CN105006821A CN201510377957.2A CN201510377957A CN105006821A CN 105006821 A CN105006821 A CN 105006821A CN 201510377957 A CN201510377957 A CN 201510377957A CN 105006821 A CN105006821 A CN 105006821A
Authority
CN
China
Prior art keywords
distribution network
power distribution
target function
constraints
flexible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510377957.2A
Other languages
Chinese (zh)
Inventor
黄媚
白恒远
王浩
林子钊
潘凯岩
赵勇
刘尚伟
王承民
谢宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI PROINVENT INFORMATION TECH Ltd
Shenzhen Power Supply Bureau Co Ltd
Dongfang Electronics Co Ltd
Original Assignee
SHANGHAI PROINVENT INFORMATION TECH Ltd
Shenzhen Power Supply Bureau Co Ltd
Dongfang Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI PROINVENT INFORMATION TECH Ltd, Shenzhen Power Supply Bureau Co Ltd, Dongfang Electronics Co Ltd filed Critical SHANGHAI PROINVENT INFORMATION TECH Ltd
Priority to CN201510377957.2A priority Critical patent/CN105006821A/en
Publication of CN105006821A publication Critical patent/CN105006821A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a method and system for researching power distribution network operation mode optimization. The method comprises steps: a current operation mode of a power distribution network is determined, and historical data corresponding to the current operation mode of the power distribution network is obtained; an object function and constraint conditions of power distribution network operation optimization are constructed, corresponding flexible parameters are introduced, and flexible description of the constructed object function and constraint conditions is carried out respectively; based on the object function and the constraint conditions after flexible processing, a multidimensional flexible integrated optimization model of power distribution network operation is formed, the obtained historical data is introduced into the multidimensional flexible integrated optimization model for solving, and the optimal desired value of the current operation mode of the power distribution network is obtained. The constructed optimal model of power distribution network operation is subjected to border flexibility, power distribution network operation structure and parameter change is adapted flexibly, the research flexibility is raised, research is carried out from many aspects and thus research is comprehensive.

Description

A kind of method and system studying power distribution network optimizing operating mode
Technical field
The present invention relates to system for distribution network of power technical field, particularly relate to a kind of method and system studying power distribution network optimizing operating mode.
Background technology
Along with the fast development of power industry and the continuous progress of industrial technology, the particularly deep enforcement of intelligent grid construction, the operation of people to power distribution network proposes more and more higher requirement, this is optimized the operational mode of power distribution network with regard to needing, and makes the operational mode of in fail safe, reliability, economy " optimum ".
Specifically, by adjusting various power equipment in power distribution network, to change the running status of power distribution network, realizing the optimizing operation of power distribution network, being called the optimization of power distribution network operational mode.In the research of power distribution network operational mode, because people's attention degree is inadequate, and be subject to the restriction of existing harvester configuration, be still in the starting stage to the research of power distribution network optimizing operating mode.At present, the method of research power distribution network optimizing operating mode mainly deposits deficiency both ways: the optimal model one, owing to adopting deterministic method establishment power distribution network to run, and the border of these model feasible solutions is rigidity, therefore be difficult to the change tackling power distribution network operating structure and parameter, make formulated optimal operation mode lack flexibility; Two, due to studying in a certain respect only for power distribution network optimizing operating mode, can not study all sidedly, therefore make formulated power distribution network optimal operation mode cannot reach comprehensive optimum.
Therefore, a kind of method needing research power distribution network optimizing operating mode newly badly can solve the problem, and makes formulated power distribution network optimal operation mode reach comprehensive optimum.
Summary of the invention
Embodiment of the present invention technical problem to be solved is, a kind of method and system studying power distribution network optimizing operating mode are provided, the power distribution network set up is run optimal models and carries out border flexibility, the change of flexible adaptation power distribution network operating structure and parameter, improve the flexibility of research, and set about research from many aspects, make research more comprehensive.
In order to solve the problems of the technologies described above, embodiments provide a kind of method studying power distribution network optimizing operating mode, described method comprises:
Determine the current operational mode of power distribution network, and obtain historical data corresponding to the current operational mode of described power distribution network;
Build target function and the constraints of power distribution network running optimizatin, and introduce corresponding flexible parameter, respectively flexibility description is carried out to the target function of described structure and constraints;
Based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and the described historical data got is directed in described multidimensional flexible comprehensive Optimized model solves, obtain the optimum desired value of the current operational mode of described power distribution network.
Wherein, the target function of described structure power distribution network running optimizatin and constraints, and introduce corresponding flexible parameter, comprise the concrete steps that the target function of described structure and constraints carry out flexibility description respectively:
Building with via net loss is the target function optimizing economic index, and structure comprises the constraint of node power equilibrium equation, node voltage retrains and the constraints of Branch Power Flow constraint;
Process in described target function, the constraint of node power equilibrium equation, node voltage constraint and the corresponding flexible parameter of the about intrafascicular introducing of Branch Power Flow respectively.
Wherein, described based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and the described historical data got is directed in described multidimensional flexible comprehensive Optimized model solves, the concrete steps obtaining the optimum desired value of the current operational mode of described power distribution network comprise:
Based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and according to the condition preset, simplify processes is carried out to described multidimensional flexible comprehensive Optimized model;
The described historical data got is directed in the multidimensional flexible comprehensive Optimized model after described simplify processes, and adopts certain algorithm to solve, obtain the optimum desired value of the current operational mode of described power distribution network.
Wherein, described algorithm is Meta-heurist algorithm, comprises genetic algorithm and particle cluster algorithm.
The embodiment of the present invention additionally provides a kind of system studying power distribution network optimizing operating mode, and described system comprises:
Data capture unit, for determining the current operational mode of power distribution network, and obtains historical data corresponding to the current operational mode of described power distribution network;
Flexible parameter introduces unit, for building target function and the constraints of power distribution network running optimizatin, and introduces corresponding flexible parameter, carries out flexibility description respectively to the target function of described structure and constraints;
Model construction and solve unit, for based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and the described historical data got is directed in described multidimensional flexible comprehensive Optimized model solves, obtain the optimum desired value of the current operational mode of described power distribution network.
Wherein, described flexible parameter introducing unit comprises:
Building module, is the target function optimizing economic index for building with via net loss, and structure comprises the constraint of node power equilibrium equation, node voltage retrains and the constraints of Branch Power Flow constraint;
Handling flexibly module, for processing in described target function, the constraint of node power equilibrium equation, node voltage constraint and the corresponding flexible parameter of the about intrafascicular introducing of Branch Power Flow respectively.
Wherein, described model construction and solve unit and comprise:
Model construction and simplification module, for based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and according to the condition preset, carry out simplify processes to described multidimensional flexible comprehensive Optimized model;
Model solution module, for the described historical data got being directed in the multidimensional flexible comprehensive Optimized model after described simplify processes, and adopting certain algorithm to solve, obtaining the optimum desired value of the current operational mode of described power distribution network.
Wherein, described algorithm is Meta-heurist algorithm, comprises genetic algorithm and particle cluster algorithm.
Implement the embodiment of the present invention, there is following beneficial effect:
In embodiments of the present invention, because constraints in the multidimensional flexible comprehensive Optimized model set up carries out flexibility process by introducing flexible parameter, make the border flexibility of constraints, can the change of flexible adaptation power distribution network operating structure and parameter, improve the flexibility of research; Also introducing flexible parameter due to target function in multidimensional flexible comprehensive Optimized model carries out flexibility process simultaneously, therefore can take into account the optimal operation mode research of power distribution network safety in operation, reliability and economy, make research more comprehensive.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, the accompanying drawing obtaining other according to these accompanying drawings still belongs to category of the present invention.
A kind of flow chart studying the method for power distribution network optimizing operating mode that Fig. 1 provides for the embodiment of the present invention;
A kind of structural representation studying the system of power distribution network optimizing operating mode that Fig. 2 provides for the embodiment of the present invention.
Embodiment
For making the object, technical solutions and advantages of the present invention clearly, below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in Figure 1, be a kind of method studying power distribution network optimizing operating mode that the embodiment of the present invention provides, described method comprises:
Step S101, determine the current operational mode of power distribution network, and obtain historical data corresponding to the current operational mode of described power distribution network;
Detailed process is, determines the historical data of the current operational mode of power distribution network and correspondence, and this historical data is in this, as the input data of optimizing operating mode method, and it selects typical Historic Section to analyze from the historical data base of the current operational mode of power distribution network.
In embodiments of the present invention, historical data includes but not limited to resistance, active power, reactive power and the terminal voltage amplitude that the sum of branch road in the current operational mode of power distribution network, each branch road are respectively corresponding, and the active power that in each branch road, each node sends and the burden with power power that reactive power, each node flow through and load or burden without work power, each node voltage magnitude etc.
Step S102, the target function building power distribution network running optimizatin and constraints, and introduce corresponding flexible parameter, carry out flexibility description to the target function of described structure and constraints respectively;
Detailed process is, building with via net loss is the target function optimizing economic index, and builds the constraints comprising the constraint of node power equilibrium equation, node voltage constraint and Branch Power Flow and retrain, specific as follows:
(1) target function built is generally optimize economic index with via net loss, is expressed as:
min f = Σ i = 1 N b R i ( P i 2 + Q i 2 ) V i 2 - - - ( 1 )
In formula (1): N brepresent the branch road sum in distribution network; R irepresent the resistance of i-th branch road; P i, Q irepresent the active power and the reactive power that flow through i-th branch road respectively; V irepresent the terminal voltage amplitude of i-th branch road.
(2) constraints built is mainly fail safe, reliability constraint, generally comprises:
I) node power equilibrium equation constraint
The operation of power distribution network must meet meritorious, the constraint of reactive power equilibrium equation of each node, as follows:
P G i - P L i - V i Σ j ∈ i V j ( G i j cosθ i j + B i j sinθ i j ) = 0 Q G i - Q L i - V i Σ j ∈ i V j ( G i j sinθ i j - B i j cosθ i j ) = 0 - - - ( 2 )
In formula (2): P gi, Q girepresent the active power that node i sends and reactive power respectively; P li, Q lirepresent the burden with power power that node i flows through and load or burden without work power respectively; V irepresent the voltage magnitude of node i; G ij, B ij, θ wjrepresent conductance, susceptance and the phase angle difference between node i and node j respectively.
II) node voltage constraint
In order to ensure the fail safe that power distribution network runs and power supply quality, require the actual conditions in conjunction with power distribution network, by the voltage magnitude Deviation Control of each node in the scope that national standard allows, the voltage magnitude of each node need meet for this reason:
V i,min≤V i≤V i,maxi=1,2,...,N (3)
In formula (3): V i, V i, max, V i, minrepresent voltage magnitude and higher limit, the lower limit of node i respectively; N represents the node total number of distribution system.
III) Branch Power Flow constraint
By the restriction of distribution current carrying capacity of conductor, require that power that each bar branch road flows through is within the specific limits, as follows:
S i≤S i,maxi=1,2,...,N b(4)
In formula (4): S l, S l, maxrepresent the apparent power on i-th branch road and restriction respectively.
In embodiments of the present invention, because above-mentioned set up model is rigid constraint Optimized model, its optimum results has certain one-sidedness and limitation, and lack the flexibility of reply power distribution network parameter change, therefore introduce flexibility analysis to improve above-mentioned set up model, process in target function, the constraint of node power equilibrium equation, node voltage constraint and the corresponding flexible parameter of the about intrafascicular introducing of Branch Power Flow respectively, specific as follows:
I) node power equilibrium equation flexible constraint
In conventional electrical distribution net, node load is generally constant, node power equilibrium equation is caused to become rigidity, therefore node load can be considered as controlled variable, by reasonably Controlling vertex load power, realize the regulation and control objects such as peak load shifting, be expressed as after making formula (2) node power equilibrium equation constrain in the flexible parameter of introducing:
P G i - V i Σ j ∈ i V j ( G i j cosθ i j + B i j sinθ i j ) = P L i + δ L i ΔP L i Q G i - V i Σ j ∈ i V j ( G i j sinθ i j - B i j cosθ i j ) = Q L i + δ L i ΔQ L i - - - ( 5 )
In formula (5): Δ P li, Δ Q lirepresent the meritorious of node i and load or burden without work power deviation respectively; δ lirepresent the load flexibility index of node i, span is [0,1].
The meaning of load flexibility index is, as the δ of node i licomparing other nodes when there is larger association with the power distribution network network loss function, illustrate that the economy that power distribution network is powered to this node load is poor, by reasonably reducing the load of this node, just can improve the macroeconomic that power distribution network runs largely.
II) node voltage flexible constraint
Introduce flexible parameter, formula (3) carried out flexibility and is expressed as:
V i,minViΔV i,min≤V i≤V i,maxViΔV i,max(6)
In formula (6): Δ V i, max, Δ V i, minrepresent V respectively i, max, V i, minthe out-of-limit value of maximum permission; δ virepresent the voltage flexibility index of node i, span is [0,1].
III) Branch Power Flow flexible constraint
The same, introduce flexible parameter, formula (4) is carried out flexibility and is expressed as:
S i≤S i,maxFiΔS i,max(7)
In formula (7): Δ S i, maxrepresent the out-of-limit value of maximum permission of trend on i-th branch road; δ firepresent the trend flexibility index of branch road i, span is [0,1].
According to formula (6) and formula (7) known, when carrying out power distribution network optimizing operating mode, need rationally expand according to the actual conditions of power distribution network or reduce restrained boundary, to improve fail safe that power distribution network runs, reliability and economy.
IV) if only run the angle consideration of constraint from power distribution network, the soft evaluation index of power distribution network operational mode can run the size of feasible zone and the degree of flexibility of system by certainty annuity intuitively, but can not determine the optimal operation mode taking into account power distribution network safety in operation, reliability and economy, need to do flexibility process to target function, to set up the flexible comprehensive Optimized model of power distribution network operational mode for this reason.
Therefore, the via net loss represented by formula (1) directly reflects the economy that power distribution network runs, and introduces flexible parameter, is translated into equality constraint, as follows:
f ′ = Σ i = 1 N b R i ( P i 2 + Q i 2 ) V i 2 = f 0 + δ f Δ f - - - ( 8 )
In formula (8): f 0represent the minimization expected value of power distribution network via net loss; Δ f represents the acceptable maximum recruitment of power distribution network via net loss; δ frepresent via net loss flexibility index, span is [0,1].
From formula (8), via net loss f ' is positioned at [f 0, f 0+ Δ f] between, although the economy that power distribution network runs decreases, can by the damage control of economy aspect within the specific limits, make via net loss index be provided with flexibility, increase the feasible zone that power distribution network runs.
Step S103, based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and the described historical data got is directed in described multidimensional flexible comprehensive Optimized model solves, obtain the optimum desired value of the current operational mode of described power distribution network.
Detailed process is, based on the target function after flexibility process and constraints, forms the multidimensional flexible comprehensive Optimized model that power distribution network runs, specific as follows:
max f ( δ ) = - δ f 2 + 1 N Σ i = 1 N δ L i 2 + 1 N Σ i = 1 N δ V i 2 + 1 N b Σ j = 1 N b δ F j 2
s . t . f ′ = Σ i = 1 N b R i ( P i 2 + Q i 2 ) V i 2 = f 0 + δ f Δ f P G i - V i Σ j ∈ i V j ( G i j cosθ i j + B i j sinθ i j ) = P L i + δ L i ΔP L i Q G i - V i Σ j ∈ i V j ( G i j sinθ i j - B i j cosθ i j ) = Q L i + δ L i ΔQ L i V i , min - δ V i ΔV i , min ≤ V i ≤ V i , max + δ V i ΔV i , max S j ≤ S j , max + δ F j ΔS j , max 0 ≤ δ f , δ L i , δ V i , δ F j ≤ 1 i = 1 , 2 , ... , N ; j = 1 , 2 , ... , N b - - - ( 9 )
From formula (9), the value of each flexibility index reflects the running status of power distribution network from different angles: via net loss flexibility index δ fless, show that via net loss f ' is less, the economy that power distribution network runs is higher; Node voltage flexibility index δ viwith Branch Power Flow flexibility index δ filarger, show that the margin of safety run is larger, the safety and reliability that power distribution network runs is higher.Maximization f (δ) means makes δ findex is as far as possible little, makes δ li, δ viand δ fjindex is as far as possible large, thus make tried to achieve operational mode reach economy, fail safe, the many-sided comprehensive optimum of reliability, the optimal solution of simultaneously trying to achieve also assures that to have larger flexibility, has stronger adaptibility to response to the changeable factor in power distribution network.
In embodiments of the present invention, because formula (9) introduces more flexibility index, the scale of solving model is had certain increase, and become a complicated non-linear higher-dimension mixed-integer programming model, direct solution formula (9) is very complicated, need, according to the condition preset, to carry out simplify processes to multidimensional flexible comprehensive Optimized model for this reason, specific as follows:
1) due under normal circumstances, generally to meeting the workload demand of each node as far as possible, not paying the utmost attention to the economy improving overall operation by reducing some node load, therefore get the load flexibility index δ of each node li=0;
2) suppose that the trend flexibility index of all equal, each bar branch road of the voltage flexibility index of each node is all equal.
Further, the historical data got is directed in the multidimensional flexible comprehensive Optimized model after simplify processes, and adopts certain algorithm to solve, obtain the optimum desired value of the current operational mode of power distribution network; Wherein, algorithm is Meta-heurist algorithm, comprises genetic algorithm and particle cluster algorithm.
As shown in Figure 2, be a kind of system studying power distribution network optimizing operating mode that the embodiment of the present invention provides, described system comprises:
Data capture unit 210, for determining the current operational mode of power distribution network, and obtains historical data corresponding to the current operational mode of described power distribution network;
Flexible parameter introduces unit 220, for building target function and the constraints of power distribution network running optimizatin, and introduces corresponding flexible parameter, carries out flexibility description respectively to the target function of described structure and constraints;
Model construction and solve unit 230, for based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and the described historical data got is directed in described multidimensional flexible comprehensive Optimized model solves, obtain the optimum desired value of the current operational mode of described power distribution network.
Wherein, flexible parameter introducing unit 220 comprises:
Building module 2201, is the target function optimizing economic index for building with via net loss, and structure comprises the constraint of node power equilibrium equation, node voltage retrains and the constraints of Branch Power Flow constraint;
Handling flexibly module 2202, for processing in described target function, the constraint of node power equilibrium equation, node voltage constraint and the corresponding flexible parameter of the about intrafascicular introducing of Branch Power Flow respectively.
Wherein, model construction and solve unit 230 and comprise:
Model construction and simplification module 2301, for based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and according to the condition preset, simplify processes is carried out to described multidimensional flexible comprehensive Optimized model;
Model solution module 2302, for the described historical data got being directed in the multidimensional flexible comprehensive Optimized model after described simplify processes, and adopting certain algorithm to solve, obtaining the optimum desired value of the current operational mode of described power distribution network.
Wherein, algorithm is Meta-heurist algorithm, comprises genetic algorithm and particle cluster algorithm
Implement the embodiment of the present invention, there is following beneficial effect:
In embodiments of the present invention, because constraints in the multidimensional flexible comprehensive Optimized model set up carries out flexibility process by introducing flexible parameter, make the border flexibility of constraints, can the change of flexible adaptation power distribution network operating structure and parameter, improve the flexibility of research; Also introducing flexible parameter due to target function in multidimensional flexible comprehensive Optimized model carries out flexibility process simultaneously, therefore can take into account the optimal operation mode research of power distribution network safety in operation, reliability and economy, make research more comprehensive.
It should be noted that in said system embodiment, each included system unit is carry out dividing according to function logic, but is not limited to above-mentioned division, as long as can realize corresponding function; In addition, the concrete title of each functional unit, also just for the ease of mutual differentiation, is not limited to protection scope of the present invention.
One of ordinary skill in the art will appreciate that all or part of step realized in above-described embodiment method is that the hardware that can carry out instruction relevant by program has come, described program can be stored in a computer read/write memory medium, described storage medium, as ROM/RAM, disk, CD etc.
Above disclosedly be only present pre-ferred embodiments, certainly can not limit the interest field of the present invention with this, therefore according to the equivalent variations that the claims in the present invention are done, still belong to the scope that the present invention is contained.

Claims (8)

1. study a method for power distribution network optimizing operating mode, it is characterized in that, described method comprises:
Determine the current operational mode of power distribution network, and obtain historical data corresponding to the current operational mode of described power distribution network;
Build target function and the constraints of power distribution network running optimizatin, and introduce corresponding flexible parameter, respectively flexibility description is carried out to the target function of described structure and constraints;
Based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and the described historical data got is directed in described multidimensional flexible comprehensive Optimized model solves, obtain the optimum desired value of the current operational mode of described power distribution network.
2. the method for claim 1, it is characterized in that, the target function of described structure power distribution network running optimizatin and constraints, and introduce corresponding flexible parameter, comprise the concrete steps that the target function of described structure and constraints carry out flexibility description respectively:
Building with via net loss is the target function optimizing economic index, and structure comprises the constraint of node power equilibrium equation, node voltage retrains and the constraints of Branch Power Flow constraint;
Process in described target function, the constraint of node power equilibrium equation, node voltage constraint and the corresponding flexible parameter of the about intrafascicular introducing of Branch Power Flow respectively.
3. the method for claim 1, it is characterized in that, described based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and the described historical data got is directed in described multidimensional flexible comprehensive Optimized model solves, the concrete steps obtaining the optimum desired value of the current operational mode of described power distribution network comprise:
Based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and according to the condition preset, simplify processes is carried out to described multidimensional flexible comprehensive Optimized model;
The described historical data got is directed in the multidimensional flexible comprehensive Optimized model after described simplify processes, and adopts certain algorithm to solve, obtain the optimum desired value of the current operational mode of described power distribution network.
4. method as claimed in claim 3, it is characterized in that, described algorithm is Meta-heurist algorithm, comprises genetic algorithm and particle cluster algorithm.
5. study a system for power distribution network optimizing operating mode, it is characterized in that, described system comprises:
Data capture unit, for determining the current operational mode of power distribution network, and obtains historical data corresponding to the current operational mode of described power distribution network;
Flexible parameter introduces unit, for building target function and the constraints of power distribution network running optimizatin, and introduces corresponding flexible parameter, carries out flexibility description respectively to the target function of described structure and constraints;
Model construction and solve unit, for based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and the described historical data got is directed in described multidimensional flexible comprehensive Optimized model solves, obtain the optimum desired value of the current operational mode of described power distribution network.
6. system as claimed in claim 5, is characterized in that, described flexible parameter is introduced unit and comprised:
Building module, is the target function optimizing economic index for building with via net loss, and structure comprises the constraint of node power equilibrium equation, node voltage retrains and the constraints of Branch Power Flow constraint;
Handling flexibly module, for processing in described target function, the constraint of node power equilibrium equation, node voltage constraint and the corresponding flexible parameter of the about intrafascicular introducing of Branch Power Flow respectively.
7. system as claimed in claim 5, is characterized in that, described model construction and solve unit and comprise:
Model construction and simplification module, for based on the target function after described flexibility process and constraints, form the multidimensional flexible comprehensive Optimized model that power distribution network runs, and according to the condition preset, carry out simplify processes to described multidimensional flexible comprehensive Optimized model;
Model solution module, for the described historical data got being directed in the multidimensional flexible comprehensive Optimized model after described simplify processes, and adopting certain algorithm to solve, obtaining the optimum desired value of the current operational mode of described power distribution network.
8. system as claimed in claim 7, it is characterized in that, described algorithm is Meta-heurist algorithm, comprises genetic algorithm and particle cluster algorithm.
CN201510377957.2A 2015-07-01 2015-07-01 Method and system for researching power distribution network operation mode optimization Pending CN105006821A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510377957.2A CN105006821A (en) 2015-07-01 2015-07-01 Method and system for researching power distribution network operation mode optimization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510377957.2A CN105006821A (en) 2015-07-01 2015-07-01 Method and system for researching power distribution network operation mode optimization

Publications (1)

Publication Number Publication Date
CN105006821A true CN105006821A (en) 2015-10-28

Family

ID=54379386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510377957.2A Pending CN105006821A (en) 2015-07-01 2015-07-01 Method and system for researching power distribution network operation mode optimization

Country Status (1)

Country Link
CN (1) CN105006821A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108736483A (en) * 2018-06-21 2018-11-02 北京能源集团有限责任公司 A kind of the determination method and determination system of power system operating mode
CN108899902A (en) * 2018-08-08 2018-11-27 深圳供电局有限公司 A kind of system and method for flexibility power distribution network optimizing operating mode
CN112001558A (en) * 2020-08-31 2020-11-27 广东电网有限责任公司广州供电局 Method and device for researching optimal operation mode of power distribution network equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101764407A (en) * 2010-01-08 2010-06-30 杨毅 Planning method of distribution network based on fuzzy expected value model
CN102945296A (en) * 2012-10-15 2013-02-27 河海大学 Method for reconstructing and modeling uncertainty of distribution network in demand response viewing angle
CN103280821A (en) * 2013-06-25 2013-09-04 国家电网公司 Multi-period dynamic reactive power optimization method of intelligent power distribution system
CN104008434A (en) * 2014-06-06 2014-08-27 上海交通大学 Flexible constraint optimization method of electric power system
CN104318326A (en) * 2014-10-15 2015-01-28 国家电网公司 Net rack optimizing model for improving renewable energy source acceptance ability

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101764407A (en) * 2010-01-08 2010-06-30 杨毅 Planning method of distribution network based on fuzzy expected value model
CN102945296A (en) * 2012-10-15 2013-02-27 河海大学 Method for reconstructing and modeling uncertainty of distribution network in demand response viewing angle
CN103280821A (en) * 2013-06-25 2013-09-04 国家电网公司 Multi-period dynamic reactive power optimization method of intelligent power distribution system
CN104008434A (en) * 2014-06-06 2014-08-27 上海交通大学 Flexible constraint optimization method of electric power system
CN104318326A (en) * 2014-10-15 2015-01-28 国家电网公司 Net rack optimizing model for improving renewable energy source acceptance ability

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108736483A (en) * 2018-06-21 2018-11-02 北京能源集团有限责任公司 A kind of the determination method and determination system of power system operating mode
CN108736483B (en) * 2018-06-21 2020-07-10 北京能源集团有限责任公司 Method and system for determining power grid operation mode
CN108899902A (en) * 2018-08-08 2018-11-27 深圳供电局有限公司 A kind of system and method for flexibility power distribution network optimizing operating mode
CN112001558A (en) * 2020-08-31 2020-11-27 广东电网有限责任公司广州供电局 Method and device for researching optimal operation mode of power distribution network equipment

Similar Documents

Publication Publication Date Title
Sheng et al. Optimal placement and sizing of distributed generation via an improved nondominated sorting genetic algorithm II
Li et al. Improved decomposition–coordination and discrete differential dynamic programming for optimization of large-scale hydropower system
CN106655227B (en) A kind of active power distribution network feeder line balancing method of loads based on intelligent Sofe Switch
CN106655177B (en) Distributed generation resource maximum access capability calculation method based on extension Second-order cone programming
CN103591637B (en) A kind of central heating secondary network runing adjustment method
CN108023364B (en) Power distribution network distributed generation resource maximum access capability calculation method based on convex difference planning
CN102402725B (en) For the Multi-target optimized energy management information processing method of virtual plant
CN104794541B (en) A kind of power distribution network running optimizatin method based on simulated annealing and cone optimization
CN106600136B (en) Power section out-of-limit control efficiency evaluation method
Rasoulzadeh-Gharibdousti et al. Optimal design and operation of pumping stations using NLP-GA
WO2024109103A1 (en) Joint control method for gates, apparatus, and parallel water supply and power generation system
CN110011358B (en) Distribution network load state adjustment controller
CN105006821A (en) Method and system for researching power distribution network operation mode optimization
CN108092284A (en) A kind of three-phase imbalance intelligent distribution network network reconstruction method based on linear model
CN107437815A (en) The optimal control method and relevant device of speed regulator in Hydropower Unit
CN103904664B (en) A kind of AGC unit real-time scheduling method based on effective static security territory
CN111626539B (en) Q reinforcement learning-based power grid operation section dynamic generation method
Shang et al. Production scheduling optimization method based on hybrid particle swarm optimization algorithm
CN103116274A (en) Track optimization method for switching cannular polypropylene production marks
Yuan et al. A SAFSA-and metabolism-based nonlinear grey Bernoulli model for annual water consumption prediction
CN104810834B (en) Many section 500kV electric network reactive compensations switching strategy optimization methods based on voltage sensibility
CN117348400A (en) Water network multichannel parallel linkage control system
CN104466979A (en) Transmission grid reactive power optimization regulation and control system and method
Chanfreut et al. Distributed model predictive control based on dual decomposition with neural-network-based warm start
CN103631991A (en) Parameter identification system and method of prime mover speed regulating system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151028