CN104993489B - Island network in emergency circumstances optimum cutting load method for determination of amount - Google Patents

Island network in emergency circumstances optimum cutting load method for determination of amount Download PDF

Info

Publication number
CN104993489B
CN104993489B CN201510401457.8A CN201510401457A CN104993489B CN 104993489 B CN104993489 B CN 104993489B CN 201510401457 A CN201510401457 A CN 201510401457A CN 104993489 B CN104993489 B CN 104993489B
Authority
CN
China
Prior art keywords
island network
amount
cutting load
frequency
mathematic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510401457.8A
Other languages
Chinese (zh)
Other versions
CN104993489A (en
Inventor
肖仕武
祁志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201510401457.8A priority Critical patent/CN104993489B/en
Publication of CN104993489A publication Critical patent/CN104993489A/en
Application granted granted Critical
Publication of CN104993489B publication Critical patent/CN104993489B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Abstract

The invention belongs to POWER SYSTEM EMERGENCY CONTROL measure technical field, disclose one kind and be applied to island network in emergency circumstances optimum cutting load method for determination of amount.It is characterized in that:Governor characteristic according to electromotor and part throttle characteristics obtain the mathematic(al) representation of the frequency characteristic of island network, can obtain the mathematic(al) representation of the maximum frequency deviation of island network further;According to maximum frequency deviation formula and the anti-pushing system of frequency normal operation range be subject to initial time after disturbance should unbalanced power amount size;Then according to the initial time that calculates should unbalanced power amount size determine the size of optimum cutting load.The inventive method is set up on strict mathematical formulae theoretical derivation basis, and quantitative obtains optimal cutting load amount, and not only principle is simple for the method, convenience of calculation, and can more accurately determine the minimum cutting load amount of island network.

Description

Island network in emergency circumstances optimum cutting load method for determination of amount
Technical field
The invention belongs to POWER SYSTEM EMERGENCY CONTROL measure technical field, more particularly, to one kind to be applied to island network urgent In the case of optimum cutting load method for determination of amount.
Background technology
Island network refers to the low capacity electrical network departing from bulk power grid, and its maximum single-machine capacity is typically no less than net capacity 8%.Due to many factors such as economy and history, China still suffers from the weak electrical network of multiple isolated operations, and its net internal loading accounts for Proportion, spare capacity is few, and unit quantity is few, and single-machine capacity accounting is big, therefore the single power source trip fault of generation will be to electrical network Cause great impact, or even collapse of frequency can be caused.Therefore, cutting load must be taken to arrange after isolated network hinders for some reason and loses power supply Apply the frequency stable to keep electrical network.
At present, the research of the determination with regard to optimum cutting load for the domestic and international Research Literature is main in the following areas:1. using examination The empirical method gathered;2. the problem of optimum cutting load is converted into general mathematical problem;3. adopt the transient emulation of time domain.And And it is mainly based upon bulk power grid with regard to optimum cutting load quantifier elimination, less to the correlational study of island network;On the other hand this A little methods lack degree of accuracy or need complicated mathematical calculation.The present invention proposes a kind of island network in emergency circumstances Excellent cutting load method for determination of amount.
Content of the invention
In order to overcome the shortcomings of prior art presence, the present invention proposes a kind of island network in emergency circumstances optimum cutting load Method for determination of amount, including:
A kind of island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:
Step 1, the operational factor of acquisition island network, including:The frequency mediating effect+6 coefficient of electromotorIts Middle R is the static difference coefficient of speed regulator, Load Regulation COEFFICIENT KL, in system, the capacity of participation primary frequency modulation unit accounts for operation machine The ratio beta of group total capacity, electromotor inertia time constant TJ, time constant T of speed regulatorG, above each time constant arrives for reduction System always specified generated output PGNUnder famous value, unit is the second, and remaining variables are system always specified generated output PGNBe System rated frequency fNUnder perunit value;
Step 2, the governor characteristic according to electromotor and part throttle characteristics set up the mathematical table of the frequency characteristic of island network Reach formula;
Step 3, obtain further island network maximum frequency deviation mathematic(al) representation;
Counter to push away island network disturbed for step 4, the mathematic(al) representation according to maximum frequency deviation and frequency normal operation range After dynamic initial time should unbalanced power amount size;
Step 5, according to the initial time that calculates should unbalanced power amount size determine the big of optimum cutting load amount Little, make the system failure occur after unbalanced power amount be equal to calculate should unbalanced power amount.
Described island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:In described step 2 The mathematic(al) representation of frequency characteristic Δ f (t) of island network is
Intermediate variable K in formulaS=KL+βKG, intermediate variableIntermediate variableIn Between variableT is the time, and unit is the second, the system before imbalance with power total Rated generation power PGNOn the basis of power initial unbalance, Δ P=PG-PL0, wherein PGIt is subject to total after disturbance for island network Generated output, PL0It is subject to total loading after disturbance for island network.
Described island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:In described step 3 The maximum frequency deviation Δ f of island networkmaxFor
Intermediate variable in formulaIntermediate variable
Described island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:Described step 4 obtains Island network be subject to disturbance after initial time should unbalanced power amount Δ P*For
The normal frequency range run of island network is (fmin,fmax).
Beneficial effects of the present invention:
The inventive method passes through the theoretical derivation of strict mathematical formula, determines the optimum cutting load of quantifier elimination island network Amount, method is simple, and calculating speed is fast, and effect is good, overcomes existing method to calculate numerous and diverse, the slow problem of convergence rate, is more favorable for Actual engineer applied.
Brief description
Fig. 1 is island network in emergency circumstances optimum cutting load method for determination of amount flow chart.
Fig. 2 is the geographical wiring diagram of certain island network that embodiment provides.
Fig. 3 is certain island network of embodiment offer in emergency circumstances by frequency before and after the cutting load amount of context of methods determination Response curve.
Specific embodiment
Below in conjunction with the accompanying drawings, preferred embodiment is elaborated.
Embodiment 1
Fig. 1 is meter island network in emergency circumstances optimum cutting load method for determination of amount flow chart.
Step 1:Obtain the operational factor of island network
Island network operational factor includes:The frequency mediating effect+6 coefficient of electromotorWherein R is speed regulator Static difference coefficient, Load Regulation COEFFICIENT KL, in system, the capacity of participation primary frequency modulation unit accounts for the ratio of operating unit total capacity Value β, electromotor inertia time constant TJ, time constant T of speed regulatorG, above each time constant is always specified of reduction to system Electrical power PGNUnder famous value, unit is the second, and remaining variables are PGN, system nominal frequency fNUnder perunit value;
Step 2:Ask for the frequency characteristic mathematic(al) representation of island network
According to the frequency characteristic mathematic(al) representation of the gain of parameter island network in step 1 it is:
In formula:Intermediate variable KS=KL+βKG, intermediate variableIntermediate variableMiddle VariableT is the time, and unit is the second, the system before imbalance with power always specified Generated output PGNOn the basis of power initial unbalance, Δ P=PG-PL0, wherein PGIt is subject to total generating electricity after disturbance for island network Power, PL0It is subject to total loading after disturbance for island network;
Step 3:Try to achieve island network maximum frequency deviation
Show that maximum frequency deviation is according to the frequency characteristic mathematics in step 2:
Intermediate variable in formulaIntermediate variable
Step 4:Try to achieve island network be subject to disturbance after initial time should unbalanced power amount size
The normal frequency range run of island network is (fmin,fmax), thus can obtain island network by when after disturbance initially Quarter should unbalanced power amount be:
Step 5:It is determined that the loading of excision
According to the initial time calculating should unbalanced power amount it is determined that excision loading, make the system failure Unbalanced power amount after generation be equal to calculate should unbalanced power amount.
Embodiment 2
Tu2Wei Mou city regional power grid geographical wiring diagram.This regional power grid is by five aluminium electrolysis enterprises having power plant for self-supply Networking isolated power grid, 10, total electromotor, wherein 350MW unit 2,150MW unit 2,155MW unit 3,135MW Unit 3.This regional power grid operating unit 9 at present, wherein 350MW unit 2,150MW unit 2,155MW unit 3, 135MW unit 2, load total amount is 1300MW.
First, obtain the operational factor of island network.The frequency mediating effect+6 COEFFICIENT K of electromotorG=20;Total with system Load Regulation COEFFICIENT K on the basis of rated powerL=1.5;Participating in the capacity of primary frequency modulation unit in system, to account for operating unit total Ratio beta=100% of capacity;Electromotor inertia time constantTJ=10s;Time constant T of speed regulatorG=3s.
Secondly, according to the mathematic(al) representation that above parameter can ask for island network frequency characteristic it is:
Island network maximum frequency deviation can be tried to achieve again according to above formula derivation is:
Again, according to island network normal operating frequency scope be 49.5~50.5Hz, try to achieve island network be subject to disturbance after Should initial power amount of unbalance size be
ΔP*=0.5 × 1735/6.116=141.8MW
If 350MW unit breaks down mediation in power plant for self-supply 3 in island network, exert oneself as 324MW, now before stop jumping Power shortage is 324MW, and the load that need to excise to not affect normal frequency is 324MW-141.8MW=182.2MW.
Excise above-mentioned load finally by PSASP power system transient simulation software verification.
As shown in figure 3, island network 350MW unit fault does not take cutting load measure system by frequency unstability after mediating, Take the optimum cutting load amount that the inventive method calculates, excise load 182.2MW, low-limit frequency is 49.5Hz, just returns to Within the scope of often.
Above-described embodiment is only the present invention preferably specific embodiment, but protection scope of the present invention is not limited to This, any those familiar with the art the invention discloses technical scope in, the change that can readily occur in or replace Change, all should be included within the scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claim Enclose and be defined.

Claims (4)

1. a kind of island network in emergency circumstances optimum cutting load method for determination of amount it is characterised in that:
Step 1, the operational factor of acquisition island network, including:The frequency mediating effect+6 coefficient of electromotorWherein R is The static difference coefficient of speed regulator, Load Regulation COEFFICIENT KL, participating in the capacity of primary frequency modulation unit in system, to account for operating unit total The ratio beta of capacity, electromotor inertia time constant TJ, time constant T of speed regulatorG, above each time constant is for reduction to system Always specified generated output PGNUnder famous value, unit is the second, and remaining variables are system always specified generated output PGNWith system volume Determine frequency fNUnder perunit value;
Step 2, the governor characteristic according to electromotor and part throttle characteristics set up the mathematic(al) representation of the frequency characteristic of island network;
Step 3, obtain further island network maximum frequency deviation mathematic(al) representation;
Step 4, the mathematic(al) representation according to maximum frequency deviation and the anti-island network that pushes away of frequency normal operation range are by after disturbance Initial time should unbalanced power amount size;
Step 5, according to the initial time that calculates should unbalanced power amount size determine the size of optimum cutting load amount, make The system failure occur after unbalanced power amount be equal to calculate should unbalanced power amount.
2. according to claim 1 method it is characterised in that:Frequency characteristic Δ f (t) of the island network in described step 2 Mathematic(al) representation be
Δ f ( t ) = 50 Δ P K s [ 1 - ( cos b t - a + c b sin b t ) e - a t ]
Intermediate variable K in formulaS=KL+βKG, intermediate variableIntermediate variableMiddle anaplasia AmountT is the time, and unit is the second, the system before imbalance with power always specified Generated output PGNOn the basis of power initial unbalance, Δ P=PG-PL0, wherein PGIt is subject to total generating electricity after disturbance for island network Power, PL0It is subject to total loading after disturbance for island network.
3. according to claim 2 method it is characterised in that:The maximum frequency deviation Δ of the island network in described step 3 fmaxFor
Δf m a x = | 50 Δ P K S ( 1 + A m e - at m ) |
Intermediate variable in formula A m = βK G T G T J , Intermediate variable t m = 1 b tan - 1 [ ( 2 T J T G b K L T G - T J ) ] .
4. according to claim 3 method it is characterised in that:Described step 4 obtains island network and is subject to initial time after disturbance Should unbalanced power amount Δ P*For
ΔP * = P G N | Δ P | = P G N ( f N - f m i n ) K S 50 ( 1 + A m e - at m )
The normal frequency range run of island network is (fmin,fmax).
CN201510401457.8A 2015-07-09 2015-07-09 Island network in emergency circumstances optimum cutting load method for determination of amount Expired - Fee Related CN104993489B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510401457.8A CN104993489B (en) 2015-07-09 2015-07-09 Island network in emergency circumstances optimum cutting load method for determination of amount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510401457.8A CN104993489B (en) 2015-07-09 2015-07-09 Island network in emergency circumstances optimum cutting load method for determination of amount

Publications (2)

Publication Number Publication Date
CN104993489A CN104993489A (en) 2015-10-21
CN104993489B true CN104993489B (en) 2017-03-08

Family

ID=54305264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510401457.8A Expired - Fee Related CN104993489B (en) 2015-07-09 2015-07-09 Island network in emergency circumstances optimum cutting load method for determination of amount

Country Status (1)

Country Link
CN (1) CN104993489B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105552935B (en) * 2016-02-26 2018-05-22 中国恩菲工程技术有限公司 Furnace power control method and device
CN105790287B (en) * 2016-04-08 2018-03-13 大连理工大学 Power system accident spare capacity collocation method
CN105978002B (en) * 2016-06-24 2022-03-15 中国电力工程顾问集团东北电力设计院有限公司 Method for determining load shedding of power grid loss power supply based on linear interpolation method
CN107800138B (en) * 2017-11-08 2020-08-11 广东电网有限责任公司电力科学研究院 Deviation peak value calculation method and device based on power grid frequency deviation change rate
CN110365028B (en) * 2019-06-28 2021-01-29 国网福建省电力有限公司 Method for judging influence of primary frequency modulation on power oscillation

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7603203B2 (en) * 2006-10-09 2009-10-13 Electric Power Research Institute, Inc. Method for voltage instability load shedding using local measurements
EP2397688A1 (en) * 2010-06-16 2011-12-21 Siemens Aktiengesellschaft Electric power control system and electric power facility comprising the electric power control system
CN104052078B (en) * 2013-03-12 2016-03-02 珠海优特电力科技股份有限公司 Micro-grid connection operational mode switches regulate and control method and the system of islet operation pattern
CN103683329B (en) * 2013-12-23 2016-01-06 国网甘肃省电力公司电力科学研究院 Based on the optimization method of the grid-connected DCgenerator motor field difference coefficient of the whole network loss minimization

Also Published As

Publication number Publication date
CN104993489A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN104993489B (en) Island network in emergency circumstances optimum cutting load method for determination of amount
CN105162164B (en) A kind of method for the low order dynamic frequency response model for establishing the system containing wind-electricity integration
EP2182207A2 (en) Wide-area transmission control of windfarms
CN102830352B (en) Simulation test method of field isolated network and system thereof
CN105138739B (en) It is a kind of meter and dead time effect electric system low-limit frequency quick calculation method
CN109038613A (en) A kind of adaptive low frequency deloading method counted and wind-powered electricity generation virtual inertia/primary frequency modulation responds
CN105678105B (en) The online evaluation method and apparatus of steam turbine Primary frequency control ability
CN105790287B (en) Power system accident spare capacity collocation method
CN103840476B (en) A kind of height week based on unit Equivalent Model cuts machine setting method
CN105119288A (en) Coordination control and parameter optimization method for multi-loop DC frequency limit controller
CN104979833B (en) Consider the static electric voltage stability determination methods of area power grid reactive power support ability
CN104079010A (en) Transient stability emergency control strategy calculating method with generator tripping and direct-current emergency power modulation coordinated
CN107330193A (en) The transient energy function method of meter and VSG inverter current amplitude limits
CN104485670B (en) The control method of voltage sensitivity industrial load time-varying damping characteristic in island network
CN110518631A (en) A kind of stability assessment method and system of directly driven wind-powered unit
Bie et al. Studies on voltage fluctuation in the integration of wind power plants using probabilistic load flow
CN105186511A (en) Method for controlling participation of battery energy storage system in power grid secondary frequency modulation
CN102904266A (en) Method for determining inactive compensation capacity network adaptability of wind power plant
CN107346889A (en) Consider that the load of a frequency modulation frequency modulation and minimum frequency deviation cuts down Optimized model construction method
CN104638638A (en) Online safety and stability trend analysis method for large power network
CN105279297B (en) A kind of PSS/E electric system equivalence methods based on engineer application
CN103490423B (en) Wind-farm reactive instruction distribution method
CN104809512B (en) A kind of fast evaluation method of electric system difference emergent control measure performance indicator
CN106874615A (en) Wind turbines adjustment effect of load coefficient testing method and device
CN104052065B (en) A kind of method of the urgent cutting load of the self adaptation based on Voltage Drop amplitude

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308

Termination date: 20170709

CF01 Termination of patent right due to non-payment of annual fee