CN104967026B - Line connector insulation separator plate - Google Patents
Line connector insulation separator plate Download PDFInfo
- Publication number
- CN104967026B CN104967026B CN201510273156.1A CN201510273156A CN104967026B CN 104967026 B CN104967026 B CN 104967026B CN 201510273156 A CN201510273156 A CN 201510273156A CN 104967026 B CN104967026 B CN 104967026B
- Authority
- CN
- China
- Prior art keywords
- cross
- installation portion
- insulating barrier
- fixture
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electric Cable Installation (AREA)
- Insulators (AREA)
Abstract
The invention discloses a line connector insulation separator plate, comprising an insulation separator plate main body (1), and a cross arm fixing part (2). The insulation separator plate main body (1) is provided with an insulation installation slot (11) used for installing an insulating porcelain sleeve; the cross arm fixing part comprises a plurality of cross arm clamping tools (21) installed on the insulation separator plate main body (1) and provided with installation holes (21d), and a clamping fixing part (22) capable of screwing in/out of the installation holes (21d) to screw the cross arm clamping tools (21) to a cross arm or disassemble the cross arm clamping tools (21) from the cross arm. The line connector insulation separator plate is convenient to operate, has a simple structure, can be dismounted and is convenient to transport and install; in addition, the line connector insulation separator plate can realize remote installation and fixing of an insulation separator plate on a cross arm through an operating lever, thereby guaranteeing the safety of line connector emergency maintenance operation on a pole.
Description
Technical field
The present invention relates to distribution line live working insulation shading tool in a kind of power system, more particularly to a kind of
10kV crane insulating barriers, belong to electric power system power distribution line insulation technical field.
Background technology
Crane (line connector), is also falling fuses, fuse switch, is 10kV distribution line branch lines
A kind of protective switch of the short circuit the most frequently used with distribution transformer.It is arranged on 10kV distribution line branch lines, because which has one
Significantly cut-off point, possesses the function of disconnecting switch, creates a safety work environment to maintenance circuit and equipment, increases
Maintenance installation, therefore, crane popularized in 10kV distribution lines and distribution transformer.
At present, when circuit is overhauled, most of companies typically take and only pull open distribution transformer 10kV long cable section of ingoing line cranes, and
The operating type that other non-faulting parts do not have a power failure is rushed to repair, although now having pulled open crane, the upper pile crown of crane is still
So powered, simultaneously because pile crown is closer to the distance with lower pile crown in 10kV long cable section of ingoing line cranes, staff is to distribution for repairing
When transformator carries out new clothes, exchanges cable, the work of spliced cables terminals, it is easy to encounter the upper pile crown of crane, personnel occur
Electric shock casualty accident causes pile crown short circuit grounding accident in crane.Insulating barrier of the prior art needs operator to lean on
At near line bar crane, insulating barrier is carried out into installation fixation, trivial operations, and the safety to operator closely and is generated sternly
The threat of weight.
Chinese patent literature CN202353092U discloses a kind of high voltage fuse insulation barrier, keeps off including upper strata
Plate, lower floor's baffle plate and solid post, are connected by solid post between the upper strata baffle plate and lower floor's baffle plate, and upper strata baffle plate is with
The same side of layer baffle plate has a groove, and the upper strata baffle plate is provided with a hanging hook assembly, the following table of lower floor's baffle plate
Face is provided with open tubular column, and high-tension fuse insulation barrier can be lifted, be hooked on horizontal stroke by insulating bar is penetrated open tubular column by which
Use in load, the device can install fixed insulation dividing plate at a distance, play safeguard protection effect to workmen, but adopt
Double-deck baffle arrangement, complex structure, and the device double layer baffle plate are not easy to disassembled for transport by four solid post connections, and
Daily placement need to take larger space.
Chinese patent literature CN201540863U discloses a kind of 10kV circuits fuse switch insulating barrier, its by
Insulation board, left U-shaped coulisses, right U-shaped coulisses, slide plate composition;Insulation board opening is machined with insulation board, is opened in insulation board
The mouth left side is bonded with left U-shaped coulisses, is bonded with right U-shaped coulisses on the right of insulation board opening, and right U-shaped coulisses are built with cunning
Plate, is provided with slide plate button on slide plate, and the live end of fuse switch is isolated by the device by the slip of slide plate, structure letter
It is single, but operation installation is needed by maintenance car or maintenance rig at line bar drop switch so that the personal safety of operator
Exist than larger hidden danger.
The content of the invention
Therefore, the technical problem to be solved is to overcome existing fuse insulating baffle arrangement complicated, inconvenient
In the defect for dismantling and existing larger potential safety hazard, so as to provide a kind of simple structure, easy to disassemble, safety is higher and is easy to
The crane insulation barrier of transport.
For solving above-mentioned technical problem, a kind of crane insulating barrier of the present invention is solid including insulating barrier main body and cross-arm
Determine part, in the insulating barrier main body, offer the insulating mounting groove for installing insulating porcelain bushing, the cross-arm fixture bag
Include several cross-arm fixture being arranged in the insulating barrier main body, the installing hole being arranged in the cross-arm fixture and energy
Enough screw-ins/screw out the card dismantled on cross-arm or from the cross-arm in the installing hole and by the cross-arm fixture turn
Tool securing member.
The cross-arm fixture includes the first installation portion in the insulating barrier main body and first installation portion
Integrally formed second installation portion and with integrally formed 3rd installation portion of second installation portion, first installation portion,
Second installation portion and the 3rd installation portion form the lateral openings groove for accommodating cross-arm.
First installation portion and the 3rd installation portion respectively positioned at second installation portion two ends, and respectively with
Second installation portion is vertically arranged.
The mounting hole site is on the 3rd installation portion.
The installing hole is the female screwed hole of setting.
The insulating barrier main body is provided with cross-arm fixture jack, and first installation portion of the cross-arm fixture is fixed on
On the cross-arm fixture jack of the insulating barrier main body.
The insulating mounting groove is U-lag, the opening of the opening of the U-lag and the open slot of the cross-arm fixture
Direction is consistent.
The insulating barrier main body is symmetrical relative to the centrage of the U-type groove, and the width of the U-type groove is exhausted with described
The diameter of edge porcelain bushing shell matches.
The cross-arm fixture is two, and the centrage relative to the U-lag is symmetrically mounted on the insulating barrier master
On body.
It is additionally provided with the insulating barrier main body and installs for by the behaviour of the crane insulating barrier jack-up for action bars
Make bar base.
The fixture securing member inserts the insertion end of the installing hole and is provided with anti-slip cap.
Fixture securing member one end relative with the insertion end is provided with action bars connecting portion.
The first raised, operation that the action bars connecting portion is circumferentially provided with several along which to be installed for action bars
Bar base along its circumference be also equipped with several for action bars install it is second raised.
Described the first of the action bars connecting portion is raised identical with described the second of the action bars base the raised quantity
And it is equal sized.
The above-mentioned technical proposal of the present invention has advantages below compared to existing technology:
(1)The crane insulating barrier of the present invention, arranges one layer of insulation board, arranges insulated openings groove, lead in insulation board main body
Cross and insulating porcelain bushing is arranged in the insulated openings groove insulation that can just realize to the powered position of crane, simple structure;
Also, the installing hole of the cross-arm fixture is screwed in/screw out by the fixture securing member, just can realize that the crane is exhausted
Installation fastening and dismounting, the simple operation of edge dividing plate;In addition, installing hole is set in the cross-arm fixture, by remote manipulation
Fixture securing member is capable of achieving installation and dismounting to cross-arm, it is to avoid operator have asking for hidden danger when closely operating
Topic, safety are higher.
(2)The crane insulating barrier of the present invention, first installation portion and second installation portion of the cross-arm fixture
Be vertically arranged, so as to ensure that the cross-arm fixture can be brought into close contact with cross-arm, more so that cross-arm be firmly stuck in it is described
Between cross-arm fixture and the fixture securing member, it is not susceptible to loosen.
(3)The crane insulating barrier of the present invention, by arranging the cross-arm fixture jack in the insulating barrier main body
And be provided for the installing hole of the fixture securing member is installed in the cross-arm fixture so that the cross-arm fixture with it is described
Between insulation board main body, disassembling section can be carried out between the cross-arm fixture and the fixture securing member, consequently facilitating crane
The transport and installation of insulating barrier.
(4)The crane insulating barrier of the present invention, the insulating barrier main body are symmetrical relative to the U-type groove, so as to more preferable
Ensure that the crane insulating barrier can be kept during jack-up balance;And the width of the U-type groove and the insulated porcelain sleeve
The diameter of pipe matches so that the insulating porcelain bushing can be inserted in the U-type groove and will not leave with the U-type groove excessive
Space, prevents operator's accident mistakenly entering into charged region, is further ensured that the personal safety of operator.
(5)The crane insulating barrier of the present invention, the fixture securing member insert the insertion end of the installing hole be provided with it is anti-
Sliding cap, can effectively prevent crane insulating barrier from sliding on cross-arm, more enhance the fixed effect of crane insulating barrier;
(6)The crane insulating barrier of the present invention, by the action bars base that arranges in the insulating barrier main body with
And the action bars connecting portion that one end relative with the insertion end of the fixture securing member is arranged is connected with the action bars
Connect so that operator can carry out installation fixation to crane insulating barrier at a distance by the hand-held action bars, simple to operate,
So as to preferably ensure that the safety of operator;The action bars base is identical with the action bars connecting portion structure simultaneously, tool
There is quantity identical and equal sized bulge-structure, i.e., first is raised and second raised so that the act of the crane insulating barrier
Rising can be carried out using same action bars with fixation, easy to operate;And first raised and second projection with it is described
The concave shape groove that the top of action bars is provided with matches, raised or described second by described first by action bars described in turn
Projection proceeds to and is stuck in the bottom of the concave shape groove, so as to realize the action bars base or the action bars connecting portion and institute
The connection of action bars is stated, the action bars is rotated and just can be driven the fixture securing member rotation, realize the cross-arm fixture
Fastening, it is simple to operate.
(7)Crane insulating barrier of the present invention, apparatus structure are simple, and light weight, material insulation property are good, effectively ensure away from
The safe distance at the powered position of fuse switch, effectively reduces the danger that personnel get an electric shock and line short is grounded, significantly
The safety of repairing work is ensure that, the power supply reliability of repairing work efficiency and company is improve.
Description of the drawings
In order that present disclosure is more likely to be clearly understood, the specific embodiment below according to the present invention is simultaneously combined
Accompanying drawing, the present invention is further detailed explanation, wherein
Fig. 1 is the top view of crane insulating barrier;
Fig. 2 is the side view of crane insulating barrier.
In figure, reference is expressed as:1- insulating barrier main bodys, 11- insulating mounting grooves, 12- action bars bases, 12a-
Two is raised, and 13- cross-arm fixture jacks, 2- cross-arm fixtures, 21- cross-arm fixtures, the first installation portions of 21a-, 21b- second are installed
Portion, the 3rd installation portions of 21c-, 21d- installing holes, 22- fixture securing members, 23- anti-slip caps, 24- action bars connecting portions, 24a- first
Projection, 3- insulating porcelain bushings, 4- cross-arms, 5- action bars.
Specific embodiment
A kind of crane insulating barrier of the present invention is described in detail with reference to specific embodiment.
As shown in Figures 1 and 2, the present embodiment provides a kind of crane insulating barrier, solid including insulating barrier main body 1 and cross-arm
Determine part 2, offer the insulating mounting groove 11 for installing insulating porcelain bushing 3 in the insulating barrier main body 1, in the present embodiment
In, the insulating mounting groove 11 is a U-lag, and the insulating barrier main body 1 is symmetrical relative to the centrage of the U-type groove, and
The width of the U-type groove is matched with the diameter of the insulating porcelain bushing 3.The cross-arm fixture 2 includes two installations
Cross-arm fixture 21 in the insulating barrier main body 1, is provided with installing hole 21d in the cross-arm fixture 21, tight by fixture
Firmware 22 is screwed in/is screwed out in the installing hole 21d and 21 turn of the cross-arm fixture is arranged on cross-arm 4 or from the cross-arm
Disassemble on 4.
In the present embodiment, the cross-arm fixture 21 includes the first installation portion in the insulating barrier main body 1
21a and the integrally formed second installation portion 21b of the first installation portion 21a and it is integrally formed with the second installation portion 21b
The 3rd installation portion 21c, the first installation portion 21a, the second installation portion 21b and the 3rd installation portion 21c are formed
For accommodating the lateral openings groove of cross-arm 4, described in the opening direction of the lateral openings groove and the insulating barrier main body 1
The opening direction of U-lag is consistent.The first installation portion 21a and the 3rd installation portion 21c are installed positioned at described second respectively
The two ends of portion 21b, and be vertically arranged with the second installation portion 21b respectively.The installing hole in the cross-arm fixture 21
21d is on the 3rd installation portion 21c.The installing hole 21d is the female screwed hole of setting.
In the present embodiment, the insulating barrier main body 1 is provided with cross-arm fixture jack 13, the cross-arm fixture 21 it is described
First installation portion 21a is fixed on the cross-arm fixture jack 13 of the insulating barrier main body 1.
In the present embodiment, the cross-arm fixture 21 is provided with two, and the centrage relative to the U-lag is symmetrically pacified
It is mounted in the insulating barrier main body 1.
It is additionally provided with the insulating barrier main body 1 and installs for by the crane insulating barrier jack-up for action bars 5
Action bars base 12.The fixture securing member 22 inserts one end of the installing hole 21d and is additionally provided with anti-slip cap 23.The fixture
The lower end of securing member 22 is provided with action bars connecting portion 24, and in the present embodiment, the action bars connecting portion 24 is provided with two
The first relative projection 24a on position, the action bars base 12 are provided with the second projection 12a relative on two positions, and
First projection knob 24a knob 12as raised with described second is equivalently-sized, the action bars connecting portion 24 and the insulation
12 structure of action bars base of diaphragm body 1 is identical, you can carry out rotation company using the mutually isostructural action bars 5
Connect.
Meanwhile, in order that insulating barrier keeps preferable insulating properties, while light quality is easy to lift, described is exhausted
The thickness of edge diaphragm body 1 is set to 0.2-1.0cm.
When needing to overhaul fuse switch, the 10kV drop types fusing for needing maintenance or changing is disconnected
Device, is inserted in the action bars base 12 of the insulating barrier main body 1 by the action bars 5, and the crane is insulated
Dividing plate is lifted so that the U-lag in the insulating barrier main body 1 passes through the insulating porcelain bushing 3, the width of the U-type groove
Degree is matched with the diameter of the insulating porcelain bushing, can preferably be ensured the insulating properties of insulating barrier, be prevented accident
Get an electric shock, it is ensured that the personal safety of operator, the crane insulating barrier is then placed to the cross-arm 4, and grasp described in turn
Make bar 5, the action bars 5 is departed from the action bars base 12, then the action bars 5 is installed in place in fixture fastening
On the action bars connecting portion 24 of 22 lower end of part, action bars 5 described in operator's turn drives affiliated fixture securing member 22 to rotate,
So that the fixture securing member 22 for penetrating into the installing hole 21d of the cross-arm fixture 21 rises the cross-arm 4 firmly
Be squeezed between the fixture securing member 22 and the cross-arm fixture 21, simultaneously as the fixture securing member 23 penetrates institute
The one end stated cross-arm fixture 21 and contact cross-arm is provided with anti-slip cap 23, can effectively prevent 10kV crane insulating barriers in horizontal stroke
Slide in load so that the crane insulating barrier is securely seated between on cross-arm.
Also, as the first installation portion 21a and the second installation portion 21b of the crosspiece fixture 21 are integrated into
The right-angle structure of type so that the medial wall of the first installation portion 21a and the second installation portion 21b is outer with the cross-arm 4
Surface is brought into close contact together, more enhances the fixed effect of the cross-arm fixture 21 of the insulating barrier so as to be difficult to send out
It is raw to loosen.
Further, since be provided with action bars base 12 in the insulating barrier main body 1, and in order that crane insulating barrier quilt
The crane insulating barrier of balance, the present invention can be kept when lifting to be determined by experiment the optimum bit of the action bars base 12
Put so that when operator lifts the crane insulating barrier using the action bars 5, the crane insulating barrier can keep
Balance, will not shake.
The present invention according to the actual distribution transformer in scene rush to repair working method and《Safety》Related request, it is exhausted to 10kV cranes
Edge baffle plate device is developed, and produces the 10kV crane insulating barriers of suitable work on the spot application;The checking of Jing actual motions,
The present invention 10kV crane insulating barrier device light weights, be readily transported and install and install simple and convenient, while material is exhausted
Edge performance is good, reliable, effectively reduces the danger that personnel get an electric shock and line short is grounded, ensure that significantly repairing work
Safety, improve repairing work efficiency and company power supply reliability.
Obviously, above-described embodiment is only intended to clearly illustrate example, and the not restriction to embodiment.It is right
For those of ordinary skill in the art, can also make on the basis of the above description other multi-forms change or
Change.There is no need to be exhaustive to all of embodiment.And thus it is extended obvious change or
Among changing still in the protection domain of the invention.
Claims (4)
1. a kind of crane insulating barrier, including insulating barrier main body (1) and cross-arm fixture (2), insulating barrier main body (1)
On offer insulating mounting groove (11) for installing insulating porcelain bushing (3), it is characterised in that:If the cross-arm fixture includes
Dry the cross-arm fixture (21) being arranged on insulating barrier main body (1), the installation being arranged in the cross-arm fixture (21)
Hole (21d) and can screw in/screw out in the installing hole (21d) and the cross-arm fixture (21) turn is arranged on into cross-arm
(4) the fixture securing member (22) dismantled on or from the cross-arm (4);
Cross-arm fixture (21) include the first installation portion (21a) on insulating barrier main body (1), and described
One installation portion (21a) integrally formed second installation portion (21b) and with the second installation portion (21b) the integrally formed 3rd
Installation portion (21c), the first installation portion (21a), second installation portion (21b) and the 3rd installation portion (21c) shape
Into for accommodating the lateral openings groove of cross-arm (4);
First installation portion (21a) and the 3rd installation portion (21c) are located at the two of the second installation portion (21b) respectively
End, and be vertically arranged with the second installation portion (21b) respectively;
First installation portion (21a) of crosspiece fixture (21) is straight with what the second installation portion (21b) was formed in one
Corner structure.
2. crane insulating barrier according to claim 1, it is characterised in that:Installing hole (21d) is located at the described 3rd
On installation portion (21c).
3. crane insulating barrier according to claim 1, it is characterised in that:Installing hole (21d) is to be provided with interior spiral shell
The screwed hole of stricture of vagina.
4. crane insulating barrier according to claim 1, it is characterised in that:Insulating barrier main body (1) is provided with horizontal stroke
Load fixture jack (13), the first installation portion (21a) of cross-arm fixture (21) are fixed on insulating barrier main body (1)
Cross-arm fixture jack (13) on.
The fixture securing member inserts the insertion end of the installing hole and is provided with anti-slip cap.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510273156.1A CN104967026B (en) | 2013-11-15 | 2013-11-15 | Line connector insulation separator plate |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510273156.1A CN104967026B (en) | 2013-11-15 | 2013-11-15 | Line connector insulation separator plate |
CN201310568700.6A CN103681142B (en) | 2013-11-15 | 2013-11-15 | A kind of crane insulating barrier |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310568700.6A Division CN103681142B (en) | 2013-11-15 | 2013-11-15 | A kind of crane insulating barrier |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104967026A CN104967026A (en) | 2015-10-07 |
CN104967026B true CN104967026B (en) | 2017-03-22 |
Family
ID=50318373
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510273172.0A Active CN104967027B (en) | 2013-11-15 | 2013-11-15 | Line connector insulation separator plate |
CN201310568700.6A Active CN103681142B (en) | 2013-11-15 | 2013-11-15 | A kind of crane insulating barrier |
CN201510273159.5A Active CN104967044B (en) | 2013-11-15 | 2013-11-15 | Line connector insulation separator plate |
CN201510273156.1A Active CN104967026B (en) | 2013-11-15 | 2013-11-15 | Line connector insulation separator plate |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510273172.0A Active CN104967027B (en) | 2013-11-15 | 2013-11-15 | Line connector insulation separator plate |
CN201310568700.6A Active CN103681142B (en) | 2013-11-15 | 2013-11-15 | A kind of crane insulating barrier |
CN201510273159.5A Active CN104967044B (en) | 2013-11-15 | 2013-11-15 | Line connector insulation separator plate |
Country Status (1)
Country | Link |
---|---|
CN (4) | CN104967027B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104967027B (en) * | 2013-11-15 | 2017-01-18 | 国网山东省电力公司青岛供电公司 | Line connector insulation separator plate |
CN104638564A (en) * | 2015-01-23 | 2015-05-20 | 国网山西省电力公司晋城供电公司 | Insulated fixing device for use in live replacement of drop-out fuse |
CN105045328A (en) * | 2015-05-26 | 2015-11-11 | 无锡晶磊电子有限公司 | High-voltage suspension regulator |
CN106785942B (en) * | 2017-01-25 | 2018-01-05 | 国网山东省电力公司乳山市供电公司 | High-tension fuse operation protecting device and high-tension fuse protection against electric shock operational method |
CN110620352B (en) * | 2019-10-10 | 2024-06-18 | 国网辽宁省电力有限公司盘锦供电公司 | 10 KV live working combined tool |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4011537A (en) * | 1975-11-19 | 1977-03-08 | S & C Electric Company | Composite dropout fuse device |
CN201307572Y (en) * | 2008-10-29 | 2009-09-09 | 北京市电力公司 | Insulation baffle plate |
CN201540863U (en) * | 2009-10-30 | 2010-08-04 | 齐齐哈尔电业局 | Drop-out fuse insulating partition of 10kV line |
WO2012012442A1 (en) * | 2010-07-20 | 2012-01-26 | Cooper Technologies Company | Fuse link auxiliary tube improvement |
CN202353092U (en) * | 2011-11-18 | 2012-07-25 | 德阳电业局 | Novel insulating barrier for high voltage fuse |
CN203445075U (en) * | 2013-11-15 | 2014-02-19 | 国网山东省电力公司青岛供电公司 | Line connector insulating separator |
CN103681142B (en) * | 2013-11-15 | 2015-12-16 | 国网山东省电力公司青岛供电公司 | A kind of crane insulating barrier |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1274868C (en) * | 1985-06-28 | 1990-10-02 | Philip Blois Andrew | Fuse fault protector |
US4707562A (en) * | 1986-10-24 | 1987-11-17 | Whited Gary L | High voltage protection barrier |
-
2013
- 2013-11-15 CN CN201510273172.0A patent/CN104967027B/en active Active
- 2013-11-15 CN CN201310568700.6A patent/CN103681142B/en active Active
- 2013-11-15 CN CN201510273159.5A patent/CN104967044B/en active Active
- 2013-11-15 CN CN201510273156.1A patent/CN104967026B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4011537A (en) * | 1975-11-19 | 1977-03-08 | S & C Electric Company | Composite dropout fuse device |
CN201307572Y (en) * | 2008-10-29 | 2009-09-09 | 北京市电力公司 | Insulation baffle plate |
CN201540863U (en) * | 2009-10-30 | 2010-08-04 | 齐齐哈尔电业局 | Drop-out fuse insulating partition of 10kV line |
WO2012012442A1 (en) * | 2010-07-20 | 2012-01-26 | Cooper Technologies Company | Fuse link auxiliary tube improvement |
CN202353092U (en) * | 2011-11-18 | 2012-07-25 | 德阳电业局 | Novel insulating barrier for high voltage fuse |
CN203445075U (en) * | 2013-11-15 | 2014-02-19 | 国网山东省电力公司青岛供电公司 | Line connector insulating separator |
CN103681142B (en) * | 2013-11-15 | 2015-12-16 | 国网山东省电力公司青岛供电公司 | A kind of crane insulating barrier |
Also Published As
Publication number | Publication date |
---|---|
CN104967044A (en) | 2015-10-07 |
CN104967044B (en) | 2017-01-25 |
CN104967026A (en) | 2015-10-07 |
CN103681142A (en) | 2014-03-26 |
CN104967027B (en) | 2017-01-18 |
CN103681142B (en) | 2015-12-16 |
CN104967027A (en) | 2015-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104967026B (en) | Line connector insulation separator plate | |
CN101174761B (en) | High-voltage power line tension insulator string forward spin live-wire altering method | |
CN201323409Y (en) | Tool for live line replacing of high voltage transmission line V-shaped insulator chain | |
CN205301375U (en) | Electroscope installing support | |
CN201812956U (en) | Portable grounding wire clip for line repair | |
CN206211061U (en) | A kind of telescopic grounding wire device | |
CN104882825A (en) | High-voltage live lead disconnecting device and lead method, and high-voltage live lead connecting device and lead method | |
CN105428841A (en) | Cable grounding device | |
CN203445075U (en) | Line connector insulating separator | |
CN210067383U (en) | Safety device is used in electric power engineering construction | |
CN102610343B (en) | Pluggable lightning arrester | |
CN106785521A (en) | A kind of combined type ground wire group | |
CN203377426U (en) | Anti-explosion pin | |
CN206211062U (en) | A kind of circlip type binding clip for ground wire group | |
CN105161878A (en) | Power distribution fast acousto-optic electricity testing grounding wire | |
CN205609783U (en) | Emergent short circuit tubulose fastener | |
CN204886031U (en) | Device of supplementary wiring | |
CN201234089Y (en) | Protective interval for live operation on 1000kV AC very high voltage line | |
CN205609782U (en) | Electric earth connection is tested to quick reputation of distribution | |
CN204760571U (en) | Electric earth connection is tested to quick reputation of distribution | |
CN208046039U (en) | JP cabinet electric operating safety aids | |
CN204706830U (en) | Electrification in high voltage breaking and connecting thread guide devices | |
CN104795280A (en) | Universal relay adapter for substation | |
CN216648626U (en) | High-efficient transmission and distribution lines examines and repair earthing device | |
CN107910812A (en) | A kind of insulating bar method on-load isolates the special isolation shading tool of switch in replacing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |