CN104989108A - Field curing room construction method - Google Patents

Field curing room construction method Download PDF

Info

Publication number
CN104989108A
CN104989108A CN201510425691.4A CN201510425691A CN104989108A CN 104989108 A CN104989108 A CN 104989108A CN 201510425691 A CN201510425691 A CN 201510425691A CN 104989108 A CN104989108 A CN 104989108A
Authority
CN
China
Prior art keywords
test block
room
construction method
fog room
block frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510425691.4A
Other languages
Chinese (zh)
Inventor
曹维存
王俊峰
肖晓光
刘楠楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201510425691.4A priority Critical patent/CN104989108A/en
Publication of CN104989108A publication Critical patent/CN104989108A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a field curing room construction method, and relates to the technical field of curing rooms. The method includes the steps that 1, paying off is conducted on all equipment foundations according to the design drawing; positioning paying off is conducted on the whole curing room, including an office room and a workroom as well as a collecting tank, test block frames and drainage ditches in the room; 2, the foundations are made; foundations are constructed, and the collecting tank and the drainage ditches are constructed; 3, a cushion layer is constructed; a concrete cushion layer is cast, and polishing is conducted while grinding is conducted; 4, a keel and a room body are mounted, and the keel is connected with foundation bolts; 5, electrical equipment is mounted; flame retardant troughs and sockets are laid on the wall, cooling and heating equipment is placed outdoors, ultrasonic atomizing humidifier and indoor decorative lamps are mounted in the room, and the test block frames are placed. By means of the field curing room construction method, standard configuration, modular assembly and intelligent control of the filed curing room can be achieved, and practicability and integrity are high.

Description

On-the-spot fog room construction method
Technical field
The present invention relates to fog room technical field.
Background technology
Nowadays, in workmanship, test block, as important evidence, plays a part very important in engineering construction and quality control procedure.In order to easy construction, save manpower, enhancing practicality and collectivity, fog room has become a markization facility that must configure in modern project.There is the infull disunity of configuration in prior art, equipment and instrument is mixed and disorderly, and maintenance water can not recycle, waste of manpower, the problems such as layout is unreasonable, space waste, also do not form the standardization fog room construction method of a simple perfect in shape and function, affect efficiency of construction.In addition, inside existing on-the-spot fog room, assembling does not have formation standard, and practicality is not high enough.
Summary of the invention
The technical problem to be solved in the present invention is for above-mentioned the deficiencies in the prior art, a kind of on-the-spot fog room construction method is provided, solve and adopt at present colored steel room and interim masonry to build function to face and build, function is incomplete, the problem such as can not to have enough to meet the need, layout and easy construction reasonable, save artificial, avoid cumbersome process and layout is disorderly and unsystematic, greatly raise the efficiency, fog room energy standard configurations, modular assembly, intelligentized control method can be realized, practicality and collectivity strong.Construction standardization can be realized; Be conducive to improving integrated engineering efficiency of construction and quality.
For solving the problems of the technologies described above, the technical solution used in the present invention is: comprise the steps:
(1) according to each equipment Foundations unwrapping wire of design drawing; To whole fog room, comprise cubicle and workplace, and the collecting-tank of indoor, test block frame, gutter line setting; In workplace, three interior wall roots arrange gutter, and a corner arranges collecting-tank, and 4 test block framves are placed, to face wall along putting a test block frame by a face wall row formula;
(2) basis makes; Foundation construction, collecting-tank, gutter construction;
(3) cushion construction; Concreting bed course, and beat and polish;
(4) install keel and room body, keel are connected with stone bolt;
(5) installation of electrical equipment: lay difficult combustion wire casing and socket at metope, outdoor placement refrigeration and heating equipment, indoor placement dress supersonic atomizing humidifier and room built-in light, place test block frame.
As preferably, step (1) unwrapping wire is pressed: the long 1000mm of collecting-tank, wide 50mm; 4 test block framves row formulas are placed, the long 1700mm of each test block frame, wide 500mm, and adjacent two test block framves are separated by 475mm; To face wall along the test block frame level 450mm apart put a test block frame and other 4 row's formulas and places.
As preferably, step (3) cushion construction: build C15 concrete cushion 200mm, and beat and polish.
As preferably, step (4) installs keel: skeleton is all 40 × 40mm with cross section, and thickness is that the square steel of 3mm welds with stone bolt.
As preferably, step (5) installation of electrical equipment: lay difficult combustion wire casing 24 × 14mm at metope, then mounted lamp and socket, refrigeration and heating equipment are placed in fog room outside, finally install supersonic atomizing humidifier.
As preferably, indoor location lamp is Fog-proof light, and socket is waterproof socket, and heating equipment adopts heat pump heat supply mode, and chiller plant adopts converter technique, and supersonic atomizing humidifier adopts ultrasonic wave high frequency oscillation.
The beneficial effect adopting technique scheme to produce is: the present invention provides a kind of simple on-the-spot fog room construction method, by improving internal construction, solving and adopting colored steel room to build the incomplete problem of built-in function at present.By simple five steps, solve the cumbersome process of currently available technology, to rational deployment, the utilization of the confined space, make layout and easy construction rationally, save manpower.By utilizing method of the present invention, the installation of modularization construction and electric fixtures, can realize fog room standard configurations, modular assembly, intelligentized control method, practicality and collectivity strong.Utilization unified standard is built, and can realize construction standardization, is conducive to improving integrated engineering efficiency of construction and quality.
Accompanying drawing explanation
Fig. 1 is that the present invention constructs schematic layout pattern.
In figure: 1, test block frame; 2, collecting-tank; 3, gutter; 4, cubicle; 5, workplace.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
As shown in Figure 1, be an embodiment of the on-the-spot fog room construction method of the present invention, comprise the steps:
(1) according to each equipment Foundations unwrapping wire of design drawing; To whole fog room, comprise cubicle 4 and workplace 5, and the collecting-tank 2 of indoor, test block frame 1, gutter 3 line setting; In workplace, three interior wall roots arrange corner, 3, one, gutter and arrange collecting-tank 2, and 4 test block framves 1 are placed, to face wall along putting a test block frame 1 by a face wall row formula.Line setting can make construction can carry out in strict accordance with drawing, convenient construction;
(2) basis makes; Foundation construction, collecting-tank 2, gutter 3 are constructed, and construct in the lump, facilitate follow-up work, save time three kinds, reduce workload;
(3) cushion construction; Concreting bed course, and beat and polish;
(4) install keel and room body, keel are connected with stone bolt, more reliably solid;
(5) installation of electrical equipment: lay difficult combustion wire casing and socket at metope, outdoor placement refrigeration and heating equipment, indoor placement dress supersonic atomizing humidifier and room built-in light, place test block frame.
Method is simply clear and definite, decreases loaded down with trivial details working procedure and unnecessary work.
Step (1) unwrapping wire is pressed: the long 1000mm of collecting-tank 2, wide 50mm; 4 test block framves 1 are arranged formulas and are placed, the long 1700mm of each test block frame 1, wide 500mm, and adjacent two test block framves 1 are separated by 475mm; To face wall along the test block frame 1 level 450mm apart put a test block frame 1 and other 4 row's formulas and places; Arrange test block frame 1 on the both sides that fog room is relative, Appropriate application space, can increase the quantity of test block frame, same staff works together more convenient.
Step (3) cushion construction: build C15 concrete cushion 200mm, and beat and polish.Bed course can water proof, draining, antifreeze, and polishing makes bed course flat smooth more, is conducive to ensuing construction.
Step (4) installs keel: skeleton is all 40 × 40mm with cross section, and thickness is that the square steel of 3mm welds with stone bolt, makes support more firm, solid.
Step (5) installation of electrical equipment: lay difficult combustion wire casing 24 × 14mm at metope, then mounted lamp and socket, refrigeration and heating equipment are placed in fog room outside, avoid the corrosion of moisture laden air to equipment, improve the unfailing performance of equipment.Finally supersonic atomizing humidifier is installed, ensures test block maintenance quality.
Indoor location lamp is Fog-proof light, and socket is waterproof socket, safety and reliability.Heating equipment adopts heat pump heat supply mode, and chiller plant adopts converter technique, saves the energy.Supersonic atomizing humidifier adopts ultrasonic wave high frequency oscillation, makes water fogging as the ultramicron of 1-5 micron, by aerophor, is diffused in air by water smoke.
After adopting technique scheme, solve operation loaded down with trivial details in on-the-spot fog room work progress, simply perfect has formulated construction method, by simple method, rational layout, can more good utilisation space, on-the-spot fog room standard configurations, modular assembly, intelligentized control method can be realized, practicality and collectivity strong.

Claims (6)

1. an on-the-spot fog room construction method, is characterized in that: comprise the steps:
(1) according to each equipment Foundations unwrapping wire of design drawing; To whole fog room, comprise cubicle (4) and workplace (5), and the collecting-tank of indoor (2), test block frame (1), gutter (3) line setting; Interior three the interior wall roots of workplace (5) arrange gutter (3), and a corner arranges collecting-tank (2), and 4 test block framves (1) are placed, to face wall along putting a test block frame (1) by a face wall row formula;
(2) basis makes; Foundation construction, collecting-tank (2), gutter (3) construction;
(3) cushion construction; Concreting bed course, and beat and polish;
(4) install keel and room body, keel are connected with stone bolt;
(5) installation of electrical equipment: lay difficult combustion wire casing and socket at metope, outdoor placement refrigeration and heating equipment, indoor placement dress supersonic atomizing humidifier and room built-in light, place test block frame (1).
2. on-the-spot fog room construction method according to claim 1, is characterized in that described step (1) unwrapping wire is pressed: collecting-tank (2) long 1000mm, wide 50mm; 4 test block framves (1) row formulas are placed, the long 1700mm of each test block frame (1), wide 500mm, and adjacent two test block framves (1) are separated by 475mm; To suitable test block frame (1) the level 450mm apart put a test block frame (1) and place with other 4 formulas of arranging of face wall.
3. on-the-spot fog room construction method according to claim 1, is characterized in that described step (3) cushion construction: build C15 concrete cushion 200mm, and beats and polish.
4. on-the-spot fog room construction method according to claim 1, is characterized in that described step (4) installs keel: skeleton is all 40 × 40mm with cross section, and thickness is that the square steel of 3mm welds with stone bolt.
5. on-the-spot fog room construction method according to claim 1, it is characterized in that described step (5) installation of electrical equipment: lay difficult combustion wire casing 24 × 14mm at metope, mounted lamp and socket again, refrigeration and heating equipment are placed in fog room outside, finally install supersonic atomizing humidifier.
6. on-the-spot fog room construction method according to claim 1, it is characterized in that described indoor location lamp is Fog-proof light, socket is waterproof socket, and heating equipment adopts heat pump heat supply mode, chiller plant adopts converter technique, and supersonic atomizing humidifier adopts ultrasonic wave high frequency oscillation.
CN201510425691.4A 2015-07-20 2015-07-20 Field curing room construction method Pending CN104989108A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510425691.4A CN104989108A (en) 2015-07-20 2015-07-20 Field curing room construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510425691.4A CN104989108A (en) 2015-07-20 2015-07-20 Field curing room construction method

Publications (1)

Publication Number Publication Date
CN104989108A true CN104989108A (en) 2015-10-21

Family

ID=54300989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510425691.4A Pending CN104989108A (en) 2015-07-20 2015-07-20 Field curing room construction method

Country Status (1)

Country Link
CN (1) CN104989108A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2433255Y (en) * 2000-07-18 2001-06-06 上海杰斯机械施工有限公司 Movable concrete mortar standard curing room
JP2001321158A (en) * 2000-05-10 2001-11-20 Akihiko Yanagisawa Method for producing filamentous diatoms
CN2548141Y (en) * 2002-06-10 2003-04-30 李四恩 Moveable concrete, mortar sampler cultivation room
CN2743109Y (en) * 2004-08-03 2005-11-30 王悦 Mobile standard test block curing chamber
CN101380776A (en) * 2008-02-26 2009-03-11 黑龙江农垦建工有限公司 Test-block standard curing room
CN101947810A (en) * 2010-06-25 2011-01-19 江苏省交通科学研究院股份有限公司 Concrete sample curing room
CN202399386U (en) * 2012-01-13 2012-08-29 中建三局建设工程股份有限公司 Automatic temperature control system for curing concrete test block
CN103264440A (en) * 2013-04-25 2013-08-28 中天建设集团有限公司 Concrete briquette maintaining process
CN203324799U (en) * 2013-07-04 2013-12-04 河南省产品质量监督检验院 Remote intelligent monitoring system for building-material maintenance room
CN103770206A (en) * 2014-01-10 2014-05-07 浙江省建工集团有限责任公司 Standardized maintenance room and construction method and maintenance method thereof
CN103950098A (en) * 2014-05-07 2014-07-30 北京六建集团有限责任公司 Energy-saving and environmental-friendly constant temperature-controlled curing system
CN105439634A (en) * 2015-11-25 2016-03-30 湖南聚创建筑科技有限公司 Intelligent control method and control equipment for steam curing of cement concrete

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001321158A (en) * 2000-05-10 2001-11-20 Akihiko Yanagisawa Method for producing filamentous diatoms
CN2433255Y (en) * 2000-07-18 2001-06-06 上海杰斯机械施工有限公司 Movable concrete mortar standard curing room
CN2548141Y (en) * 2002-06-10 2003-04-30 李四恩 Moveable concrete, mortar sampler cultivation room
CN2743109Y (en) * 2004-08-03 2005-11-30 王悦 Mobile standard test block curing chamber
CN101380776A (en) * 2008-02-26 2009-03-11 黑龙江农垦建工有限公司 Test-block standard curing room
CN101947810A (en) * 2010-06-25 2011-01-19 江苏省交通科学研究院股份有限公司 Concrete sample curing room
CN202399386U (en) * 2012-01-13 2012-08-29 中建三局建设工程股份有限公司 Automatic temperature control system for curing concrete test block
CN103264440A (en) * 2013-04-25 2013-08-28 中天建设集团有限公司 Concrete briquette maintaining process
CN203324799U (en) * 2013-07-04 2013-12-04 河南省产品质量监督检验院 Remote intelligent monitoring system for building-material maintenance room
CN103770206A (en) * 2014-01-10 2014-05-07 浙江省建工集团有限责任公司 Standardized maintenance room and construction method and maintenance method thereof
CN103950098A (en) * 2014-05-07 2014-07-30 北京六建集团有限责任公司 Energy-saving and environmental-friendly constant temperature-controlled curing system
CN105439634A (en) * 2015-11-25 2016-03-30 湖南聚创建筑科技有限公司 Intelligent control method and control equipment for steam curing of cement concrete

Similar Documents

Publication Publication Date Title
CN109518811A (en) A kind of easy-to-mount building structure
CN203320760U (en) Modularization curtain wall
CN204748894U (en) Building integrated photovoltaic precast concrete spare and be used for making its mould
CN104131711B (en) Building based on integration module
CN104989108A (en) Field curing room construction method
CN209896553U (en) High-pressure branch box with dehumidification function
CN101716797A (en) Spraying health promotion system of precast beam slab
CN203821903U (en) Assembly type power distribution room
CN214227477U (en) Outdoor electric power cabinet
CN210278629U (en) Construction site raise dust controlling means
CN107975291A (en) It is a kind of can the pollution of anti-construction site dust environmentally friendly divider wall
CN210577277U (en) Power equipment protection device
CN203654534U (en) Photovoltaic module fixing device for curtain wall
CN204163293U (en) The roof structure of steel concrete integrated building
CN208226429U (en) A kind of container restructuring substation equipment installation prefabricated cabin
CN205558354U (en) Integrates at photovoltaic power generation concrete standard curing room
CN209001546U (en) A kind of pin-connected panel device carrying screen cabinet
CN204456277U (en) Surface water water source heat pump system water fetching device
CN208870194U (en) Space module house
CN203130377U (en) Temperature difference ventilation power generation system for bottom layer of high-rise building
CN203361343U (en) Building based on integrated modules
CN207975726U (en) Laminated type dry-laid electrothemic floor device
CN209066943U (en) It is a kind of to solve the device that it is difficult that rural migrant worker worker building site is had a bath
CN205776753U (en) A kind of solar energy rope membrane building with auxiliary electricity system
CN205490294U (en) Arrange high -efficient photovoltaic power generation device in natural cooling of high tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021

RJ01 Rejection of invention patent application after publication