CN105033948A - Electrical stay wire sleeve installation device - Google Patents

Electrical stay wire sleeve installation device Download PDF

Info

Publication number
CN105033948A
CN105033948A CN201510460880.5A CN201510460880A CN105033948A CN 105033948 A CN105033948 A CN 105033948A CN 201510460880 A CN201510460880 A CN 201510460880A CN 105033948 A CN105033948 A CN 105033948A
Authority
CN
China
Prior art keywords
expansion
fixing
clamp handle
tong
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510460880.5A
Other languages
Chinese (zh)
Other versions
CN105033948B (en
Inventor
张加茂
马向前
陈修坤
冯展勋
秦芳
郑允杰
王超俊
秦培亮
赵德民
康丽娜
邱询伟
高曰勤
陈洪莲
范玲玲
穆超
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HU YAN
State Grid Corp of China SGCC
Original Assignee
Electric Co Of Guo Wang Wulian County Shandong Province County
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Co Of Guo Wang Wulian County Shandong Province County, State Grid Corp of China SGCC filed Critical Electric Co Of Guo Wang Wulian County Shandong Province County
Priority to CN201510460880.5A priority Critical patent/CN105033948B/en
Publication of CN105033948A publication Critical patent/CN105033948A/en
Application granted granted Critical
Publication of CN105033948B publication Critical patent/CN105033948B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • B25B27/14Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

The invention discloses an electrical stay wire sleeve installation device. The device comprises an expansion tong and a fixing tong which are arranged in a front-back mode. The expansion tong comprises two expansion tong handles, and an expansion pin shaft is hinged between the two expansion tong handles. An expansion locking mechanism is disposed between the two expansion tong handles. The two expansion tong handles are each connected with an expansion tong head after being hinged. The two expansion tong heads are each connected with an expansion stretching tong head stretching forwards. The fixing tong comprises two fixing tong handles. A fixing pin shaft is hinged between the two fixing tong handles. A fixing locking mechanism is arranged between the two fixing tong handles. The two fixing tong handles are each connected with a fixing tong head after being hinged. Stay wire clamping half grooves matched with each other are formed between the two fixing tong heads. The expansion pin shaft and the fixing pin shaft are connected with a supporting connection mechanism. By means of the electrical stay wire sleeve installation device, a sleeve can be conveniently installed on an electrical stay wire by one person, the installation device is convenient and quick to use, labor intensity of workers is greatly reduced, and work efficiency is improved.

Description

Line of power sleeve pipe erecting device
Technical field
The present invention relates to a kind of erecting tools of line of power sleeve pipe.
Background technology
Line of power is set with sleeve pipe, and both can play the effect of protection line of power, can prevent damages passes by pedestrian, and the outside of sleeve pipe is designed with obvious candy strip more, can play warning function well again.But, the mar proof of sleeve pipe is poor, and need periodic replacement, this brings larger difficulty to staff, many employing manual type mounting sleeves in prior art, need the gap opening along sleeve pipe to be installed on line of power by sleeve pipe, the gap opening of sleeve pipe is narrow and small, at least needs two people's work compounds, installation in trouble, labour intensity is large, labor intensive, and operating efficiency is not high yet.
Summary of the invention
Technical problem to be solved by this invention is to provide one and is conveniently arranged on line of power by sleeve pipe, and one man operation can complete, conveniently line of power sleeve pipe erecting device.
For solving the problems of the technologies described above, technical scheme of the present invention is: line of power sleeve pipe erecting device, the expansion pincers arranged before and after comprising and fixing pincers, described expansion pincers comprise two expansion clamp handles, expand described in two between clamp handle and be hinged with expansion bearing pin, expand described in two between clamp handle and be provided with expansion retaining mechanism, expand described in two clamp handle hinged after be connected to expansion binding clip, expand binding clip described in two and be connected to the expansion of stretching out forward and lean out binding clip; Described fixing pincers comprise two fixing clamp handles, fix described in two between clamp handle and be hinged with fixed pin shaft, fix described in two between clamp handle and be provided with fixing and locking mechanism, fix described in two clamp handle hinged after be connected to fixed pliers head, be provided with the bracing wire cooperatively interacted described in two between fixed pliers head and clamp half groove; Described expansion bearing pin and described fixed pin shaft are connected with in the described support and connection mechanism expanded between pincers and described fixing pincers.
As preferred technical scheme, described expansion retaining mechanism comprises the expansion of expanding clamp handle hinged described in and struts crossbeam, described expansion struts crossbeam and is provided with some expansions and struts hole, expands clamp handle and be provided with and strut hole with described expansion and coordinate the expansion of grafting to strut pin described in another.
As the improvement to technique scheme, expand the periphery arc leaning out binding clip described in two and arrange and reduce gradually along forward direction radius, expansion described in two leans out the procephalic periphery of pincers and is respectively equipped with ball.
As the further improvement to technique scheme, expand described in two and to expand binding clip described in clamp handle and two and to strut and the direction of closing up oppositely is arranged.
As the further improvement to technique scheme, described fixing and locking mechanism comprise to fix described in one clamp handle hinged fixedly strut crossbeam, the described crossbeam that fixedly struts is provided with some rigid staybolt perforates, fixes clamp handle and be provided with the rigid staybolt expense coordinating grafting with described rigid staybolt perforate described in another.
As improving especially further technique scheme, bracing wire described in two clamps and is respectively equipped with clamping in half groove and adds permanent tooth.
As improving especially further technique scheme, fix fixed pliers head described in clamp handle and two described in two and to strut and the direction of closing up is arranged in the same way.
As improving especially further technique scheme, described support and connection mechanism comprises the two support and connection bodies of rod, locking pin is provided with between the inner of the support and connection body of rod described in two, described locking pin coordinates and is provided with locking nut, the outer end of the support and connection body of rod described in two is bent upwards with described expansion bearing pin respectively and described fixed pin shaft is corresponding connects.
Owing to have employed technique scheme, line of power sleeve pipe erecting device, the expansion pincers arranged before and after comprising and fixing pincers, described expansion pincers comprise two expansion clamp handles, expand described in two between clamp handle and be hinged with expansion bearing pin, expand described in two between clamp handle and be provided with expansion retaining mechanism, expand described in two clamp handle hinged after be connected to expansion binding clip, expand binding clip described in two and be connected to the expansion of stretching out forward and lean out binding clip; Described fixing pincers comprise two fixing clamp handles, fix described in two between clamp handle and be hinged with fixed pin shaft, fix described in two between clamp handle and be provided with fixing and locking mechanism, fix described in two clamp handle hinged after be connected to fixed pliers head, be provided with the bracing wire cooperatively interacted described in two between fixed pliers head and clamp half groove; Described expansion bearing pin and described fixed pin shaft are connected with in the described support and connection mechanism expanded between pincers and described fixing pincers.During use, clamp handle is fixed described in operation two, fixed pliers head described in two clamps half groove clamping line of power by bracing wire described in two, described fixing and locking mechanism fastens to be fixed fixing clamp handle described in two, lean out binding clip and close up by expanding described in two and put in the port of sleeve pipe, clamp handle is expanded described in pinching two, expand binding clip described in drive two to strut, and make to expand described in two to lean out binding clip and strut, the gap opening of sleeve pipe is extended to the diameter being greater than bracing wire, described expansion retaining mechanism fastens to be fixed expanding clamp handle described in two, pulls sleeve pipe until be all enclosed within line of power.The present invention is convenient to be arranged on line of power by sleeve pipe, and one man operation can complete, convenient and swift, greatly reduces the labour intensity of workman, improves operating efficiency.
Accompanying drawing explanation
The following drawings is only intended to schematically illustrate the present invention and explain, not delimit the scope of the invention.Wherein:
Fig. 1 is the structural representation of the embodiment of the present invention;
Fig. 2 be expand pincers in Fig. 1 A-A to structural representation;
Fig. 3 is that the B-B of fixing pincers in Fig. 1 is to structural representation.
In figure: 1-expands pincers; 11-expands clamp handle; 12-expands bearing pin; 13-expands binding clip; 14-expansion leans out binding clip; 15-ball; 21-expansion struts crossbeam; 22-expansion struts hole; 23-expansion struts pin; The fixing pincers of 3-; 31-fixes clamp handle; 32-fixed pin shaft; 33-fixed pliers head; 34-bracing wire clamps half groove; 35-clamping adds permanent tooth; 41-fixedly struts crossbeam; The perforate of 42-rigid staybolt; 43-rigid staybolt expense; The 51-support and connection body of rod; 52-locking pin.
Detailed description of the invention
Below in conjunction with drawings and Examples, set forth the present invention further.In the following detailed description, the mode only by illustrating describes some one exemplary embodiment of the present invention.Undoubtedly, those of ordinary skill in the art can recognize, when without departing from the spirit and scope of the present invention, can revise by various different mode to described embodiment.Therefore, accompanying drawing is illustrative with being described in essence, instead of for limiting the protection domain of claim.
As shown in Fig. 1,2 and Fig. 3, line of power sleeve pipe erecting device, the expansion pincers 1 arranged before and after comprising and fixing pincers 3, described expansion pincers 1 comprise two expansion clamp handles 11, expand described in two between clamp handle 11 and be hinged with expansion bearing pin 12, expand described in two between clamp handle 11 and be provided with expansion retaining mechanism, expand described in two clamp handle 11 hinged after be connected to and expand binding clip 13, expand binding clip 13 described in two and be connected to the expansion of stretching out forward and lean out binding clip 14; Described fixing pincers 3 comprise two fixing clamp handles 31, fix described in two between clamp handle 31 and be hinged with fixed pin shaft 32, fix described in two between clamp handle 31 and be provided with fixing and locking mechanism, fix described in two clamp handle 31 hinged after be connected to fixed pliers head 33, be provided with the bracing wire cooperatively interacted described in two between fixed pliers head 33 and clamp half groove 34; Described expansion bearing pin 12 and described fixed pin shaft 32 are connected with the support and connection mechanism between described expansion pincers 1 and described fixing pincers 3.During use, clamp handle 31 is fixed described in operation two, fixed pliers head 33 described in two clamps half groove 34 by bracing wire described in two and clamps line of power, described fixing and locking mechanism fastens to be fixed fixing clamp handle 31 described in two, lean out binding clip 14 and close up by expanding described in two and put in the port of sleeve pipe, clamp handle 11 is expanded described in pinching two, expand binding clip 13 described in drive two to strut, and make to expand described in two to lean out binding clip 14 and strut, the gap opening of sleeve pipe is extended to the diameter being greater than bracing wire, described expansion retaining mechanism fastens to be fixed expanding clamp handle 11 described in two, pull sleeve pipe until be all enclosed within line of power.The present embodiment is convenient to be arranged on line of power by sleeve pipe, and one man operation can complete, convenient and swift, greatly reduces the labour intensity of workman, improves operating efficiency.
Described expansion retaining mechanism comprises and expands the hinged expansion of clamp handle 11 described in one and strut crossbeam 21, described expansion struts crossbeam 21 and is provided with some expansions and struts hole 22, expands clamp handle 11 and be provided with and strut hole 22 with described expansion and coordinate the expansion of grafting to strut pin 23 described in another.Different described expansions struts hole 22 and struts pin 23 with described expansion and fasten fixing, can regulate the distraction angle expanding described in two and lean out binding clip 14, the size that the gap opening of final adjusting sleeve pipe is softened, but is applicable to the sleeve pipe of different size.
Expand the periphery arc leaning out binding clip 14 described in two arrange and reduce gradually along forward direction radius, said structure is convenient to lean out binding clip 14 put in the port of sleeve pipe by expanding described in two before strutting sleeve pipe; Expand the periphery leaning out binding clip 14 front portion described in two and be respectively equipped with ball 15, described ball 15 can effectively reduce friction, uses less strength just can strut sleeve pipe, reduces the labour intensity of workman.
Expand described in two and to expand binding clip 13 described in clamp handle 11 and two and to strut and the direction of closing up oppositely is arranged, described expansion clamp handle 11 is positioned at the homonymy of described expansion bearing pin 12 with the corresponding described expansion binding clip 13 connected, expand clamp handle 11 described in pinching when strutting, expand binding clip 13 correspondence described in two and close up; Expand clamp handle 11 described in pinching when closing up, expand binding clip 13 correspondence described in two and strut.
Described fixing and locking mechanism comprise to fix described in one clamp handle 31 hinged fixedly strut crossbeam 41, the described crossbeam 41 that fixedly struts is provided with some rigid staybolt perforates 42, fixes clamp handle 31 and be provided with the rigid staybolt expense 43 coordinating grafting with described rigid staybolt perforate 42 described in another.Different described rigid staybolt perforates 42 fastens fixing with described rigid staybolt expense 43, can regulate the distraction angle of fixed pliers head 33 described in two, is applicable to the line of power clamping different size.
Bracing wire described in two clamps and is respectively equipped with clamping in half groove 34 and adds permanent tooth 35, and said structure can clamp line of power further, prevents from sliding during clamping.
Fix fixed pliers head 33 described in clamp handle 31 and two described in two to strut and the direction of closing up is arranged in the same way, described fixing clamp handle 31 is positioned at described fixed pin shaft 32 both sides with the corresponding described fixed pliers head 33 connected, fix clamp handle 31 described in pinching when strutting, described in two, fixed pliers head 33 correspondence struts; Fix clamp handle 31 described in pinching when closing up, described in two, fixed pliers head 33 correspondence is closed up.
Described support and connection mechanism comprises the two support and connection bodies of rod 51, locking pin 52 is provided with between the inner of the support and connection body of rod 51 described in two, described locking pin 52 coordinates and is provided with locking nut, the outer end of the support and connection body of rod 51 described in two is bent upwards with described expansion bearing pin 12 respectively and described fixed pin shaft 32 is corresponding connects.Described fixing pincers 3 nip clamping line of power, by expand described in two lean out binding clip 14 close up put into sleeve pipe port in after, can regulate to expand described in two and lean out the angle of binding clip 14, then tighten described locking nut, facilitate the installation of sleeve pipe.
More than show and describe general principle of the present invention, principal character and advantage of the present invention.The technical staff of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and description just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.Application claims protection domain is defined by appending claims and equivalent thereof.

Claims (8)

1. line of power sleeve pipe erecting device, it is characterized in that: the expansion pincers arranged before and after comprising and fixing pincers, described expansion pincers comprise two expansion clamp handles, expand described in two between clamp handle and be hinged with expansion bearing pin, expand described in two between clamp handle and be provided with expansion retaining mechanism, expand described in two clamp handle hinged after be connected to expansion binding clip, expand binding clip described in two and be connected to the expansion of stretching out forward and lean out binding clip; Described fixing pincers comprise two fixing clamp handles, fix described in two between clamp handle and be hinged with fixed pin shaft, fix described in two between clamp handle and be provided with fixing and locking mechanism, fix described in two clamp handle hinged after be connected to fixed pliers head, be provided with the bracing wire cooperatively interacted described in two between fixed pliers head and clamp half groove; Described expansion bearing pin and described fixed pin shaft are connected with in the described support and connection mechanism expanded between pincers and described fixing pincers.
2. line of power sleeve pipe erecting device as claimed in claim 1, it is characterized in that: described expansion retaining mechanism comprises the expansion of expanding clamp handle hinged described in and struts crossbeam, described expansion struts crossbeam and is provided with some expansions and struts hole, expands clamp handle and be provided with and strut hole with described expansion and coordinate the expansion of grafting to strut pin described in another.
3. line of power sleeve pipe erecting device as claimed in claim 1, is characterized in that: expand the periphery arc leaning out binding clip described in two and arrange and reduce gradually along forward direction radius, expansion described in two leans out the procephalic periphery of pincers and is respectively equipped with ball.
4. line of power sleeve pipe erecting device as claimed in claim 1, is characterized in that: expand described in two and to expand binding clip described in clamp handle and two and to strut and the direction of closing up oppositely is arranged.
5. line of power sleeve pipe erecting device as claimed in claim 1, it is characterized in that: described fixing and locking mechanism comprise to fix described in one clamp handle hinged fixedly strut crossbeam, the described crossbeam that fixedly struts is provided with some rigid staybolt perforates, fixes clamp handle and be provided with the rigid staybolt expense coordinating grafting with described rigid staybolt perforate described in another.
6. line of power sleeve pipe erecting device as claimed in claim 1, is characterized in that: bracing wire described in two clamps and is respectively equipped with clamping in half groove and adds permanent tooth.
7. line of power sleeve pipe erecting device as claimed in claim 1, is characterized in that: fix fixed pliers head described in clamp handle and two described in two and to strut and the direction of closing up is arranged in the same way.
8. the line of power sleeve pipe erecting device as described in claim as arbitrary in claim 1 to 7, it is characterized in that: described support and connection mechanism comprises the two support and connection bodies of rod, locking pin is provided with between the inner of the support and connection body of rod described in two, described locking pin coordinates and is provided with locking nut, the outer end of the support and connection body of rod described in two is bent upwards with described expansion bearing pin respectively and described fixed pin shaft is corresponding connects.
CN201510460880.5A 2015-07-31 2015-07-31 Electrical stay wire sleeve installation device Expired - Fee Related CN105033948B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510460880.5A CN105033948B (en) 2015-07-31 2015-07-31 Electrical stay wire sleeve installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510460880.5A CN105033948B (en) 2015-07-31 2015-07-31 Electrical stay wire sleeve installation device

Publications (2)

Publication Number Publication Date
CN105033948A true CN105033948A (en) 2015-11-11
CN105033948B CN105033948B (en) 2017-01-18

Family

ID=54441216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510460880.5A Expired - Fee Related CN105033948B (en) 2015-07-31 2015-07-31 Electrical stay wire sleeve installation device

Country Status (1)

Country Link
CN (1) CN105033948B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD132914A1 (en) * 1977-08-30 1978-11-15 Reiner Boerner MECHANICAL PRESSING GEAR
DE10217266A1 (en) * 2002-04-18 2003-11-13 Rennsteig Werkzeuge Gmbh Press pliers device for compressing hollow bodies has press lever of elbow lever drive movable with supporting joint along gate machined into fixed pliers part and supported on crank pivoting on bolt
CN2618747Y (en) * 2003-04-28 2004-06-02 林岳华 Pipe expanding clamp
CN2936597Y (en) * 2006-07-13 2007-08-22 常建强 Wire connection pincer for quick connection sleeve joining pipe
CN203853943U (en) * 2014-04-14 2014-10-01 沃德思源集团有限公司 Tool for quickly disassembling insertion tube
CN203911359U (en) * 2014-06-23 2014-10-29 国家电网公司 Mouth opener special for wire drawing sleeve
CN204819369U (en) * 2015-07-31 2015-12-02 国网山东五莲县供电公司 Electric power draws wire sleeve installation device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD132914A1 (en) * 1977-08-30 1978-11-15 Reiner Boerner MECHANICAL PRESSING GEAR
DE10217266A1 (en) * 2002-04-18 2003-11-13 Rennsteig Werkzeuge Gmbh Press pliers device for compressing hollow bodies has press lever of elbow lever drive movable with supporting joint along gate machined into fixed pliers part and supported on crank pivoting on bolt
CN2618747Y (en) * 2003-04-28 2004-06-02 林岳华 Pipe expanding clamp
CN2936597Y (en) * 2006-07-13 2007-08-22 常建强 Wire connection pincer for quick connection sleeve joining pipe
CN203853943U (en) * 2014-04-14 2014-10-01 沃德思源集团有限公司 Tool for quickly disassembling insertion tube
CN203911359U (en) * 2014-06-23 2014-10-29 国家电网公司 Mouth opener special for wire drawing sleeve
CN204819369U (en) * 2015-07-31 2015-12-02 国网山东五莲县供电公司 Electric power draws wire sleeve installation device

Also Published As

Publication number Publication date
CN105033948B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
GB2444208A (en) Gripping assembly for expandable tubulars
CN204369535U (en) The assembly of the valve protection cap of dismounting steel cylinder
BRPI0801634A2 (en) Method for manufacturing pipe and device connectors, in particular to perform the same
ATE443812T1 (en) BLIND RIVET, IN PARTICULAR FOR FASTENING A STRUCTURE AND METHOD FOR INSTRUCTION THEREOF
CN204819369U (en) Electric power draws wire sleeve installation device
CL2018000029A1 (en) Shell and tube equipment with anti-vibration baffles.
CN105033948A (en) Electrical stay wire sleeve installation device
CN204819219U (en) Electric power sheath spread support device that acts as go -between
CN105033879A (en) Electrical stay wire sheath expander
CN109449850B (en) Limit device
CN105047077A (en) Installation and fixation device of aisle alarm tube
CN204833923U (en) Passageway warning pipe installation fixing device
CN103357711A (en) Processing method for bending plate-shaped metal sample into U-shaped metal sample
BR112013027608A2 (en) expansion system for an expandable tubular assembly
CN206357092U (en) An a kind of ball of string for Weaving device is clamped
CN204603000U (en) A kind of aluminum window body fixture for hole drilling
CN101579712A (en) Auxiliary expanding sheath
ES2693453T3 (en) Clamping apparatus with rapidly changing jaw inserts, methods for holding a work piece and stretching machine with such an apparatus
CN204643581U (en) A kind of stripping assembly of crankshaft bearing seat of driving engine
CN204419790U (en) A kind of combined cupboard
JP2010084894A (en) Pipe connecting tool
CN217176210U (en) Double-pin-shaft hinge convenient to install
CN207273141U (en) Flexible extension bar
JPH09314232A (en) Puller device for sheet metal
JP3224010U (en) Tire tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161020

Address after: 262300 No. 150 Binhe Road, Wulian County, Shandong, Rizhao City

Applicant after: HU YAN

Applicant after: State Grid Corporation of China

Address before: 262300, Shandong County, Rizhao City province Wulian Binhe Road No. 150 State Grid Shandong Wulian county power supply company

Applicant before: Electric company of Guo Wang Wulian County, shandong Province county

Applicant before: State Grid Corporation of China

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20170731