CN105042183A - 一种穿过河流超长管道的安装方法 - Google Patents

一种穿过河流超长管道的安装方法 Download PDF

Info

Publication number
CN105042183A
CN105042183A CN201510396435.7A CN201510396435A CN105042183A CN 105042183 A CN105042183 A CN 105042183A CN 201510396435 A CN201510396435 A CN 201510396435A CN 105042183 A CN105042183 A CN 105042183A
Authority
CN
China
Prior art keywords
river
seamless tube
winch
weldless tube
super
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510396435.7A
Other languages
English (en)
Inventor
王正先
胡海泉
丁守明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510396435.7A priority Critical patent/CN105042183A/zh
Publication of CN105042183A publication Critical patent/CN105042183A/zh
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

一种穿过河流超长管道的安装方法,首先取直径为500-800mm的经过防腐处理的无缝管,将无缝管的一端通过端板封闭,另一端安装阀门;无缝管与卷扬机分别置于河流两侧,卷扬机通过绳索连接无缝管封闭的一端,通过卷扬机将无缝管牵引至卷扬机所在的河流一侧;接着通过阀门向无缝管内注满水,关闭阀门使其自然下沉;最后,固定无缝管露出底面部分,防止因水位变化而导致无缝管自由上漂;抽出无缝管内的水即可完成穿过河流超长管道的安装。本发明的穿过河流超长管道的安装方法,利用牵引法及注水法使管道安装至河底,简单、实用、低成本,无需等待停水即可施工,充分保证施工周期。

Description

一种穿过河流超长管道的安装方法
技术领域
本发明涉及一种管道的安装方法,具体是涉及一种穿过河流超长管道的安装方法。
背景技术
目前,大部分穿过河流的管道安装,必须在停水时才能进行施工,施工周期长,施工成本高。
发明内容
针对现有技术中存在的技术问题,本发明的目的在于提供一种方法简单的穿过河流超长管道的安装方法。
为了实现上述目的,本发明所采用的技术方案为:一种穿过河流超长管道的安装方法,首先取直径为500-800mm的经过防腐处理的无缝管,将无缝管的一端通过端板封闭,另一端安装阀门;无缝管与卷扬机分别置于河流两侧,卷扬机通过绳索连接无缝管封闭的一端,通过卷扬机将无缝管牵引至卷扬机所在的河流一侧;接着通过阀门向无缝管内注满水,关闭阀门使其自然下沉;最后,固定无缝管露出底面部分,防止因水位变化而导致无缝管自由上漂;抽出无缝管内的水即可完成穿过河流超长管道的安装。
本发明的穿过河流超长管道的安装方法,利用牵引法及注水法使管道安装至河底,简单、实用、低成本,无需等待停水即可施工,充分保证施工周期。
附图说明
图1为本发明的结构示意图。
具体实施方式
为进一步描述本发明的穿过河流超长管道的安装方法,下面结合附图对其作进一步详细说明。
如图1所示,一种穿过河流超长管道的安装方法,首先取直径为500-800mm的经过防腐处理的无缝管2(根据河流的宽度及深度情况制作),将无缝管2的一端通过端板4封闭,另一端安装阀门1;无缝管2与卷扬机5分别置于河流3两侧,卷扬机5通过绳索连接无缝管2封闭的一端,通过卷扬机5将无缝管2牵引至卷扬机5所在的河流一侧;接着通过阀门1向无缝管2内注满水,关闭阀门使其自然下沉;最后,固定无缝管2露出底面部分,防止因水位变化而导致无缝管2自由上漂;抽出无缝管2内的水即可完成穿过河流超长管道的安装。
以上内容仅仅是对本发明的构思所作的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明的构思或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。

Claims (1)

1.一种穿过河流超长管道的安装方法,其特征在于:首先取直径为500-800mm的经过防腐处理的无缝管(2),将无缝管(2)的一端通过端板(4)封闭,另一端安装阀门(1);无缝管(2)与卷扬机(5)分别置于河流(3)两侧,卷扬机(5)通过绳索连接无缝管(2)封闭的一端,通过卷扬机(5)将无缝管(2)牵引至卷扬机(5)所在的河流一侧;接着通过阀门(1)向无缝管(2)内注满水,关闭阀门使其自然下沉;最后,固定无缝管(2)露出底面部分,防止因水位变化而导致无缝管(2)自由上漂;抽出无缝管(2)内的水即可完成穿过河流超长管道的安装。
CN201510396435.7A 2015-07-08 2015-07-08 一种穿过河流超长管道的安装方法 Pending CN105042183A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510396435.7A CN105042183A (zh) 2015-07-08 2015-07-08 一种穿过河流超长管道的安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510396435.7A CN105042183A (zh) 2015-07-08 2015-07-08 一种穿过河流超长管道的安装方法

Publications (1)

Publication Number Publication Date
CN105042183A true CN105042183A (zh) 2015-11-11

Family

ID=54448983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510396435.7A Pending CN105042183A (zh) 2015-07-08 2015-07-08 一种穿过河流超长管道的安装方法

Country Status (1)

Country Link
CN (1) CN105042183A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952967A (zh) * 2016-06-01 2016-09-21 天津市城安热电有限公司 一种利用浮球沉放管道的沉管作业方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4887931A (en) * 1989-02-16 1989-12-19 Baker Hughes Incorporated Method and apparatus for towing subsea pipeline sections
CN1197902A (zh) * 1998-01-21 1998-11-04 袁根木 输水排污管铺设方法
CN1558129A (zh) * 2004-01-30 2004-12-29 胜利油田胜利石油化工建设有限责任公 管道穿越河流施工方法
CN101315139A (zh) * 2008-06-20 2008-12-03 广州市自来水工程公司 一种过河管沉管施工工艺
CN101691893A (zh) * 2009-06-17 2010-04-07 钟爱民 一种钢管水中施工方法
CN103912721A (zh) * 2014-04-23 2014-07-09 中国化学工程第三建设有限公司 一种水下开槽、沉管穿越河流的施工方法
CN104676108A (zh) * 2015-03-18 2015-06-03 广东省水利电力勘测设计研究院 一种跨海钢沉管的设计方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4887931A (en) * 1989-02-16 1989-12-19 Baker Hughes Incorporated Method and apparatus for towing subsea pipeline sections
CN1197902A (zh) * 1998-01-21 1998-11-04 袁根木 输水排污管铺设方法
CN1558129A (zh) * 2004-01-30 2004-12-29 胜利油田胜利石油化工建设有限责任公 管道穿越河流施工方法
CN101315139A (zh) * 2008-06-20 2008-12-03 广州市自来水工程公司 一种过河管沉管施工工艺
CN101691893A (zh) * 2009-06-17 2010-04-07 钟爱民 一种钢管水中施工方法
CN103912721A (zh) * 2014-04-23 2014-07-09 中国化学工程第三建设有限公司 一种水下开槽、沉管穿越河流的施工方法
CN104676108A (zh) * 2015-03-18 2015-06-03 广东省水利电力勘测设计研究院 一种跨海钢沉管的设计方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
左治武等: "水下成钩穿越河流技术在长输管道工程的应用", 《天然气与石油》 *
马丽贤等: "大口径供水管道牵引穿越河流工程的设计与施工", 《中国给水排水》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952967A (zh) * 2016-06-01 2016-09-21 天津市城安热电有限公司 一种利用浮球沉放管道的沉管作业方法

Similar Documents

Publication Publication Date Title
CN102900125B (zh) 海水吸取的方法及输送装置
CN203796321U (zh) 一种隧道内均衡排水系统
CN103572740B (zh) 一种充气式自动启闭闸门和水闸装置
CN105042183A (zh) 一种穿过河流超长管道的安装方法
CN204252165U (zh) 一种双向交替人工顶管工作井
CN208565828U (zh) 穿楼板防水防渗透套管结构
CN203729376U (zh) 用于水利水电工程的取水管井结构
CN104335977A (zh) 带有防逃逸装置的水蛭养殖池进排水系统
CN205026223U (zh) 直埋蒸汽管道在阀门检查井处的防水连接结构
CN204059778U (zh) 一种结构改良的屋檐接水槽
CN204456024U (zh) 用于水电站输水隧洞钢衬段的接地设备
CN203847378U (zh) 化工泵机封冷却水自动回收装置
CN205857140U (zh) 一种新型围油栏
CN203429608U (zh) 一种溢流槽简易排洪装置
CN205350712U (zh) 管道通畅试验球装置
CN201891118U (zh) 井下涌水钻孔骨料添加系统
CN202680267U (zh) 娃娃鱼人工培养装置
CN203569548U (zh) 暗管排水用出水口流量自动控制装置
CN204104545U (zh) 节水节能的鱼塘拔管排水装置
CN205065296U (zh) 煤水提升泵自动放水输送管道
CN203583578U (zh) 地下水取水系统
CN103437334B (zh) 无压隧洞侧槽式进口设计方法
CN104236136A (zh) 太阳能水管存余水排出装置
CN203407371U (zh) 带有防逃逸装置的水蛭养殖池进排水系统
CN202280854U (zh) 地埋式弹性座封闸阀

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151111