CN105040586A - Water collection and drainage system for long-large bridge - Google Patents

Water collection and drainage system for long-large bridge Download PDF

Info

Publication number
CN105040586A
CN105040586A CN201510496865.6A CN201510496865A CN105040586A CN 105040586 A CN105040586 A CN 105040586A CN 201510496865 A CN201510496865 A CN 201510496865A CN 105040586 A CN105040586 A CN 105040586A
Authority
CN
China
Prior art keywords
pipe
bridge
water
bridge floor
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510496865.6A
Other languages
Chinese (zh)
Inventor
高宗余
刘汉顺
王志平
唐贺强
张德平
杜萍
王恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Original Assignee
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Reconnaissance and Design Institute Co Ltd filed Critical China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority to CN201510496865.6A priority Critical patent/CN105040586A/en
Publication of CN105040586A publication Critical patent/CN105040586A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a water collection and drainage system for a long-large bridge. A bridge floor water drain pipe arranged on the bridge floor is connected with a long longitudinal water collection pipe arranged under the bridge floor through a three-way pipe, the longitudinal water collection pipe is connected with a beam end water collection and drainage pipe arranged at a bridge juncture pier or bridge abutment, and the beam end water collection and drainage pipe is led to a ground water collection pool; the longitudinal water collection pipe and a vertical water drainage pipe are connected through an elbow communicating pipe, the elbow communicating pipe is higher than the longitudinal water collection pipe and the vertical water drainage pipe and lower than a water inlet of the bridge floor water drain pipe. When water flow such as early heavy rain, moderate rain, light rain or other bridge floor waste water is small, rainwater flows in the longitudinal water collection pipe through the bridge floor water drain pipe to be collected in the beam end water collection pipe and then drained after being purified through the water collection pool; when the water flow is large, the longitudinal water collection pipe is filled with water, a water head difference exists between the bridge floor water drain pipe and the elbow communicating pipe, and the rainwater flows in the vertical water drainage pipe to be directly drained. According to the water collection and drainage system for the long-large bridge, various bridge floor water can be drained in time, the bridge load is reduced, pollutants are prevented from being directly discharged in a river is reduced, and meanwhile the burdens of a sewerage system is reduced.

Description

A kind of long-span bridge collection drainage system
Technical field
The present invention relates to city planting ductwork and bridge draining field, be specifically related to a kind of long-span bridge collection drainage system.
Background technology
The drainage system of existing highway bridge is generally divided into direct draining and central drainage.Direct draining is that bridge floor ponding is directly entered vertical drainage pipe through bridge floor tapping pipe, then under being discharged to bridge, also referred to as loose row; Central drainage bridge floor ponding is entered longitudinal header through bridge floor tapping pipe collect the discharge of end of the bridge collecting-tank or focus on.For the bridge crossing over important water body, stream protection district, bridge floor catchments and can not directly enter in river, or just can enter in river after needing purified treatment, otherwise may cause severe contamination, has a strong impact on ecological environment and fwaater resources protection.Along with the enhancing of people's environmental consciousness, the protection of water resource is more and more paid attention to, for often requiring bridge floor rainwater across river crossing bridge after collecting, being pooled to drainage on the bank, being used after treatment or discharging.
For small bridge, central drainage is often easier to accomplish, its catchment area is less, by deck profile grade or arrange longitudinal drainage pipe, is easy to bridge deck rainwater collecting and is disposed to end of the bridge.And for long-span bridge, because bridge is long, bridge floor is wide, bridge floor catchment area is comparatively large, the rainwater catchment collected to end of the bridge, often need to arrange very thick collection gutter.Collection gutter is excessively thick, and often take the position of bridge floor, increase bridge load simultaneously, at this moment bridge construction often needs to widen or strengthen.And bridge longer time, header is corresponding also longer, and at this moment water velocity is comparatively slow, and rainwater can not be discharged in time, often also can cause bridge floor ponding or unrestrained water, increase the weight of the load of drainage simultaneously.And under normal circumstances, the pollutant contained in early-stage rainwater is more, along with rainfall increases, the degree of contamination of bridge floor ponding also can be more and more less.
How economically by the middle or small bridge floor ponding that rains and other bridge floor wastewater reuse approach, the bridge floor ponding rained greatly can be discharged in time is again the matter of utmost importance of long-span bridge collection Water drainage system design simultaneously.In order to make long-span bridge bridge floor rainwater discharge smoothly, avoiding arranging very thick collection gutter simultaneously, being necessary to invent a kind of novel bridge collection drainage system.
Summary of the invention
The object of the invention is for above-mentioned present situation, aim to provide a kind of by the middle or small bridge floor ponding that rains and other bridge floor wastewater reuse approach, the long-span bridge collection drainage system simultaneously the bridge floor ponding rained greatly can discharged in time again.
The implementation of the object of the invention is, a kind of long-span bridge collection drainage system, by the some bridge floor tapping pipes be arranged on bridge floor, longitudinally elongated header and some vertical drainage pipes under bridge floor, and the beam-ends collection gutter of bridge border pier or Abutment and ground collecting-tank composition; Bridge floor tapping pipe is connected by threeway with longitudinal header, and longitudinal header is connected with the beam-ends collection gutter of bridge border pier or Abutment, and beam-ends collection gutter leads to ground collecting-tank; Longitudinal header is connected by elbow communicating pipe with vertical drainage pipe, and described elbow communicating pipe is higher than longitudinal header and vertical drainage pipe; Be provided with expansion coupling in the middle of longitudinal header, vertical drainage pipe, beam-ends collection gutter pipe, and be fixed in bridge construction with pipe clamp or clip.
The present invention utilizes the principle of linker, ponding is discharged by longitudinal collecting conduit and vertical drainage pipeline two kinds of modes, sewage when rainwater is less or on bridge floor, can be collected to the collecting-tank of bridge termination through longitudinal header, discharge or reclaim after purified treatment.When amount of rainfall is very large, longitudinal header drainability is limited, at this moment water is full of in longitudinal header, because elbow communicating pipe is higher than longitudinal header and vertical drainage pipe, lower than bridge floor tapping pipe water inlet, can produce head difference between such bridge floor tapping pipe and vertical drainage pipe water inlet, rainwater flows into vertical drainage pipe and discharges.Simultaneously because elbow linker exceeds longitudinal header, flow into the water in vertical drainage pipe, the partial particulate of the inside and pollutant etc. can precipitate, and can play preliminary effect of filtering.
Adopt the present invention, heavy rain initial stage and moderate rain, light rain or when there are other bridge floor sewage, at this moment discharge is less and seriously polluted, current are discharged after being collected to end of the bridge purified treatment by longitudinal header; In heavy rain situation, at this moment discharge is polluted comparatively greatly comparatively light, and rainwater is discharged fast mainly through vertical drainage pipe, can avoid on bridge, arranged slightly overweight collection gutter, cause structure width and structural load to increase, avoid ponding and Man Shui appear in bridge simultaneously, alleviate drainage burden.In addition for the bridge newly built up, the hazardous substances often on bridge floor is more, or the pollutant that bridge floor is revealed occasionally, can first artificial flushing bridge floor in these situations, and such discharge is less, and hazardous substances can collect the collecting-tank purification of end of the bridge.This sample drainage system also well can adapt to long-span bridge and often require central drainage, the requirement that the later stage can be in line early stage.
The present invention can discharge various bridge floor ponding in time, alleviates bridge load, can reduce bridge floor pollutant etc. simultaneously and directly enter in a large number in river, alleviate blowdown treatment system burden.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention,
Fig. 2 be the A-A of Fig. 1 to side elevation view,
Fig. 3 is that the B of Fig. 1 is to side elevation view.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in detail.
With reference to Fig. 1,2,3, the present invention is connected with longitudinal header 2 longitudinally elongated under bridge floor by tee piece 6 by some bridge floor tapping pipes 1 be arranged on bridge floor.Longitudinal header 2 connects the beam-ends collection gutter 4 of bridge border pier or Abutment, and beam-ends collection gutter 4 leads to ground collecting-tank 7.Longitudinal header 2 is connected by elbow communicating pipe 5 with vertical drainage pipe 3.Is provided with expansion coupling 9 in the middle of longitudinal header 2, vertical drainage pipe 3, beam-ends collection gutter 4 pipe, and is fixed in bridge construction 10 with pipe clamp 8 or clip, can the change in length of adaptive temperature water pipe when changing.U-shaped communicating pipe and other forms of communicating pipe is can be elbow communicating pipe between longitudinal header and vertical drainage pipe.Rainwater in vertical drainage pipe can directly enter in river, and beam-ends collection drainpipe outlet access land drainage facility, rainwater can be discharged after purification.
With reference to Fig. 1,2,3, bridge floor tapping pipe 1 water inlet is provided with filter screen, can big particle in filtered water.Bridge floor tapping pipe 1 water inlet, higher than longitudinal header 2 and elbow communicating pipe 5, makes rainwater can flow into longitudinal header 2 and vertical drainage pipe 3.Elbow communicating pipe 5, higher than longitudinal header 2 and vertical drainage pipe 3, lower than bridge floor tapping pipe 1 water inlet, can produce head difference between such bridge floor tapping pipe and vertical drainage pipe water inlet, and rainwater flows into vertical drainage pipe and discharges; Rainwater in longitudinal header 2 does not enter vertical drainage pipe 3 when discharge is less, directly be collected to collecting-tank 7 through beam-ends collection gutter 4, when discharge is larger, water is full of in longitudinal header 2, produce head difference between bridge floor tapping pipe 1 and vertical drainage pipe 3, rainwater enters in river through flowing into vertical drainage pipe 3 elbow communicating pipe 5.Owing to exceeding longitudinal header 2 elbow communicating pipe 5, the partial particulate in inflow vertical drainage pipe 5 li of water and pollutant etc. can precipitate, and can play preliminary effect of filtering.Elbow communicating pipe 5, water inlet was higher than beam-ends collection gutter 4, and so a small amount of rainwater and other bridge floor sewage can be collected into collecting-tank 7 by beam-ends collection gutter 4.Beam-ends collection gutter 4 two ends also should lower than bridge floor tapping pipe 1 water inlet, and lower than bridge floor, when such water yield is less, in longitudinal header 2, rainwater can be collected to the collecting-tank 7 of end of the bridge.Longitudinal header 2 is provided with longitudinal gradient, and the longitudinal drainage pipe longitudinal gradient gradient is 0.1 ~ 89.9 °, is convenient to the rainwater catchment of longitudinal header 2 to beam-ends collection gutter 4, then flow to collecting-tank 7.

Claims (4)

1. a long-span bridge collection drainage system, by the some bridge floor tapping pipes be arranged on bridge floor, longitudinally elongated header and some vertical drainage pipes under bridge floor, and the beam-ends collection gutter of bridge border pier or Abutment and ground collecting-tank composition; It is characterized in that: bridge floor tapping pipe is connected by threeway with longitudinal header, longitudinal header is connected with the beam-ends collection gutter of bridge border pier or Abutment, and beam-ends collection gutter leads to ground collecting-tank; Longitudinal header is connected by elbow communicating pipe with vertical drainage pipe, and described elbow communicating pipe is higher than longitudinal header and vertical drainage pipe; Be provided with expansion coupling in the middle of longitudinal header, vertical drainage pipe, beam-ends collection gutter pipe, and be fixed in bridge construction with pipe clamp or clip.
2. a kind of long-span bridge collection drainage system according to claim 1, is characterized in that: elbow communicating pipe is lower than bridge floor tapping pipe water inlet.
3. a kind of long-span bridge collection drainage system according to claim 1, is characterized in that: elbow communicating pipe, water inlet was higher than beam-ends collection gutter.
4. a kind of long-span bridge collection drainage system according to claim 1, is characterized in that: longitudinal header is provided with longitudinal gradient, and the longitudinal drainage pipe longitudinal gradient gradient is 0.1 ~ 89.9 °.
CN201510496865.6A 2015-08-13 2015-08-13 Water collection and drainage system for long-large bridge Pending CN105040586A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510496865.6A CN105040586A (en) 2015-08-13 2015-08-13 Water collection and drainage system for long-large bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510496865.6A CN105040586A (en) 2015-08-13 2015-08-13 Water collection and drainage system for long-large bridge

Publications (1)

Publication Number Publication Date
CN105040586A true CN105040586A (en) 2015-11-11

Family

ID=54447536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510496865.6A Pending CN105040586A (en) 2015-08-13 2015-08-13 Water collection and drainage system for long-large bridge

Country Status (1)

Country Link
CN (1) CN105040586A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065568A (en) * 2016-07-01 2016-11-02 中铁大桥勘测设计院集团有限公司 A kind of bridge classification drainage system being applicable to Steel Bridge Deck
CN108729500A (en) * 2018-06-28 2018-11-02 长江师范学院 A kind of waters Antipollution method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100755626B1 (en) * 2006-01-05 2007-09-04 김동필 Oil seperating drain apparatus of bridge
KR100912590B1 (en) * 2008-10-28 2009-08-18 주식회사 에스티씨 A draining system for bridge
CN201952730U (en) * 2011-02-25 2011-08-31 大连市市政设计研究院有限责任公司 Semicircular water drain pipe device
CN203065960U (en) * 2013-01-15 2013-07-17 广州市市政工程设计研究院 Bridge drainage system
CN103452042A (en) * 2013-08-15 2013-12-18 龙口丛林中德车体系统工程有限公司 Drainage system for aluminum alloy pedestrian bridge
CN204919322U (en) * 2015-08-13 2015-12-30 中铁大桥勘测设计院集团有限公司 Bridge collection drainage system grows up

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100755626B1 (en) * 2006-01-05 2007-09-04 김동필 Oil seperating drain apparatus of bridge
KR100912590B1 (en) * 2008-10-28 2009-08-18 주식회사 에스티씨 A draining system for bridge
CN201952730U (en) * 2011-02-25 2011-08-31 大连市市政设计研究院有限责任公司 Semicircular water drain pipe device
CN203065960U (en) * 2013-01-15 2013-07-17 广州市市政工程设计研究院 Bridge drainage system
CN103452042A (en) * 2013-08-15 2013-12-18 龙口丛林中德车体系统工程有限公司 Drainage system for aluminum alloy pedestrian bridge
CN204919322U (en) * 2015-08-13 2015-12-30 中铁大桥勘测设计院集团有限公司 Bridge collection drainage system grows up

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065568A (en) * 2016-07-01 2016-11-02 中铁大桥勘测设计院集团有限公司 A kind of bridge classification drainage system being applicable to Steel Bridge Deck
CN108729500A (en) * 2018-06-28 2018-11-02 长江师范学院 A kind of waters Antipollution method

Similar Documents

Publication Publication Date Title
CN109457789A (en) Primary rainwater closure well
KR20100020185A (en) Treating system of rainwater
CN204919322U (en) Bridge collection drainage system grows up
CN102392487A (en) Pollutant separation device of rainwater and sewage pipeline
KR101306943B1 (en) Draining device for use in a bridge
CN205857343U (en) A kind of sponge urban rainwater collection utilizes device
CN105040586A (en) Water collection and drainage system for long-large bridge
CN110195463A (en) A kind of the sponge urban rainwater processing system and method for Control the Plan Pollution Sources
CN206940449U (en) A kind of drainage system of the dirty shunting of rain
CN106065568A (en) A kind of bridge classification drainage system being applicable to Steel Bridge Deck
CN202730942U (en) Drainage ditch cover plate
KR20140095783A (en) Equipment and method for decrease non-point pollution sources using separating vegetation waterway
CN103936178A (en) Roof storm runoff automatic desanding apparatus
CN103785220B (en) A kind of building rain water filtering device
CN204803962U (en) Town road peak clipping rainwater collecting system
CN107043141A (en) A kind of drainage system of rain dirt shunting
CN208389555U (en) Symmetrical purification pollution cutting device based on existing drainage system
CN209164792U (en) A kind of anti-corrosion prefabricated reinforced concrete drainpipe
CN202466779U (en) Ecological retention pond
RU2338829C2 (en) Device for water drain from trafficway of bridges
CN207314489U (en) A kind of catch-basin of environment-protecting clean
CN207685976U (en) A kind of road quickly collects rain drainage arrangement
CN207295962U (en) A kind of rainwater automatic filtering unit
CN206529873U (en) Control water dustproof sponge type roads rain inlet in a kind of cities and towns
CN207048021U (en) Strengthen the inlet for stom water that early-stage rainwater is collected

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151111

RJ01 Rejection of invention patent application after publication