CN105003745A - Improved structure of petroleum pipeline fixing bracket with object of improving use range - Google Patents

Improved structure of petroleum pipeline fixing bracket with object of improving use range Download PDF

Info

Publication number
CN105003745A
CN105003745A CN201510403551.7A CN201510403551A CN105003745A CN 105003745 A CN105003745 A CN 105003745A CN 201510403551 A CN201510403551 A CN 201510403551A CN 105003745 A CN105003745 A CN 105003745A
Authority
CN
China
Prior art keywords
groove
fixed
grooves
petroleum pipeline
concave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510403551.7A
Other languages
Chinese (zh)
Other versions
CN105003745B (en
Inventor
贺昶明
Original Assignee
Chengdu Kesheng Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Kesheng Petroleum Technology Co Ltd filed Critical Chengdu Kesheng Petroleum Technology Co Ltd
Priority to CN201510403551.7A priority Critical patent/CN105003745B/en
Publication of CN105003745A publication Critical patent/CN105003745A/en
Application granted granted Critical
Publication of CN105003745B publication Critical patent/CN105003745B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/10Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
    • F16L3/1075Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing with two members, the two members being joined with a hinge on one side and fastened together on the other side

Abstract

The invention relates to an improved structure of a petroleum pipeline fixing bracket with the object of improving the use range. The improved structure comprises a base, wherein fixing plates are arranged at the bottom end of the base, the upper end of the base is recessed downwards to form a concave through groove, a flange is arranged at one end of the side wall of the concave through groove, threaded grooves are formed in the flange, the other end of the side wall of the concave through groove is hinged to an arc-shaped fixing plate, a fixing piece matched with the flange is arranged at the end part of the arc-shaped fixing plate, threaded through holes are formed in the fixing piece, screw levers are matched with the threaded through holes and the threaded grooves, fixing grooves I are formed in the two ends of the inner side of the arc-shaped fixing plate, and fixing grooves II are formed in the two ends of the inner side of the concave through groove. The number of the fixing grooves I is increased through the cooperation of clamping pieces I and baffles I, the number of the fixing grooves II is increased through the cooperation of clamping pieces II and baffles II, and then, a clamping plate I and a clamping plate II which are matched with the fixing grooves I and the fixing grooves II are respectively arranged, so that the size of a clamped petroleum pipeline is reduced. The number of the fixing grooves I and the number of the fixing grooves II can be properly increased or reduced according to the size of the petroleum pipeline to be fixed.

Description

Based on the modified node method of the petroleum pipeline fixing frame of raising using scope
Technical field
The present invention relates to pipe fixing bracket field, particularly, relate to a kind of modified node method of the petroleum pipeline fixing frame based on raising using scope.
Background technique
Oil after exploitation is in transportation process, because the route of transport is long, the use fixing frame at interval petroleum pipeline must be clamped in transportation route for the petroleum pipeline that transports, avoid petroleum pipeline because the intermediate section of the middle cardioptosia that causes of the transport of long distance and the petroleum pipeline problem of subsiding downwards.Fixing frame is as the supporting structure of petroleum pipeline, also different according to the concrete structure of the ground environment of petroleum pipeline approach and the difference of weather conditions fixing frame used, but be substantially all the carrier ring including base and the setting of base upper end, existing fixing frame can only be used for the petroleum pipeline of fixing same size, also need to change fixing frame to the pipeline of different-diameter, not only use inconvenience, and cost is high, poor practicability.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of modified node method of the petroleum pipeline fixing frame based on raising using scope, can only be used for the fixing petroleum pipeline of same size, the problem of poor practicability to overcome existing fixing frame.
The present invention's adopted technological scheme that solves the problem is: based on the modified node method of petroleum pipeline fixing frame improving using scope, comprise rectangular-shaped pedestal, the surrounding of base bottom is provided with fixed plate, fixed plate is provided with some fixed holes, the upper end of pedestal is recessed to form concave through grooves downwards, sidewall one end of concave through grooves is provided with chimb, the end of chimb has established some thread grooves, the other end by rotating shaft and arc fixed plate hinged, the end of arc fixed plate is provided with the fixed plate coordinated with chimb, fixed plate is provided with the tapped through hole coordinated with thread groove, leading screw and tapped through hole, thread groove coordinates, the two ends of the axially inner side of described arc fixed plate are provided with fixed groove I, fixed groove I is provided with baffle plate I away from the side upper and lower end of arc fixed plate, the side that 2 baffle plates I are relative is provided with draw-in groove I, two fixed grooves I are connected with the cooperation of draw-in groove I by being arranged on the card I on fixed groove I, grip block I is arranged between the fixed groove I at the axially two ends of inner side of arc fixed plate, the two ends of the axially inner side of described concave through grooves are provided with fixed groove II, fixed groove II is provided with baffle plate II away from the side upper and lower end of concave through grooves, the side that 2 baffle plates II are relative is provided with draw-in groove II, two fixed grooves II are connected with the cooperation of draw-in groove II by being arranged on the card II on fixed groove II, grip block II is arranged between the fixed groove II at the axially two ends of inner side of concave through grooves.Existing fixing frame can only be used for the petroleum pipeline of fixing same size, also need to change fixing frame to the pipeline of different-diameter, not only use inconvenience, and cost is high, poor practicability, concave through grooves of the present invention specifically refer to this groove be fed through pedestal to side, other two offsides become the sidewall of groove, and the bottom of groove is the arcuate structure of depression, the outwardly formation arc plate of arc fixed plate, the retaining ring coordinated with petroleum pipeline outer wall is complemented each other to form with concave through grooves, described thread groove specifically refers to that inwall is provided with the groove of worm structure, described fixed groove I, fixed groove II specifically refer to that upper-end surface offers the rectangular block of groove I, groove II respectively, the length of rectangular block is consistent with arc fixed plate length in the axial direction, the present invention is in practical process, the one end first arc fixed plate being provided with fixed plate is opened, petroleum pipeline is placed on after in concave through grooves, again arc fixed plate is closed, fixed plate is coordinated with chimb, also tighten gradually with leading screw insertion fixed hole and thread groove, thus arc fixed plate coordinates with concave through grooves and is well fixed in fixing frame by petroleum pipeline, the present invention coordinates by card I and baffle plate I the increase realizing fixed groove I, the increase realizing fixed groove II is coordinated by card II and baffle plate II, again respectively arrange coordinate with fixed groove I, fixed groove II clamping version I, clamp version II, and then reduce the size of clamped petroleum pipeline, the present invention carrys out suitable increase by the size of actual anchor stone oil-piping or reduces fixed groove I, fixed groove II, so, instant invention overcomes existing fixing frame and can only be used for the fixing petroleum pipeline of same size, the problem of poor practicability.
Further, the bottom of fixed groove I, fixed groove II, draw-in groove I, draw-in groove II is provided with elastic structure.The setting of elastic structure is convenient to clamp version I, clamping version II is established with the card of fixed groove I, fixed groove II, is convenient to card I, card II is established with the card of draw-in groove I, draw-in groove II, is more convenient operation.
Further, the lower end surrounding of pedestal is arranged and stiffening plate.The setting of stiffening plate makes pedestal more firm, improves the stability of pedestal, thus the stability of whole fixing device is strengthened.
Further, the sidewall of pedestal is provided with nameplate draw-in groove.Be convenient to place the nameplate for indicating and record fixing frame essential information, to carry out maintenance management and maintenance to fixing frame.
Further, the end of leading screw is provided with handle.Turning of leading screw is convenient in the setting of handle, improves the convenience of leading screw operation.
To sum up, the invention has the beneficial effects as follows:
1, the present invention coordinates by card I and baffle plate I increase realizing fixed groove I; The increase realizing fixed groove II is coordinated by card II and baffle plate II, again respectively arrange coordinate with fixed groove I, fixed groove II clamping version I, clamp version II, and then reducing the size of clamped petroleum pipeline, the present invention carrys out suitable increase by the size of actual anchor stone oil-piping or reduces fixed groove I, fixed groove II.
2, the present invention to be coordinated with concave through grooves by arc fixed plate and is well fixed in fixing device by petroleum pipeline, avoids petroleum pipeline because shaking the offset problem caused.
3, the present invention is arranged and stiffening plate by the lower end surrounding at pedestal, improves the stability of pedestal, thus the stability of whole fixing frame is strengthened.
Accompanying drawing explanation
Fig. 1 is the structural representation of petroleum pipeline fixing frame;
Fig. 2 is fixed groove I and grip block I cooperating structure schematic diagram.
Mark and corresponding component title in accompanying drawing:
1-pedestal; 2-rotating shaft; 3-arc fixed plate; 4-leading screw; 5-grip block I; 6-; 11-fixed plate; 12-stiffening plate; 13-nameplate draw-in groove; 14-chimb; 15-concave through grooves; 16-grip block II; 17-baffle plate II; 18-card II; 31-fixed plate; 32-fixed groove I; 33-baffle plate I; 34-card I; 41-handle.
Embodiment
Below in conjunction with embodiment and accompanying drawing, the present invention is described in further detail, but embodiments of the present invention are not limited thereto.
Embodiment:
As Fig. 1, shown in Fig. 2, based on the modified node method of the petroleum pipeline fixing frame of raising using scope, comprise rectangular-shaped pedestal 1, the surrounding of pedestal 1 bottom is provided with fixed plate 11, fixed plate 11 is provided with some fixed holes, the lower end surrounding of pedestal 1 is arranged and stiffening plate 12, the sidewall of pedestal 1 is provided with nameplate draw-in groove 13, the upper end of pedestal 1 is recessed to form concave through grooves 15 downwards, sidewall one end of concave through grooves 15 is provided with chimb 14, the end of chimb 14 has established some thread grooves, the other end is hinged by rotating shaft 2 and arc fixed plate 3, the end of arc fixed plate 3 is provided with the fixed plate 31 coordinated with chimb 14, fixed plate 31 is provided with the tapped through hole coordinated with thread groove, leading screw 4 and tapped through hole, thread groove coordinates, the end of leading screw 4 is provided with handle 41, the two ends of the axially inner side of described arc fixed plate 3 are provided with fixed groove I 32, fixed groove I 32 is provided with baffle plate I 33 away from the side upper and lower end of arc fixed plate 3, the side that 2 baffle plates I 33 are relative is provided with draw-in groove I, two fixed grooves I 32 are connected with the cooperation of draw-in groove I by being arranged on the card I 34 on fixed groove I 32, grip block I 5 is arranged between the fixed groove I 32 at the axially two ends of inner side of arc fixed plate 3, the two ends of the axially inner side of described concave through grooves 15 are provided with fixed groove II 16, fixed groove II 16 is provided with baffle plate II 17 away from the side upper and lower end of concave through grooves 15, the side that 2 baffle plates II 17 are relative is provided with draw-in groove II, two fixed grooves II 16 are connected with the cooperation of draw-in groove II by being arranged on the card II 18 on fixed groove II 16, grip block II 6 is arranged between the fixed groove II 16 at the axially two ends of inner side of concave through grooves 15, described fixed groove I 32, fixed groove II 16, draw-in groove I, the bottom of draw-in groove II is provided with elastic structure.
As mentioned above, the present invention can be realized preferably.

Claims (5)

1. based on the modified node method of the petroleum pipeline fixing frame of raising using scope, it is characterized in that, comprise rectangular-shaped pedestal (1), the surrounding of pedestal (1) bottom is provided with fixed plate (11), (11) are provided with some fixed holes with fixed plate, the upper end of pedestal (1) is recessed to form concave through grooves (15) downwards, sidewall one end of concave through grooves (15) is provided with chimb (14), the end of chimb (14) has established some thread grooves, the other end is hinged by rotating shaft (2) and arc fixed plate (3), the end of arc fixed plate (3) is provided with the fixed plate (31) coordinated with chimb (14), (31) are provided with the tapped through hole coordinated with thread groove to fixed plate, leading screw (4) and tapped through hole, thread groove coordinates, the two ends of the axially inner side of described arc fixed plate (3) are provided with fixed groove I (32), fixed groove I (32) is provided with baffle plate I (33) away from the side upper and lower end of arc fixed plate (3), the side that 2 baffle plates I (33) are relative is provided with draw-in groove I, two fixed grooves I (32) are connected with the cooperation of draw-in groove I by being arranged on the card I (34) on fixed groove I (32), grip block I (5) is arranged between the fixed groove I (32) at the axially two ends of inner side of arc fixed plate (3), the two ends of the axially inner side of described concave through grooves (15) are provided with fixed groove II (16), fixed groove II (16) is provided with baffle plate II (17) away from the side upper and lower end of concave through grooves (15), the side that 2 baffle plates II (17) are relative is provided with draw-in groove II, two fixed grooves II (16) are connected with the cooperation of draw-in groove II by being arranged on the card II (18) on fixed groove II (16), grip block II (6) is arranged between the fixed groove II (16) at the axially two ends of inner side of concave through grooves (15).
2. the modified node method of the petroleum pipeline fixing frame based on raising using scope according to claim 1, it is characterized in that, the bottom of described fixed groove I (32), fixed groove II (16), draw-in groove I, draw-in groove II is provided with elastic structure.
3. the modified node method of the petroleum pipeline fixing frame based on raising using scope according to claim 1 and 2, is characterized in that, the lower end surrounding of described pedestal (1) is arranged and stiffening plate (12).
4. the modified node method of the petroleum pipeline fixing frame based on raising using scope according to claim 3, is characterized in that, the sidewall of described pedestal (1) is provided with nameplate draw-in groove (13).
5. the modified node method of the petroleum pipeline fixing frame based on raising using scope according to claim 4, it is characterized in that, the end of described leading screw (4) is provided with handle (41).
CN201510403551.7A 2015-07-12 2015-07-12 Based on the improved structure improved using the petroleum pipeline fixed mount of scope Expired - Fee Related CN105003745B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510403551.7A CN105003745B (en) 2015-07-12 2015-07-12 Based on the improved structure improved using the petroleum pipeline fixed mount of scope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510403551.7A CN105003745B (en) 2015-07-12 2015-07-12 Based on the improved structure improved using the petroleum pipeline fixed mount of scope

Publications (2)

Publication Number Publication Date
CN105003745A true CN105003745A (en) 2015-10-28
CN105003745B CN105003745B (en) 2017-07-04

Family

ID=54376531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510403551.7A Expired - Fee Related CN105003745B (en) 2015-07-12 2015-07-12 Based on the improved structure improved using the petroleum pipeline fixed mount of scope

Country Status (1)

Country Link
CN (1) CN105003745B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105966442A (en) * 2016-06-06 2016-09-28 成都大漠石油技术有限公司 Pipeline transportation mechanism based on clamping diversity improvement
CN109630759A (en) * 2018-12-28 2019-04-16 邵阳学院 Clamp-type support of pipelines with three-dimensional vibration-damping function
CN110513539A (en) * 2019-09-29 2019-11-29 江阴市星宇塑胶有限公司 A kind of Combined pipe fitting double bracket
CN112032576A (en) * 2020-08-12 2020-12-04 临沂实康水务有限公司 Distributed pipe network leakage monitoring device based on Raman temperature measurement

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4252466A (en) * 1978-10-17 1981-02-24 Snamprogetti, S.P.A. Adjustable apparatus for supporting a pipe, laid on a deep sea bed, at a depression in the sea bed
CN203836392U (en) * 2014-05-04 2014-09-17 成都辉腾塑胶有限公司 Adjustable pipeline support
CN204103417U (en) * 2014-06-19 2015-01-14 国网四川省电力公司成都市新都供电分公司 Anchor ear type cable trough cable support
CN104390054A (en) * 2014-10-31 2015-03-04 无锡金顶石油管材配件制造有限公司 Petroleum pipeline support
CN204879059U (en) * 2015-07-12 2015-12-16 成都科盛石油科技有限公司 A petroleum pipeline mount for fixing different pipe diameters

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4252466A (en) * 1978-10-17 1981-02-24 Snamprogetti, S.P.A. Adjustable apparatus for supporting a pipe, laid on a deep sea bed, at a depression in the sea bed
CN203836392U (en) * 2014-05-04 2014-09-17 成都辉腾塑胶有限公司 Adjustable pipeline support
CN204103417U (en) * 2014-06-19 2015-01-14 国网四川省电力公司成都市新都供电分公司 Anchor ear type cable trough cable support
CN104390054A (en) * 2014-10-31 2015-03-04 无锡金顶石油管材配件制造有限公司 Petroleum pipeline support
CN204879059U (en) * 2015-07-12 2015-12-16 成都科盛石油科技有限公司 A petroleum pipeline mount for fixing different pipe diameters

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105966442A (en) * 2016-06-06 2016-09-28 成都大漠石油技术有限公司 Pipeline transportation mechanism based on clamping diversity improvement
CN109630759A (en) * 2018-12-28 2019-04-16 邵阳学院 Clamp-type support of pipelines with three-dimensional vibration-damping function
CN110513539A (en) * 2019-09-29 2019-11-29 江阴市星宇塑胶有限公司 A kind of Combined pipe fitting double bracket
CN112032576A (en) * 2020-08-12 2020-12-04 临沂实康水务有限公司 Distributed pipe network leakage monitoring device based on Raman temperature measurement

Also Published As

Publication number Publication date
CN105003745B (en) 2017-07-04

Similar Documents

Publication Publication Date Title
CN105003745A (en) Improved structure of petroleum pipeline fixing bracket with object of improving use range
CN204879059U (en) A petroleum pipeline mount for fixing different pipe diameters
CN105042192A (en) Improved structure of fixing device for preventing petroleum pipeline from deviating
CN204485921U (en) A kind of test tube stand
CN205165929U (en) Adjustable chuck
CN104976425A (en) Improved petroleum pipeline clamping device
CN203868524U (en) Oil pipe support frame
CN204805721U (en) Prevent distorting pipeline support frame
CN203924111U (en) Underground municipal Pipe rack
CN204171914U (en) Inspection shaft pipe fitting clamping device
CN208467774U (en) A kind of vertical sliding frock clamp for pipe fitting drilling
CN104989878A (en) Petroleum pipeline fixing frame convenient for replacing location limiting plates
CN207056612U (en) A kind of stirring reaction platform structure
CN203726382U (en) Assembly positioning device for swinging arms
CN204204339U (en) 500kV line steel tower Installation Mark board special stand
CN205076421U (en) Can dismantle spacing bearing roller frame of movable belt
CN205927308U (en) Construction pipe cutting jig
CN204265244U (en) A kind of pedestal of fuel line hanger
CN204523984U (en) Easy-to-mount threeway punch device
CN104607920A (en) Bearing dismantling device
CN207840731U (en) A kind of horizontal sliding frock clamp for pipe fitting drilling
CN204265245U (en) A kind of structure of pedestal of fuel line hanger
CN204240928U (en) Ship cylinder cover supporting shoulder lower surface tapering and depth of groove appliance special for detecting
CN208528559U (en) A kind of bull fixture for pipe fitting drilling
CN205342524U (en) Part drilling positioning fixture

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zheng Weidong

Inventor after: Xie Mina

Inventor after: Gao Pingping

Inventor before: He Changming

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170607

Address after: The three district two road 510000 Guangdong city of Guangzhou province Panyu District 42 Asian Games athlete village nine Room 401

Applicant after: Xie Jianzhi

Address before: 610000 Sichuan city of Chengdu province high tech Zone Shiyang Industrial Park

Applicant before: Chengdu Kesheng Petroleum Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170704

Termination date: 20180712