CN104984846B - Shower - Google Patents

Shower Download PDF

Info

Publication number
CN104984846B
CN104984846B CN201410344979.4A CN201410344979A CN104984846B CN 104984846 B CN104984846 B CN 104984846B CN 201410344979 A CN201410344979 A CN 201410344979A CN 104984846 B CN104984846 B CN 104984846B
Authority
CN
China
Prior art keywords
water
point
water route
segment
mouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410344979.4A
Other languages
Chinese (zh)
Other versions
CN104984846A (en
Inventor
曹勇斌
赖灿彬
蔡涛
周华松
Original Assignee
Xiamen Solex High Tech Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Solex High Tech Industries Co Ltd filed Critical Xiamen Solex High Tech Industries Co Ltd
Priority to CN201410344979.4A priority Critical patent/CN104984846B/en
Publication of CN104984846A publication Critical patent/CN104984846A/en
Application granted granted Critical
Publication of CN104984846B publication Critical patent/CN104984846B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of showers, including fixed part and switching mechanism.Fixed part sets up separately into Shui Lu and two point of water route, and two points of water routes can connect water inlet road, and switching mechanism connects water inlet road for switching two points of water routes.First point of water route includes tap hole and the mutation chamber for connecting tap hole, and being mutated intracavitary be equipped with can be for the rectification body for the water flow collision flowed out by tap hole.Second point of water route includes first segment water route and the second segment water route for connecting first segment water route, and the outlet of first segment water route is less than second segment water route.Suction hole is set between mutation chamber and second segment water route.It has the following advantages: using water route cooperation suction hole is divided then: when first point of water route is discharged, outside air enters mutation chamber through suction hole by second point of water route, and first point of water route goes out air-bubble;When second point of water route water outlet, outside air enters second segment water route, mixing wastewater with air in second point of water route, therefore two points of water route water outlets all mixing wastewater with air through suction hole by first point of water route;It is compact-sized, it occupies little space.

Description

Shower
Technical field
The present invention relates to a kind of showers.
Background technique
Existing shower, including fixed part and switching mechanism, the fixed part set up separately into Shui Lu, first point of water route and second Divide water route, which can connect water inlet road with second point of water route, which is installed in fixed part and is used for Switch first point of water route and connects water inlet road with second point of water route.First point of water route sets bubbler, which sets air inlet, should Suction hole is connected inside and outside fixed part, and due to separately setting inlet channel, total is complicated, and occupied space is big.
Summary of the invention
The present invention provides showers, and which overcome deficiencies present in shower in background technique.
The used technical solution that the present invention solves its technical problem is:
Shower, including fixed part (10) and switching mechanism (20), the fixed part (10) set water inlet road (11), first point Water route (30) and second point of water route (40), first point of water route (30) and second point of water route (40) can connect water inlet road (11), The switching mechanism (20) is installed in fixed part (10) and connects for switching first point of water route (30) with second point of water route (40) It intakes road (11);First point of water route (30) includes the mutation chamber that an at least tap hole (31) connects tap hole (31) with one (32), being equipped in the mutation chamber (32) can be for the rectification body (33) for the water flow collision flowed out by tap hole (31);Second point of water Road (40) includes first segment water route (41) and the second segment water route (42) for connecting first segment water route (41), the first segment water route (41) Outlet is less than second segment water route (42);Suction hole (50) are set between the mutation chamber (32) and second segment water route (42).
Among one embodiment: the water outlet port of first point of water route (30) and second point of water route (40) is all located at fixed part (10) one end, the second segment water route (42) is in a ring and encirclement is mutated chamber (32).
Among one embodiment: first point of water route (30) and second point of water route (40) are respectively equipped with first point of water end (W.E.) mouth (34) With second point of water end (W.E.) mouth (43);The switching mechanism (20) includes switching shaft (21), is set in the switching sealing of switching shaft (21) outside (22) and toggle (23) are enclosed, which is slidingly arranged in fixed part (10), toggle (23) one end self-retaining Partially (10) are outside by pass through aperture by protruding into outside fixed part (10) in fixed part (10) and affixed switching shaft (21);This is cut Changing axis (21) can drive switching sealing ring (22) sliding to seal first point of water end (W.E.) mouth (34) or second point of water end (W.E.) mouth with selectivity (43), which can slide up and down along fixed part (10) direction switching shaft (21) can be driven to slide up and down.
Among one embodiment: first point of water end (W.E.) mouth (34) and second point of water end (W.E.) mouth (43) are right up and down along fixed part (10) To arrangement, the switching sealing ring (22) is between first point of water end (W.E.) mouth (43) and second point of water end (W.E.) mouth (34).
Among one embodiment: the switching mechanism (20) further includes a bullet being located between switching shaft (21) and fixed part (10) Property body (24).
Among one embodiment: the fixed part (10) includes the ontology (13), valve body (14) and cover for setting hollow hole (12) (15);
The valve body (14) has inlet segment (141) and downward opening barrel (142), sets in the inlet segment (141) The water inlet road (11) stated, the barrel (142) are equipped with downward opening groove (143), and sealing is installed in the groove (143) Water distribution component (16), formed between water distribution component (16) and the slot bottom of groove (143) on this one connects intake road (11) divide water cavity (144);Water distribution component (16) sets perforative first point of water end (W.E.) mouth (34) up and down on this, is installed with position in the groove (143) Lower water distribution component (17) under upper water distribution component (16), the lower water distribution component (17) are equipped with above-mentioned tap hole (31), the rectification body (33) it is installed in groove (143) and is located under lower water distribution component (17);The slot bottom of the groove (143) is equipped with above-mentioned second point Water end (W.E.) mouth (43);
The cover (15) set a ring cover, one upwardly extended as ring cover inner peripheral made of internal perisporium (151) and one by Periphery wall made of ring cover outer peripheral edge upwardly extends (152), the ring cover set the second faucet;The periphery wall of the cover (152) sealing is fixed in hollow hole (12) inner wall of ontology (13);
The valve body (14) is fixedly attached in the hollow hole (13) of ontology (12) and barrel (142) cooperation internal perisporium (151), above-mentioned first segment water route (41) is constituted between the periphery wall (152) and barrel (142), the periphery wall (152) and interior Second segment water route (42) are constituted between peripheral wall (151), which is molded between barrel (142) and internal perisporium (151).
Among one embodiment: the valve body (14) further includes the transverse slat (145) of an affixed inlet segment (141), the transverse slat (145) Composition one is connected between second point of water end (W.E.) mouth (43) and first segment water route (41) and crosses water section between the end face of barrel (142);It should Transverse slat (145) sets through-hole (146), and the switching shaft (21) sealing slides through through-hole (145).
Among one embodiment: the ontology (13) is equipped with the through hole (131) connected inside and outside hollow hole (12), the toggle (23) One end passes through through hole (131) and affixed switching shaft (21) from ontology (13) outside.
Among one embodiment: the barrel (142) and internal perisporium (151) annular gap, the annular gap is at suction hole (50)。
Among one embodiment: the protrusion of projection annular display arrangement outside barrel (142) lower part, the lobe terminus and outer There are gaps for peripheral wall.
The technical program compared with the background art, it has the following advantages:
1, it is mutated between chamber and second segment water route and sets suction hole, on the one hand using dividing water route cooperation suction hole then: first point of water When road is discharged, outside air enters mutation chamber through suction hole by second point of water route, and first point of water route goes out air-bubble;Second point of water When road is discharged, outside air enters second segment water route through suction hole by first point of water route, mixing wastewater with air in second point of water route, because This two points of water route water outlets all mixing wastewater with air, it is on the other hand, compact-sized without the air intake passage being interlinked to the outside in adding, it occupies empty Between it is small.
2, the water outlet port in first point of water route and second point of water route is all located at one end of fixed part, which is in Annular and encirclement mutation chamber, compact-sized, two water outlets are located at the same end, practical.
3, switching mechanism includes switching shaft, switching sealing ring and toggle, drives switching shaft to slide up and down by toggle, switches Axis drives switching sealing ring to slide up and down realization switching, and outer diameter is small, compact-sized, occupies little space.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 depicts the stereoscopic schematic diagram of shower.
Fig. 2 depicts the perspective exploded view of shower.
Fig. 3 depicts the A-A diagrammatic cross-section of Fig. 5, at this time first point of water route water outlet.
Fig. 4 depicts the C-C diagrammatic cross-section of Fig. 6, at this time second point of water route water outlet.
Fig. 5 depicts the B-B diagrammatic cross-section of Fig. 3, at this time first point of water route water outlet.
Fig. 6 depicts the D-D diagrammatic cross-section of Fig. 4, at this time second point of water route water outlet.
Specific embodiment
Please refer to Fig. 1 to Fig. 6, shower, including fixed part 10 and switching mechanism 20.The fixed part 10 sets water inlet road 11, first point of water route 30 and second point of water route 40, first point of water route 30 and second point of water route 40 can connect water inlet road 11, should Switching mechanism 20 is installed in fixed part 10 and connects water inlet road 11 with second point of water route 40 for switching first point of water route 30.It should First point of water route 30 includes the mutation chamber 32 that at least a tap hole 31 connects tap hole 31 with one, and being equipped in the mutation chamber 32 can supply By the rectification body 33 for the water flow collision that tap hole 31 flows out;Second point of water route 40 include first segment water route 41 with connect first segment The second segment water route 42 in water route 41, the first segment water route 41 outlet is less than second segment water route 42, so that water flow is from first segment water route When outlet water outlet enters second segment water route 42, negative pressure is generated in second segment water route;It is set between the mutation chamber 32 and second segment water route 42 Suction hole 50;Wherein: when first point of water route 30 is discharged, flowing water generates negative pressure when entering mutation chamber 32 from tap hole 31, extraneous empty Gas enters mutation chamber 32, mixing wastewater with air through suction hole 50 by second point of water route 40, when water flow is hit to rectification body 33, further beats Aproll stream, so that first point of water route 30 goes out air-bubble;When second point of water route 40 is discharged, negative pressure is generated in second segment water route 42, outside Boundary's air enters second segment water route 42, mixing wastewater with air in second point of water route 40 through suction hole 50 by first point of water route 30.
First point of water route 30 and second point of water route 40 are respectively equipped with first point of water end (W.E.) mouth 34 and second point of water end (W.E.) mouth 43, the One point of water end (W.E.) mouth 34 and second point of water end (W.E.) mouth 43 are along the opposite arrangement of about 10 fixed part.The switching mechanism 20 includes switching shaft 21, switching sealing ring 22, toggle 23 and the elastomer being located between switching shaft 21 and fixed part 10 being set in outside switching shaft 21 24, the switching sealing ring 22 is between first point of water end (W.E.) mouth 43 and second point of water end (W.E.) mouth 34.The switching shaft 21 slides up and down to It is set in fixed part 10, which is protruded into fixed part 10 outside and affixed switching shaft 21; The switching shaft 21 can drive switching sealing ring 22 to slide up and down and seal first point of water end (W.E.) mouth 34 or second point of water end (W.E.) mouth with selectivity 43, which can slide up and down along 10 direction of fixed part switching shaft 21 can be driven to slide up and down, and the drive of switching shaft 21 is cut It changes sealing ring 22 to slide up and down, makes to switch the first point of water end (W.E.) mouth of sealing of sealing ring 22, so that second point of water end (W.E.) mouth connects water inlet road, Alternatively, switching sealing ring 22 seals second point of water end (W.E.) mouth, so that first point of water end (W.E.) mouth connects water inlet road.
The water outlet port in first point of water route 30 and second point of water route 40 is all located at one end of fixed part 10, the second segment Water route 42 is in a ring and encirclement is mutated chamber 32.
In specific structure: the fixed part 10 includes ontology 13, valve body 14 and cover 15.
The ontology 13 is hollow to be equipped with hollow hole 12, which is additionally provided with the through hole 131 connected inside and outside hollow hole 12, should 23 one end of toggle passes through through hole 131 and affixed switching shaft 21 from outside ontology 13, so that toggle 23 can opposite about 131 through hole Sliding, so that toggle can drive switching shaft to slide up and down.
The valve body 14 has the transverse slat 145 of inlet segment 141, downward opening barrel 142 and an affixed inlet segment 141, Inlet segment 141 is fixed in the upper surface of barrel 142, the upper end face interval of the transverse slat 145 and barrel 142, and is formed with one The water section excessively of opening outwardly.Above-mentioned water inlet road 11 is set in the inlet segment 141, which is equipped with downward opening groove 143, sealing is installed with water distribution component 16 in the groove 143, formed between water distribution component 16 and the slot bottom of groove 143 on this one connect into Water cavity 144 is divided in water route 11;Water distribution component 16 sets perforative first point of water end (W.E.) mouth 34 up and down on this, consolidates in the groove 143 Equipped with the lower water distribution component 17 being located under upper water distribution component 16, which is equipped with above-mentioned tap hole 31, the rectification body 33 It is installed in groove 143 and is located under lower water distribution component 17.The slot bottom of the groove 143 is equipped with second point of above-mentioned water end (W.E.) mouth 43, This is crossed water section and connects second point of water end (W.E.) mouth 43 and first segment water route 41.Annulus of the rectification body for example including multiple concentric circles and solid The radial item of multiple annulus is connect, radial item and annulus fixing position are formed at shock, and each tap hole is corresponding to be located at a shock On place.The elastomer contact is between switching shaft lower end and lower water distribution component.
The transverse slat 145 sets through-hole 146, and the switching shaft 21 sealing slides through through-hole 145, and 21 lower end of switching shaft passes through Second point of water end (W.E.) mouth protrudes into point water cavity.
The cover 15 set a ring cover, one upwardly extended as ring cover inner peripheral made of internal perisporium 151 and one by annular Periphery wall 152 made of lid outer peripheral edge upwardly extends, the ring cover set the second faucet;The sealing of periphery wall 152 of the cover is solid Connect 12 inner wall of hollow hole in ontology 13.
The valve body 14 is fixedly attached in the hollow hole 13 of ontology 12 and barrel 142 cooperates internal perisporium 151, the periphery wall Above-mentioned first segment water route 41 is constituted between 152 and barrel 142, and second segment water route is constituted between the periphery wall 152 and internal perisporium 151 42, which is molded between barrel 142 and internal perisporium 151, preferably, between 151 annular of the barrel 142 and internal perisporium Gap, the annular gap is at suction hole 50.
The protrusion of projection annular display arrangement outside 142 lower part of barrel, there are gaps for the lobe terminus and periphery wall, make The water outlet in first segment water route includes per the gap between the through slot and protrusion and periphery wall between adjacent two protrusion, into second segment Area becomes larger when water route.
The above is only the preferred embodiment of the present invention, the range implemented of the present invention that therefore, it cannot be limited according to, i.e., according to Equivalent changes and modifications made by the invention patent range and description, should still be within the scope of the present invention.

Claims (10)

1. shower, including fixed part (10) and switching mechanism (20), which sets water inlet road (11), first point of water Road (30) and second point of water route (40), first point of water route (30) and second point of water route (40) can connect water inlet road (11), should Switching mechanism (20) be installed in fixed part (10) and for switch first point of water route (30) connected with second point of water route (40) into Water route (11), it is characterised in that: first point of water route (30) connects tap hole (31) with one including an at least tap hole (31) It is mutated chamber (32), being equipped in the mutation chamber (32) can be for the rectification body (33) for the water flow collision flowed out by tap hole (31);This Two points of water routes (40) include first segment water route (41) and the second segment water route (42) for connecting first segment water route (41), the first segment water Road (41) outlet is less than second segment water route (42);Suction hole (50) are set between the mutation chamber (32) and second segment water route (42).
2. shower according to claim 1, it is characterised in that: first point of water route (30) and second point of water route (40) go out Water end (W.E.) mouth is all located at one end of fixed part (10), and the second segment water route (42) is in a ring and encirclement is mutated chamber (32).
3. shower according to claim 2, it is characterised in that: first point of water route (30) and second point of water route (40) are respectively Equipped with first point of water end (W.E.) mouth (34) and second point of water end (W.E.) mouth (43);The switching mechanism (20) includes switching shaft (21), is set in and cuts The switching sealing ring (22) and toggle (23) of axis (21) outside are changed, which is slidingly arranged in fixed part (10), Toggle (23) one end self-retaining part (10) outside fixed part (10) outside by pass through aperture by protruding into fixed part (10) And affixed switching shaft (21);The switching shaft (21) can drive switching sealing ring (22) sliding to seal first point of water end (W.E.) mouth with selectivity (34) or second point of water end (W.E.) mouth (43), the toggle (23) can be slided up and down along fixed part (10) direction can drive switching shaft (21) it slides up and down.
4. shower according to claim 3, it is characterised in that: first point of water end (W.E.) mouth (34) and second point of water end (W.E.) mouth (43) Along fixed part (10), opposite direction arranges that the switching sealing ring (22) is between first point of water end (W.E.) mouth (43) and second point of water end (W.E.) mouth up and down (34) between.
5. shower according to claim 3, it is characterised in that: the switching mechanism (20) further includes one being located at switching shaft (21) Elastomer (24) between fixed part (10).
6. shower according to claim 4, it is characterised in that:
The fixed part (10) includes the ontology (12), valve body (14) and cover (15) for setting hollow hole (13);
The valve body (14) has inlet segment (141) and downward opening barrel (142), sets in the inlet segment (141) above-mentioned It intakes road (11), which is equipped with downward opening groove (143), and sealing is installed with Shang Fenshui in the groove (143) Body (16), formed between water distribution component (16) and the slot bottom of groove (143) on this one connects intake road (11) divide water cavity (144);It should Upper water distribution component (16) sets perforative first point of water end (W.E.) mouth (34) up and down, is installed in the groove (143) positioned at upper point water Lower water distribution component (17) under body (16), the lower water distribution component (17) are equipped with above-mentioned tap hole (31), and the rectification body (33) is fixed In groove (143) and it is located under lower water distribution component (17);The slot bottom of the groove (143) is equipped with second point of above-mentioned water end (W.E.) mouth (43);
The cover (15) set a ring cover, one upwardly extended as ring cover inner peripheral made of internal perisporium (151) and one by annular Periphery wall made of lid outer peripheral edge upwardly extends (152), the ring cover set the second faucet;The periphery wall (152) of the cover is close Envelope is fixed in hollow hole (12) inner wall of ontology (13);
The valve body (14) is fixedly attached in the hollow hole (13) of ontology (12) and barrel (142) cooperation internal perisporium (151), should Above-mentioned first segment water route (41) is constituted between periphery wall (152) and barrel (142), the periphery wall (152) and internal perisporium (151) Between constitute second segment water route (42), which is molded between barrel (142) and internal perisporium (151).
7. shower according to claim 6, it is characterised in that: the valve body (14) further includes an affixed inlet segment (141) Transverse slat (145), the transverse slat (145) connect second point of water end (W.E.) mouth (43) and first segment with composition one between the end face of barrel (142) Water section is crossed between water route (41);The transverse slat (145) sets through-hole (146), and the switching shaft (21) sealing slides through through-hole (145).
8. shower according to claim 6, it is characterised in that: the ontology (13), which is equipped with, connects passing through inside and outside hollow hole (12) It perforates (131), which passes through through hole (131) and affixed switching shaft (21) from ontology (13) outside.
9. shower according to claim 6, it is characterised in that: the barrel (142) and internal perisporium (151) annular gap, The annular gap is at suction hole (50).
10. shower according to claim 6, it is characterised in that: projection annular display arrangement outside barrel (142) lower part Protrusion, there are gaps for the lobe terminus and periphery wall.
CN201410344979.4A 2014-07-18 2014-07-18 Shower Expired - Fee Related CN104984846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410344979.4A CN104984846B (en) 2014-07-18 2014-07-18 Shower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410344979.4A CN104984846B (en) 2014-07-18 2014-07-18 Shower

Publications (2)

Publication Number Publication Date
CN104984846A CN104984846A (en) 2015-10-21
CN104984846B true CN104984846B (en) 2019-09-06

Family

ID=54296809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410344979.4A Expired - Fee Related CN104984846B (en) 2014-07-18 2014-07-18 Shower

Country Status (1)

Country Link
CN (1) CN104984846B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112871479B (en) * 2019-11-29 2023-11-21 厦门松霖科技股份有限公司 Hollow luminous water outlet mechanism and water outlet device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1578867A (en) * 2001-11-09 2005-02-09 东陶机器株式会社 Water discharge switching device
CN200958229Y (en) * 2006-08-21 2007-10-10 周华松 Water sprayer in kitchen
JP4501499B2 (en) * 2004-03-31 2010-07-14 Toto株式会社 Water discharge switching device
CN203613607U (en) * 2013-12-11 2014-05-28 成霖企业股份有限公司 Dual-gear water outlet device
CN203955399U (en) * 2014-07-18 2014-11-26 厦门松霖科技有限公司 A kind of gondola water faucet

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1578867A (en) * 2001-11-09 2005-02-09 东陶机器株式会社 Water discharge switching device
JP4501499B2 (en) * 2004-03-31 2010-07-14 Toto株式会社 Water discharge switching device
CN200958229Y (en) * 2006-08-21 2007-10-10 周华松 Water sprayer in kitchen
CN203613607U (en) * 2013-12-11 2014-05-28 成霖企业股份有限公司 Dual-gear water outlet device
CN203955399U (en) * 2014-07-18 2014-11-26 厦门松霖科技有限公司 A kind of gondola water faucet

Also Published As

Publication number Publication date
CN104984846A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
US9550195B1 (en) Shower head
MX365354B (en) Faucet valve cartridge.
AU2010349429A1 (en) Jet regulator
CN101252999B (en) Shower attachment
CN107187724A (en) Foam pump spray-head
CN102366739B (en) Residual water drainage and water suction non-return mechanism
CN106968758A (en) A kind of Combined oil gas separator
CN104984846B (en) Shower
CN204186557U (en) Air pump
CN210386244U (en) Shower head capable of switching water outlet mode
CN202401534U (en) Adjusting bubbler of faucet
CN102502033A (en) Multi-chamber combined bottle
CN209277242U (en) Flow control device and kitchen shower head
CN206128223U (en) Anti -siphon water intake valve
CN105422415A (en) Air pump
US9982423B2 (en) Water saving flow regulator that is flow volume switchable
CN203955399U (en) A kind of gondola water faucet
CN208719449U (en) It is a kind of to divide water showering automatically
CN204186556U (en) Air pump
CN204781147U (en) Bibbler goes out network of rivers and bibbler
CN204186558U (en) Air pump
CN208074184U (en) A kind of waterway mechanism with control valve
CN208625387U (en) Water dispenser
CN106984075B (en) A kind of filter of purifying kettle
CN201513601U (en) Water dividing valve spool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 361002, Fujian, Xiamen, China (Fujian) free trade test area, Xiamen area (bonded port), Seaview East Road, No. 4, building 18, A06

Applicant after: XIAMEN SOLEX HIGH-TECH INDUSTRIES Co.,Ltd.

Applicant after: Zhou Huasong

Address before: 361002 Fujian city of Xiamen province sunshine West Haicang Xinyang Industrial Zone, No. 298

Applicant before: XIAMEN SOLEX HIGH-TECH INDUSTRIES Co.,Ltd.

Applicant before: Zhou Huasong

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170930

Address after: 361000, Fujian, Xiamen, China (Fujian) free trade test area, Xiamen area (bonded port), Seaview East Road, No. 4, building 18, A06

Applicant after: XIAMEN SOLEX HIGH-TECH INDUSTRIES Co.,Ltd.

Address before: 361002, Fujian, Xiamen, China (Fujian) free trade test area, Xiamen area (bonded port), Seaview East Road, No. 4, building 18, A06

Applicant before: XIAMEN SOLEX HIGH-TECH INDUSTRIES Co.,Ltd.

Applicant before: Zhou Huasong

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190906

Termination date: 20210718