CN105002988B - Bar with linkage function - Google Patents
Bar with linkage function Download PDFInfo
- Publication number
- CN105002988B CN105002988B CN201510364029.2A CN201510364029A CN105002988B CN 105002988 B CN105002988 B CN 105002988B CN 201510364029 A CN201510364029 A CN 201510364029A CN 105002988 B CN105002988 B CN 105002988B
- Authority
- CN
- China
- Prior art keywords
- connector
- bulb
- barred body
- linkage function
- flow channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention belongs to technical field of buildings, is related to a kind of bar with linkage function.Solves prior art technical problem inconvenient to use.Including the barred body in bar shaped, the barred body both ends are respectively equipped with a bulb and a connector are arranged with each bulb, and the connector has accommodating cavity.The bar of the present invention is strong with adaptive, and suitable for different prefabricated components, fit connection can realize the quick connection between two prefabricated components.
Description
Technical field
The invention belongs to technical field of buildings, is related to a kind of bar with linkage function.
Background technology
The applicant pushes up pile extension and prefabricated component [Authorization Notice No. in the patent applied before under spiral shell:
CN100348803C] in, by drawing nut, top pull nut and pile pile longitudinal reinforcement to form positioned at rising for pile pile both ends, wherein, drawing of rising
Nut and top pull nut are internal thread structure, and for the internal thread to hale screw thread, cap bottom center is provided with reinforced hole, the week of reinforced hole
Side is reinforcing bar end upset chuck, and the both ends upsetting of pile pile longitudinal reinforcement is connected in chuck into heading.The pile for prestressed pipe pile extension by
Rise and draw nut, top pull nut, combination sleeve, intermediate sleeve and connecting rod to form, wherein, rising, to draw nut and top pull nut be internal thread
Structure, for the internal thread to hale screw thread, cap bottom center is provided with reinforced hole, and the periphery of reinforced hole is reinforcing bar end upset chuck, pile pile
The both ends upsetting of longitudinal reinforcement is connected in chuck into heading;Connecting rod one end is dentalation, and the other end is external thread structure;Two
Piece or multi-disc combination sleeve be located in top pull nut, it is described combination sleeve on the inside of be in dentalation and with the dentation knot in connecting rod
Structure matches;Intermediate sleeve is external thread structure, is screwed in top pull nut and positioned at two panels or multi-disc combination sleeve top;Docking
When, connecting rod one end draws the screw thread of nut to be screwed on rising, and the other end combines sleeve with the two panels in top pull nut or multi-disc and formed
Clamping.
Docking calculation between the prestressing force prefabricated component, the end for two prefabricated components to be docked are respectively equipped with several
Rise and draw nut and be located at several corresponding top pull nuts, two panels or multi-disc combination sleeve in top pull nut, it is middle
Cover and be screwed in top pull nut and in two panels or multi-disc combination sleeve, connecting rod one end is screwed on the drawing nut that rises, the other end
Sleeve is combined with the two panels in top pull nut or multi-disc and forms clamping.
In above-mentioned scheme, rise and draw nut, the longitudinal reinforcement of top pull nut difference connecting tube pile cages, longitudinal reinforcement
Two formed after chuck and draw nut, top pull nut to be clamped with rising respectively, and be fastenedly connected by being carried out after tensioning, and tensioning is
Completed in the production process of pile pile, this is there have been a defect, as this button is embedded into other no-reinforcing-bar cages
Such as wall, cement block in component, and when scene is without tensioning equipment, then this prefabricated components just can not normal use.
The content of the invention
Regarding the issue above, the present invention provides it is a kind of easy to connect, having in prefabricated components can be embedded into
The bar of linkage function.
To reach above-mentioned purpose, present invention employs following technical proposal:A kind of bar with linkage function, including in
The barred body of bar shaped, the barred body both ends are respectively equipped with a bulb and a connector are arranged with each bulb,
The connector has accommodating cavity.
In the above-mentioned bar with linkage function, there is hollow air flow channel, air stream inside the barred body
Road connects connector, and the barred body wall is equipped with the solarization air cap of at least one connection air flow channel.
In the above-mentioned bar with linkage function, the air flow channel both ends are through bulb so that air stream
Road connects accommodating cavity.
In the above-mentioned bar with linkage function, the side wall of the connector is equipped with least one connection and houses
The grout hole of chamber.
In the above-mentioned bar with linkage function, connector bottom matches so that connector and rod with bulb
Body, which is realized, to be engaged by clamping, and after bulb and connector bottom are engaged by clamping, the outlet of the grout hole is towards bulb.
In the above-mentioned bar with linkage function, the connector bottom has chuck, the bulb bottom
Portion is engaged by clamping with chuck.
In the above-mentioned bar with linkage function, the surface of the chuck is vertical with the axial line of barred body, described
Bulb lower surface it is vertical with the axial line of barred body.
In the above-mentioned bar with linkage function, the accommodating cavity has internal thread or Morse's taper.
Compared with prior art, the advantage of the invention is that:Bar design with connector is reasonable, can make mark
Quasi- part, is embedded into prefabricated components, and can realize and be connected with the quick of plug connector, so as to connect suitable for the quick of prefabricated components
Connect, it is strong with adaptive.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is the structure diagram of connector;
Fig. 3 is another structure diagram of connector;
Fig. 4 is the use principle figure of the present invention.
In figure:It is barred body 1, bulb 2, connector 3, accommodating cavity 4, air flow channel 5, solarization air cap 6, grout hole 7, chuck 8, fixed
Position column 10, prefabricated components 100, plug connector 101, shackle member 102.
Embodiment
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
As shown in Figure 1, a kind of bar with linkage function, including the barred body 1 in bar shaped, 1 both ends of barred body point
A bulb 2 and a connector 3 She You not be arranged with each bulb 2, the connector 3 has accommodating cavity 4,
Connector, such as bolt, screw, spiral shell rod can be connected in accommodating cavity 4, taper fit grafting connection-peg can also be passed through.
In the present embodiment, accommodating cavity 4 has internal thread or Morse's taper.
The inside of barred body 1 has hollow air flow channel 5, and air flow channel 5 connects connector 3, and 1 wall of barred body is equipped with
The solarization air cap 6 of at least one connection air flow channel 5.Bulb 2 is run through at 5 both ends of air flow channel so that the connection of air flow channel 5 is held
Chamber 4 is put, certainly, air flow channel 5 can not also run through bulb 2, need to only be beaten on bulb 2 or in the end of barred body 2 suitable
The aperture of amount is used to connect air flow channel 5, can similarly play air inlet function.With reference to shown in Fig. 4, when barred body 1 is embedded to
, can be from connector 3 to air flow channel such as 100 ot-yet-hardened of prefabricated components during into the prefabricated components 100 with cement mortar
5 are passed through air, and are blown out from solarization air cap 6, and not solidified prefabricated components are accelerated to harden.
With reference to shown in Fig. 2 and Fig. 3, the side wall of connector 3 is equipped with the grout hole 7 of at least one connection accommodating cavity 4.Cement
Slurry can be entered in accommodating cavity 4 along grout hole 7, when having connector in accommodating cavity 3, can be condensed and be fixed by cement mortar, into
One step improves degree of being connected firmly.Grout hole 7 can vertically with connector 3 axial line, can also have with the axial line of connector 3
There is acute angle, it is, of course, preferable to, the outlet of the grout hole 7 is towards bulb 2 so that cement mortar can be directly circulated into expands
Portion and the contact site of connector 3.
3 bottom of connector matches with bulb 2 so that connector 3 realizes clamping engagement with barred body 1, in the present embodiment
In, 3 bottom of connector has chuck 8, and 2 bottom of bulb is engaged by clamping with chuck 8.In order to make chuck 8 and bulb 2
It is in close contact so as to improve snap effect, the surface of chuck 8 is vertical with the axial line of barred body 1, the lower surface of the bulb 2
It is vertical with the axial line of barred body 1.For the ease of being located by connecting first 3, the afterbody of connector 3 can also set the positioning in polygon
Column 10.
The operation principle of the present invention is as shown in figure 4, two barred bodies 1 are embedded in two prefabricated components 100 respectively, prefabricated structure
Part 100 can be wall, building block, pile pile etc., and plug connector 101 and the connector 3 on one of barred body 1 are affixed, another
The affixed shackle member 102 of connector 3 on barred body 1, plug connector 101, which is inserted into shackle member 102, can be achieved two prefabricated components
100 connection.The advantage of the invention is that pre- can bury, it is strong with adaptive, it is easy to use.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led
The technical staff in domain can do various modifications or additions to described specific embodiment or replace in a similar way
Generation, but without departing from spirit of the invention or beyond the scope of the appended claims.
Although be used more herein barred body 1, bulb 2, connector 3, accommodating cavity 4, air flow channel 5, solarization air cap 6,
The terms such as grout hole 7, chuck 8, positioning column 10, prefabricated components 100, plug connector 101, shackle member 102, but be not precluded from using it
The possibility of its term.The use of these items is only for more easily describe and explain the essence of the present invention;They are solved
Any one of the additional limitations is interpreted into all to disagree with spirit of the present invention.
Claims (6)
1. a kind of bar with linkage function, including the barred body (1) in bar shaped, it is characterised in that described barred body (1) both ends
It is respectively equipped with a bulb (2) and a connector (3) is arranged with each bulb (2), the connector (3) tool
There is accommodating cavity (4),
There is hollow air flow channel (5), air flow channel (5) connection connector (3), the rod inside the barred body (1)
Body (1) wall is equipped with the solarization air cap (6) of at least one connection air flow channel (5);Described air flow channel (5) both ends, which are run through, expands
Portion (2) is so that air flow channel (5) connects accommodating cavity (4), when barred body (1) is embedded to the prefabricated components (100) with cement mortar
When middle, air is passed through to air flow channel (5) from connector (3), and blow out from solarization air cap (6).
2. the bar according to claim 1 with linkage function, it is characterised in that the side wall of the connector (3)
It is equipped with the grout hole (7) of at least one connection accommodating cavity (4).
3. the bar according to claim 2 with linkage function, it is characterised in that connector (3) bottom and bulb
(2) match so that connector (3) realizes clamping engagement with barred body (1), when bulb (2) and connector (3) bottom are clamped
After cooperation, the outlet of the grout hole (7) is towards bulb (2).
4. the bar according to claim 1 or 2 with linkage function, it is characterised in that described connector (3) bottom
With chuck (8), the bulb (2) bottom is engaged by clamping with chuck (8).
5. the bar according to claim 4 with linkage function, it is characterised in that the surface of the chuck (8) with
The axial line of barred body (1) is vertical, and the lower surface of the bulb (2) is vertical with the axial line of barred body (1).
6. the bar according to claim 1 or 2 with linkage function, it is characterised in that the accommodating cavity (4) has
Internal thread or Morse's taper.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510364029.2A CN105002988B (en) | 2015-06-25 | 2015-06-25 | Bar with linkage function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510364029.2A CN105002988B (en) | 2015-06-25 | 2015-06-25 | Bar with linkage function |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105002988A CN105002988A (en) | 2015-10-28 |
CN105002988B true CN105002988B (en) | 2018-05-15 |
Family
ID=54375830
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510364029.2A Active CN105002988B (en) | 2015-06-25 | 2015-06-25 | Bar with linkage function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105002988B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111188416B (en) * | 2018-11-14 | 2021-09-17 | 湖北大成空间科技股份有限公司 | Prefabricated part connecting piece and connecting mode thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2707238A1 (en) * | 1977-02-19 | 1978-08-24 | Dyckerhoff & Widmann Ag | CORROSION-PROOF TENSION LINK FOR A PRELETCHABLE ANCHOR IN THE SOLID STONE |
CN201012520Y (en) * | 2006-09-15 | 2008-01-30 | 周兆弟 | Lengthways convex rib pipe pile peg mould |
CN101519876A (en) * | 2008-03-17 | 2009-09-02 | 周兆弟 | Cutting-free fast tearing butt coupler and butt joint piece |
CN203307997U (en) * | 2013-05-10 | 2013-11-27 | 周兆弟 | Precast concrete strong-pull fastener |
CN103498469A (en) * | 2013-08-27 | 2014-01-08 | 周兆弟 | General dead-drawn screw caps and reinforcing steel bars for concrete pipe pile and component |
CN204112604U (en) * | 2014-10-29 | 2015-01-21 | 赵虎 | The slip casting rebar connector of band cone tail |
CN204826216U (en) * | 2015-06-25 | 2015-12-02 | 周兆弟 | Rod with connect function |
-
2015
- 2015-06-25 CN CN201510364029.2A patent/CN105002988B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2707238A1 (en) * | 1977-02-19 | 1978-08-24 | Dyckerhoff & Widmann Ag | CORROSION-PROOF TENSION LINK FOR A PRELETCHABLE ANCHOR IN THE SOLID STONE |
CN201012520Y (en) * | 2006-09-15 | 2008-01-30 | 周兆弟 | Lengthways convex rib pipe pile peg mould |
CN101519876A (en) * | 2008-03-17 | 2009-09-02 | 周兆弟 | Cutting-free fast tearing butt coupler and butt joint piece |
CN203307997U (en) * | 2013-05-10 | 2013-11-27 | 周兆弟 | Precast concrete strong-pull fastener |
CN103498469A (en) * | 2013-08-27 | 2014-01-08 | 周兆弟 | General dead-drawn screw caps and reinforcing steel bars for concrete pipe pile and component |
CN204112604U (en) * | 2014-10-29 | 2015-01-21 | 赵虎 | The slip casting rebar connector of band cone tail |
CN204826216U (en) * | 2015-06-25 | 2015-12-02 | 周兆弟 | Rod with connect function |
Also Published As
Publication number | Publication date |
---|---|
CN105002988A (en) | 2015-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105002986B (en) | Clamping engagement formula connector | |
CN105040687B (en) | Connecting piece with adjustable distance | |
CN105002988B (en) | Bar with linkage function | |
CN105257642B (en) | Be spirally connected the fixed attachment structure for connecting two objects | |
CN105155677B (en) | Grafting clamp-close type connector | |
CN204781343U (en) | A joint formula connection structure for prefabricated component connects | |
CN105155676A (en) | Rod with connecting head | |
CN204940547U (en) | There is the bar of connector | |
CN204826216U (en) | Rod with connect function | |
CN204876083U (en) | Connect formula rod soon | |
CN105155673B (en) | Plug-in connection structure for prefabricated components connection | |
CN204781349U (en) | But connecting piece of roll adjustment | |
CN105040824B (en) | Fast-connecting type bar | |
CN104358359A (en) | Concave-convex steel bar joint | |
CN105201076B (en) | Integral type bar with connector | |
CN105155678B (en) | Unitary nut connector | |
CN204780886U (en) | A bayonet joint for joint formula connecting piece | |
CN204781344U (en) | Joint formula connecting piece | |
CN105040689B (en) | Multi-column clamping connecting piece | |
CN204959983U (en) | Integral type rod with connector | |
CN108951852A (en) | A kind of prefabricated column | |
CN204781351U (en) | Integral type nut connecting piece | |
CN204174842U (en) | A kind of concavo-convex bar splice | |
CN207419713U (en) | A kind of built-in connection | |
CN204940262U (en) | Multicolumn plug-in connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Cao Yongjie Inventor after: Zhou Zhaodi Inventor before: Zhou Zhaodi |
|
GR01 | Patent grant | ||
GR01 | Patent grant |