CN105036329B - Combined integral sewage disposal device and installation method - Google Patents

Combined integral sewage disposal device and installation method Download PDF

Info

Publication number
CN105036329B
CN105036329B CN201510355126.5A CN201510355126A CN105036329B CN 105036329 B CN105036329 B CN 105036329B CN 201510355126 A CN201510355126 A CN 201510355126A CN 105036329 B CN105036329 B CN 105036329B
Authority
CN
China
Prior art keywords
plate
riser
sewage disposal
disposal device
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510355126.5A
Other languages
Chinese (zh)
Other versions
CN105036329A (en
Inventor
黄德汀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Better Environmental Protection Equipment Co Ltd
Original Assignee
Fuzhou Better Environmental Protection Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Better Environmental Protection Equipment Co Ltd filed Critical Fuzhou Better Environmental Protection Equipment Co Ltd
Priority to CN201510355126.5A priority Critical patent/CN105036329B/en
Publication of CN105036329A publication Critical patent/CN105036329A/en
Application granted granted Critical
Publication of CN105036329B publication Critical patent/CN105036329B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

The present invention relates to combined integral sewage disposal device, the combined integral sewage disposal device includes anaerobic pond, Aerobic Pond and sedimentation basin, described anaerobic pond, Aerobic Pond and sedimentation basin top are provided with inspection shaft, both sides are provided with water inlet and delivery port, described anaerobic pond, Aerobic Pond and sedimentation basin are by top plate, bottom plate, side plate, riser, dividing plate and the first bolt composition, described top plate, bottom plate, side plate, riser and dividing plate are by template, stay tube, second bolt is made with frame, described top plate, bottom plate, side plate, riser and dividing plate are surrounded by sealing strip, the cross section of the template is in periodic wave wave-like.Combined integral sewage disposal device proposed by the present invention greatly reduces cost, raising productivity ratio, with preferable economic technology benefit no matter the size for the treatment of capacity, all can be achieved standardization, the production of automatic assembly line formula in plant produced.The invention also discloses the installation method of combined integral sewage disposal device.

Description

Combined integral sewage disposal device and installation method
Technical field
The present invention relates to sewage disposal device, a kind of achievable standardization, the production of automatic assembly line formula are particularly related to, With convenient disassembly, the good cost of quality is low, and antiseptic property is good, practical novel combination type integrated sewage treating apparatus. Belong to sewage treatment area, be applicable to newly-built sewage disposal device, be equally applicable to change old sewage treatment plant progress equipment Make, be particularly suitable for use in the sewage disposal device high to dismounting, volume requirement.
Background technology
Integrated sewage treating apparatus refers to the sewage for realizing A/O or A2/O sewage treatment process in a container body Processing equipment.After user installation integrated sewage treating apparatus, waste water can just be handled.Integrated sewage treating apparatus leads to Often the part such as point hydrolysis acidification pool, contact-oxidation pool, sludge-tank and sedimentation basin, extensive in small-sized sewage treating system Use.With the specification of China's water quality discharge standard, integrated sewage treating apparatus is increasingly becoming a kind of indispensable product, Played an important role in sewage treatment project.But existing integrated sewage treating apparatus can be according to without standard, very different, User is unable to decide which is right, it is difficult to select.
The most frequently used integration apparatus of present China has several materials such as fiberglass, carbon steel, stainless steel.Fiberglass integration Sewage disposal device is easily broken deformation and gone wrong after charging because Steel Properties are bad, be particularly dividing plate.And existing glass Glass steel integration apparatus is typically circular, and this installation for being aerated aerator in the system of form for roots blower is very much inconvenience. Effect is also made a discount.The integrated sewage treating apparatus of carbon steel class is because be that steel plate is made, but corrosion-resistant is fine or not into use The problem of family is worried.In addition, the usual volume of integration apparatus is larger, even if thick steel plate, its rigidity also turns into problem.After welding Easily there is flexural deformation in steel plate, the limited pressure that can bear.Stainless steel integration apparatus because of its Master Cost problem seldom It is accepted.The volume of integrated sewage treating apparatus requirement is generally larger, and transport is also frequently problem.Because railway carriage is wide The factors such as degree, road limit for height, integration apparatus width, height are all no more than 3m.And the sewage disposal device of larger process amount, It is generally necessary to the equipment of bigger volume.Field fabrication, quality and cost are problem again.Huge equipment, freight, mounting bar Part is the problem of can not be ignored.Some places at all can not transport huge equipment because being limited by road conditions, structures etc. To scene.
At present also there are some sewage disposal devices to achieve preferable effect in certain circumstances, but still suffer from above-mentioned Some problems.In summary, fortune is caused very much greatly to solve poor, the internal fragile, volume of antiseptic property present in prior art Defeated inconvenient the problems such as, a kind of achievable standardization of invention, the production of automatic assembly line formula are needed badly at present, with dismounting side Just, the good cost of quality is low, and antiseptic property is good, practical novel combination type integrated sewage treating apparatus and installation method.
The content of the invention
The present invention proposes a kind of achievable standardization, the production of automatic assembly line formula, and with convenient disassembly, quality is got well into This is low, and antiseptic property is good, practical novel combination type integrated sewage treating apparatus and installation method, solves existing skill The problems such as poor, the internal fragile, volume of antiseptic property present in art causes to transport inconvenience very much greatly.
The technical proposal of the invention is realized in this way:
Combined integral sewage disposal device, it is characterised in that the combined integral sewage disposal device includes detesting Oxygen pond, Aerobic Pond and sedimentation basin, described anaerobic pond, Aerobic Pond and sedimentation basin top are provided with inspection shaft, both sides provided with water inlet Mouth and delivery port, described anaerobic pond, Aerobic Pond and sedimentation basin is by top plate, bottom plate, side plate, riser, dividing plate and the first bolt group Into, described top plate, bottom plate, side plate, riser and dividing plate is made up of template, stay tube, the second bolt and frame, described top plate, Bottom plate, side plate, riser and dividing plate are surrounded by sealing strip, and the cross section of the template is in periodic wave wave-like.
Further, described frame is divided into plane frame, corner frame and dividing plate frame, described plane frame, turns Mounting hole is arranged at intervals with arm of angle frame and dividing plate frame.
Above-mentioned top plate, side plate and bottom plate is made up of template, stay tube, the second bolt, plane frame and corner frame.
Above-mentioned riser is made up of template, stay tube, the second bolt and plane frame.
Above-mentioned dividing plate is made up of template, stay tube, the second bolt, plane frame and dividing plate frame.
Above-mentioned stay tube interval is uniformly arranged on device interior, and the stay tube is central hollow round steel pipe, and two ends are provided with Installing plate and installing plate are provided with mounting hole.
Above-mentioned sedimentation basin, anaerobic pond and Aerobic Pond outer surface is provided with zinc coat or covered plastics layer.
Present invention also offers the installation method of combinations thereof formula integrated sewage treating apparatus.
The installation method of combined integral sewage disposal device, comprises the following steps:
1) top plate, bottom plate, side plate, riser and the shaping of dividing plate prefabrication:Template, frame and the second bolt are used in factory The assembling of top plate, bottom plate, side plate, riser and dividing plate is carried out, and inspection shaft, water inlet are welded with the outermost of top plate, side plate And delivery port, inspection shaft, water inlet and delivery port are mill works;
2) prepare before installing:According to design drawing, place cleaning, by top plate, bottom plate, side plate, riser and dividing plate, stay tube, First bolt is transported in place, and establishment officer is in place;
3) top plate, bottom plate, side plate, riser and dividing plate are installed:Bottom plate is installed ready first in design attitude, then, peace Side plate, riser and dividing plate are filled, stay tube and top plate are finally installed, top plate, bottom plate, side plate, riser and dividing plate are ensured during installation Vertical precision, length, deviation meet design requirement;
4) sealing strip is pasted:Top plate after installation is complete, bottom plate, side plate, the surrounding of riser and dividing plate install sealing strip, And scribble fluid sealant.
5) anaerobic pond, Aerobic Pond and sedimentation basin are installed:Top plate, bottom plate, side plate, riser and dividing plate are entered by the second bolt Row combination connection, forms anaerobic pond, Aerobic Pond and sedimentation basin;
6) preservative treatment:The mode of galvanizing or plastic processing is taken, preservative treatment is carried out to whole equipment, is formed zinc-plated Layer or covered plastics layer.
The characteristics of present invention has following and beneficial effect:
(1) combined integral sewage disposal device is made up of template, stay tube, accessory and frame in the present invention, material letter It is single, in practical application, it can at the scene be assembled and taken the post as according to situations such as the size, the situation in place, COD of sewage of sewage load The integrated sewage treating apparatus for treating capacity of anticipating, is not limited by place, position, flexibly practical.
(2) template and frame can realize standardization, batch production, the production of automatic assembly line formula, and material is simple, transporter Just, cost of transportation is reduced.
(3) top plate, bottom plate, side plate, riser and dividing plate are made up of the thin plate and frame, because template is stronger than plane steel plate Degree is much larger, so the steel plate of thinner thickness can be used in template.Combined integral sewage disposal device rolled steel dosage is few, reduction Cost, also greatly improves the bearing capacity of equipment.
(4) combined integral sewage disposal device anti-corrosion uses galvanizing or plastic processing in the present invention, high-quality Anti-corrosion, improves the quality and service life of equipment.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is the structural representation of combined integral sewage disposal device one embodiment of the present invention;
Fig. 2 is the mounting structure figure of combined integral sewage disposal device one embodiment of the present invention;
Fig. 3 is the elevation of riser in combined integral sewage disposal device of the present invention;
Fig. 4 is the sectional view of template in combined integral sewage disposal device of the present invention;
Fig. 5 is the plan of combined integral sewage disposal device midplane frame of the present invention;
Fig. 6 is the elevation of combined integral sewage disposal device midplane frame of the present invention;
Fig. 7 is the plan of corner frame in combined integral sewage disposal device of the present invention;
Fig. 8 is the elevation of corner frame in combined integral sewage disposal device of the present invention;
Fig. 9 is the plan of combined integral sewage disposal device median septum frame of the present invention;
Figure 10 is the elevation of combined integral sewage disposal device median septum frame of the present invention;
Figure 11 is the plan of stay tube in combined integral sewage disposal device of the present invention;
Figure 12 is the elevation of stay tube in combined integral sewage disposal device of the present invention.
In figure, 1- top plates;2- bottom plates;3- side plates;4- risers;5- dividing plates;6- water inlets;7- delivery ports;8- inspection shafts;9- Anaerobic pond;10- Aerobic Ponds;11- sedimentation basins;12- sealing strips;The bolts of 13- first;14- templates;15- frames;16- plane frames; 17- corner frames;18- dividing plate frames;19- stay tubes;The bolts of 20- second;21- mounting holes.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
The structural representation of combined integral sewage disposal device one embodiment shown in reference picture 1.Combined type one Body sewage disposal device includes pushing up on sedimentation basin 11, anaerobic pond 9 and Aerobic Pond 10, sedimentation basin 11, anaerobic pond 9 and Aerobic Pond 10 End is provided with inspection shaft 8, and both sides are provided with water inlet 6 and delivery port 7.
The mounting structure figure of combined integral sewage disposal device one embodiment shown in reference picture 2.Anaerobic pond 9, Aerobic Pond 10 and sedimentation basin 11 are made up of top plate 1, bottom plate 2, side plate 3, riser 4, the bolt 13 of dividing plate 5 and first, top plate 1, bottom plate 2nd, side plate 3, riser 4 and dividing plate 5 are made up of template 14, stay tube 19, the second bolt 20 with frame 15, top plate 1, bottom plate 2, side plate 3, Riser 4 and dividing plate 5 are surrounded by sealing strip 12.During in-site installation, each plate is linked together with the first bolt 13.For The sealing of sewage disposal device, and encrypting strip of paper used for sealing 12 between each plate.And fluid sealant is coated after installing.With true Protect sewage disposal device sealing.The material of sealing strip 12 is rubber.
The sectional view of template in combined integral sewage disposal device shown in reference picture 4.The cross section of template 14 is in Periodic wave wave-like.Template 14 uses appearance and size for 3000mm × 1180mm × 4mm sheet metal, half circular diameter of template 14 For 50mm, straight flange is 50mm.
Combined integral sewage disposal device midplane frame, corner frame and dividing plate side shown in reference picture 5~10 The plan and elevation of frame.15 points of frame is plane frame 16, corner frame 17 and dividing plate frame 18, described plane frame 16th, it is arranged at intervals with mounting hole 21 on corner frame 17 and dividing plate frame 18.Plane frame 16 use appearance and size for 70mm × 1180mm × 10mm steel plate, the facade size of corner frame 17 is 70mm × 70mm, and length is 1180mm, and thickness is 10mm. The facade size of dividing plate frame 18 is 70mm × 70mm, and length is 1180mm, and thickness is 10mm.Plane frame 16, corner frame 17 and dividing plate frame 18 the centre-to-centre spacing of adjacent mounting hole 21 it is unified be 100mm.
Top plate 1, bottom plate 2 and side plate 3 are made by template 14, stay tube 19, the second bolt 20, plane frame 16 with corner frame 17 Into.Dividing plate 5 is made up of template 14, stay tube 19, the second bolt 20, plane frame 16 with dividing plate frame 18.
The elevation of riser in combined integral sewage disposal device shown in reference picture 3.Riser 4 is by template 14, support Pipe 19, the second bolt 20 are made with plane frame 16.
The flat of stay tube, elevation in reference picture 11 and combined integral sewage disposal device shown in Figure 12.Stay tube 19 Interval is uniformly arranged on device interior, and stay tube 19 is central hollow round steel pipe, and two ends are provided with installing plate and installing plate is provided with Mounting hole.A diameter of 76mm of the central hollow round steel pipe of stay tube 19, length is 1160mm, the length of the square solid steel tube in two ends For 80mm, width is 70mm, and thickness is 10mm.The mounting hole 21 of stay tube 19 is arranged on 35mm under the top of stay tube 19.
Sedimentation basin 11, anaerobic pond 9 and the outer surface of Aerobic Pond 10 are provided with zinc coat or covered plastics layer.
The main installation process of combinations thereof formula integrated sewage treating apparatus is as follows:
1) top plate 1, bottom plate 2, side plate 3, riser 4 and the shaping of the prefabrication of dividing plate 5:Template 14, frame 15 are used in factory The assembling of top plate 1, bottom plate 2, side plate 3, riser 4 and dividing plate 5 is carried out with the second bolt 20, and in the outermost of top plate 1, side plate 3 Inspection shaft 8, water inlet 6 and delivery port 7 are welded with, inspection shaft 8, water inlet 6 and delivery port 7 are mill works;
2) prepare before installing:According to design drawing, place cleaning, by top plate 1, bottom plate 2, side plate 3, riser 4, dividing plate 5, support Pipe 19, the first bolt 13 are transported in place, and establishment officer is in place;
3) top plate 1, bottom plate 2, side plate 3, riser 4 and dividing plate 5 are installed:Bottom plate 2 is installed ready first in design attitude, so Afterwards, installation side plate 3, riser 4 and dividing plate 5, finally install stay tube 19 and top plate 1, top plate 1, bottom plate 2, side plate are ensured during installation 3rd, the vertical precision of riser 4 and dividing plate 5, length, deviation meet design requirement;
4) sealing strip 12 is pasted:Top plate 1 after installation is complete, bottom plate 2, side plate 3, the surrounding of riser 4 and dividing plate 5 are installed Sealing strip 12, and scribble fluid sealant.
5) anaerobic pond 9, Aerobic Pond 10 and sedimentation basin 11 are installed:By the second bolt 20 by top plate 1, bottom plate 2, side plate 3, vertical Plate 4 and dividing plate 5 are combined connection, form anaerobic pond 9, Aerobic Pond 10 and sedimentation basin 11;
6) preservative treatment:The mode of galvanizing or plastic processing is taken, preservative treatment is carried out to whole equipment, is formed zinc-plated Layer or covered plastics layer.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God is with principle, and any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (7)

1. the installation method of combined integral sewage disposal device, the combined integral sewage disposal device includes anaerobism Pond, Aerobic Pond and sedimentation basin, described anaerobic pond, Aerobic Pond and sedimentation basin top are provided with inspection shaft, the Combined integrated Change sewage disposal device both sides and be provided with water inlet and delivery port, described anaerobic pond, Aerobic Pond and sedimentation basin by top plate, bottom plate, Side plate, riser, dividing plate and the first bolt composition, described top plate, bottom plate, side plate, riser and dividing plate is by template, stay tube, second Bolt is made with frame, and described top plate, bottom plate, side plate, riser and dividing plate are surrounded by sealing strip, the template it is transversal Face is in periodic wave wave-like, it is characterised in that:Comprise the following steps:
1) top plate, bottom plate, side plate, riser and the shaping of dividing plate prefabrication:Carried out in factory using template, frame and the second bolt Top plate, bottom plate, side plate, the assembling of riser and dividing plate, and be welded with inspection shaft, water inlet in the outermost of top plate, side plate and go out The mouth of a river, inspection shaft, water inlet and delivery port are mill works;
2) prepare before installing:According to design drawing, place cleaning, by top plate, bottom plate, side plate, riser and dividing plate, stay tube, first Bolt is transported in place, and establishment officer is in place;
3) top plate, bottom plate, side plate, riser and dividing plate are installed:Bottom plate is installed ready first in design attitude, then, installation side Plate, riser and dividing plate, finally install stay tube and top plate, the vertical of top plate, bottom plate, side plate, riser and dividing plate is ensured during installation Precision, length, deviation meet design requirement;
4) sealing strip is pasted:Top plate after installation is complete, bottom plate, side plate, the surrounding of riser and dividing plate are installed sealing strip, and applied There is fluid sealant;
5) anaerobic pond, Aerobic Pond and sedimentation basin are installed:By the second bolt by top plate, bottom plate, side plate, riser and dividing plate carry out group Connection is closed, anaerobic pond, Aerobic Pond and sedimentation basin is formed;
6) preservative treatment:Take the mode of galvanizing or plastic processing, to whole equipment carry out preservative treatment, formed zinc coat or Covered plastics layer.
2. the installation method of combined integral sewage disposal device according to claim 1, it is characterised in that described Frame, which is divided into being spaced on plane frame, corner frame and dividing plate frame, described plane frame, corner frame and dividing plate frame, to be set It is equipped with mounting hole.
3. the installation method of combined integral sewage disposal device according to claim 2, it is characterised in that described Top plate, side plate and bottom plate are by the template, the stay tube, second bolt, the plane frame and the corner frame system Into.
4. the installation method of combined integral sewage disposal device according to claim 2, it is characterised in that described Riser is made up of the template, the stay tube, second bolt and the plane frame.
5. the installation method of combined integral sewage disposal device according to claim 2, it is characterised in that described Dividing plate is made up of the template, the stay tube, second bolt, the plane frame and the dividing plate frame.
6. the installation method of the combined integral sewage disposal device according to claim 3,4 or 5, it is characterised in that institute The stay tube interval stated is uniformly arranged on inside the sewage disposal device, and the stay tube is central hollow round steel pipe, and two ends are set There is installing plate and installing plate is provided with mounting hole.
7. the installation method of combined integral sewage disposal device according to claim 1, it is characterised in that described Sedimentation basin, anaerobic pond and Aerobic Pond outer surface are provided with zinc coat or covered plastics layer.
CN201510355126.5A 2015-06-24 2015-06-24 Combined integral sewage disposal device and installation method Active CN105036329B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510355126.5A CN105036329B (en) 2015-06-24 2015-06-24 Combined integral sewage disposal device and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510355126.5A CN105036329B (en) 2015-06-24 2015-06-24 Combined integral sewage disposal device and installation method

Publications (2)

Publication Number Publication Date
CN105036329A CN105036329A (en) 2015-11-11
CN105036329B true CN105036329B (en) 2017-08-11

Family

ID=54443379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510355126.5A Active CN105036329B (en) 2015-06-24 2015-06-24 Combined integral sewage disposal device and installation method

Country Status (1)

Country Link
CN (1) CN105036329B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547367A (en) * 2018-05-11 2018-09-18 深圳市中邦(集团)建设总承包有限公司 A kind of sedimentation basin and its construction method closing on seashore

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1015584A (en) * 1996-07-08 1998-01-20 Clean Tec Kk Heating of anaerobic tank in sewage treatment apparatus and apparatus therefor
CN2813746Y (en) * 2005-06-30 2006-09-06 任孚保 Assembling sewage treating tank
CN204824348U (en) * 2015-06-24 2015-12-02 福州百特环保设备有限公司 Modular integration sewage treatment device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1015584A (en) * 1996-07-08 1998-01-20 Clean Tec Kk Heating of anaerobic tank in sewage treatment apparatus and apparatus therefor
CN2813746Y (en) * 2005-06-30 2006-09-06 任孚保 Assembling sewage treating tank
CN204824348U (en) * 2015-06-24 2015-12-02 福州百特环保设备有限公司 Modular integration sewage treatment device

Also Published As

Publication number Publication date
CN105036329A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
EP2239234A1 (en) Jet aeration apparatus and wastewater treatment process
CN105036329B (en) Combined integral sewage disposal device and installation method
CN112044664A (en) Anticorrosive treatment's coating device is used in cement culvert pipe production
CN107986442A (en) Container type sewage treatment equipment and its manufacture method
CN201962091U (en) Glass reinforced plastic cover plate for cesspools
CN210825474U (en) Sewage treatment pond mud discharging device based on environmental protection
CN204824348U (en) Modular integration sewage treatment device
CN106938867A (en) A kind of acid waste water processing unit
CN202924824U (en) Integrated MBR (membrane bioreactor) membrane assembly
CN206730875U (en) A kind of high density plate film assembly
CN207091163U (en) A kind of acid waste water processing unit
CN206654828U (en) A kind of environment-friendly type is molded septic tank
CN210438606U (en) Sludge treatment system for preventing system blockage and anaerobic phosphorus release
CN207620050U (en) A kind of buried water tank of board-type
CN207031092U (en) A kind of waste water aeration apparatus
CN212476291U (en) Compound reinforcing support of sewage treatment aeration system air supply line
CN208667407U (en) A kind of MBR intelligent integral sewage disposal device
CN208378554U (en) A kind of sewage treatment aeration tank
CN215559722U (en) Integrated sewage treatment equipment
CN201458922U (en) Combined septic tank
CN210620952U (en) Pickling bath for stainless steel precise and bright pipe
CN201458918U (en) Buried glass fiber reinforced plastic septic tank
CN220867194U (en) Foam baffle of aerobic tank
CN207270786U (en) A kind of inclined-tube sedimentation tank catch basin
CN103212301B (en) Ultrafiltration membrane pool with secondary on-line coagulation function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant