CN104989108A - Field curing room construction method - Google Patents
Field curing room construction method Download PDFInfo
- Publication number
- CN104989108A CN104989108A CN201510425691.4A CN201510425691A CN104989108A CN 104989108 A CN104989108 A CN 104989108A CN 201510425691 A CN201510425691 A CN 201510425691A CN 104989108 A CN104989108 A CN 104989108A
- Authority
- CN
- China
- Prior art keywords
- test block
- room
- construction method
- fog room
- block frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a field curing room construction method, and relates to the technical field of curing rooms. The method includes the steps that 1, paying off is conducted on all equipment foundations according to the design drawing; positioning paying off is conducted on the whole curing room, including an office room and a workroom as well as a collecting tank, test block frames and drainage ditches in the room; 2, the foundations are made; foundations are constructed, and the collecting tank and the drainage ditches are constructed; 3, a cushion layer is constructed; a concrete cushion layer is cast, and polishing is conducted while grinding is conducted; 4, a keel and a room body are mounted, and the keel is connected with foundation bolts; 5, electrical equipment is mounted; flame retardant troughs and sockets are laid on the wall, cooling and heating equipment is placed outdoors, ultrasonic atomizing humidifier and indoor decorative lamps are mounted in the room, and the test block frames are placed. By means of the field curing room construction method, standard configuration, modular assembly and intelligent control of the filed curing room can be achieved, and practicability and integrity are high.
Description
Technical field
The present invention relates to fog room technical field.
Background technology
Nowadays, in workmanship, test block, as important evidence, plays a part very important in engineering construction and quality control procedure.In order to easy construction, save manpower, enhancing practicality and collectivity, fog room has become a markization facility that must configure in modern project.There is the infull disunity of configuration in prior art, equipment and instrument is mixed and disorderly, and maintenance water can not recycle, waste of manpower, the problems such as layout is unreasonable, space waste, also do not form the standardization fog room construction method of a simple perfect in shape and function, affect efficiency of construction.In addition, inside existing on-the-spot fog room, assembling does not have formation standard, and practicality is not high enough.
Summary of the invention
The technical problem to be solved in the present invention is for above-mentioned the deficiencies in the prior art, a kind of on-the-spot fog room construction method is provided, solve and adopt at present colored steel room and interim masonry to build function to face and build, function is incomplete, the problem such as can not to have enough to meet the need, layout and easy construction reasonable, save artificial, avoid cumbersome process and layout is disorderly and unsystematic, greatly raise the efficiency, fog room energy standard configurations, modular assembly, intelligentized control method can be realized, practicality and collectivity strong.Construction standardization can be realized; Be conducive to improving integrated engineering efficiency of construction and quality.
For solving the problems of the technologies described above, the technical solution used in the present invention is: comprise the steps:
(1) according to each equipment Foundations unwrapping wire of design drawing; To whole fog room, comprise cubicle and workplace, and the collecting-tank of indoor, test block frame, gutter line setting; In workplace, three interior wall roots arrange gutter, and a corner arranges collecting-tank, and 4 test block framves are placed, to face wall along putting a test block frame by a face wall row formula;
(2) basis makes; Foundation construction, collecting-tank, gutter construction;
(3) cushion construction; Concreting bed course, and beat and polish;
(4) install keel and room body, keel are connected with stone bolt;
(5) installation of electrical equipment: lay difficult combustion wire casing and socket at metope, outdoor placement refrigeration and heating equipment, indoor placement dress supersonic atomizing humidifier and room built-in light, place test block frame.
As preferably, step (1) unwrapping wire is pressed: the long 1000mm of collecting-tank, wide 50mm; 4 test block framves row formulas are placed, the long 1700mm of each test block frame, wide 500mm, and adjacent two test block framves are separated by 475mm; To face wall along the test block frame level 450mm apart put a test block frame and other 4 row's formulas and places.
As preferably, step (3) cushion construction: build C15 concrete cushion 200mm, and beat and polish.
As preferably, step (4) installs keel: skeleton is all 40 × 40mm with cross section, and thickness is that the square steel of 3mm welds with stone bolt.
As preferably, step (5) installation of electrical equipment: lay difficult combustion wire casing 24 × 14mm at metope, then mounted lamp and socket, refrigeration and heating equipment are placed in fog room outside, finally install supersonic atomizing humidifier.
As preferably, indoor location lamp is Fog-proof light, and socket is waterproof socket, and heating equipment adopts heat pump heat supply mode, and chiller plant adopts converter technique, and supersonic atomizing humidifier adopts ultrasonic wave high frequency oscillation.
The beneficial effect adopting technique scheme to produce is: the present invention provides a kind of simple on-the-spot fog room construction method, by improving internal construction, solving and adopting colored steel room to build the incomplete problem of built-in function at present.By simple five steps, solve the cumbersome process of currently available technology, to rational deployment, the utilization of the confined space, make layout and easy construction rationally, save manpower.By utilizing method of the present invention, the installation of modularization construction and electric fixtures, can realize fog room standard configurations, modular assembly, intelligentized control method, practicality and collectivity strong.Utilization unified standard is built, and can realize construction standardization, is conducive to improving integrated engineering efficiency of construction and quality.
Accompanying drawing explanation
Fig. 1 is that the present invention constructs schematic layout pattern.
In figure: 1, test block frame; 2, collecting-tank; 3, gutter; 4, cubicle; 5, workplace.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
As shown in Figure 1, be an embodiment of the on-the-spot fog room construction method of the present invention, comprise the steps:
(1) according to each equipment Foundations unwrapping wire of design drawing; To whole fog room, comprise cubicle 4 and workplace 5, and the collecting-tank 2 of indoor, test block frame 1, gutter 3 line setting; In workplace, three interior wall roots arrange corner, 3, one, gutter and arrange collecting-tank 2, and 4 test block framves 1 are placed, to face wall along putting a test block frame 1 by a face wall row formula.Line setting can make construction can carry out in strict accordance with drawing, convenient construction;
(2) basis makes; Foundation construction, collecting-tank 2, gutter 3 are constructed, and construct in the lump, facilitate follow-up work, save time three kinds, reduce workload;
(3) cushion construction; Concreting bed course, and beat and polish;
(4) install keel and room body, keel are connected with stone bolt, more reliably solid;
(5) installation of electrical equipment: lay difficult combustion wire casing and socket at metope, outdoor placement refrigeration and heating equipment, indoor placement dress supersonic atomizing humidifier and room built-in light, place test block frame.
Method is simply clear and definite, decreases loaded down with trivial details working procedure and unnecessary work.
Step (1) unwrapping wire is pressed: the long 1000mm of collecting-tank 2, wide 50mm; 4 test block framves 1 are arranged formulas and are placed, the long 1700mm of each test block frame 1, wide 500mm, and adjacent two test block framves 1 are separated by 475mm; To face wall along the test block frame 1 level 450mm apart put a test block frame 1 and other 4 row's formulas and places; Arrange test block frame 1 on the both sides that fog room is relative, Appropriate application space, can increase the quantity of test block frame, same staff works together more convenient.
Step (3) cushion construction: build C15 concrete cushion 200mm, and beat and polish.Bed course can water proof, draining, antifreeze, and polishing makes bed course flat smooth more, is conducive to ensuing construction.
Step (4) installs keel: skeleton is all 40 × 40mm with cross section, and thickness is that the square steel of 3mm welds with stone bolt, makes support more firm, solid.
Step (5) installation of electrical equipment: lay difficult combustion wire casing 24 × 14mm at metope, then mounted lamp and socket, refrigeration and heating equipment are placed in fog room outside, avoid the corrosion of moisture laden air to equipment, improve the unfailing performance of equipment.Finally supersonic atomizing humidifier is installed, ensures test block maintenance quality.
Indoor location lamp is Fog-proof light, and socket is waterproof socket, safety and reliability.Heating equipment adopts heat pump heat supply mode, and chiller plant adopts converter technique, saves the energy.Supersonic atomizing humidifier adopts ultrasonic wave high frequency oscillation, makes water fogging as the ultramicron of 1-5 micron, by aerophor, is diffused in air by water smoke.
After adopting technique scheme, solve operation loaded down with trivial details in on-the-spot fog room work progress, simply perfect has formulated construction method, by simple method, rational layout, can more good utilisation space, on-the-spot fog room standard configurations, modular assembly, intelligentized control method can be realized, practicality and collectivity strong.
Claims (6)
1. an on-the-spot fog room construction method, is characterized in that: comprise the steps:
(1) according to each equipment Foundations unwrapping wire of design drawing; To whole fog room, comprise cubicle (4) and workplace (5), and the collecting-tank of indoor (2), test block frame (1), gutter (3) line setting; Interior three the interior wall roots of workplace (5) arrange gutter (3), and a corner arranges collecting-tank (2), and 4 test block framves (1) are placed, to face wall along putting a test block frame (1) by a face wall row formula;
(2) basis makes; Foundation construction, collecting-tank (2), gutter (3) construction;
(3) cushion construction; Concreting bed course, and beat and polish;
(4) install keel and room body, keel are connected with stone bolt;
(5) installation of electrical equipment: lay difficult combustion wire casing and socket at metope, outdoor placement refrigeration and heating equipment, indoor placement dress supersonic atomizing humidifier and room built-in light, place test block frame (1).
2. on-the-spot fog room construction method according to claim 1, is characterized in that described step (1) unwrapping wire is pressed: collecting-tank (2) long 1000mm, wide 50mm; 4 test block framves (1) row formulas are placed, the long 1700mm of each test block frame (1), wide 500mm, and adjacent two test block framves (1) are separated by 475mm; To suitable test block frame (1) the level 450mm apart put a test block frame (1) and place with other 4 formulas of arranging of face wall.
3. on-the-spot fog room construction method according to claim 1, is characterized in that described step (3) cushion construction: build C15 concrete cushion 200mm, and beats and polish.
4. on-the-spot fog room construction method according to claim 1, is characterized in that described step (4) installs keel: skeleton is all 40 × 40mm with cross section, and thickness is that the square steel of 3mm welds with stone bolt.
5. on-the-spot fog room construction method according to claim 1, it is characterized in that described step (5) installation of electrical equipment: lay difficult combustion wire casing 24 × 14mm at metope, mounted lamp and socket again, refrigeration and heating equipment are placed in fog room outside, finally install supersonic atomizing humidifier.
6. on-the-spot fog room construction method according to claim 1, it is characterized in that described indoor location lamp is Fog-proof light, socket is waterproof socket, and heating equipment adopts heat pump heat supply mode, chiller plant adopts converter technique, and supersonic atomizing humidifier adopts ultrasonic wave high frequency oscillation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510425691.4A CN104989108A (en) | 2015-07-20 | 2015-07-20 | Field curing room construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510425691.4A CN104989108A (en) | 2015-07-20 | 2015-07-20 | Field curing room construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104989108A true CN104989108A (en) | 2015-10-21 |
Family
ID=54300989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510425691.4A Pending CN104989108A (en) | 2015-07-20 | 2015-07-20 | Field curing room construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104989108A (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2433255Y (en) * | 2000-07-18 | 2001-06-06 | 上海杰斯机械施工有限公司 | Movable concrete mortar standard curing room |
JP2001321158A (en) * | 2000-05-10 | 2001-11-20 | Akihiko Yanagisawa | Method for producing filamentous diatoms |
CN2548141Y (en) * | 2002-06-10 | 2003-04-30 | 李四恩 | Moveable concrete, mortar sampler cultivation room |
CN2743109Y (en) * | 2004-08-03 | 2005-11-30 | 王悦 | Mobile standard test block curing chamber |
CN101380776A (en) * | 2008-02-26 | 2009-03-11 | 黑龙江农垦建工有限公司 | Test-block standard curing room |
CN101947810A (en) * | 2010-06-25 | 2011-01-19 | 江苏省交通科学研究院股份有限公司 | Concrete sample curing room |
CN202399386U (en) * | 2012-01-13 | 2012-08-29 | 中建三局建设工程股份有限公司 | Automatic temperature control system for curing concrete test block |
CN103264440A (en) * | 2013-04-25 | 2013-08-28 | 中天建设集团有限公司 | Concrete briquette maintaining process |
CN203324799U (en) * | 2013-07-04 | 2013-12-04 | 河南省产品质量监督检验院 | Remote intelligent monitoring system for building-material maintenance room |
CN103770206A (en) * | 2014-01-10 | 2014-05-07 | 浙江省建工集团有限责任公司 | Standardized maintenance room and construction method and maintenance method thereof |
CN103950098A (en) * | 2014-05-07 | 2014-07-30 | 北京六建集团有限责任公司 | Energy-saving and environmental-friendly constant temperature-controlled curing system |
CN105439634A (en) * | 2015-11-25 | 2016-03-30 | 湖南聚创建筑科技有限公司 | Intelligent control method and control equipment for steam curing of cement concrete |
-
2015
- 2015-07-20 CN CN201510425691.4A patent/CN104989108A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001321158A (en) * | 2000-05-10 | 2001-11-20 | Akihiko Yanagisawa | Method for producing filamentous diatoms |
CN2433255Y (en) * | 2000-07-18 | 2001-06-06 | 上海杰斯机械施工有限公司 | Movable concrete mortar standard curing room |
CN2548141Y (en) * | 2002-06-10 | 2003-04-30 | 李四恩 | Moveable concrete, mortar sampler cultivation room |
CN2743109Y (en) * | 2004-08-03 | 2005-11-30 | 王悦 | Mobile standard test block curing chamber |
CN101380776A (en) * | 2008-02-26 | 2009-03-11 | 黑龙江农垦建工有限公司 | Test-block standard curing room |
CN101947810A (en) * | 2010-06-25 | 2011-01-19 | 江苏省交通科学研究院股份有限公司 | Concrete sample curing room |
CN202399386U (en) * | 2012-01-13 | 2012-08-29 | 中建三局建设工程股份有限公司 | Automatic temperature control system for curing concrete test block |
CN103264440A (en) * | 2013-04-25 | 2013-08-28 | 中天建设集团有限公司 | Concrete briquette maintaining process |
CN203324799U (en) * | 2013-07-04 | 2013-12-04 | 河南省产品质量监督检验院 | Remote intelligent monitoring system for building-material maintenance room |
CN103770206A (en) * | 2014-01-10 | 2014-05-07 | 浙江省建工集团有限责任公司 | Standardized maintenance room and construction method and maintenance method thereof |
CN103950098A (en) * | 2014-05-07 | 2014-07-30 | 北京六建集团有限责任公司 | Energy-saving and environmental-friendly constant temperature-controlled curing system |
CN105439634A (en) * | 2015-11-25 | 2016-03-30 | 湖南聚创建筑科技有限公司 | Intelligent control method and control equipment for steam curing of cement concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109518811A (en) | A kind of easy-to-mount building structure | |
CN203320760U (en) | Modularization curtain wall | |
CN204748894U (en) | Building integrated photovoltaic precast concrete spare and be used for making its mould | |
CN104131711B (en) | Building based on integration module | |
CN104989108A (en) | Field curing room construction method | |
CN209896553U (en) | High-pressure branch box with dehumidification function | |
CN101716797A (en) | Spraying health promotion system of precast beam slab | |
CN203821903U (en) | Assembly type power distribution room | |
CN214227477U (en) | Outdoor electric power cabinet | |
CN210278629U (en) | Construction site raise dust controlling means | |
CN107975291A (en) | It is a kind of can the pollution of anti-construction site dust environmentally friendly divider wall | |
CN210577277U (en) | Power equipment protection device | |
CN203654534U (en) | Photovoltaic module fixing device for curtain wall | |
CN204163293U (en) | The roof structure of steel concrete integrated building | |
CN208226429U (en) | A kind of container restructuring substation equipment installation prefabricated cabin | |
CN205558354U (en) | Integrates at photovoltaic power generation concrete standard curing room | |
CN209001546U (en) | A kind of pin-connected panel device carrying screen cabinet | |
CN204456277U (en) | Surface water water source heat pump system water fetching device | |
CN208870194U (en) | Space module house | |
CN203130377U (en) | Temperature difference ventilation power generation system for bottom layer of high-rise building | |
CN203361343U (en) | Building based on integrated modules | |
CN207975726U (en) | Laminated type dry-laid electrothemic floor device | |
CN209066943U (en) | It is a kind of to solve the device that it is difficult that rural migrant worker worker building site is had a bath | |
CN205776753U (en) | A kind of solar energy rope membrane building with auxiliary electricity system | |
CN205490294U (en) | Arrange high -efficient photovoltaic power generation device in natural cooling of high tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151021 |
|
RJ01 | Rejection of invention patent application after publication |