CN104993489B - Island network in emergency circumstances optimum cutting load method for determination of amount - Google Patents
Island network in emergency circumstances optimum cutting load method for determination of amount Download PDFInfo
- Publication number
- CN104993489B CN104993489B CN201510401457.8A CN201510401457A CN104993489B CN 104993489 B CN104993489 B CN 104993489B CN 201510401457 A CN201510401457 A CN 201510401457A CN 104993489 B CN104993489 B CN 104993489B
- Authority
- CN
- China
- Prior art keywords
- island network
- amount
- cutting load
- frequency
- mathematic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Abstract
The invention belongs to POWER SYSTEM EMERGENCY CONTROL measure technical field, disclose one kind and be applied to island network in emergency circumstances optimum cutting load method for determination of amount.It is characterized in that:Governor characteristic according to electromotor and part throttle characteristics obtain the mathematic(al) representation of the frequency characteristic of island network, can obtain the mathematic(al) representation of the maximum frequency deviation of island network further;According to maximum frequency deviation formula and the anti-pushing system of frequency normal operation range be subject to initial time after disturbance should unbalanced power amount size;Then according to the initial time that calculates should unbalanced power amount size determine the size of optimum cutting load.The inventive method is set up on strict mathematical formulae theoretical derivation basis, and quantitative obtains optimal cutting load amount, and not only principle is simple for the method, convenience of calculation, and can more accurately determine the minimum cutting load amount of island network.
Description
Technical field
The invention belongs to POWER SYSTEM EMERGENCY CONTROL measure technical field, more particularly, to one kind to be applied to island network urgent
In the case of optimum cutting load method for determination of amount.
Background technology
Island network refers to the low capacity electrical network departing from bulk power grid, and its maximum single-machine capacity is typically no less than net capacity
8%.Due to many factors such as economy and history, China still suffers from the weak electrical network of multiple isolated operations, and its net internal loading accounts for
Proportion, spare capacity is few, and unit quantity is few, and single-machine capacity accounting is big, therefore the single power source trip fault of generation will be to electrical network
Cause great impact, or even collapse of frequency can be caused.Therefore, cutting load must be taken to arrange after isolated network hinders for some reason and loses power supply
Apply the frequency stable to keep electrical network.
At present, the research of the determination with regard to optimum cutting load for the domestic and international Research Literature is main in the following areas:1. using examination
The empirical method gathered;2. the problem of optimum cutting load is converted into general mathematical problem;3. adopt the transient emulation of time domain.And
And it is mainly based upon bulk power grid with regard to optimum cutting load quantifier elimination, less to the correlational study of island network;On the other hand this
A little methods lack degree of accuracy or need complicated mathematical calculation.The present invention proposes a kind of island network in emergency circumstances
Excellent cutting load method for determination of amount.
Content of the invention
In order to overcome the shortcomings of prior art presence, the present invention proposes a kind of island network in emergency circumstances optimum cutting load
Method for determination of amount, including:
A kind of island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:
Step 1, the operational factor of acquisition island network, including:The frequency mediating effect+6 coefficient of electromotorIts
Middle R is the static difference coefficient of speed regulator, Load Regulation COEFFICIENT KL, in system, the capacity of participation primary frequency modulation unit accounts for operation machine
The ratio beta of group total capacity, electromotor inertia time constant TJ, time constant T of speed regulatorG, above each time constant arrives for reduction
System always specified generated output PGNUnder famous value, unit is the second, and remaining variables are system always specified generated output PGNBe
System rated frequency fNUnder perunit value;
Step 2, the governor characteristic according to electromotor and part throttle characteristics set up the mathematical table of the frequency characteristic of island network
Reach formula;
Step 3, obtain further island network maximum frequency deviation mathematic(al) representation;
Counter to push away island network disturbed for step 4, the mathematic(al) representation according to maximum frequency deviation and frequency normal operation range
After dynamic initial time should unbalanced power amount size;
Step 5, according to the initial time that calculates should unbalanced power amount size determine the big of optimum cutting load amount
Little, make the system failure occur after unbalanced power amount be equal to calculate should unbalanced power amount.
Described island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:In described step 2
The mathematic(al) representation of frequency characteristic Δ f (t) of island network is
Intermediate variable K in formulaS=KL+βKG, intermediate variableIntermediate variableIn
Between variableT is the time, and unit is the second, the system before imbalance with power total
Rated generation power PGNOn the basis of power initial unbalance, Δ P=PG-PL0, wherein PGIt is subject to total after disturbance for island network
Generated output, PL0It is subject to total loading after disturbance for island network.
Described island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:In described step 3
The maximum frequency deviation Δ f of island networkmaxFor
Intermediate variable in formulaIntermediate variable
Described island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:Described step 4 obtains
Island network be subject to disturbance after initial time should unbalanced power amount Δ P*For
The normal frequency range run of island network is (fmin,fmax).
Beneficial effects of the present invention:
The inventive method passes through the theoretical derivation of strict mathematical formula, determines the optimum cutting load of quantifier elimination island network
Amount, method is simple, and calculating speed is fast, and effect is good, overcomes existing method to calculate numerous and diverse, the slow problem of convergence rate, is more favorable for
Actual engineer applied.
Brief description
Fig. 1 is island network in emergency circumstances optimum cutting load method for determination of amount flow chart.
Fig. 2 is the geographical wiring diagram of certain island network that embodiment provides.
Fig. 3 is certain island network of embodiment offer in emergency circumstances by frequency before and after the cutting load amount of context of methods determination
Response curve.
Specific embodiment
Below in conjunction with the accompanying drawings, preferred embodiment is elaborated.
Embodiment 1
Fig. 1 is meter island network in emergency circumstances optimum cutting load method for determination of amount flow chart.
Step 1:Obtain the operational factor of island network
Island network operational factor includes:The frequency mediating effect+6 coefficient of electromotorWherein R is speed regulator
Static difference coefficient, Load Regulation COEFFICIENT KL, in system, the capacity of participation primary frequency modulation unit accounts for the ratio of operating unit total capacity
Value β, electromotor inertia time constant TJ, time constant T of speed regulatorG, above each time constant is always specified of reduction to system
Electrical power PGNUnder famous value, unit is the second, and remaining variables are PGN, system nominal frequency fNUnder perunit value;
Step 2:Ask for the frequency characteristic mathematic(al) representation of island network
According to the frequency characteristic mathematic(al) representation of the gain of parameter island network in step 1 it is:
In formula:Intermediate variable KS=KL+βKG, intermediate variableIntermediate variableMiddle
VariableT is the time, and unit is the second, the system before imbalance with power always specified
Generated output PGNOn the basis of power initial unbalance, Δ P=PG-PL0, wherein PGIt is subject to total generating electricity after disturbance for island network
Power, PL0It is subject to total loading after disturbance for island network;
Step 3:Try to achieve island network maximum frequency deviation
Show that maximum frequency deviation is according to the frequency characteristic mathematics in step 2:
Intermediate variable in formulaIntermediate variable
Step 4:Try to achieve island network be subject to disturbance after initial time should unbalanced power amount size
The normal frequency range run of island network is (fmin,fmax), thus can obtain island network by when after disturbance initially
Quarter should unbalanced power amount be:
Step 5:It is determined that the loading of excision
According to the initial time calculating should unbalanced power amount it is determined that excision loading, make the system failure
Unbalanced power amount after generation be equal to calculate should unbalanced power amount.
Embodiment 2
Tu2Wei Mou city regional power grid geographical wiring diagram.This regional power grid is by five aluminium electrolysis enterprises having power plant for self-supply
Networking isolated power grid, 10, total electromotor, wherein 350MW unit 2,150MW unit 2,155MW unit 3,135MW
Unit 3.This regional power grid operating unit 9 at present, wherein 350MW unit 2,150MW unit 2,155MW unit 3,
135MW unit 2, load total amount is 1300MW.
First, obtain the operational factor of island network.The frequency mediating effect+6 COEFFICIENT K of electromotorG=20;Total with system
Load Regulation COEFFICIENT K on the basis of rated powerL=1.5;Participating in the capacity of primary frequency modulation unit in system, to account for operating unit total
Ratio beta=100% of capacity;Electromotor inertia time constantTJ=10s;Time constant T of speed regulatorG=3s.
Secondly, according to the mathematic(al) representation that above parameter can ask for island network frequency characteristic it is:
Island network maximum frequency deviation can be tried to achieve again according to above formula derivation is:
Again, according to island network normal operating frequency scope be 49.5~50.5Hz, try to achieve island network be subject to disturbance after
Should initial power amount of unbalance size be
ΔP*=0.5 × 1735/6.116=141.8MW
If 350MW unit breaks down mediation in power plant for self-supply 3 in island network, exert oneself as 324MW, now before stop jumping
Power shortage is 324MW, and the load that need to excise to not affect normal frequency is 324MW-141.8MW=182.2MW.
Excise above-mentioned load finally by PSASP power system transient simulation software verification.
As shown in figure 3, island network 350MW unit fault does not take cutting load measure system by frequency unstability after mediating,
Take the optimum cutting load amount that the inventive method calculates, excise load 182.2MW, low-limit frequency is 49.5Hz, just returns to
Within the scope of often.
Above-described embodiment is only the present invention preferably specific embodiment, but protection scope of the present invention is not limited to
This, any those familiar with the art the invention discloses technical scope in, the change that can readily occur in or replace
Change, all should be included within the scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claim
Enclose and be defined.
Claims (4)
1. a kind of island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:
Step 1, the operational factor of acquisition island network, including:The frequency mediating effect+6 coefficient of electromotorWherein R is
The static difference coefficient of speed regulator, Load Regulation COEFFICIENT KL, participating in the capacity of primary frequency modulation unit in system, to account for operating unit total
The ratio beta of capacity, electromotor inertia time constant TJ, time constant T of speed regulatorG, above each time constant is for reduction to system
Always specified generated output PGNUnder famous value, unit is the second, and remaining variables are system always specified generated output PGNWith system volume
Determine frequency fNUnder perunit value;
Step 2, the governor characteristic according to electromotor and part throttle characteristics set up the mathematic(al) representation of the frequency characteristic of island network;
Step 3, obtain further island network maximum frequency deviation mathematic(al) representation;
Step 4, the mathematic(al) representation according to maximum frequency deviation and the anti-island network that pushes away of frequency normal operation range are by after disturbance
Initial time should unbalanced power amount size;
Step 5, according to the initial time that calculates should unbalanced power amount size determine the size of optimum cutting load amount, make
The system failure occur after unbalanced power amount be equal to calculate should unbalanced power amount.
2. according to claim 1 method it is characterised in that:Frequency characteristic Δ f (t) of the island network in described step 2
Mathematic(al) representation be
Intermediate variable K in formulaS=KL+βKG, intermediate variableIntermediate variableMiddle anaplasia
AmountT is the time, and unit is the second, the system before imbalance with power always specified
Generated output PGNOn the basis of power initial unbalance, Δ P=PG-PL0, wherein PGIt is subject to total generating electricity after disturbance for island network
Power, PL0It is subject to total loading after disturbance for island network.
3. according to claim 2 method it is characterised in that:The maximum frequency deviation Δ of the island network in described step 3
fmaxFor
Intermediate variable in formula Intermediate variable
4. according to claim 3 method it is characterised in that:Described step 4 obtains island network and is subject to initial time after disturbance
Should unbalanced power amount Δ P*For
The normal frequency range run of island network is (fmin,fmax).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510401457.8A CN104993489B (en) | 2015-07-09 | 2015-07-09 | Island network in emergency circumstances optimum cutting load method for determination of amount |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510401457.8A CN104993489B (en) | 2015-07-09 | 2015-07-09 | Island network in emergency circumstances optimum cutting load method for determination of amount |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104993489A CN104993489A (en) | 2015-10-21 |
CN104993489B true CN104993489B (en) | 2017-03-08 |
Family
ID=54305264
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510401457.8A Expired - Fee Related CN104993489B (en) | 2015-07-09 | 2015-07-09 | Island network in emergency circumstances optimum cutting load method for determination of amount |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104993489B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105552935B (en) * | 2016-02-26 | 2018-05-22 | 中国恩菲工程技术有限公司 | Furnace power control method and device |
CN105790287B (en) * | 2016-04-08 | 2018-03-13 | 大连理工大学 | Power system accident spare capacity collocation method |
CN105978002B (en) * | 2016-06-24 | 2022-03-15 | 中国电力工程顾问集团东北电力设计院有限公司 | Method for determining load shedding of power grid loss power supply based on linear interpolation method |
CN107800138B (en) * | 2017-11-08 | 2020-08-11 | 广东电网有限责任公司电力科学研究院 | Deviation peak value calculation method and device based on power grid frequency deviation change rate |
CN110365028B (en) * | 2019-06-28 | 2021-01-29 | 国网福建省电力有限公司 | Method for judging influence of primary frequency modulation on power oscillation |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7603203B2 (en) * | 2006-10-09 | 2009-10-13 | Electric Power Research Institute, Inc. | Method for voltage instability load shedding using local measurements |
EP2397688A1 (en) * | 2010-06-16 | 2011-12-21 | Siemens Aktiengesellschaft | Electric power control system and electric power facility comprising the electric power control system |
CN104052078B (en) * | 2013-03-12 | 2016-03-02 | 珠海优特电力科技股份有限公司 | Micro-grid connection operational mode switches regulate and control method and the system of islet operation pattern |
CN103683329B (en) * | 2013-12-23 | 2016-01-06 | 国网甘肃省电力公司电力科学研究院 | Based on the optimization method of the grid-connected DCgenerator motor field difference coefficient of the whole network loss minimization |
-
2015
- 2015-07-09 CN CN201510401457.8A patent/CN104993489B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104993489A (en) | 2015-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104993489B (en) | Island network in emergency circumstances optimum cutting load method for determination of amount | |
CN105162164B (en) | A kind of method for the low order dynamic frequency response model for establishing the system containing wind-electricity integration | |
EP2182207A2 (en) | Wide-area transmission control of windfarms | |
CN102830352B (en) | Simulation test method of field isolated network and system thereof | |
CN105138739B (en) | It is a kind of meter and dead time effect electric system low-limit frequency quick calculation method | |
CN109038613A (en) | A kind of adaptive low frequency deloading method counted and wind-powered electricity generation virtual inertia/primary frequency modulation responds | |
CN105678105B (en) | The online evaluation method and apparatus of steam turbine Primary frequency control ability | |
CN105790287B (en) | Power system accident spare capacity collocation method | |
CN103840476B (en) | A kind of height week based on unit Equivalent Model cuts machine setting method | |
CN105119288A (en) | Coordination control and parameter optimization method for multi-loop DC frequency limit controller | |
CN104979833B (en) | Consider the static electric voltage stability determination methods of area power grid reactive power support ability | |
CN104079010A (en) | Transient stability emergency control strategy calculating method with generator tripping and direct-current emergency power modulation coordinated | |
CN107330193A (en) | The transient energy function method of meter and VSG inverter current amplitude limits | |
CN104485670B (en) | The control method of voltage sensitivity industrial load time-varying damping characteristic in island network | |
CN110518631A (en) | A kind of stability assessment method and system of directly driven wind-powered unit | |
Bie et al. | Studies on voltage fluctuation in the integration of wind power plants using probabilistic load flow | |
CN105186511A (en) | Method for controlling participation of battery energy storage system in power grid secondary frequency modulation | |
CN102904266A (en) | Method for determining inactive compensation capacity network adaptability of wind power plant | |
CN107346889A (en) | Consider that the load of a frequency modulation frequency modulation and minimum frequency deviation cuts down Optimized model construction method | |
CN104638638A (en) | Online safety and stability trend analysis method for large power network | |
CN105279297B (en) | A kind of PSS/E electric system equivalence methods based on engineer application | |
CN103490423B (en) | Wind-farm reactive instruction distribution method | |
CN104809512B (en) | A kind of fast evaluation method of electric system difference emergent control measure performance indicator | |
CN106874615A (en) | Wind turbines adjustment effect of load coefficient testing method and device | |
CN104052065B (en) | A kind of method of the urgent cutting load of the self adaptation based on Voltage Drop amplitude |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170308 Termination date: 20170709 |
|
CF01 | Termination of patent right due to non-payment of annual fee |