CN105003597B - Steel cable core conveying belt shells belting - Google Patents
Steel cable core conveying belt shells belting Download PDFInfo
- Publication number
- CN105003597B CN105003597B CN201510468300.7A CN201510468300A CN105003597B CN 105003597 B CN105003597 B CN 105003597B CN 201510468300 A CN201510468300 A CN 201510468300A CN 105003597 B CN105003597 B CN 105003597B
- Authority
- CN
- China
- Prior art keywords
- stripping
- hook
- adhesive tape
- conveying belt
- power traction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16G—BELTS, CABLES, OR ROPES, PREDOMINANTLY USED FOR DRIVING PURPOSES; CHAINS; FITTINGS PREDOMINANTLY USED THEREFOR
- F16G3/00—Belt fastenings, e.g. for conveyor belts
- F16G3/10—Joining belts by sewing, sticking, vulcanising, or the like; Constructional adaptations of the belt ends for this purpose
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16G—BELTS, CABLES, OR ROPES, PREDOMINANTLY USED FOR DRIVING PURPOSES; CHAINS; FITTINGS PREDOMINANTLY USED THEREFOR
- F16G3/00—Belt fastenings, e.g. for conveyor belts
- F16G3/16—Devices or machines for connecting driving-belts or the like
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Belt Conveyors (AREA)
Abstract
The present invention provides a kind of steel cable core conveying belt stripping belting, including:Power traction device, hook device and stripping band device;The power traction device is used to provide tractive force;Hook is provided with the hook device, the hook device is connected with the power traction device;Connection component that the stripping includes being set on the hook with device, the stripping that is set on Steel cord is with portion and is connected to the connecting portion of the connection component and the stripping with portion, and the stripping fits in the outer wall that Steel cord exposes from adhesive tape with portion.The steel cable core conveying belt stripping belting that the present invention is provided, can improve the stripping band efficiency of steel cable core conveying belt.
Description
Technical field
The present invention relates to coal mine conveying belt field, more particularly to a kind of steel cable core conveying belt stripping belting.
Background technology
Substantial amounts of belt feeder has been used to be used for conveying material in shaft production, belt feeder is to be used as material using flexible conveyer belt
The mechanical device of carrying, the material of conveyer belt is a lot, wherein, steel cable core conveying belt is covered by the both sides padded in steel wire rope
Rubber and be made, because its tensile strength is big, shock resistance is good, long lifespan the advantages of, be widely used in shaft production.
In the installation of steel cable core conveying belt and maintenance process, it is necessary to be conveyed to Steel cord under some scenes
Band carries out stripping band and vulcanizing treatment, for example:When steel cable core conveying belt length not enough needs to lengthen processing, Steel cord conveying
During band well damage, etc..It is so-called that stripping tape handling is carried out to steel cable core conveying belt, refer to the upper strata of steel cable core conveying belt
The process that the Steel cord laying of adhesive tape, lower floor's adhesive tape and wrapped wire wire rope core is peeled off, upper strata adhesive tape and lower floor's adhesive tape are
Comparatively, for example, when steel cable core conveying belt is put on the ground, the adhesive tape as upper strata for the one side that workman can see
Adhesive tape, the adhesive tape for the one side being affixed with ground is lower floor's adhesive tape, and the Steel cord laying of wrapped wire wire rope core is located at upper strata
Between adhesive tape and lower floor's adhesive tape.So-called vulcanizing treatment, refers to during conveying band joint is connected, by adding in raw material glue
Sulphur, generates flexible rubber to connect the process of conveyer belt after heating mixing.
At present, for the stripping band of steel cable core conveying belt, all using artificial operation, i.e. operating personnel use cutter by steel
The upper strata adhesive tape of cord core conveyer belt and lower floor's adhesive tape peel off Steel cord laying, then using cutter by Steel cord from bag
Stripped out in the Steel cord laying for wrapping up in Steel cord.In the process, it is necessary to which putting into a large amount of manpowers carries out artificial stripping band so that
Stripping is with extremely inefficient.
The content of the invention
The present invention provides a kind of steel cable core conveying belt stripping belting, improves the stripping band efficiency of steel cable core conveying belt.
The steel cable core conveying belt stripping belting that the present invention is provided, including:Power traction device, hook device and stripping band device;
The power traction device is used to provide tractive force;
Hook is provided with the hook device, the hook device is connected with the power traction device;
Connection component that the stripping includes being set on the hook with device, the stripping band portion that is set on Steel cord and
The connecting portion of the connection component and the stripping with portion is connected to, the stripping fits in what Steel cord exposed from adhesive tape with portion
Outer wall.
According to device as described above, optionally, the stripping band portion is enclosed by wire to be set as or is enclosed by elongated metal piece
It is set as.
According to device as described above, optionally, the hook device is square-shaped metal plate, the square-shaped metal plate
A line, which is fixed with, to be additionally provided with multiple hooks, the square-shaped metal plate for leading to for being connected with the power traction device
Hole;Or
The hook device is isosceles triangle metallic plate, and the base of the isosceles triangle metallic plate is fixed with multiple extensions
It is additionally provided with hook, the isosceles triangle metallic plate on the through hole for being connected with the dynamic connector, the base
The center that vertical line passes through the through hole.
According to device as described above, optionally, the hook has multiple, and the spacing between each hook is equal.
According to device as described above, optionally, the spacing between at least two hooks is more than where described two hooks
4/5ths of the length on side.
According to device as described above, optionally, in addition to:
Connects chain, the connects chain is connected to the through hole and the power traction device.
According to device as described above, optionally, the power traction device is drawing hoist.
According to device as described above, optionally, the steel cable core conveying belt stripping belting also includes:Adhesive tape is pressed from both sides;
The adhesive tape folder includes doubling portion, linking arm and the connector being sequentially connected;
Wherein, the spacing that the doubling portion is included between two sheet metals being oppositely arranged, two sheet metals can pass through institute
Linking arm adjustment is stated, the doubling portion is used to clamp the upper strata adhesive tape or lower floor's adhesive tape in the steel cable core conveying belt;
The linking arm includes two forearms and two postbrachiums, one end of two forearms respectively with described two metals
Piece is connected, and is hinged between two forearms, is hinged between two postbrachiums, two forearms respectively with described two after
Arm is hinged, and upper-arm circumference sets to form quadrangle after two forearms and two;
The connector is connected with the power traction device and the connector is connected with two postbrachiums respectively.
According to device as described above, optionally, the relative side of described two sheet metals is provided with anti-slip veins.
The steel cable core conveying belt stripping belting that the present invention is provided, including power traction device, hook device and stripping band device, shell band
When, stripping of the stripping with device fits in the outer wall that Steel cord exposes from adhesive tape with portion, and connection component of the stripping with device is set in hook
On the hook of device, power traction device, hook device and stripping band device are sequentially connected, and pull hook device by power traction device, and then drag
Drag stripping band device and carry out stripping band, because during stripping band, by power traction, the outer wall that Steel cord can be close to portion by shelling is moved
Move to peel off on the adhesive tape of wrapped wire wire rope core, it is not necessary to artificial by a stripping of Steel cord piece, therefore, greatly improve
The stripping band efficiency of Steel cord.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are this hairs
Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the structural representation that the steel cable core conveying belt that the embodiment of the present invention one is provided shells belting;
Fig. 2A~Fig. 2 C are that the steel cable core conveying belt that the embodiment of the present invention one is provided is shelling the signal of the state with during
Figure;
Fig. 3 is a kind of structural representation for implementation of the stripping with device that the embodiment of the present invention one is provided;
Fig. 4 is the structural representation for another implementation of the stripping with device that the embodiment of the present invention one is provided;
Fig. 5 is the structural representation for another implementation of the stripping with device that the embodiment of the present invention one is provided;
Fig. 6 is a kind of top view of the implementation for the hook device that the embodiment of the present invention two is provided;
Fig. 7 is a kind of front view of the implementation for the hook device that the embodiment of the present invention two is provided;
Fig. 8 is the top view of another implementation for the hook device that the embodiment of the present invention two is provided;
Fig. 9 is the front view of another implementation for the hook device that the embodiment of the present invention two is provided;
Figure 10 is the structural representation for the adhesive tape folder that the embodiment of the present invention three is provided.
Description of reference numerals:
11:Connection component; 13:Shell band portion;
15:Connecting portion; 21:Hook;
23:Through hole; 25:Base;
27:Vertical line; 31:Doubling portion;
33:Linking arm; 35:Connector;
101:Power traction device; 103:Hook device;
105:Stripping band device; 201:Steel cable core conveying belt joint;
203:Steel cable core conveying belt termination; 301:Forearm;
303:Postbrachium; 311:Sheet metal;
401:Steel cord.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art
The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 1 is the structural representation that the steel cable core conveying belt that the embodiment of the present invention one is provided shells belting.Such as Fig. 1 institutes
Show that the steel cable core conveying belt stripping belting that the present embodiment is provided can include:Power traction device 101, hook device 103 and stripping
Band device 105.
Wherein, power traction device 101 is used to provide tractive force;Hook is provided with hook device 103, hook device 103 is with moving
Power tractor 101 is connected;Shell includes the connection component being set on hook, the stripping band portion being set on Steel cord with device 105
And the connecting portion of connection component and stripping with portion is connected to, stripping fits in the outer wall that Steel cord exposes from adhesive tape with portion.
Illustrate the structural representation of the Steel cord conveying stripping belting of the present embodiment using way of example below.It please join
According to Fig. 2A~Fig. 2 C, Fig. 2A~Fig. 2 C are that the steel cable core conveying belt that the embodiment of the present invention one is provided is shelling the state with during
Schematic diagram, the steel cable core conveying belt stripping belting that the present embodiment is provided, concrete operating principle is as follows:
As shown in Figure 2 A, steel cable core conveying belt needs the part connected to have an end face perpendicular to Steel cord,
The steel cable core conveying belt needs the part connected to be referred to as steel cable core conveying belt joint 201, and it is defeated that the end face is referred to as Steel cord
Send belt end 203.Steel cable core conveying belt joint 201 is laid on operating desk, the adhesive tape layer of upward one side is upper strata glue
Band, the adhesive tape layer for pressing close to the one side of operating desk is lower floor's adhesive tape.It is being pre-determined distance L apart from steel cable core conveying belt termination 203
Place carries out looking for middle operation to steel cable core conveying belt joint 201, and midpoint is labeled as O, by midpoint O on the adhesive tape of upper strata according to connecing
Head angle, θ marks angular rim AB.
Upper strata adhesive tape is peeled off at the angular rim AB of the upper strata adhesive tape of steel cable core conveying belt joint 201, exposes and is located at
Steel cord laying between upper strata adhesive tape and lower floor's adhesive tape.
Overturn steel cable core conveying belt joint 201 so that lower floor's adhesive tape of steel cable core conveying belt joint 201 be changed into
On, mark angular rim corresponding with upper strata adhesive tape angular rim AB on lower floor's adhesive tape, i.e., the angular rim drawn on lower floor's adhesive tape with
The plane that the angular rim AB that upper strata adhesive tape is drawn is constituted is cut perpendicular to ground, and at the angular rim of lower floor's adhesive tape, in steel
The cutting belt that width is W is formed on cord core conveying belt joint 201.For example, the cutting belt is parallelogram, the cutting belt
One long side is the angular rim marked on lower floor's adhesive tape, and the length of short side is W.Lower floor's adhesive tape at cutting belt is peeled off, dew
Go out Steel cord laying, the adhesive tape of the Steel cord laying in cutting belt is peeled off, i.e., every steel will be wrapped up in cutting belt
Adhesive tape between the adhesive tape and Steel cord of cord core is peeled off, and exposes the outer wall of Steel cord 401.Wherein, width W is according to need
It is configured, it is preferred that width W can be 200 millimeters.
Stripping band portion of the stripping with device 105 is set on Steel cord 401, inwall of the stripping with portion fits in Steel cord 401
Outer wall, shell upper strata adhesive tape of the connection component with device 105 towards steel cable core conveying belt joint 201.Steel cord is conveyed
Belt lacing 201 is turned back so that upwards, now, connection component is in Steel cord for the upper strata adhesive tape of steel cable core conveying belt joint 201
The top of conveying band joint 201, the state of steel cable core conveying belt now is as shown in Figure 2 B.The connection group with device 105 will be shelled
Part is set on the hook of hook device 103, because hook device 103 is connected with power traction device 101, passes through power traction device 101
The tractive force of offer, power traction device 101 pulls hook device 103, and then pulls stripping band device 105, due to shelling the stripping band with device 105
The inwall in portion fits in the outer wall that Steel cord 401 exposes from adhesive tape, therefore, in the distraction procedure of power traction device 101,
Stripping can be close to the movement of the outer wall of Steel cord 401 so as to by wrapped wire rope on steel cable core conveying belt joint 201 with portion 105
The remaining adhesive tape of core 401 is peeled off, meanwhile, also the lower floor's adhesive tape being covered under Steel cord pad is peeled off in the lump, separated
The end-state of the steel cable core conveying belt of Steel cord 401 is as shown in Figure 2 C.
It should be noted that in above process, the upper strata adhesive tape of steel cable core conveying belt joint 201 can not also be independent
Peel off, i.e. marked on the upper strata adhesive tape of steel cable core conveying belt joint 201 after angular rim AB, overturning, Steel cord is defeated
Before sending belt lacing 201, it is not necessary to carry out the step of upper strata adhesive tape is peeled off, it is only necessary to formed at angular rim AB by subsequent step
The cutting belt that one width is W, the upper strata adhesive tape in cutting belt, lower floor's adhesive tape and Steel cord laying are peeled off,
So that all Steel cords in cutting belt expose outer wall, and then stripping band portion of the stripping with device 105 can be set on Steel cord,
By adjusting power and then the traction stripping band completion stripping band of device 105 that power traction device 101 is provided.Due to need not be by upper strata adhesive tape
The step of stripping, it can further lift stripping band efficiency.
It can be seen that, the Steel cord provided by the present embodiment shells belting, is close to steel by being set on Steel cord
The stripping band portion of cord outer core, by power traction, can completely strip out Steel cord, it is not necessary to artificial by Steel cord one
Piece stripping of root, therefore, substantially increases the stripping band efficiency of Steel cord.
Optionally, stripping band portion is enclosed by wire is set as or is enclosed by elongated metal piece to be set as.
Optionally, power traction device 101 can be drawing hoist.
Optionally, stripping band device 105 can be multiple.It is in Steel cord conveying due to being arranged stripping band device on Steel cord
Carried out under the rollover states of belt lacing 201, when stripping band device 105 is multiple, once can be arranged stripping on many Steel cords
A stripping band device 105 is arranged on band device 105, every Steel cord, so, steel cable core conveying belt joint 201 is turned back, will be many
Individual connection component of the stripping with device 105 is set on the hook of hook device 103, under the power traction that power traction device 101 is provided,
Once-through operation can just strip out many Steel cords, so as to further increase the stripping band efficiency of steel cable core conveying belt.
, can be with it should be noted that the stripping band device 105 that the present embodiment is provided, including connection component, stripping band portion and connecting portion
By being integrally formed realization, it can also be realized by Split type structure, the present embodiment is not any limitation as to this.
Optionally, Fig. 3 is a kind of structural representation for implementation of the stripping with device that the embodiment of the present invention one is provided, and is such as schemed
Shown in 3, stripping band device 105 is Split type structure, and stripping band device 105 includes:Be set in hook on connection component 11, be set in steel wire rope
Stripping on core is with portion 13 and is connected to the connecting portion 15 of connection component 11 and stripping with portion 13.
Wherein, connection component 11 is pre-formed, then is arranged on connecting portion 15, for example, be welded on connecting portion 15.Shell band
Portion 13 is that during stripping band, stripping can be set in the Steel cord in cutting belt with portion 13 with adjusted size of not close ring
On, fit in the outer wall that Steel cord exposes from adhesive tape with portion 13 by being sized so that shelling.Stripping band device 105 passes through split
Structure realizes that the material and structure for each section are simultaneously not particularly limited, it is possible to achieve mechanism diversity of the stripping with device, carries
Height stripping is with adaptability of the device for Steel cord.
Optionally, Fig. 4 is the structural representation for another implementation of the stripping with device that the embodiment of the present invention one is provided, such as
Shown in Fig. 4, stripping band device 105 is formed in one structure, and stripping band device 105 can be made up of an one metal wire, by the two ends of wire
The connection component 11 being set on hook is bent to form, before stripping band, the center section of wire is bent, hung in cutting belt
Steel cord on, by the two ends of cross-wires the center section of wire is set on Steel cord so as to being formed
Band portion 13 is shelled, inwall of the stripping with portion 13 will fit in the outer wall that Steel cord exposes from adhesive tape, connection component 11 and stripping band portion
It is connecting portion 15 between 13.Stripping band device 105 is integrally formed realization by an one metal wire, can improve intensity of the stripping with device 105,
Be conducive to improving stripping band effect.
Optionally, Fig. 5 is the structural representation for another implementation of the stripping with device that the embodiment of the present invention one is provided, such as
Shown in Fig. 5, stripping band device 105 is formed in one structure, and stripping band device 105 can be made up of an elongated metal piece, in strip
The two ends providing holes formation of sheet metal is set in the connection component 11 on hook, before stripping band, by the centre of elongated metal piece
Part is bent, and is formed and is shelled band portion 13, and is set on the Steel cord in cutting belt, by by the cross cap of connection component 11
On the hook for being located at hook device 103, the center section of elongated metal piece can form the stripping band portion being set on Steel cord
13, stripping will fit in the outer wall that Steel cord exposes from adhesive tape with portion 13.It is connection between connection component 11 and stripping band portion 13
Portion 15.Stripping band device 105 is integrally formed realization by an elongated metal piece, and stripping band portion can be caused to be pasted with Steel cord outer wall
That closes is even closer, is conducive to improving stripping band effect.
Present embodiments provide a kind of steel cable core conveying belt stripping belting, including power traction device, hook device and stripping band
Device, wherein, shell includes being set in the connection component on linking up with, the stripping band portion being set on Steel cord and is connected to device
The connecting portion of connected components and stripping with portion, stripping fits in the outer wall that Steel cord exposes from adhesive tape with portion.What the present embodiment was provided
Steel cable core conveying belt shells belting, and hook device is pulled by power traction device, and then pulls stripping band device, due to shelling the stripping with device
The outer wall that Steel cord exposes from adhesive tape is fitted in portion, therefore, during stripping band, by power traction, stripping band portion can
Moved with being close to the outer wall of Steel cord so as to which the adhesive tape of wrapped wire wire rope core be peeled off, it is artificial by Steel cord due to not needing
A piece stripping, therefore, substantially increases the stripping band efficiency of Steel cord.
Fig. 6 is a kind of top view of the implementation for the hook device that the embodiment of the present invention two is provided, and Fig. 7 is implemented for the present invention
A kind of front view of the implementation for the hook device that example two is provided;Fig. 8 is the another of the hook device that the embodiment of the present invention two is provided
The top view of implementation is planted, Fig. 9 is the front view of another implementation for the hook device that the embodiment of the present invention two is provided, please
Referring concurrently to Fig. 6~Fig. 9.There is provided the specific implementation of hook device on the basis of embodiment one for the present embodiment.
As shown in Fig. 6~Fig. 7, hook device is square-shaped metal plate, and a line of square-shaped metal plate is fixed with multiple extensions
The through hole 23 for being connected with power traction device is additionally provided with hook 21, square-shaped metal plate.
As shown in Fig. 8~Fig. 9, hook device is isosceles triangle metallic plate, and the base 25 of isosceles triangle metallic plate is fixed
Have on the through hole 23 being additionally provided with multiple hooks 21, isosceles triangle metallic plate for being connected with power traction device, base 25
The center that passes through through hole 23 of vertical line 27.Under identical tractive force, Fig. 8 and through hole 23 shown in Fig. 9 are closer to isosceles triangle
Summit, shell it is bigger with the pulling force suffered by device 105.
Optionally, the hook set on hook device can have multiple, and the spacing between each hook is equal, as shown in Figure 6.
Optionally, 4/5ths of the length on side where the spacing between at least two hooks is more than this two hooks, such as
Shown in Fig. 8.Certainly, hook in Fig. 6 is it can also be provided that the spacing between at least two hooks is more than side where two hooks
Length 4/5ths, Fig. 8 in hook it can also be provided that the spacing between each hook is equal, with specific reference to being actually needed
Setting, will not be repeated here.
Optionally, steel cable core conveying belt stripping belting can also include:Connects chain, connects chain is connected to through hole 23
With power traction device.The connects chain can be the rope made of hemp, steel wire rope etc..
The specific implementation of hook device is present embodiments provided, passes through square or the hook of isosceles triangular structure
Device so that the uniform force of hook device everywhere, enhances traction effect, improves stripping band efficiency.
Figure 10 is the structural representation for the adhesive tape folder that the embodiment of the present invention three is provided, and the present embodiment is on the basis of embodiment one
On there is provided steel cable core conveying belt shell belting another implementation.As shown in Figure 10, the steel wire that the present embodiment is provided
Wire rope core conveyer belt shells belting, can include:Power traction device, hook device and stripping band device, in addition to adhesive tape are pressed from both sides.
Adhesive tape folder includes doubling portion 31, linking arm 33 and the connector 35 being sequentially connected.
Wherein, the spacing that doubling portion 31 is included between two sheet metals 311 being oppositely arranged, two sheet metals 311 can lead to
Cross linking arm 33 to adjust, doubling portion 31 is used to clamp the upper strata adhesive tape or lower floor's adhesive tape in steel cable core conveying belt.That is embodiment
The instrument of a kind of stripping upper strata adhesive tape and lower floor's adhesive tape can press from both sides for the adhesive tape of the present embodiment.
Linking arm 33 includes two forearms 301 and two postbrachiums 303, one end of two forearms 301 respectively with two metals
Piece 311 is connected, and is hinged between two forearms 301, is hinged between two postbrachiums 303, two forearms 301 respectively with two postbrachiums
303 are hinged, and two forearms 301 and two postbrachiums 303 enclose and set to form quadrangle.
Connector 35 is connected with power traction device and connector 35 is connected with two postbrachiums 303 respectively.Shown in Figure 10
Connector 35 can be inc cyclic structure, that is, the articulated section having between cyclic structure jaggy, two postbrachiums 303 can
With through the breach of connector 35, and the two side ends of breach are separately fixed to by fixed component the both sides of the articulated section.When
So, through hole can also be set at two equitant positions of postbrachium 303, and connector 35 is a ring bodies, and connector 35 passes through logical
Hole.Certainly, connector 35 also has many kinds with the mode that postbrachium 303 is connected, and can specifically set according to actual needs, herein not
Repeat again.
Power traction device, hook device and stripping band device, its structure and operation principle and the phase of embodiment one that the present embodiment is provided
Together, it will not be repeated here.
In the present embodiment, in addition to adhesive tape folder, stripping band during, adhesive tape folder can be used for steel cable core conveying belt
Upper strata adhesive tape or lower floor adhesive tape peel off.Specifically, during upper strata adhesive tape or lower floor's adhesive tape is peeled off, by two phases
Adhesive tape is clamped to the doubling portion 31 of the formation of sheet metal 311 of setting, is connected by connector 35 with power traction device, thus it is possible to vary
Two forearms 301 and two postbrachiums 303 enclose the shape of the quadrangle set, so as to adjust the spacing between two sheet metals, i.e. can
To adjust the dynamics that doubling portion 31 clamps adhesive tape.The tractive force that power traction device is provided is bigger, then doubling portion 31 clamps adhesive tape
Dynamics is also bigger, is conducive to quickly peeling off upper strata adhesive tape or lower floor's adhesive tape, further improves stripping band efficiency.
It should be noted that during stripping tape, adhesive tape can be divided into multiple long strip type subbands in advance, so
Adhesive tape is peeled off by adhesive tape folder and power traction device burst afterwards.
Optionally, two relative sides of sheet metal 311 are provided with anti-slip veins.
Present embodiments provide a kind of steel cable core conveying belt stripping belting, including power traction device, hook device, stripping band device
With adhesive tape folder, hook device is pulled by power traction device, and then pulls stripping band device, steel wire is fitted in due to shelling the stripping band portion with device
The outer wall that wire rope core exposes from adhesive tape, therefore, during stripping band, by power traction, stripping band portion can be close to Steel cord
Outer wall movement so as to which the adhesive tape of wrapped wire wire rope core be peeled off, due to need not be artificial by a stripping of Steel cord piece,
Therefore, the stripping band efficiency of Steel cord is substantially increased.It is connected by adhesive tape folder with power traction device, the doubling portion folder of adhesive tape folder
The firmly upper strata adhesive tape or lower floor's adhesive tape of steel cable core conveying belt, by power traction, by the upper strata glue of steel cable core conveying belt
Band or lower floor's adhesive tape are peeled off, and further increase the stripping band efficiency of Steel cord.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent
The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to
The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered
Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology
The scope of scheme.
Claims (8)
1. a kind of steel cable core conveying belt shells belting, it is characterised in that including:Power traction device, hook device and stripping band device;
The power traction device is used to provide tractive force;
Hook is provided with the hook device, the hook device is connected with the power traction device;
The stripping includes the connection component being set on the hook, the stripping band portion being set on Steel cord and connection with device
In the connecting portion of the connection component and the stripping with portion, the stripping with portion fit in that Steel cord exposes from adhesive tape it is outer
Wall;
The steel cable core conveying belt stripping belting also includes:Adhesive tape is pressed from both sides;
The adhesive tape folder includes doubling portion, linking arm and the connector being sequentially connected;
Wherein, the spacing that the doubling portion is included between two sheet metals being oppositely arranged, two sheet metals can pass through the company
Arm adjustment is connect, the doubling portion is used to clamp the upper strata adhesive tape or lower floor's adhesive tape in the steel cable core conveying belt;
The linking arm includes two forearms and two postbrachiums, and one end of two forearms connects with described two sheet metals respectively
Connect, be hinged between two forearms, is hinged between two postbrachiums, two forearms are cut with scissors with two postbrachiums respectively
Connect, and upper-arm circumference sets to form quadrangle after two forearms and two;
The connector is connected with the power traction device and the connector is connected with two postbrachiums respectively.
2. device according to claim 1, it is characterised in that the stripping band portion is enclosed by wire to be set as or by strip gold
Category piece, which encloses, to be set as.
3. device according to claim 1, it is characterised in that the hook device is square-shaped metal plate, the square
The a line of metallic plate, which is fixed with multiple hooks, the square-shaped metal plate, to be additionally provided with for connecting with the power traction device
The through hole connect;Or
The hook device is isosceles triangle metallic plate, and the base of the isosceles triangle metallic plate is fixed with multiple hooks, institute
The vertical line stated on the through hole being additionally provided with isosceles triangle metallic plate for being connected with the power traction device, the base leads to
Cross the center of the through hole.
4. between the device according to any one of claims 1 to 3, it is characterised in that the hook has multiple, and each hook
Spacing it is equal.
5. device according to claim 3, it is characterised in that the spacing between at least two hooks is more than described two hang
4/5ths of the length on side where hook.
6. device according to claim 3, it is characterised in that also include:
Connects chain, the connects chain is connected to the through hole and the power traction device.
7. device according to claim 1, it is characterised in that the power traction device is drawing hoist.
8. device according to claim 1, it is characterised in that the relative side of described two sheet metals is provided with anti-skidding
Line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510468300.7A CN105003597B (en) | 2015-07-30 | 2015-07-30 | Steel cable core conveying belt shells belting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510468300.7A CN105003597B (en) | 2015-07-30 | 2015-07-30 | Steel cable core conveying belt shells belting |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105003597A CN105003597A (en) | 2015-10-28 |
CN105003597B true CN105003597B (en) | 2017-09-29 |
Family
ID=54376394
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510468300.7A Active CN105003597B (en) | 2015-07-30 | 2015-07-30 | Steel cable core conveying belt shells belting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105003597B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106515190A (en) * | 2016-12-20 | 2017-03-22 | 潍坊盛瑞铸造有限公司 | Conveyor line removing device |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001066907A (en) * | 1999-08-26 | 2001-03-16 | Fuji Xerox Co Ltd | Image forming device |
CN2936672Y (en) * | 2006-08-16 | 2007-08-22 | 上海尼罗斯硫化运输设备有限公司 | Peeler tractor for peeling conveyer belt steel wire rope core |
CN102218755A (en) * | 2011-05-11 | 2011-10-19 | 李超 | Wire cable belt head stripper |
CN204852170U (en) * | 2015-07-30 | 2015-12-09 | 淮南矿业(集团)有限责任公司 | Belting is shelled to wire rope core conveyer belt |
-
2015
- 2015-07-30 CN CN201510468300.7A patent/CN105003597B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105003597A (en) | 2015-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5812325B2 (en) | Electric wire tension reduction device and electric wire tension reduction method | |
CN105003597B (en) | Steel cable core conveying belt shells belting | |
CN206957328U (en) | Wiring, bracing wire predetermined manufactured operation platform | |
CN207638298U (en) | A kind of double strain hardware fitting strings of ground wire simply connected | |
CN111559612A (en) | Method for replacing belt of coal conveyor | |
CN204852170U (en) | Belting is shelled to wire rope core conveyer belt | |
CN205051256U (en) | A pay -off for power distribution network | |
CN110867777B (en) | Modular submarine cable dragging tool | |
CN206857703U (en) | For the Log Grapple on woodland lumber carrier | |
CN207559258U (en) | It cuts and clamp cable device | |
CN206336691U (en) | 3 D stereo is mining belt carcass | |
CN207530433U (en) | For replacing the specific purpose tool of suspension clamp shield lines | |
CN205489294U (en) | Second grade formula electric power construction cable tractor that goes forward one by one | |
CN209433950U (en) | A kind of automatic cutting thread casing equipment | |
CN203723189U (en) | Lifting device for moving trees planted in gardens | |
CN206870932U (en) | A kind of mountain region pole trailer equipment | |
CN205153317U (en) | But propelling movement formula outband is put finished steel stranded conductor that cramps ring and is restrainted | |
CN207569147U (en) | A kind of rope hook of adjustable rope lengths | |
US1764905A (en) | Stump puller | |
CN207151332U (en) | The thread-laying device of crops and the seton device containing the thread-laying device | |
CN207497913U (en) | A kind of aluminium alloy bars special hanger | |
CN204966163U (en) | Stranding machine and many line tension control device thereof | |
CN203921916U (en) | Timber gathering-device | |
CN205134744U (en) | But propelling movement formula in -band is put finished steel stranded conductor that cramps ring and is restrainted | |
CN205555594U (en) | Joint homogenization cloth machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |