CN104962836A - Corrosion-resistance iron-based austenite oil well pipe and manufacturing method thereof - Google Patents

Corrosion-resistance iron-based austenite oil well pipe and manufacturing method thereof Download PDF

Info

Publication number
CN104962836A
CN104962836A CN201510301637.9A CN201510301637A CN104962836A CN 104962836 A CN104962836 A CN 104962836A CN 201510301637 A CN201510301637 A CN 201510301637A CN 104962836 A CN104962836 A CN 104962836A
Authority
CN
China
Prior art keywords
pipe
oil well
well pipe
temperature
billet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510301637.9A
Other languages
Chinese (zh)
Inventor
聂飞
康喜唐
侯楠
李鹏
刘宇
付俊生
梁祥祥
张琳
张晓�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201510301637.9A priority Critical patent/CN104962836A/en
Publication of CN104962836A publication Critical patent/CN104962836A/en
Pending legal-status Critical Current

Links

Landscapes

  • Heat Treatment Of Steel (AREA)

Abstract

The invention discloses a corrosion-resistance iron-based austenite oil well pipe and a manufacturing method thereof. The main chemical components of the oil well pipe include C larger than 0 and smaller than or equal to 0.03%, Si larger than 0 and smaller than or equal to 1.00%, Mn larger than 0 and smaller than or equal to 2.50%, P smaller than or equal to 0.03%, S smaller than or equal to 0.03%, 20.0%-28.0% of Cr, 20.0%-38.0% of Ni, 3.0%-5.0% of Mo and 0.50%-2.00% of Cu. The manufacturing method includes the first step of smelting; the second step of billet pouring; the third step of electroslag remelting; the fourth step of homogenizing annealing; the fifth step of billet forging; the sixth step of pipe billet preparing; the seventhly step of hot extruding, wherein a seamless steel pipe is formed through pipe billet preheating, power frequency induction furnace heating, pipe billet broaching, secondary induction heating and extruding; the eighth step of solid solution treating; and the ninth step of conducting of a deformation strengthening mode in cold drawing, wherein the percentage reduction of area is controlled within 20-40%, and the oil well pipe is manufactured. According to the corrosion-resistance iron-based austenite oil well pipe and the manufacturing method thereof, the wall thickness of the manufactured oil well pipe ranges from 15 mm to 40 mm, the yield strength is 760 MPa or higher, the tensile strength is 793 MPa or higher, the impact energy is 100 J or higher, the corrosion resistance is good, and the requirement for strictest and slow-strain tests is met.

Description

A kind of corrosion resistant iron base austenite oil well pipe and manufacture method thereof
Technical field
The present invention relates to a kind of iron-based austenite oil well pipe and manufacture method thereof, relate generally to a kind of high strength, corrosion resistant iron-based austenite weldless steel tube and manufacture method thereof.
Background technology
Increasingly severe with oil-gas mining environment, " three is high " (high temperature, high pressure, high corrosion) Oil/gas Well also increases gradually, and the Oil/gas Well degree of depth in Some Domestic area is more than 7000 meters, and the temperature of down-hole, more than 150 DEG C, exists the H of high density simultaneously 2s and CO 2gas, and H 2the dividing potential drop of S gas reaches more than 8MPa.For this kind of conditions down-hole, iron-based, abros must be adopted to meet service requirements.
Iron-based austenite corrosion-resistant alloy be organized as austenite, and adding due to non-corrosive metal element, broaden between austenitic area, under normal temperature and the condition of high temperature, without obvious phase transition process in hot and cold processing and heat treatment process, therefore cannot be strengthened by phase transformation, only have and reach by other schedule of reinforcement the object promoting intensity.
Conventional schedule of reinforcement has two kinds: alloy strengthening and deformation strengthening.
Alloy strengthening is when not affecting alloying constituent system, adds or raising part does not affect the element of alloy property, the elements such as such as C, N.These elements exist between the gap of austenite lattice, hinder the deformation process of alloy, reach enhancement purpose.
The major way of deformation strengthening is cold work reinforced.For alloy pipe, cold rolling, cold-drawn, aligning are three kinds of modes of strengthening.By distortion, tubing inside forms a large amount of dislocation group, hinders sliding deformation, reaches enhancement purpose.
Under normal circumstances, in view of the interpolation difficulty of alloying element is large, affect final tissue morphology, deformation strengthening is the main schedule of reinforcement of Fe base non-corrosive metal pipe.
For oil well pipe, usually require that yield strength is at more than 760MPa, tensile strength at more than 793MPa, unit elongation usually more than 11%, the stress corrosion (SCC) of anti-acid environment and the H 2 S stress corrosion (SSC) of high density.
But the specification of oil well pipe is many, for the Fe base non-corrosive metal oil well pipe (wall thickness is generally at more than 15mm) that wall thickness is larger, conventional cold-work strengthening cannot meet the requirement (surface deformation of strengthening, heart portion is indeformable), if strengthen cold deformation, cannot industrial production be realized again.Therefore.The non-corrosive metal pipe of large gauge, high strength is a production difficult problem for steel pipe circle all the time.
Summary of the invention
In order to overcome the above-mentioned deficiency of existing corrosion resistant iron base austenite oil well pipe, the invention provides a kind of corrosion resistant iron base austenite oil well pipe, the wall thickness of this corrosion resistant iron base austenite oil well pipe is at 15mm ~ 40mm, yield strength is at more than 760MPa, more than tensile strength 793MPa, unit elongation more than 20%, more than ballistic work 100J, in the NaCl solution of concentration 37%, the CO2 stress corrosion (SCC) of H2S and 1.1MPa of resistance to 0.6MPa and H 2 S stress corrosion (SSC), and meet the strictest slow strain-gauge test requirement (SSRT).
Another object of the present invention is to provide a kind of manufacture method of this oil well pipe.
The chemical composition (weight percent) of this corrosion resistant iron base austenite oil well pipe is:
0<C≤0.03%,  0<Si≤1.00%,  0<Mn≤2.50%,  P≤0.03%,
S≤0.03%, Cr  20.0%~28.0%,  Ni  20.0%~38.0%,
Mo  3.0%~5.0%, Cu  0.50%~2.00%,
All the other are iron and its impurity element of trace.
Above-mentioned corrosion resistant iron base austenite oil well pipe, it is characterized in that the content also containing N, N is 0.05% ~ 0.30%, namely its chemical composition percentage ratio (weight) is:
0<C≤0.03%,  0<Si≤1.00%,  0<Mn≤2.50%,  P≤0.03%,
S≤0.03%, Cr  20.0%~28.0%,  Ni  20.0%~38.0%,
Mo  3.0%~5.0%, Cu  0.50%~2.00%, N  0.05%~0.30%,
All the other are iron and its impurity element of trace.
The wall thickness of corrosion resistant iron base austenite oil well pipe of the present invention is at 15mm ~ 40mm; And intensity is high, through hot extrusion, solid solution and cold-drawn, yield strength at more than 760MPa, more than tensile strength 793MPa, unit elongation more than 20%, more than ballistic work 100J.
Corrosion resistant iron base austenite oil well pipe of the present invention has good erosion resistance, it is in the NaCl solution of concentration 37%, the CO2 stress corrosion (SCC) of H2S and 1.1MPa of resistance to 0.6MPa and H 2 S stress corrosion (SSC), meet the strictest slow strain-gauge test and require (SSRT).
The key step of the manufacture method of this oil well pipe is as follows:
Preprocessed molten iron → converter or electric furnace → AOD or VOD → continuous casting or die casting → esr → homogenizing anneal → cogging → rolling or forging → pipe prepare (boring, chamfering) → hot extrusion → solid solution → cold-drawn (rolling) → aligning → crop → detect a flaw → weigh → spray and mark → pack.
The manufacture method of this corrosion resistant iron base austenite oil well pipe comprises following step successively:
i, smelt
Pretreated molten iron is after converter or electrosmelting and AOD or VOD refining, and ladle chemistry percentage ratio (weight) reaches following requirement and can tap:
0<C≤0.03%,  0<Si≤1.00%,  0<Mn≤2.50%,  P≤0.03%,
S≤0.03%, Cr  20.0%~28.0%,  Ni  20.0%~38.0%,
Mo  3.0%~5.0%, Cu  0.50%~2.00%,
All the other are iron and its impurity element of trace.
iI, cast steel billet
By above-mentioned continuous casting of molten steel or be molded into steel billet.
iII, esr
Adopt argon shield electroslag remelting furnace and ingot shape, after remelting, in 2min, enter water cooling.
iV, homogenizing anneal
Annealing temperature controls at 1150 ~ 1250 DEG C, annealing time 20 ~ 40h.
v, blank forging
A heats
By heating steel billet, soaking temperature is 1100-1200 DEG C, and heat-up time, according to steel billet THICKNESS CALCULATION, gets 1-2min/mm, and soaking time is 30-60min, guarantees that steel billet is grilled thoroughly, evenly.
B rolling or forging solid pipe billet
When rolling or forging solid pipe billet, open rolling or the temperature opening forging are 1100 ~ 1200 DEG C, and minimum finish to gauge or final forging temperature are 1000-1060 DEG C.Forge in rear 2min and entered water cooling.
vI, pipe prepare
Pipe prepares to comprise sawing, gun drilling, chamfering three operations.Sawing carries out cutting according to the dimensional requirement of steel pipe; Gun drilling be by cutting after pipe carry out centre-drilling hole, aperture is generally 40-100mm; Chamfering be by boring after pipe carry out two ends chamfered edge, avoid sharp-pointed rib portion to affect subsequent production.
vII, hot extrusion
The preheating of advanced line pipe base, usual preheating temperature is 600-1000 DEG C, and warm up time is pipe diameter × (1-2) min.
Enter line frequency induction furnace heating after preheating, the temperature of heating is 1100-1150 DEG C, and soaking time is 1-5min, and after induction heating, temperature head is within 20 DEG C.
Then pipe carries out reaming, and the size of reaming is fixed with the size of fished pipe, carries out glass powder lubrication before reaming at pipe surfaces externally and internally;
Carry out line-frequency induction heating again after reaming, Heating temperature comparatively reaming temperature wants high, and for hot extrusion is prepared, the temperature of secondary induction heating is between 1150-1200 DEG C;
Secondary induction heating is complete, pipe is delivered in extrusion machine container after carrying out surfaces externally and internally glass powder lubrication and is extruded, choose the tool and mould (comprising squeezing needle, overflow mould, pressure pad etc.) adapted with final dimension, extrusion speed is generally 100-300mm/s, is crushed to weldless steel tube; Extrude complete air cooling to room temperature.
vIII, solid solution
The temperature of solid solution is 1150 ~ 1200 DEG C, and soaking time is determined according to thickness of steel pipe, is generally wall thickness × (2-3) minute, Putting into water rapidly cooling in 30 seconds after solid solution.The object of solid solution is the intermetallic phase that elimination alloying element causes, and avoids affecting follow-up severe rugged environment and is on active service.
, cold-drawn (rolling)
This corrosion resistant iron base austenite oil well pipe, the high strength gap of the intensity after solid solution and requirement is larger.For ensureing high strength, must carry out cold work reinforced ,the cold work reinforced major way being austenitic steel and strengthening.For alloy pipe, cold rolling, cold-drawn, aligning are three kinds of modes of strengthening.By distortion, tubing inside forms a large amount of dislocation group, hinders sliding deformation, reaches enhancement purpose.
The cooled weldless steel tube of solid solution, carry out cold rolling, cold-drawn, the minimum a kind of deformation strengthening mode of aligning, control section shrinking percentage, 20 ~ 40%, makes oil well pipe.
aligning and crop
After cold working is complete, perform finishing procedure.Aligning ensures steel pipe linearity, and crop ensures that steel pipe section gradient meets standard-required.Standard performs ISO 13680-2010 " oil and natural gas industrial non-corrosive metal oil well pipe technical qualification ".
flaw detection, spray mark, packaging
Flaw detection, spray mark, packaging can be delivered.
The manufacture method of above-mentioned corrosion resistant iron base austenite oil well pipe, what it is characterized in that it manufactures is the steel pipe of wall thickness 15-40mm.
The manufacture method of above-mentioned corrosion resistant iron base austenite oil well pipe, its steps characteristic is: in step iin smelting, the content smelted also containing N, N in the molten steel composition is 0.05% ~ 0.30%, and namely its chemical composition percentage ratio (weight) is:
0<C≤0.03%,  0<Si≤1.00%,  0<Mn≤2.50%,  P≤0.03%,
S≤0.03%, Cr  20.0%~28.0%,  Ni  20.0%~38.0%,
Mo  3.0%~5.0%, Cu  0.50%~2.00%, N  0.05%~0.30%,
All the other are iron and its impurity element of trace.
Advantage of the present invention is as follows:
(1) by cold-drawn (rolling) mode, cold-work strengthening is carried out to steel pipe, the relative reduction in area of cold-drawn (rolling) controls 20 ~ 40%, can be made into yield strength at more than 760MPa, tensile strength is at more than 793MPa, unit elongation more than 20%, the height strengthening non-corrosive metal seamless tube of more than ballistic work 100J.And steel pipe meets in the NaCl solution of concentration 37%, the CO2 stress corrosion (SCC) of H2S and 1.1MPa of resistance to 0.6MPa and H 2 S stress corrosion (SSC), can also meet the strictest slow strain-gauge test requirement (SSRT).
(2) this section shrinkage is mainly applicable to the weldless steel tube of wall thickness at more than 15mm.For the weldless steel tube of more than wall thickness 15mm, when strengthening without N element, cold work reinforced relative reduction in area must reach 40 ~ 80% and could realize strengthening requirement, therefore this patent novelty adds the mode that appropriate N element carries out strengthening, relative reduction in area controls 20 ~ 40%, both ensure that industrial smooth realization, meet again the requirement of high strength.
By method of the present invention, thickness 40mm can be produced, yield strength at more than 760MPa, more than tensile strength 793MPa, unit elongation more than 20%, the Fe based austenite non-corrosive metal weldless steel tube of more than ballistic work 100J.
Specific embodiment
The embodiment of Fe based austenite non-corrosive metal seamless tube and manufacture method thereof is described in detail below in conjunction with embodiment.
based austenite non-corrosive metal pipe embodiment 1
The present embodiment mass percent is:
C 0.011, Si 0.25, Mn 0.56, P 0.022, S 0.001,
Cr 26.55, Ni 30.27, Mo 3.83, Cu 0.81, N 0.08, all the other are iron and its impurity element of trace.
This enforcement specification is Φ 192 × 18 × 6000mm, and the detected result after cold working is, surrender 820MPa, tension 855MPa, unit elongation 30%, ballistic work 150-200J.
manufacture method embodiment 1
One, smelt
Pretreated molten iron is after electric furnace+AOD furnace refining, and the Ingredient percent of molten steel reaches following requirement and can tap:
C 0.011, Si 0.25, Mn 0.56, P 0.022, S 0.001,
Cr 26.55, Ni 30.27, Mo 3.83, Cu 0.81, N 0.08,
All the other are iron and its impurity element of trace.
Two, steel billet is poured into a mould
Adopt the ingot mould of 9 tons, above-mentioned pouring molten steel is become the electrode blank of Φ 800mm.
Three, esr
Adopt argon shield esr mode, ingot shape is Φ 500mm.Water cooling time 50s is entered after remelting.
Four, homogenizing anneal
Annealing temperature controls at 1200 ~ 1220 DEG C, annealing time 25h.
Five, blank forging
A heats
By heating steel billet, soaking temperature is 1180 DEG C, heat-up time 600min, soaking time is 60min, guarantees that steel billet is grilled thoroughly, evenly.
B forges solid pipe billet
During forging solid pipe billet, the temperature opening forging is 1160 DEG C, and most final forging temperature is 1030 DEG C.Enter water time 58s after having forged, forging is of a size of Φ 400mm.
Six, pipe prepares
Pipe prepares to comprise sawing, gun drilling, chamfering three operations.Sawing length 600mm/ props up; Gun drilling aperture 60mm; Chamfer dimesion R25.
Seven, hot extrusion
Preheating temperature is 950 DEG C, and warm up time is 400min, guarantees that preheating is even.Enter line frequency induction furnace heating after preheating, the temperature of heating is 1123 DEG C, and soaking time is 1.5min.Induction heating is complete, and pipe is delivered to staving press and carried out reaming, and rose bit is of a size of Φ 200mm, carries out glass powder lubrication before reaming at pipe surfaces externally and internally; Carry out line-frequency induction heating again after reaming, the temperature of secondary induction heating is 1183 DEG C; Secondary induction heating is complete, pipe is delivered in extrusion machine container after carrying out surfaces externally and internally glass powder lubrication and is extruded, and overflow mould is of a size of Φ 219mm, and squeezing needle is of a size of Φ 191mm, extrusion speed 150mm/s, extrudes the complete weldless steel tube obtaining Φ 219 × 14mm.
Eight, solid solution
The temperature of solid solution is 1183 DEG C, and soaking time 30 minutes, is quickly cooled to room temperature after solid solution.
Nine, cold rolling
This specification is by cold work reinforced, and deformation technique is that Φ 250 × 20mm is cold-rolled to Φ 192 × 18mm, and relative reduction in area is 31.5%.
Ten, aligning and crop
Cold working is complete, performs finishing procedure, aligning and crop.Aligning ensures steel pipe linearity, and crop ensures that steel pipe section gradient meets standard-required.
11, detect a flaw, spray is marked, packaging
Flaw detection, spray mark, packaging can be delivered.
Produce by above-mentioned steps, production tube surrender 820MPa, tension 855MPa, unit elongation 30%, ballistic work 150-200J.
based austenite non-corrosive metal pipe embodiment 2
The present embodiment mass percent is:
C 0.013, Si 0.21, Mn 0.58, P 0.021, S 0.002,
Cr 26.33, Ni 31.20, Mo 3.88, Cu 0.83, N 0.11,
All the other are iron and its impurity element of trace.
This enforcement specification is Φ 195 × 25 × 6000mm, and the detected result after cold working is, surrender 830MPa, tension 900MPa, unit elongation 25%, ballistic work 150-200J.
manufacture method embodiment 2
One, smelt
Pretreated molten iron is after electric furnace+AOD furnace refining, and the Ingredient percent of molten steel reaches following requirement and can tap:
C 0.013, Si 0.21, Mn 0.58, P 0.021, S 0.002,
Cr 26.33, Ni 31.20, Mo 3.88, Cu 0.83, N 0.11,
All the other are iron and its impurity element of trace.
Two, steel billet is poured into a mould
Adopt the ingot mould of 9 tons, above-mentioned pouring molten steel is become the electrode blank of Φ 800mm.
Three, esr
Adopt argon shield esr mode, ingot shape is Φ 500mm.Water time 52s is entered after remelting.
Four, homogenizing anneal
Annealing temperature controls at 1200 ~ 1220 DEG C, annealing time 25h.
Five, blank forging
A heats
By heating steel billet, soaking temperature is 1180 DEG C, heat-up time 600min, soaking time is 60min, guarantees that steel billet is grilled thoroughly, evenly.
B forges solid pipe billet
During forging solid pipe billet, the temperature opening forging is 1153 DEG C, and most final forging temperature is 1011 DEG C.Enter water time 65s after having forged, forging is of a size of Φ 400mm.
Six, pipe prepares
Pipe prepares to comprise sawing, gun drilling, chamfering three operations.Sawing length 800mm/ props up; Gun drilling aperture 60mm; Chamfer dimesion R25.
Seven, hot extrusion
Preheating temperature is 950 DEG C, and warm up time is 400min, guarantees that preheating is even.Enter line frequency induction furnace heating after preheating, the temperature of heating is 1118 DEG C, and soaking time is 1.5min.Induction heating is complete, and pipe is delivered to staving press and carried out reaming, and rose bit is of a size of Φ 200mm, carries out glass powder lubrication before reaming at pipe surfaces externally and internally; Carry out line-frequency induction heating again after reaming, the temperature of secondary induction heating is 1175 DEG C; Secondary induction heating is complete, pipe is delivered in extrusion machine container after carrying out surfaces externally and internally glass powder lubrication and is extruded, and overflow mould is of a size of Φ 250mm, and squeezing needle is of a size of Φ 190mm, extrusion speed 200mm/s, extrudes the complete weldless steel tube obtaining Φ 250 × 30mm.
Eight, solid solution
The temperature of solid solution is 1181 DEG C, soaking time 60 minutes, Putting into water rapidly cooling after solid solution.
Nine, cold rolling
This specification is by cold rolling strengthening, and deformation technique is that Φ 250 × 30mm is cold-rolled to Φ 195 × 25mm, and relative reduction in area is 35%.
Ten, aligning and crop
Cold working is complete, performs finishing procedure, aligning and crop.Aligning ensures steel pipe linearity, and crop ensures that steel pipe section gradient meets standard-required.
11, detect a flaw, spray is marked, packaging
Flaw detection, spray mark, packaging can be delivered.
Produce by above-mentioned steps, production tube surrender 830MPa, tension 900MPa, unit elongation 25%, ballistic work 150-200J.

Claims (9)

1. a corrosion resistant iron base austenite oil well pipe, its chemical composition (weight percent) is:
0<C≤0.03%,  0<Si≤1.00%,  0<Mn≤2.50%,  P≤0.03%,
S≤0.03%, Cr  20.0%~28.0%,  Ni  20.0%~38.0%,
Mo  3.0%~5.0%, Cu  0.50%~2.00%,
All the other are iron and its impurity element of trace.
2. corrosion resistant iron base austenite oil well pipe according to claim 1, is characterized in that the content also containing N, N is 0.05% ~ 0.30%.
3., according to described corrosion resistant iron base austenite oil well pipe arbitrary in claim 1 or 2, it is characterized in that: its wall thickness at 15mm ~ 40mm, through hot extrusion, solid solution and cold-drawn, yield strength is at more than 760MPa, more than tensile strength 793MPa, unit elongation more than 20%, more than ballistic work 100J.
4. corrosion resistant iron base austenite oil well pipe according to claim 3, it is characterized in that: it is in the NaCl solution of concentration 37%, the CO2 stress corrosion (SCC) of H2S and 1.1MPa of resistance to 0.6MPa and H 2 S stress corrosion (SSC), meet the strictest slow strain-gauge test and require (SSRT).
5. a manufacture method for corrosion resistant iron base austenite oil well pipe, comprises following step successively:
i, smelt
Pretreated molten iron is after converter or electrosmelting and AOD or VOD refining, and molten steel composition percentage ratio reaches following requirement and can tap:
0<C≤0.03%,  0<Si≤1.00%,  0<Mn≤2.50%,  P≤0.03%,
S≤0.03%, Cr  20.0%~28.0%,  Ni  20.0%~38.0%,
Mo  3.0%~5.0%, Cu  0.50%~2.00%,
All the other are iron and its impurity element of trace;
iI, cast steel billet
By above-mentioned continuous casting of molten steel or be molded into steel billet;
iII, esr
Adopt argon shield electroslag remelting furnace and ingot shape, after remelting, in 2min, enter water cooling;
iV, homogenizing anneal
Annealing temperature controls at 1150 ~ 1250 DEG C, annealing time 20 ~ 40h;
v, blank forging
A heats
By heating steel billet, soaking temperature is 1100-1200 DEG C, and heat-up time, according to steel billet THICKNESS CALCULATION, gets 1-2min/mm, and soaking time is 30-60min, guarantees that steel billet is grilled thoroughly, evenly;
B rolling or forging solid pipe billet
When rolling or forging solid pipe billet, open rolling or the temperature opening forging are 1100 ~ 1200 DEG C, and minimum finish to gauge or final forging temperature are 1000-1060 DEG C; Forge in rear 2min and entered water cooling;
vI, pipe prepare
Pipe prepares to comprise sawing, gun drilling, chamfering three operations; Sawing carries out cutting according to the dimensional requirement of steel pipe; Gun drilling be by cutting after pipe carry out centre-drilling hole; Chamfering be by boring after pipe carry out two ends chamfered edge;
vII, hot extrusion
The preheating of advanced line pipe base, preheating temperature is 600-1000 DEG C, and warm up time is pipe diameter × (1-2) min;
Enter line frequency induction furnace heating after preheating, the temperature of heating is 1100-1150 DEG C, and soaking time is 1-5min, and after induction heating, temperature head is within 20 DEG C;
Then pipe carries out reaming, carries out glass powder lubrication before reaming at pipe surfaces externally and internally; Carry out secondary induction heating again after reaming, the temperature of secondary induction heating is between 1150-1200 DEG C;
Secondary induction heating is complete, and pipe is delivered in extrusion machine container after carrying out surfaces externally and internally glass powder lubrication and extruded, and extrusion speed is generally 100-300mm/s, is crushed to weldless steel tube; Extrude complete air cooling to room temperature;
vIII, solid solution
The temperature of solid solution is 1150 ~ 1200 DEG C, and soaking time is determined according to thickness of steel pipe, is generally wall thickness × (2-3) minute, Putting into water rapidly cooling in 30 seconds after solid solution;
, cold-drawn (rolling)
The cooled weldless steel tube of solid solution, carry out cold rolling, cold-drawn, the minimum a kind of deformation strengthening mode of aligning, control section shrinking percentage, 20 ~ 40%, makes oil well pipe.
6. the manufacture method of corrosion resistant iron base austenite oil well pipe according to claim 5, is characterized in that: in step after cold-drawn, (cold working is complete) also performs finishing procedure and carries out step aligning and crop, aligning ensures steel pipe linearity, and crop ensures that steel pipe section gradient meets standard-required.
7., according to the manufacture method of described corrosion resistant iron base austenite oil well pipe arbitrary in claim 5 or 6, what it is characterized in that it manufactures is the steel pipe of wall thickness 15-40mm.
8., according to the manufacture method of described corrosion resistant iron base austenite oil well pipe arbitrary in claim 5 or 6, its steps characteristic is:
In step iin smelting, the content smelted also containing N, N in the molten steel composition is 0.05% ~ 0.30%.
9. the manufacture method of corrosion resistant iron base austenite oil well pipe according to claim 7, its steps characteristic is:
In step iin smelting, the content smelted also containing N, N in the molten steel composition is 0.05% ~ 0.30%.
CN201510301637.9A 2015-06-05 2015-06-05 Corrosion-resistance iron-based austenite oil well pipe and manufacturing method thereof Pending CN104962836A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510301637.9A CN104962836A (en) 2015-06-05 2015-06-05 Corrosion-resistance iron-based austenite oil well pipe and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510301637.9A CN104962836A (en) 2015-06-05 2015-06-05 Corrosion-resistance iron-based austenite oil well pipe and manufacturing method thereof

Publications (1)

Publication Number Publication Date
CN104962836A true CN104962836A (en) 2015-10-07

Family

ID=54216919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510301637.9A Pending CN104962836A (en) 2015-06-05 2015-06-05 Corrosion-resistance iron-based austenite oil well pipe and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN104962836A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105750357A (en) * 2016-04-11 2016-07-13 邯郸新兴特种管材有限公司 Fabrication method of zirconium alloy pipe
CN106112391A (en) * 2016-06-28 2016-11-16 邯郸新兴特种管材有限公司 A kind of production technology of metallurgical composite bimetal pipe
CN106555095A (en) * 2016-11-18 2017-04-05 山西太钢不锈钢股份有限公司 For containing H2The corrosion resistant alloy of S oil gas engineerings, the oil well pipe containing the alloy and its manufacture method
CN106893921A (en) * 2017-03-24 2017-06-27 山西太钢不锈钢股份有限公司 A kind of method of nickel-base alloy electric slag refusion and smelting
WO2017114849A1 (en) * 2015-12-30 2017-07-06 Sandvik Intellectual Property Ab A process of producing an austenitic stainless steel tube
CN107138553A (en) * 2017-04-24 2017-09-08 山西太钢不锈钢股份有限公司 A kind of seamless pipe manufacturing method of potassium steel
CN107639129A (en) * 2017-08-31 2018-01-30 宝丰钢业集团有限公司 The processing technology of corrosion-resistant stainless steel seamless steel pipe
CN108472701A (en) * 2015-12-30 2018-08-31 山特维克知识产权股份有限公司 The method for producing biphase stainless steel tubing
CN109234500A (en) * 2018-11-20 2019-01-18 山西太钢不锈钢股份有限公司 A method of improving iron abros oil well pipe anti-stress corrosion performance
JP2019035122A (en) * 2017-08-17 2019-03-07 日本冶金工業株式会社 Fe-Ni-Cr-Mo ALLOY AND METHOD FOR PRODUCING THE SAME
CN110743931A (en) * 2019-10-29 2020-02-04 浙江国邦钢业有限公司 High-strength NS1402 nickel-based alloy seamless pipe and preparation process thereof
CN112317555A (en) * 2020-09-24 2021-02-05 邯郸新兴特种管材有限公司 Production method of aging-strengthened nickel-based alloy pipe
CN112853231A (en) * 2020-08-18 2021-05-28 浙江增诚钢管有限公司 Stainless steel seamless steel tube for high-pressure boiler and manufacturing method thereof
CN113088832A (en) * 2021-03-26 2021-07-09 中国石油天然气集团有限公司 Iron-nickel-based corrosion-resistant alloy continuous tube and manufacturing method thereof
CN113492151A (en) * 2021-07-16 2021-10-12 山西太钢不锈钢股份有限公司 Manufacturing method of iron-nickel-based alloy hot-rolled coil
CN113817954A (en) * 2020-06-19 2021-12-21 宝山钢铁股份有限公司 High-molybdenum high-nitrogen steel and slab continuous casting process thereof
CN114635030A (en) * 2022-03-07 2022-06-17 山西太钢不锈钢股份有限公司 Manufacturing method of ultrahigh-strength seamless steel pipe
CN115740079A (en) * 2022-09-27 2023-03-07 浙江中达新材料股份有限公司 Preparation method of seamless alloy pipe of petroleum refining cracking furnace
CN117947247A (en) * 2024-03-27 2024-04-30 烟台哈尔滨工程大学研究院 Seamless thin-wall high-nitrogen steel pipe and preparation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1148635A (en) * 1995-10-25 1997-04-30 刘平清 High corrosion-resisting austenite stainless steel
JP2009046759A (en) * 2007-07-20 2009-03-05 Sumitomo Metal Ind Ltd Process for production of duplex stainless steel tubes
CN101708537A (en) * 2009-11-28 2010-05-19 山西太钢不锈钢股份有限公司 Austenitic heat-resistant stainless steel continuous casting method
CN102274854A (en) * 2011-08-13 2011-12-14 四川三洲特种钢管有限公司 Process for manufacturing superascoloy stainless steel tube
CN103769812A (en) * 2014-01-06 2014-05-07 山西太钢不锈钢股份有限公司 Method for producing austenite stainless steel furnace tube

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1148635A (en) * 1995-10-25 1997-04-30 刘平清 High corrosion-resisting austenite stainless steel
JP2009046759A (en) * 2007-07-20 2009-03-05 Sumitomo Metal Ind Ltd Process for production of duplex stainless steel tubes
CN101708537A (en) * 2009-11-28 2010-05-19 山西太钢不锈钢股份有限公司 Austenitic heat-resistant stainless steel continuous casting method
CN102274854A (en) * 2011-08-13 2011-12-14 四川三洲特种钢管有限公司 Process for manufacturing superascoloy stainless steel tube
CN103769812A (en) * 2014-01-06 2014-05-07 山西太钢不锈钢股份有限公司 Method for producing austenite stainless steel furnace tube

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴祖乾等译: "《镍基合金焊接冶金和焊接性》", 31 May 2014 *
王国璋: "《压力容器焊接实用手册》", 30 June 2013 *

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108474053B (en) * 2015-12-30 2020-03-10 山特维克知识产权股份有限公司 Method for producing austenitic stainless steel pipe
KR102583353B1 (en) * 2015-12-30 2023-09-26 산드빅 인터렉츄얼 프로퍼티 에이비 Method for manufacturing austenitic stainless steel tube
US11313006B2 (en) 2015-12-30 2022-04-26 Sandvik Intellectual Property Ab Process of producing an austenitic stainless steel tube
JP7058601B2 (en) 2015-12-30 2022-04-22 サンドビック インテレクチュアル プロパティー アクティエボラーグ Manufacturing method of austenitic stainless steel pipe
WO2017114849A1 (en) * 2015-12-30 2017-07-06 Sandvik Intellectual Property Ab A process of producing an austenitic stainless steel tube
US10704114B2 (en) 2015-12-30 2020-07-07 Sandvik Intellectual Property Ab Process of producing a duplex stainless steel tube
JP2019507016A (en) * 2015-12-30 2019-03-14 サンドビック インテレクチュアル プロパティー アクティエボラーグ Manufacturing method of austenitic stainless steel pipe
CN108474053A (en) * 2015-12-30 2018-08-31 山特维克知识产权股份有限公司 The method for producing Austenitic stainless steel pipe
CN108472701A (en) * 2015-12-30 2018-08-31 山特维克知识产权股份有限公司 The method for producing biphase stainless steel tubing
KR20180097575A (en) * 2015-12-30 2018-08-31 산드빅 인터렉츄얼 프로퍼티 에이비 Process for producing austenitic stainless steel tube
CN105750357A (en) * 2016-04-11 2016-07-13 邯郸新兴特种管材有限公司 Fabrication method of zirconium alloy pipe
CN106112391A (en) * 2016-06-28 2016-11-16 邯郸新兴特种管材有限公司 A kind of production technology of metallurgical composite bimetal pipe
CN106555095A (en) * 2016-11-18 2017-04-05 山西太钢不锈钢股份有限公司 For containing H2The corrosion resistant alloy of S oil gas engineerings, the oil well pipe containing the alloy and its manufacture method
CN106555095B (en) * 2016-11-18 2018-03-30 山西太钢不锈钢股份有限公司 For containing H2The corrosion resistant alloy of S oil gas engineerings, oil well pipe and its manufacture method containing the alloy
CN106893921A (en) * 2017-03-24 2017-06-27 山西太钢不锈钢股份有限公司 A kind of method of nickel-base alloy electric slag refusion and smelting
CN107138553A (en) * 2017-04-24 2017-09-08 山西太钢不锈钢股份有限公司 A kind of seamless pipe manufacturing method of potassium steel
JP2019035122A (en) * 2017-08-17 2019-03-07 日本冶金工業株式会社 Fe-Ni-Cr-Mo ALLOY AND METHOD FOR PRODUCING THE SAME
CN107639129B (en) * 2017-08-31 2019-03-29 宝丰钢业集团有限公司 The processing technology of corrosion-resistant stainless steel seamless steel pipe
CN107639129A (en) * 2017-08-31 2018-01-30 宝丰钢业集团有限公司 The processing technology of corrosion-resistant stainless steel seamless steel pipe
CN109234500A (en) * 2018-11-20 2019-01-18 山西太钢不锈钢股份有限公司 A method of improving iron abros oil well pipe anti-stress corrosion performance
CN110743931B (en) * 2019-10-29 2021-02-05 浙江国邦钢业有限公司 High-strength NS1402 nickel-based alloy seamless pipe and preparation process thereof
CN110743931A (en) * 2019-10-29 2020-02-04 浙江国邦钢业有限公司 High-strength NS1402 nickel-based alloy seamless pipe and preparation process thereof
CN113817954A (en) * 2020-06-19 2021-12-21 宝山钢铁股份有限公司 High-molybdenum high-nitrogen steel and slab continuous casting process thereof
CN112853231A (en) * 2020-08-18 2021-05-28 浙江增诚钢管有限公司 Stainless steel seamless steel tube for high-pressure boiler and manufacturing method thereof
CN112317555A (en) * 2020-09-24 2021-02-05 邯郸新兴特种管材有限公司 Production method of aging-strengthened nickel-based alloy pipe
CN113088832A (en) * 2021-03-26 2021-07-09 中国石油天然气集团有限公司 Iron-nickel-based corrosion-resistant alloy continuous tube and manufacturing method thereof
CN113492151A (en) * 2021-07-16 2021-10-12 山西太钢不锈钢股份有限公司 Manufacturing method of iron-nickel-based alloy hot-rolled coil
CN114635030A (en) * 2022-03-07 2022-06-17 山西太钢不锈钢股份有限公司 Manufacturing method of ultrahigh-strength seamless steel pipe
CN114635030B (en) * 2022-03-07 2023-09-08 山西太钢不锈钢股份有限公司 Manufacturing method of ultra-high strength seamless steel tube
CN115740079A (en) * 2022-09-27 2023-03-07 浙江中达新材料股份有限公司 Preparation method of seamless alloy pipe of petroleum refining cracking furnace
CN117947247B (en) * 2024-03-27 2024-06-11 烟台哈尔滨工程大学研究院 Seamless thin-wall high-nitrogen steel pipe and preparation method thereof
CN117947247A (en) * 2024-03-27 2024-04-30 烟台哈尔滨工程大学研究院 Seamless thin-wall high-nitrogen steel pipe and preparation method thereof

Similar Documents

Publication Publication Date Title
CN104962836A (en) Corrosion-resistance iron-based austenite oil well pipe and manufacturing method thereof
CN104826890B (en) A kind of manufacture method of super austenitic stainless steel seamless pipe
CN104073739B (en) A kind of manufacture method of heat-resistance stainless steel seamless steel pipe and rustless steel and seamless steel pipe
CN101417296B (en) Manufacture method of large caliber high steel grade corrosion proof seamless steel tube in diameter phi 219.0-460.0mm
CN106480381B (en) A kind of good hot rolled heavy plate of cryogenic pipelines plasticity and toughness and its manufacture method
WO2018090682A1 (en) High hardenability, medium carbon, low alloy round steel for fasteners and manufacturing method therefor
CN101892443A (en) High strength and high toughness petroleum casing pipe at steel grade with yield strength of 170-180ksi and manufacturing method thereof
CN101413088B (en) Sulfurated hydrogen stress etching-resisting petroleum casing pipe and manufacturing method thereof
CN104988403B (en) A kind of oil-gas mining martensitic stainless steel seamless steel pipe and its manufacture method
CN104975235A (en) High-toughness medium-carbon quenched and tempered round steel of grade 120 KSI and manufacturing method thereof
CN107747068B (en) A kind of heat-resistance stainless steel seamless pipe and preparation method thereof
CN104357756B (en) A kind of anti-H 2 S stress corrosion straight seam welding petroleum casing pipe and manufacture method thereof
EP1876254A1 (en) Thick seamless steel pipe for line pipe and method for production thereof
CN105925894A (en) Super-thick high-strength lamellar-tearing-resistant Q500D-Z35 hydroelectric generating set steel plate and manufacturing method thereof
CN103451551B (en) Preparation method of cast steel perforator top tip with high-temperature resistance and corrosion resistance
CN104089109B (en) A kind of 625MPa grades of UOE welded tube and its manufacture method
CN110284062B (en) Large-diameter round steel with high strength and high toughness and manufacturing method thereof
CN105039863A (en) Manufacturing method of martensite stainless steel seamless tube for oil well
CN109504897A (en) A kind of big thickness water power steel of 80kg grades of low-carbon-equivalent low-crackle sensitive and its manufacturing method
CN108277438A (en) Mo ultralow-carbon martensitic stainless steel seamless pipe and its manufacturing method
CN102000954A (en) Method for manufacturing continuous pipe mill retained mandrel
CN109722601A (en) A kind of production method of the super-thick steel plate Q420E of low-carbon-equivalent
CN109913757A (en) A kind of corrosion-resistant high anti-extrusion petroleum casing pipe and preparation method thereof
CN104131238B (en) High molding high durable Ultra-thin hot rolled steel plate and CSP production technology thereof
CN103290334A (en) Atmosphere corrosion resistance seamless steel tube containing rare earth and production method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151007

RJ01 Rejection of invention patent application after publication