CN104971607A - Synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment - Google Patents

Synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment Download PDF

Info

Publication number
CN104971607A
CN104971607A CN201510374192.7A CN201510374192A CN104971607A CN 104971607 A CN104971607 A CN 104971607A CN 201510374192 A CN201510374192 A CN 201510374192A CN 104971607 A CN104971607 A CN 104971607A
Authority
CN
China
Prior art keywords
tower
shaped
denitrating
desulfurization
desulfurizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510374192.7A
Other languages
Chinese (zh)
Inventor
汤荣康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510374192.7A priority Critical patent/CN104971607A/en
Publication of CN104971607A publication Critical patent/CN104971607A/en
Pending legal-status Critical Current

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The invention discloses a synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment, and belongs to the field of environmental protection equipment. The synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment comprises at least one U-shaped tower; the U-shaped towers are connected in series; the output terminal of the U-shaped towers connected in series is connected with a discharging tower; each U-shaped tower comprises a desulfurization tower, a denitration tower, and an arc-shaped connection tower; the upper end of the desulfurization tower is connected with a drum-shaped tower, the upper end of the denitration tower is connected with another drum-shaped tower, and the two drum-shaped towers are connected via the arc-shaped connection tower; a plurality of sets of screw blade subassemblies are arranged in the desulfurization tower and the denitration tower; each set of screw blade subassemblies comprises a supporting seat and a plurality of supporting shafts; one end of each supporting shaft is connected with a corresponding supporting seat, in the desulfurization tower the other end of each supporting shaft is connected with the desulfurization, and in the denitration tower the other end of each supporting shaft is connected with the denitration tower, and each supporting shaft is connected with universal guide vanes; water pipes are arranged in the desulfurization towers and the denitration towers; each water pipe is provided with a plurality of nozzles; and the lower ends of the desulfurization tower, the nitration tower, and the discharging tower are provided with a water tank respectively. Purifying effect of the synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment is excellent.

Description

Collaborative method U-shaped integration desulfurization denitration dedusting complete set of equipments
Technical field
The present invention relates to a kind of environmental protection equipment, the cleaning equipment of the sulfur dioxide, nitrogen oxide and the dust that particularly produce for chemical industry, boiler kiln, coking, power plant, glass factory etc.
Background technology
Clarifier in existing Market and Technology, the equipment had only removes for a content, and what have extremely expends the energy, and what have needs superhigh temperature, and what have removes the chemicals that agent is high-risk, and some floor spaces are wide, and complicated operation maintenance not easily.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of collaborative method U-shaped integration desulfurization denitration dedusting complete set of equipments of good purification is provided.
The object of the present invention is achieved like this: collaborative method U-shaped integration desulfurization denitration dedusting complete set of equipments, and comprise at least one U-shaped tower, each U-shaped tower is in series, and the output of the U-shaped tower after series connection connects discharge tower; Described U-shaped tower comprises vertical desulfurizing tower, the vertically denitrating tower of layout arranged and is connected tower with arc, the upper end of desulfurizing tower and the upper end of denitrating tower are all connected cydariform tower broad in the middle small in ends, and arc connection one end of tower is connected with the cydariform tower above desulfurizing tower, the other end is connected with the cydariform tower above denitrating tower; All many group helical blade assemblies are connected along short transverse in desulfurizing tower with in denitrating tower, often organize helical blade assembly and include a supporting seat and Duo Gen back shaft, each back shaft is along the circumferential directions of supporting seat, one end of each back shaft is all connected on supporting seat, the other end of each back shaft in desulfurizing tower is all connected with desulfurizing tower, the other end of each back shaft in denitrating tower is all connected with denitrating tower, and each back shaft all connects guiding in all directions blade; In desulfurizing tower He in denitrating tower, all arrange water pipe, each water pipe is connected in corresponding supporting seat, and every root water pipe all connects several nozzles, all arranges pond in the lower end of desulfurizing tower, denitrating tower and discharge tower.
During purification, from the smoke evacuation that the smoke discharging pipe of Industrial Stoves, boiler comes, enter in desulfurizing tower from exhaust gas entrance, air-flow is broken up by guiding in all directions blade, extends the time of air-flow in tower, the alkali lye of the nozzle ejection on water pipe carries out washing atomization to air-flow, carry out chemical neutralization, air-flow buffer upwards, slowly absorbs, in extending and the time, make sulfur limitation effect better.Utilize cydariform tower can reduce the speed of air-flow, carry out being oxidized, active reaction.Air-flow enters out of stock tower, the same desulfurizing tower of principle through connecting tower.Enter discharge tower again to purify further, reach the flue gas of discharge standard after purification from discharging the top of tower discharged to air, sewage is then advanced into down the pond of each tower bottom, carries out the purification recycling of next technique.Desulfurizing tower, denitrating tower, discharge tower all adopt the manufacture of polymer inlet material, have acid/alkali-corrosion-resistant, and cost are low.The present invention can according to discharge needs, and adopt one group of U-shaped tower, two groups of U-shaped towers, three groups of U-shaped towers purify, energy consumption is low, good purification, can be used for the gas cleaning of various chemical industry, boiler, coking, power plant, glass factory.
In order to further water conservancy diversion, diffusing air current, at desulfurizing tower and the deflectors being all connected several vertical layouts the inwall ring week of denitrating tower.
In order to prevent tower tower distortion when expanding with heat and contract with cold, on desulfurizing tower He on denitrating tower, be wholely set multiple outwardly reinforcement, reinforcement plays reinforcement effect.
In order to make clean-up effect better, in each cydariform tower, equal bonding pad net, arranges filler on the net at filler.
Accompanying drawing explanation
Fig. 1 is the first structural representation of the present invention.
Fig. 2 is the structural representation of desulfurizing tower in Fig. 1.
Fig. 3 is A direction view in Fig. 2.
Fig. 4 is the structural representation of cydariform tower.
Fig. 5 is the second structural representation of the present invention.
Detailed description of the invention
Embodiment 1
As Figure 1-4, be the first collaborative method U-shaped integration desulfurization denitration dedusting complete set of equipments, mainly comprise a U-shaped tower 1 and a discharge tower 2.
U-shaped tower 1 comprises vertical desulfurizing tower 1-1, the vertical denitrating tower 1-2 arranged arranged and is connected tower 1-4 with arc, the upper end of desulfurizing tower 1-1 and the upper end of denitrating tower 1-2 are all connected cydariform tower 1-3 broad in the middle small in ends, and one end of arc connection tower 1-4 is connected with the cydariform tower 1-3 above desulfurizing tower 1-1, the other end is connected with the cydariform tower 1-3 above denitrating tower 1-2.Desulfurizing tower 1-1 connects exhaust gas entrance 5, and the output of denitrating tower 1-2 is connected with discharge tower 2 by connecting pipe 3.
In each cydariform tower 1-3, equal bonding pad net 1-13, filler net 1-13 arranges filler 1-12.
Multiple outwardly reinforcement 1-7 is all wholely set on desulfurizing tower 1-1 He on denitrating tower 1-2, all many group helical blade assembly 1-14 are connected along short transverse in desulfurizing tower 1-1 with in denitrating tower 1-2, often organize helical blade assembly 1-14 and include a supporting seat 1-11 and six roots of sensation back shaft 1-10, each back shaft 1-10 is along the circumferential directions of supporting seat 1-11, one end of each back shaft 1-10 is all connected on supporting seat 1-11, the other end of each back shaft 1-10 in desulfurizing tower 1-1 is all connected with desulfurizing tower 1-1, the other end of each back shaft 1-10 in denitrating tower 1-2 is all connected with denitrating tower 1-2, each back shaft 1-10 all connects guiding in all directions blade 1-9.At desulfurizing tower 1-1 and the deflector 1-8 being all connected several vertical layouts the inwall ring week of denitrating tower 1-2.
In desulfurizing tower 1-1 He in denitrating tower 1-2, all arrange water pipe 1-6, each water pipe 1-6 is connected in corresponding supporting seat 1-11, and every root water pipe 1-6 all connects several nozzles 1-5, all arranges pond 4 in the lower end of desulfurizing tower 1-1, denitrating tower 1-2 and discharge tower 2.
Embodiment 2
As shown in Figure 5, for the second works in coordination with method U-shaped integration desulfurization denitration dedusting complete set of equipments, three U-shaped towers 1 and a discharge tower 2 is mainly comprised.Three U-shaped towers 1 are in series, and the output of the U-shaped tower 1 after series connection connects discharge tower 2.
The present invention is not limited to above embodiment, also can according to purification demand, and U-shaped tower has two, connects discharge tower after two U-shaped towers are in series.

Claims (4)

1. collaborative method U-shaped integration desulfurization denitration dedusting complete set of equipments, it is characterized in that: comprise at least one U-shaped tower, each U-shaped tower is in series, and the output of the U-shaped tower after series connection connects discharge tower; Described U-shaped tower comprises vertical desulfurizing tower, the vertically denitrating tower of layout arranged and is connected tower with arc, the upper end of desulfurizing tower and the upper end of denitrating tower are all connected cydariform tower broad in the middle small in ends, and arc connection one end of tower is connected with the cydariform tower above desulfurizing tower, the other end is connected with the cydariform tower above denitrating tower; All many group helical blade assemblies are connected along short transverse in desulfurizing tower with in denitrating tower, often organize helical blade assembly and include a supporting seat and Duo Gen back shaft, each back shaft is along the circumferential directions of supporting seat, one end of each back shaft is all connected on supporting seat, the other end of each back shaft in desulfurizing tower is all connected with desulfurizing tower, the other end of each back shaft in denitrating tower is all connected with denitrating tower, and each back shaft all connects guiding in all directions blade; In desulfurizing tower He in denitrating tower, all arrange water pipe, each water pipe is connected in corresponding supporting seat, and every root water pipe all connects several nozzles, all arranges pond in the lower end of desulfurizing tower, denitrating tower and discharge tower.
2. collaborative method according to claim 1 U-shaped integration desulfurization denitration dedusting complete set of equipments, is characterized in that: at desulfurizing tower and the deflectors being all connected several vertical layouts the inwall ring week of denitrating tower.
3. collaborative method according to claim 1 U-shaped integration desulfurization denitration dedusting complete set of equipments, is characterized in that: on desulfurizing tower He on denitrating tower, be wholely set multiple outwardly reinforcement.
4. collaborative method according to claim 1 U-shaped integration desulfurization denitration dedusting complete set of equipments, is characterized in that: equal bonding pad net in each cydariform tower, arranges filler on the net at filler.
CN201510374192.7A 2015-07-01 2015-07-01 Synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment Pending CN104971607A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510374192.7A CN104971607A (en) 2015-07-01 2015-07-01 Synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510374192.7A CN104971607A (en) 2015-07-01 2015-07-01 Synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment

Publications (1)

Publication Number Publication Date
CN104971607A true CN104971607A (en) 2015-10-14

Family

ID=54268905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510374192.7A Pending CN104971607A (en) 2015-07-01 2015-07-01 Synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment

Country Status (1)

Country Link
CN (1) CN104971607A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105797554A (en) * 2016-05-30 2016-07-27 扬州荣康空气净化设备有限公司 Compound efficient energy-saving desulfurization, denitrification and dedusting integrated purifying column

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201040229Y (en) * 2007-04-06 2008-03-26 东南大学 Flue gas simultaneous desulfurize denitrate integrated two-stage spraying type absorption reactor
CN201524520U (en) * 2009-05-06 2010-07-14 吴来田 Efficient desulfuration and dedusting device
CN102423616A (en) * 2011-08-30 2012-04-25 湖南麓南脱硫脱硝科技有限公司 Flue gas purification device for middle and small coal-fired boiler
CN204034532U (en) * 2014-09-02 2014-12-24 河北宏达环境工程有限公司 Desulfurization and denitrification integral equipment
CN204746077U (en) * 2015-07-01 2015-11-11 汤荣康 In coordination with method U type integration SOx/NOx control dust removal complete sets

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201040229Y (en) * 2007-04-06 2008-03-26 东南大学 Flue gas simultaneous desulfurize denitrate integrated two-stage spraying type absorption reactor
CN201524520U (en) * 2009-05-06 2010-07-14 吴来田 Efficient desulfuration and dedusting device
CN102423616A (en) * 2011-08-30 2012-04-25 湖南麓南脱硫脱硝科技有限公司 Flue gas purification device for middle and small coal-fired boiler
CN204034532U (en) * 2014-09-02 2014-12-24 河北宏达环境工程有限公司 Desulfurization and denitrification integral equipment
CN204746077U (en) * 2015-07-01 2015-11-11 汤荣康 In coordination with method U type integration SOx/NOx control dust removal complete sets

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105797554A (en) * 2016-05-30 2016-07-27 扬州荣康空气净化设备有限公司 Compound efficient energy-saving desulfurization, denitrification and dedusting integrated purifying column
CN105797554B (en) * 2016-05-30 2018-03-20 江苏绿塔环境工程有限公司 A kind of compound dust removal integrated purifying column of efficient energy-saving desulphurization denitration

Similar Documents

Publication Publication Date Title
CN104107626A (en) Sintering flue gas circulating fluidized bed (CFB) semi-dry combined desulfurization and denitrification device and method
CN202860406U (en) SCR flue gas denitrating device for glass kiln
CN202823151U (en) Multistage spray efficient wet process of flue gas desulfurization and synergistic mercury removal integrated device
CN105126560A (en) Ozone multipoint-adding sectional-oxidizing NOx absorption and removal system and ozone-multipoint-adding sectional-oxidizing NOx absorption and removal method
CN103933841A (en) Device and method for simultaneously desulfurizing and denitrating sintering smoke
CN204746077U (en) In coordination with method U type integration SOx/NOx control dust removal complete sets
CN105148698A (en) Boiler flue gas desulfurization and denitrification system
CN105056723B (en) Twin-tower type flue gas deep purification device through plasma coupling and sodium based absorption and method thereof
CN205796922U (en) A kind of compound dust removal integrated purifying column of efficient energy-saving desulphurization denitration
CN207769554U (en) Sintering flue gas heating denitration device and sintering flue gas heating denitrating system
CN104971607A (en) Synergy-method U-shaped integrated desulfurization denitration dedusting complete equipment
CN211328808U (en) Negative pressure flue gas purification device of thermal power plant
CN102210967A (en) Two-stage treatment wet desulphurization method for high-sulfur coal-fired flue gas
CN107029531A (en) The desulfurization of industrial smoke, dedusting denitrification integral handling process
CN105797554B (en) A kind of compound dust removal integrated purifying column of efficient energy-saving desulphurization denitration
CN202751941U (en) Three-level tail gas purifying tower system device for high-concentration nitrogen oxides
CN204952620U (en) Double tower type plasma coupling sodium base absorbs flue gas deep purification device
CN203764127U (en) Tunnel kiln desulfurizing tower
CN211328868U (en) High-efficient gas desulfurization device
CN103768926B (en) Efficient desulfurization spraying tower
CN202516471U (en) Desulfurizing device for industrial kiln flue gas
CN203075829U (en) Novel high-concentration nitrogen oxide (NOx) tail gas purifying tower
CN207745712U (en) A kind of glass furnace exhaust treatment system
CN207708806U (en) A kind of mixing arrangement of ammonia sky gaseous mixture and flue gas
CN204746076U (en) In coordination with method U type integration SOx/NOx control dust removal complete sets

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151014