CN104989879A - Improved structure for oil pipeline holding device - Google Patents

Improved structure for oil pipeline holding device Download PDF

Info

Publication number
CN104989879A
CN104989879A CN201510403561.0A CN201510403561A CN104989879A CN 104989879 A CN104989879 A CN 104989879A CN 201510403561 A CN201510403561 A CN 201510403561A CN 104989879 A CN104989879 A CN 104989879A
Authority
CN
China
Prior art keywords
hole
column
fixed
groove
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510403561.0A
Other languages
Chinese (zh)
Inventor
贺昶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Kesheng Petroleum Technology Co Ltd
Original Assignee
Chengdu Kesheng Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Kesheng Petroleum Technology Co Ltd filed Critical Chengdu Kesheng Petroleum Technology Co Ltd
Priority to CN201510403561.0A priority Critical patent/CN104989879A/en
Publication of CN104989879A publication Critical patent/CN104989879A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing

Abstract

The invention relates to an improved structure for an oil pipeline holding device. The improved structure comprises two symmetrically-arranged uprights. The outer wall of each upright is provided with symmetric fixing grooves. The bottoms of every two corresponding fixing grooves are provided with communicated through holes. The two ends of a fixed board are provided with U-shaped through grooves matched with the fixing grooves. The two side walls of each U-shaped through groove are provided with through holes I matched with the through holes in the bottoms of the corresponding fixing grooves. The through holes I on the side wall at one end of each U-shaped through groove are internally provided with a fixing rod. Internal threaded holes are axially formed in the fixing rods. The through holes I on the side wall at the other end of each U-shaped through groove are internally provided with a lead screw matched with the corresponding internal threaded holes. The fixed board is provided with two symmetric fixing columns. An arc-shaped board is arranged at the upper ends of the two fixing columns. One end of each upright is provided with a threaded hole. Lead screws I are arranged in the threaded holes. The fixed board is fixed to the uprights in the manner that the lead screws are matched with the internal threaded holes, a holding rack is assembled and disassembled, and the problem that the whole holding rack is inconvenient to transport is solved.

Description

The modified node method of petroleum pipeline shelving unit
Technical field
The present invention relates to pipeline rack field, particularly, relate to a kind of modified node method of petroleum pipeline shelving unit.
Background technique
Oil after exploitation is in transportation process, because the route of transport is long, the use fixing device at interval petroleum pipeline must be clamped in transportation route for the petroleum pipeline that transports, avoid petroleum pipeline because the intermediate section of the middle cardioptosia that causes of the transport of long distance and the petroleum pipeline problem of subsiding downwards.Rack is as the supporting structure of petroleum pipeline, also different according to the concrete structure of the ground environment of petroleum pipeline approach and the difference of weather conditions rack used, the rack of existing petroleum pipeline is all generally a single unit system, can not dismantle, be not easy to support bracket fastened transport, and non-detachable rack cannot be installed and used in such as rough hill path and snowfield on some ground.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of modified node method of petroleum pipeline shelving unit, to overcome existing petroleum pipeline rack because not dismantling the problem of the transport inconvenience caused.
The present invention's adopted technological scheme that solves the problem is: the modified node method of petroleum pipeline shelving unit, comprise 2 symmetrically arranged columns, column outer wall is provided with symmetrical fixed groove, the bottom of 2 fixed grooves is provided with the through hole communicated, the two ends of fixed plate are provided with the U-shaped groove coordinated with fixed groove, 2 sidewalls of U-shaped groove are provided with the through hole I coordinated with the through hole bottom fixed groove, fixing rod is provided with in through hole I on the sidewall of U-shaped groove one end, the axis of fixing rod is provided with interior pitch thread hole, the leading screw coordinated with interior pitch thread hole is provided with in through hole I on U-shaped groove the other end sidewall, described fixed plate is provided with 2 symmetrical fixing columns, 2 fixing column upper ends are provided with arc plate, arc plate caves in fixed plate direction, one end of described column is provided with tapped hole, leading screw I is provided with in tapped hole.The rack of existing petroleum pipeline is all generally a single unit system, can not dismantle, be not easy to the transport of rack, especially when rack weight is larger, transport or the carrying of whole rack more bother, and non-detachable rack cannot be installed and used in such as rough hill path and snowfield on some ground.Rack of the present invention is detachable and assembling, first U-shaped groove is fastened in 2 fixed grooves by assembling of the present invention, again by leading screw, fixing rod is through through hole I, leading screw and fixing rod are converged in through hole, leading screw is inserted fixing rod axially arrange in pitch thread hole, and tighten leading screw gradually until be fixed on firmly on column by fixed plate, fixed plate is fixed on column by the mode that the present invention is coordinated with interior pitch thread hole by leading screw, simple to operation, leading screw I of the present invention is also detachable, can by column in the process of carrying, fixed plate and leading screw I are separately, assemble again after reaching infield, which reduce the difficulty of transport rack, and the column of 2 symmetric types is also convenient to insert hill to full of bumpy and holes and snowfield, improve the applicability of rack, so, instant invention overcomes existing petroleum pipeline fixed support because the problem of the transport inconvenience caused can not be dismantled, and assemble simple and convenient.
Further, the degree of depth of fixed groove is 1/3 of column width.If the mistake that the degree of depth of fixed groove is arranged can reduce the structure stability of column deeply, the degree of depth of fixed groove is set to 1/3 of column width, while ensure that column structure stability, is convenient to the U-shaped groove of fixed plate end setting and coordinating of fixed groove.
Further, the inner side surface of arc plate is set to check face.Check face is crisscross flank of thread, effectively can increase the frictional force between arc plate and petroleum pipeline, avoid the problem that petroleum pipeline skids in arc plate.
Further, cross bar is provided with between 2 fixing columns.The setting of cross bar can improve the structure stability of 2 vertical columns, and then improves the structure stability of whole rack.
Further, leading screw I one end outside column is provided with handle.Turning of leading screw I is convenient in the setting of handle, improves the convenience of operation.
To sum up, the invention has the beneficial effects as follows:
1, the present invention by fixed plate detachable be fixed on the assembling 2 symmetrically arranged columns realizing rack, leading screw I is also detachable, can by column, fixed plate and leading screw I separately in the process of carrying, assemble again after reaching infield, which reduce the difficulty of transport rack, avoid the problem of overall rack transport inconvenience.
Fixed plate is fixed on column by the mode that 2, the present invention is coordinated with interior pitch thread hole by leading screw, simple to operation.
3, the present invention is by being set to 1/3 of column width by the degree of depth of fixed groove, is convenient to the U-shaped groove of fixed plate end setting and coordinating of fixed groove while ensure that column structure stability.
Accompanying drawing explanation
Fig. 1 is the structural representation of rack;
Fig. 2 is the structural representation of fixed plate;
Fig. 3 is the structural representation of column.
Mark and corresponding component title in accompanying drawing:
1-column; 2-leading screw; 3-leading screw I; 4-handle; 5-fixed plate; 6-arc plate; 7-fixing column; 8-cross bar; 11-fixed groove; 51-U-shaped groove.
Embodiment
Below in conjunction with embodiment and accompanying drawing, the present invention is described in further detail, but embodiments of the present invention are not limited thereto.
Embodiment:
As shown in Figure 1 to Figure 3, the modified node method of petroleum pipeline shelving unit, comprise 2 symmetrically arranged columns 1, column 1 outer wall is provided with symmetrical fixed groove 11, the bottom of 2 fixed grooves 11 is provided with the through hole communicated, the two ends of fixed plate 5 are provided with the U-shaped groove 51 coordinated with fixed groove 11, 2 sidewalls of U-shaped groove 51 are provided with the through hole I coordinated with the through hole bottom fixed groove 11, fixing rod is provided with in through hole I on the sidewall of U-shaped groove 51 one end, the axis of fixing rod is provided with interior pitch thread hole, the leading screw 2 coordinated with interior pitch thread hole is provided with in through hole I on U-shaped groove 51 the other end sidewall, described fixed plate 5 is provided with 2 symmetrical fixing columns 7, cross bar 8 is provided with between 2 fixing columns 7, 2 fixing column 7 upper ends are provided with arc plate 6, arc plate 6 caves in fixed plate 5 direction, the inner side surface of arc plate 6 is set to check face, one end of described column 1 is provided with tapped hole, leading screw I 3 is provided with in tapped hole, leading screw I 3 one end outside column 1 is provided with handle 4.
Working principle of the present invention: in the process of carrying or transport, by column 1, fixed plate 5, leading screw I 3, leading screw 2 is taken apart, after arriving destination, the U-shaped groove 51 that fixed plate 5 is arranged by its end is engaged with the fixed groove 11 that column 1 is arranged, again by leading screw 2, fixing rod is through through hole I, leading screw 2 and fixing rod are converged in through hole, leading screw 2 is inserted fixing rod axially arrange in pitch thread hole, and tighten leading screw 2 gradually until be fixed on column 1 firmly by fixed plate 8, then petroleum pipeline is placed on inside the arc plate 6 coordinated with it, finally leading screw 3 is inserted column 1 end arrange tapped hole in tighten.
As mentioned above, the present invention can be realized preferably.

Claims (5)

1. the modified node method of petroleum pipeline shelving unit, it is characterized in that, comprise 2 symmetrically arranged columns (1), column (1) outer wall is provided with symmetrical fixed groove (11), the bottom of 2 fixed grooves (11) is provided with the through hole communicated, the two ends of fixed plate (5) are provided with the U-shaped groove (51) coordinated with fixed groove (11), 2 sidewalls of U-shaped groove (51) are provided with the through hole I coordinated with the through hole of fixed groove (11) bottom, fixing rod is provided with in through hole I on the sidewall of U-shaped groove (51) one end, the axis of fixing rod is provided with interior pitch thread hole, the leading screw (2) coordinated with interior pitch thread hole is provided with in through hole I on U-shaped groove (51) the other end sidewall, described fixed plate (5) is provided with 2 symmetrical fixing columns (7), 2 fixing column (7) upper ends are provided with arc plate (6), arc plate (6) caves in fixed plate (5) direction, one end of described column (1) is provided with tapped hole, leading screw I (3) is provided with in tapped hole.
2. the modified node method of petroleum pipeline shelving unit according to claim 1, is characterized in that, the degree of depth of described fixed groove (11) is 1/3 of column (1) width.
3. the modified node method of petroleum pipeline shelving unit according to claim 2, is characterized in that, the inner side surface of described arc plate (6) is set to check face.
4., according to the modified node method of the arbitrary described petroleum pipeline shelving unit of claims 1 to 3, it is characterized in that, between described 2 fixing columns (7), be provided with cross bar (8).
5. the modified node method of petroleum pipeline shelving unit according to claim 4, is characterized in that, described leading screw I (3) is provided with handle (4) in the one end in column (1) outside.
CN201510403561.0A 2015-07-12 2015-07-12 Improved structure for oil pipeline holding device Pending CN104989879A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510403561.0A CN104989879A (en) 2015-07-12 2015-07-12 Improved structure for oil pipeline holding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510403561.0A CN104989879A (en) 2015-07-12 2015-07-12 Improved structure for oil pipeline holding device

Publications (1)

Publication Number Publication Date
CN104989879A true CN104989879A (en) 2015-10-21

Family

ID=54301734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510403561.0A Pending CN104989879A (en) 2015-07-12 2015-07-12 Improved structure for oil pipeline holding device

Country Status (1)

Country Link
CN (1) CN104989879A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103574170A (en) * 2013-11-12 2014-02-12 成都科盛石油科技有限公司 Adjustable pipeline support
CN203560602U (en) * 2013-11-12 2014-04-23 成都科盛石油科技有限公司 Petroleum pipeline support
CN203963252U (en) * 2014-07-02 2014-11-26 中国石油大学(北京) A kind of petroleum pipeline bracket
CN104747805A (en) * 2015-02-03 2015-07-01 成都大漠石油机械有限公司 Fixing rack for supporting oil pipeline
CN204879046U (en) * 2015-07-12 2015-12-16 成都科盛石油科技有限公司 Detachable petroleum pipeline rack convenient to fixed plate installation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103574170A (en) * 2013-11-12 2014-02-12 成都科盛石油科技有限公司 Adjustable pipeline support
CN203560602U (en) * 2013-11-12 2014-04-23 成都科盛石油科技有限公司 Petroleum pipeline support
CN203963252U (en) * 2014-07-02 2014-11-26 中国石油大学(北京) A kind of petroleum pipeline bracket
CN104747805A (en) * 2015-02-03 2015-07-01 成都大漠石油机械有限公司 Fixing rack for supporting oil pipeline
CN204879046U (en) * 2015-07-12 2015-12-16 成都科盛石油科技有限公司 Detachable petroleum pipeline rack convenient to fixed plate installation

Similar Documents

Publication Publication Date Title
CN104989877A (en) Fixing device used in petroleum transportation process
US9187111B2 (en) Tool-free shelving system
CN204879040U (en) Petroleum pipeline supports base convenient to remove clamping structure
CN204879046U (en) Detachable petroleum pipeline rack convenient to fixed plate installation
US8596731B2 (en) Installation support unit for slide assembly
CN106793870A (en) Modularization cable wine frame system
CN104131693B (en) A kind of base for support scaffolding
CN104735930A (en) Server cabinet
CN105065781A (en) Petroleum pipeline holding frame based on improvement of stability of fixing plate
CN204879060U (en) Detachable petroleum pipeline support frame of limiting plate
CN104989879A (en) Improved structure for oil pipeline holding device
CN204879047U (en) Petroleum pipeline fixed bolster convenient to dismantle equipment
CN205432868U (en) Switching footing with adjustable single screw rod
CN204226851U (en) Assembly type cable bearer
CN201559059U (en) Wire-hanging type aligner
CN104976425A (en) Improved petroleum pipeline clamping device
CN204879039U (en) Fixed dimension adjustable petroleum pipeline clamping device
CN109108014B (en) Ball-serving device of pipe cleaner
CN204656593U (en) The vertical storage rack of a kind of ocean sample cell
CN213036264U (en) Device is put to pipeline for civil engineering
CN104340820A (en) Car frame without lower beam
CN210289194U (en) One-column one-pile perpendicularity adjusting and verticality adjusting structure
CN204005087U (en) Bottom positioning means in a kind of multi-functional TV bracket
CN204363363U (en) A kind of composite goods rack
WO2012159758A3 (en) Height-adjustable heavy-duty support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021

RJ01 Rejection of invention patent application after publication