standpipe 6 was not cut off, main nacelle, secondary nacelle form by two hemihedrism nacelles.Symmetrical half nacelle passes through rotatable pin Axle can realize opening closure, pass through hasp quick locking.The hasp is made up of stainless steel, and shape is constructed using itself Into chucking power pre- quick locking carried out to two halves waterproof cabin 1 and opened soon, quick locking two halves water proof when being closed for waterproof cabin 1 Cabin 1.When waterproof cabin 1 closes, in closing seam face, two halves waterproof cabin 1 is provided with sealing column, by sealing column by two halves waterproof cabin 1 Clearance seal get up, prevent leak.To strengthen sealing, caulking gum is additionally provided between sealing column.In addition, waterproof cabin 1 Inwall is provided with cat ladder, and cat ladder is close to the wall firm welding of waterproof cabin 1, and waterproof cabin 1 is passed in and out for staff;Also set in waterproof cabin 1 Dangerous gas detector, underwater illuminating device and camera device.Set the safety such as detector for hazardous gas, fire extinguisher attached simultaneously Part.
Referring to Fig. 1, connection component includes two symmetrical arc pipe clamps 31, at sea put down for waterproof cabin 1 to be fixed The steel wire rope 32 of platform spud leg and shackle, two symmetrical arc pipe clamps 31 are securedly mounted on the wallboard of waterproof cabin 1 (two curved pipes Card 31 is separately positioned on the outside wall surfaces of two halves nacelle and at the closure of two halves nacelles), one end of steel wire rope 32 is fixed on the On one arc pipe clamp 31, the other end installation shackle of steel wire rope 32.
When connection component fastens, larger tension is produced at the closing seam face by offshore platform spud leg of waterproof cabin 1 And torque, i.e. closing seam face can be due to tension, and sealing is destroyed.In order to prevent sealing to be destroyed, every The position that water tank 1 is connected with connection component is provided with equalizer bar, and two arc pipe clamps 31 are tightly fixed together by equalizer bar, balance Tension and torque, ensure that closing seam face is closed, do not intake in waterproof cabin 1.
Fig. 2 and Fig. 3 is referred to, seal 2 includes the rubber seal cylinder 22 and rubber seal frustum 21 set gradually, rubber Sealing drum 22 and rubber seal frustum 21 are integral, and the diameter of the upper bottom surface 211 of rubber seal frustum 21 is less than bottom surface 212 Diameter, rubber seal cylinder 22 connects with the upper bottom surface 211 of rubber seal frustum 21;Seal 2, which is provided with, runs through rubber seal cylinder 22nd, the inner chamber of rubber seal frustum 21 and axial both ends of the surface, inner chamber corresponding to caulking gum cylinder 22 are cylindrical type, and rubber seal is bored Inner chamber corresponding to platform 21 is frustum type.Seal 2 enters inside waterproof cabin 1 for preventing and treating seawater.Rubber seal frustum 21 and rubber The position that glue sealing drum 22 connects is the first circular hole, and a diameter of 560mm of the first circular hole is (according to various sizes of crude oil standpipe 6 Or the difference of different platform surrounding ambient, size can be different), the bottom surface 212 of rubber seal frustum 21 is open For the second circular hole, a diameter of 800mm of the second circular hole is (according to various sizes of crude oil standpipe 6 or different platform surrounding environment The difference in space, size can be different).The open edge of the bottom surface 212 of rubber seal frustum 21 be provided with one enclose be used for every The caulking gum piece of water.The making material of rubber seal frustum 21 and rubber seal cylinder 22 is what the materials such as IR fiber cloth were made Composite strengthening rubber.
Rubber seal frustum 21 and rubber seal cylinder 22 are inside waterproof cabin 1, the bottom surface 212 of rubber seal frustum 21 It is connected with the through hole of waterproof cabin bottom.Caulking gum piece can be by rubber seal frustum 21 and rubber seal cylinder 22 and waterproof cabin bottom The through hole in portion enters to be sealed with row, prevents seawater from entering in waterproof cabin.
Referring to Fig. 4, hanging waterproof cabin 1 for convenience, in addition to hang component, hang component include hand hoist 42 and Chain sling 41.The first end of chain sling 41 connects with arc pipe clamp, and the second end and the hand hoist 42 of chain sling 41 coordinate.
At sea set up temporary structure on the outside of platform leg to float platform 5, temporary structure floats the corresponding crude oil standpipe 6 of platform 5 provided with one Indent surrounds mouth 51, and indent surrounds the encirclement crude oil of mouth 51 standpipe 6, and (before decentralization waterproof cabin, waterproof cabin 1 is placed in indent and surrounds mouth 51 In, staff surrounds the side of mouth 51 control decentralization waterproof cabin in indent), it is work top 52 that indent, which surrounds the side of mouth 51,.Face When the structure platform 5 that floats be easy to control waterproof cabin 1 to slide into water posture, staff can float the work top of platform 5 in temporary structure The decentralization of waterproof cabin 1 is controlled on 52.
Using above-mentioned new crude oil of offshore platform standpipe maintenance more changing device, crude oil of offshore platform standpipe of the present invention Maintenance replacing options step it is as follows:
Step 1:Based on crude standpipe 6 needs to safeguard or the depth of the position of replacing setting waterproof cabin 1.Apply at investigation sea Work working condition, determine the design parameter of waterproof cabin 1.Waterproof cabin 1 includes main nacelle, secondary nacelle and manger board.The number of secondary nacelle Amount is more than or equal to one.By adjusting the quantity of time nacelle, it can increase or reduce the projected depth of waterproof cabin 1.It is determined that After projected depth, the quantity in closing seam face, hasp and the connection component of waterproof cabin 1 is determined according to the size of waterproof cabin 1.
Step 2:Waterproof cabin is made according to above-mentioned parameter.In waterproof cabin manufacturing process, it is divided to two kinds of processing modes:1st, water proof Cabin is applied to crude oil standpipe 6 cut-off before waterproof cabin decentralization, and the main nacelle of waterproof cabin, secondary nacelle form by whole cabin, close Sealing first installs the through hole of waterproof cabin bottom;2nd, waterproof cabin is applied to the crude oil standpipe 6 being not cut off before waterproof cabin decentralization, every The main nacelle of water tank, secondary nacelle form by half nacelle, and the crude oil standpipe 6 more than the water surface wraps around a circle composite strengthening rubber Glue and situ vulcanized formation seal, half nacelle of waterproof cabin is then enclosed in outside the crude oil standpipe 6 of seal has been set Outside and closure is locked, seal is now fixed on to the through hole of waterproof cabin bottom again.Therefore, waterproof cabin sealed bottom does not need work Make personnel's underwater operation, avoid Renewal process from being influenceed by weather wave, also ensure that the safety of whole work progress.
Step 3:Water ballast is injected in waterproof cabin (now the water surface is higher than the seawater water surface in cabin).The first end of chain sling 41 Hook on arc pipe clamp (arc pipe clamp is correspondingly provided with hole position), the second end of each chain sling 41 connects a chain block 42.Work Make personnel by controlling the second end of chain sling 41, waterproof cabin 1 is put under water along the float transportation route of platform 5 of temporary structure.If (not Chain sling 41 and chain block 42 are set, can be put into waterproof cabin 1 under water using existing mode)
Step 4:The crude oil standpipe position that 1 time water of waterproof cabin need to extremely be changed;According to step 2, two kinds of feelings of this time-division Condition is carried out:1st, waterproof cabin is applied to crude oil standpipe 6 cut-off before waterproof cabin decentralization, and waterproof cabin transfers to the quilt of crude oil standpipe 6 During the port cut out, crude oil standpipe 6 enters seal through the through hole of waterproof cabin bottom from bottom to top.2nd, waterproof cabin is applied to The crude oil standpipe 6 being not cut off before waterproof cabin decentralization, because crude oil standpipe 6 has moved down in the inside of waterproof cabin, waterproof cabin The position that need to be changed to crude oil standpipe 6.
Step 5:Waterproof cabin 1 is close to offshore platform spud leg, and steel wire rope 32 is taken up at sea on platform leg and by unloading Button interfixes with the second arc pipe clamp, and now waterproof cabin 1 is fastened on offshore platform spud leg;When needing to remove, it is only necessary to will Shackle is tripped.(if the connection component that crude oil of offshore platform standpipe maintenance more changing device is set is not by arc pipe clamp 31, steel Cord 32 and shackle composition, then fixed waterproof cabin using mode corresponding with the connection component of actual setting)
Step 6:Start suction pump to extract the water in waterproof cabin 1 out.
Step 7:Safeguard or change crude oil standpipe 6.Crude oil standpipe 6 includes inner and outer tubes.Remove in crude oil standpipe 6 Combustion gas, the inner tube of crude oil standpipe 6 is cut using cold work, and keep divulging information in waterproof cabin 1.At the outer tube of crude oil standpipe 6 position to be cut Nearby left and right respectively tightens 1 clip, and clip outer rim respectively welds 1 hanger.Hanger is connected with shackle using guide chain, steel cable, is prevented Standpipe cuts open rear submerged riser under Gravitative Loads toward tenesmus.It is curved with the lower end outer tube of gas flame cuttiug bending section crude oil standpipe 6, top The crude oil standpipe 6 of song deformation is hung away after winding suspender belt using hoist engine.Bending section standpipe Cutting Length is measured, cuts equal length Double-deck seamless steel pipe, inner and outer pipe both ends prepare groove.By the outer tube of crude oil standpipe 6 of replacing from the right and left and upper lower standing tube Outer tube group to, welding, ultrasonic inspection, weld bond touch-up paint and 3PE anti-corrosions.
The part-structure feature of new crude oil of offshore platform standpipe maintenance more changing device of the present invention:
Rubber seal frustum 21 and rubber seal cylinder 22:Be enclosed on the outside of crude oil standpipe 6, by water proof cavity space and seawater every Leave.
The flexible material of steel wire rope 32, pulling force is big, and weight is light, easy to operate and do not limited by confining space, tightens up and puts Pine is all easy, and the optional position in the decentralization process of waterproof cabin 1 can tighten up steel wire rope 32 and fix waterproof cabin 1.Also can guarantee that The construction safety of staff.
New crude oil of offshore platform standpipe maintenance more changing device of the present invention, can make the inside of waterproof cabin 1 and seawater every From preventing waterproof cabin 1 from intaking;When the lower section of waterproof cabin 1 and fixed installation, construction peace that is easy to operate and can guarantee that staff Entirely.What crude oil standpipe maintenance replacing options guarantee crude oil standpipe of the present invention was changed is smoothed out and ensures staff Job safety.
The invention is not limited in above-mentioned embodiment, if not departing from the present invention to the various changes or modifications of the present invention Spirit and scope, if these changes and modification belong within the scope of the claim and equivalent technologies of the present invention, then this hair It is bright to be also intended to comprising these changes and change.

Claims (10)

1. a kind of crude oil of offshore platform standpipe repairs more changing device, including waterproof cabin and some groups of connection waterproof cabins and offshore platform The connection component of spud leg, the bottom of the waterproof cabin are provided with a through hole run through for crude oil standpipe;Characterized in that,
Also include seal, the seal includes the rubber seal cylinder and rubber seal frustum set gradually, and the rubber is close The diameter for sealing the upper bottom surface of frustum is less than the diameter of bottom surface;The upper bottom surface phase of the rubber seal cylinder and rubber seal frustum Connect, the seal is provided with through the inner chamber of rubber seal cylinder, rubber seal frustum and axial both ends of the surface;The rubber seal cone The bottom surface of platform is connected with through hole;
The connection component includes two arc pipe clamps, the steel wire rope for waterproof cabin to be fixed on to offshore platform spud leg and unloaded Button;Described two arc pipe clamps connect waterproof cabin, and one end of the steel wire rope is arranged on the first arc pipe clamp, the steel wire rope The other end be provided with the shackle.
2. crude oil of offshore platform standpipe according to claim 1 repairs more changing device, it is characterised in that also includes hanging group Part, the component that hangs include hand hoist and chain sling;The first end of the chain sling connects with arc pipe clamp, and the of the chain sling Two ends coordinate with hand hoist.
3. the crude oil of offshore platform standpipe maintenance more changing device according to claim 1 to 2 any claim, its feature exist In, in addition to one be easy to the temporary structure for hanging waterproof cabin to float platform, and the temporary structure stand that floats is located on offshore platform spud leg, The temporary structure platform that floats corresponds to crude oil standpipe and surrounds mouth provided with an indent, and the indent surrounds mouth and surrounds crude oil standpipe.
4. crude oil of offshore platform standpipe according to claim 1 repairs more changing device, it is characterised in that the rubber seal The position that frustum connects with rubber seal cylinder is the first circular hole, a diameter of 560mm of first circular hole;The rubber seal cone The bottom surface opening of platform is the second circular hole, a diameter of 800mm of second circular hole.
5. the crude oil of offshore platform standpipe maintenance more changing device according to claim 1 or 4, it is characterised in that the rubber The edge of the bottom surface opening of sealing frustum encloses the caulking gum piece for water proof provided with one.
6. crude oil of offshore platform standpipe according to claim 1 repairs more changing device, it is characterised in that the rubber seal The making material of frustum and rubber seal cylinder is the composite strengthening rubber that IR fiber cloth is made.
7. crude oil of offshore platform standpipe according to claim 1 repairs more changing device, it is characterised in that the waterproof cabin bag The main nacelle being sequentially connected, secondary nacelle and manger board are included, the main nacelle, secondary nacelle are by two symmetrical half nacelles or whole cabin group Into.
8. a kind of maintenance replacing options of crude oil of offshore platform standpipe, it is characterised in that comprise the following steps:
Step 1:The position that based on crude standpipe needs to safeguard or change determines the design parameter of waterproof cabin;
Step 2:Waterproof cabin is made according to above-mentioned design parameter, the outside wall surface for being included in waterproof cabin sets connection component;Waterproof cabin Manufacturing process is divided to two kinds of processing modes:1st, waterproof cabin is applied to crude oil standpipe cut-off before waterproof cabin decentralization, waterproof cabin Main nacelle, secondary nacelle form by whole cabin, and seal is directly installed on the through hole of waterproof cabin bottom;2nd, waterproof cabin is applied to water proof The crude oil standpipe being not cut off before the decentralization of cabin, the main nacelle of waterproof cabin, secondary nacelle form by half nacelle, more than the water surface One seal of shaping on the outside of crude oil standpipe, waterproof cabin is then arranged on outside and set outside the crude oil standpipe of seal, now Seal is fixed on to the through hole of waterproof cabin bottom again;
Step 3:Water ballast is injected in waterproof cabin, now the water surface is higher than the seawater water surface in cabin;Staff faces waterproof cabin edge When the float transportation route of platform of structure be put under water;
Step 4:The crude oil standpipe position that water need to extremely be changed under waterproof cabin;According to step 2, now enter in two kinds of situation OK:1st, waterproof cabin is applied to crude oil standpipe cut-off before waterproof cabin decentralization, and waterproof cabin is transferred to crude oil standpipe and is cut to Port, crude oil standpipe enters seal through the through hole of waterproof cabin bottom from bottom to top;2nd, waterproof cabin is applied under waterproof cabin The crude oil standpipe being not cut off before putting, waterproof cabin are displaced downwardly to the position that crude oil standpipe need to be changed;
Step 5:Waterproof cabin is fixedly mounted on offshore platform spud leg;
Step 6:Start suction pump to extract the water in waterproof cabin out;
Step 7:Safeguard or change crude oil standpipe.
9. the maintenance replacing options of crude oil of offshore platform standpipe according to claim 8, it is characterised in that
Step 2:The connection component includes two arc pipe clamps, and described two arc pipe clamps connect waterproof cabin;
Waterproof cabin is put under water by staff along the float transportation route of platform of temporary structure in step 3, and concrete mode is:By one The first end of chain sling is connected with arc pipe clamp, and the second end of each chain sling connects a chain block, and then staff passes through Waterproof cabin is put under water by control chain sling.
10. the maintenance replacing options of the crude oil of offshore platform standpipe according to any claim of claim 8 or 9, it is special Sign is,
Step 2:The connection component includes two arc pipe clamps, the steel wire for waterproof cabin to be fixed on to offshore platform spud leg Rope and shackle;Described two arc pipe clamps connect waterproof cabin, and one end of the steel wire rope is arranged on the first arc pipe clamp, described The other end of steel wire rope is provided with the shackle;
Step 5 is specially:Waterproof cabin is close to offshore platform spud leg, steel wire rope is taken up at sea on platform leg and by unloading Button interfixes with the second arc pipe clamp.
CN201510386074.8A 2015-06-30 2015-06-30 Crude oil of offshore platform standpipe repairs more changing device and crude oil standpipe maintenance replacing options Active CN105042186B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510386074.8A CN105042186B (en) 2015-06-30 2015-06-30 Crude oil of offshore platform standpipe repairs more changing device and crude oil standpipe maintenance replacing options

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510386074.8A CN105042186B (en) 2015-06-30 2015-06-30 Crude oil of offshore platform standpipe repairs more changing device and crude oil standpipe maintenance replacing options

Publications (2)

Publication Number Publication Date
CN105042186A CN105042186A (en) 2015-11-11
CN105042186B true CN105042186B (en) 2017-11-24

Family

ID=54448986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510386074.8A Active CN105042186B (en) 2015-06-30 2015-06-30 Crude oil of offshore platform standpipe repairs more changing device and crude oil standpipe maintenance replacing options

Country Status (1)

Country Link
CN (1) CN105042186B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109990139A (en) * 2019-04-17 2019-07-09 海洋石油工程股份有限公司 A method of it is replaced applied to crude oil of offshore platform standpipe

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1986006121A1 (en) * 1985-04-11 1986-10-23 Maple Engineering Projects Limited Apparatus for maintenance of oil rig legs
US5324140A (en) * 1991-03-18 1994-06-28 Lopez Jose De Jesus F S Flexible submersible compartment
CN1533861A (en) * 2003-03-27 2004-10-06 本溪市自来水总公司 Device used in welding pipeline under water
CN102133692A (en) * 2010-01-21 2011-07-27 中国石油天然气集团公司 Floating butt-welding device for submarine pipeline
CN104006216A (en) * 2013-02-27 2014-08-27 中国海洋石油总公司 Offshore platform crude oil riser maintenance and replacement method and device
CN204785056U (en) * 2015-06-30 2015-11-18 中国海洋石油总公司 Device is changed in maintenance of offshore platform crude oil riser

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1986006121A1 (en) * 1985-04-11 1986-10-23 Maple Engineering Projects Limited Apparatus for maintenance of oil rig legs
US5324140A (en) * 1991-03-18 1994-06-28 Lopez Jose De Jesus F S Flexible submersible compartment
CN1533861A (en) * 2003-03-27 2004-10-06 本溪市自来水总公司 Device used in welding pipeline under water
CN102133692A (en) * 2010-01-21 2011-07-27 中国石油天然气集团公司 Floating butt-welding device for submarine pipeline
CN104006216A (en) * 2013-02-27 2014-08-27 中国海洋石油总公司 Offshore platform crude oil riser maintenance and replacement method and device
CN204785056U (en) * 2015-06-30 2015-11-18 中国海洋石油总公司 Device is changed in maintenance of offshore platform crude oil riser

Also Published As

Publication number Publication date
CN105042186A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105987253B (en) Oil-gas pipeline method for blocking
CN107815969A (en) A kind of filled-type epoxy coating strand drag-line construction technology
CN105909865A (en) Underwater air bag balance submarine pipeline repairing device and method thereof
CN108612910B (en) Construction method for installing T-shaped nodular cast iron pipe
NO147689B (en) DEVICE FOR RAISING A PIPE PIPE LAYING ON DEEP WATER
CN206693980U (en) Oil pipe antifouling flow controller
CN104477755B (en) Method for rapidly hoisting suspended type vertical vessel
CN106365036B (en) Submarine pipeline briquetting discharges Combined hanging rack
WO2021232479A1 (en) Underwater repairing method for large-diameter hdpe pipeline
CN105042186B (en) Crude oil of offshore platform standpipe repairs more changing device and crude oil standpipe maintenance replacing options
CN104006216B (en) A kind of crude oil of offshore platform standpipe maintain and replace method and apparatus
CN204785056U (en) Device is changed in maintenance of offshore platform crude oil riser
CN105735222B (en) A kind of seawater column and self-elevating drilling platform for self-elevating drilling platform
KR101705379B1 (en) Moon Pool Hoses Suspension Structure for Drilling Ship
CN203273003U (en) Maintenance and replacement device for crude oil vertical pipe of offshore platform
CN115162999B (en) Large-diameter continuous gas production pipe column throwing construction method
CN104947637B (en) Blocking sluice gate of diversion tunnel detecting system and detection method
CN211521339U (en) Hoisting device for hanging and releasing steel wire rope
CN207178576U (en) Cable wire end locking and connecting device
CN208269756U (en) A kind of quick-fried means for loading of emulsion deep water brill
CN203383751U (en) Toppling type hydraulic lifting spraying-resistant device
JP3099815U (en) Jig for leak test of drain pipe
CN217618581U (en) Closed floating bin with emergency function
CN107176273B (en) Using method of rubber buoy for sunken ship salvage
CN215289776U (en) Winch traction installation prefabricated pipe culvert device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20170216

Address after: 100027 Beijing city Dongcheng District Dongzhimen Street No. 6

Applicant after: CNOOC Energy Technology Co., Ltd.

Applicant after: Energy development equipment technology Co., Ltd of CNOOC

Applicant after: Zhanjiang Nanhai West Petroleum Hezhong Offshore Construction Co., Ltd.

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant before: China National Offshore Oil Corporation

Applicant before: CNOOC Energy Technology Co., Ltd.

Applicant before: Zhanjiang Nanhai West Petroleum Hezhong Offshore Construction Co., Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200529

Address after: 100027, No. 6, east side street, Dongcheng District, Beijing

Co-patentee after: CNOOC ENERGY DEVELOPMENT EQUIPMENT TECHNOLOGY Co.,Ltd.

Patentee after: CNOOC ENERGY TECHNOLOGY & SERVICES Ltd.

Co-patentee after: Zhanjiang Branch of CNOOC energy development equipment Technology Co.,Ltd.

Address before: 100027, No. 6, east side street, Dongcheng District, Beijing

Co-patentee before: CNOOC ENERGY DEVELOPMENT EQUIPMENT TECHNOLOGY Co.,Ltd.