CN104930262B - Boiler hot First air pipeline elevator arrangement - Google Patents

Boiler hot First air pipeline elevator arrangement Download PDF

Info

Publication number
CN104930262B
CN104930262B CN201510347397.6A CN201510347397A CN104930262B CN 104930262 B CN104930262 B CN 104930262B CN 201510347397 A CN201510347397 A CN 201510347397A CN 104930262 B CN104930262 B CN 104930262B
Authority
CN
China
Prior art keywords
pipeline
section
support portion
suspension bracket
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510347397.6A
Other languages
Chinese (zh)
Other versions
CN104930262A (en
Inventor
范旭
杨劲
范永春
李伟科
潘灏
马雪松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN201510347397.6A priority Critical patent/CN104930262B/en
Publication of CN104930262A publication Critical patent/CN104930262A/en
Application granted granted Critical
Publication of CN104930262B publication Critical patent/CN104930262B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
    • F16L3/205Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Air Supply (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The invention discloses a kind of boiler hot First air pipeline elevator arrangement, including heat primary air pipeline and bracing frame;The heat primary air pipeline includes air preheater heat primary air interface, channel bend section, pipeline vertical section and the pipe outlet for being sequentially connected setting;The channel bend section is provided with flexible suspension, and the pipeline vertical section is provided with Three-D compensator and combination suspension bracket, and the flexible suspension and combination suspension bracket are all connected to support frame as described above.The blind flange force at air preheater heat primary air pipe joint can be eliminated, interface stress can be shared and solve compensator herein and be drawn bad risk.

Description

Boiler hot First air pipeline elevator arrangement
Technical field
The present invention relates to thermal power generating technology field, more particularly to a kind of boiler hot First air pipeline elevator arrangement.
Background technology
In thermal power plant, heat primary air pipeline is the pipeline for providing coal dust drying medium and combustion air, heat primary air Pipeline uniform force, piping have very important effect safely to safe operation of power plant.In conventional art, export in air preheater It is all to be connected using non-metal compensator at heat primary air pipe joint, for compensating the displacement of air preheater interface, but compensator Setting can increase the blind flange force of pipeline, the suspension and support above compensator is arranged and is difficult to shadow of the blind flange force to compensator is completely eliminated Ring, the compensator for interface occur is drawn bad phenomenon, when serious, affect the safe operation of unit.
Content of the invention
Based on this, for the problems referred to above, the present invention proposes a kind of boiler hot First air pipeline elevator arrangement, can eliminate Blind flange force at air preheater heat primary air pipe joint, can share interface stress and solve compensator herein and be drawn bad wind Danger.
Its technical scheme is as follows:
A kind of boiler hot First air pipeline elevator arrangement, including heat primary air pipeline and bracing frame;The heat is once Wind pipeline includes air preheater heat primary air interface, channel bend section, pipeline vertical section and the pipe outlet for being sequentially connected setting;Institute State channel bend section and flexible suspension is provided with, and the pipeline vertical section is provided with Three-D compensator and combination suspension bracket, described Flexible suspension and combination suspension bracket are all connected to support frame as described above.
Air preheater heat primary air interface eliminates compensator, by having an area of section air preheater heat primary air interface transitions to circle Shape heat primary air pipe section, and the channel bend section in the heat primary air pipeline is provided with flexible suspension, also in channel bend Rigidity and spring assembly suspension bracket are provided with pipeline vertical section after section, between the combination suspension bracket, are provided with Three-D compensator absorption The axially and radially displacement of heat primary air pipeline.
When heat primary air pipeline is in cold conditions, the setting of Three-D compensator will not produce blind flange force, now combine suspension bracket Bear self weight of pipeline and combination suspension bracket make a concerted effort;When heat primary air pipeline is in hot, due to the setting of Three-D compensator, Blind flange force upwards is produced at channel bend section, and now combination suspension bracket can be used to balance this blind flange force, make piping stress balance, separately The deadweight of heat primary air pipeline can also be shared by outer spring suspension bracket, and combination suspension bracket lower support limits top on buckstay Pipeline vertical section displacement expands downwards, and blind flange force is caused entirely by spring hanger and combination suspension bracket by suspension bracket absorption is combined Piping uniform force, and blind flange force effect is eliminated, while without the need for arranging compensator, pipeline in air preheater heat primary air interface Blind flange force upwards is also eliminated at elbow section, is thoroughly solved interface compensator and is drawn bad risk, improve heat once The security of wind pipeline, so as to improve the security reliability of unit operation.
Below its further technical scheme is illustrated:
Further, the pipeline exit is additionally provided with fixed mount, and the fixed mount is connected to support frame as described above.Pass through Fixed mount is provided with the bottom of pipeline vertical section, can the expansion of restriction conduit and piping further direction of displacement.
Further, the channel bend section includes pipeline the first elbow section being sequentially connected and pipeline the second elbow section, And the first flexible suspension is provided with the pipeline the first elbow section, the second bullet is provided with the pipeline the second elbow section Property suspension bracket.Multiple flexible suspensions are correspondingly arranged according to channel bend section elbow structure feature, make piping stress more balanced.
Further, first flexible suspension and the second flexible suspension all include to be set to U-shaped and be sheathed on pipeline Suspension bracket base, and be respectively symmetrically the spring hanger portion for being connected to the suspension bracket base two ends, the spring hanger portion connection In support frame as described above.Arrange U-shaped suspension bracket base to be easy to flexible suspension is sheathed on pipeline, symmetrically arranged spring hanger portion makes Stress evenly supports more stable reliability.
Further, the pipeline vertical section both sides are respectively symmetrically and are provided with a combination suspension bracket, and described in two Combination suspension bracket is enclosed on the outside of the Three-D compensator.In the same manner, pipeline vertical section both sides are symmetricly set in two combination suspension brackets, Pipeline stress is made evenly to support more stable.
Further, each described combination suspension bracket includes to be arranged at the rigid support portion on the pipeline vertical section top, institute State that rigid support portion one end is connected to the pipeline vertical section and the other end is connected to support frame as described above;Also include to be arranged at described The elastic support portion of the vertical pars infrasegmentalis of pipeline, elastic support portion two ends are all connected to the pipeline vertical section.In heat once Wind pipeline in cold conditions when, making a concerted effort for self weight of pipeline and elastic support portion is born in the rigid support portion for combining suspension bracket, now elasticity Cradle portion is in compressive state;When heat primary air pipeline is in hot, due to the setting of Three-D compensator, at channel bend section Blind flange force upwards is produced, now the rigid support portion failure in combination suspension bracket, elastic support portion stress downwards, balances this blind Plate power, makes piping stress balance.
Further, described elastic support portion and the rigid support portion of each combination suspension bracket all staggers setting, And two springy support parts are not symmetricly set on the outside of the Three-D compensator.By elastic support portion and rigid support portion Stagger setting, so that the two stress point on pipeline is in staggered distribution, it is to avoid the stress at pipeline one is excessive, force balance effect is also more Good.
Further, the elastic support portion is mutually staggered 90 ° with the rigid support portion and arranges.Two of combination suspension bracket Misclassification opens 90 ° of settings, makes pipeline and itself stress reach optimum state.
The present invention has following prominent:The form of rigid hanger and spring hanger combination is employed, without the need in sky Pre- device heat primary air interface arranges compensator, eliminates the blind flange force arranged produced by compensator so that the stress of interface is divided Carry on a shoulder pole and thoroughly can solve compensator herein and bad risk is drawn, improve unit operation security.
Description of the drawings
Fig. 1 is the perspective view of the pipeline elevator arrangement of boiler hot First air described in the embodiment of the present invention;
Fig. 2 is the receiving when pipeline elevator of boiler hot First air described in embodiment of the present invention arrangement is in cold conditions state Power analyzes schematic diagram;
Fig. 3 is the receiving when pipeline elevator of boiler hot First air described in embodiment of the present invention arrangement is in hot state Power analyzes schematic diagram.
Description of reference numerals:
100- heat primary air pipeline, 110- air preheater heat primary air interface, 120- pipeline the first elbow section, 130- pipeline Double section belt arm section, 140- pipeline vertical section, 150- pipe outlet, the first flexible suspension of 200-, the second flexible suspension of 300-, 400- group Close suspension bracket, 410- rigid support portion, 420- rigid support portion, 500- Three-D compensator, 600- fixed mount.
Specific embodiment
Below in conjunction with the accompanying drawings embodiments of the invention are described in detail.
As shown in figure 1, a kind of boiler hot First air pipeline elevator arrangement, including heat primary air pipeline 100 and support Frame (in figure is not illustrated).The heat primary air pipeline 100 includes air preheater heat primary air interface 110, the pipe for being sequentially connected setting Road elbow section, pipeline vertical section 140 and pipe outlet 150.The channel bend section is provided with flexible suspension, and vertical in the pipeline Section is provided with Three-D compensator 500 and combination suspension bracket 400, and the flexible suspension and combination suspension bracket 400 are all connected to bracing frame.
Compensator is eliminated at air preheater heat primary air interface 110, by having an area of 110 mistake of section air preheater heat primary air interface Circular heat First air pipe section is crossed, and the channel bend section in the heat primary air pipeline 100 arranges flexible suspension, also in pipe Rigidity and spring assembly suspension bracket 400 is provided with pipeline vertical section 140 after road elbow section, is arranged between the combination suspension bracket 400 Three-D compensator 500 absorbs the axially and radially displacement of heat primary air pipeline 100.And, also set up at pipe outlet 150 There is fixed mount 600, fixed mount 600 is connected to bracing frame.By being provided with fixed mount 600 in the bottom of pipeline vertical section 140, can The further expansion of restriction conduit and the direction of displacement of piping.
Further, above-mentioned channel bend section includes the first elbow of the pipeline section 120 being sequentially connected and the second elbow of pipeline Section 130, and the first flexible suspension 200 is provided with the first elbow of pipeline section 120, at the second elbow of pipeline section 120 It is provided with the second flexible suspension 300.Multiple flexible suspensions are correspondingly arranged according to channel bend section elbow structure feature, receive piping Power is more balanced.And, first flexible suspension 200 and the second flexible suspension 300 all include to be set to U-shaped and are sheathed on pipeline On suspension bracket base, and be respectively symmetrically the spring hanger portion for being connected to suspension bracket base two ends, spring hanger portion is connected to support Frame.Arrange U-shaped suspension bracket base to be easy to flexible suspension is sheathed on pipeline, symmetrically arranged spring hanger portion makes stress evenly Support more stable reliability.
Additionally, above-mentioned 140 both sides of pipeline vertical section are respectively symmetrically is provided with a combinations of the above suspension bracket 400, and two Combination suspension bracket 400 is enclosed located at 500 outside of Three-D compensator.In the same manner, two combination suspension brackets 400 are symmetricly set in pipeline vertical section 140 both sides, make pipeline stress evenly support more stable.And, each combination suspension bracket 400 includes to be arranged at pipeline vertical section The rigid support portion 410 on 140 tops, 410 one end of rigid support portion is connected to pipeline vertical section 140 and the other end is connected to support Frame.Each combination suspension bracket 400 also includes to be arranged at the elastic support portion 420 of 140 bottom of pipeline vertical section, the elastic support portion 420 two ends are all connected to pipeline vertical section 140.As shown in Fig. 2 when heat primary air pipeline 100 is in cold conditions, combining suspension bracket Making a concerted effort for self weight of pipeline and elastic support portion 420 is born in 400 rigid support portion 410, and now elastic support portion 420 is in compression State;As shown in figure 3, when heat primary air pipeline 100 is in hot, the rigid support portion 410 combined in suspension bracket 400 fails, 420 stress of elastic support portion downwards, makes piping stress balance.In the present embodiment, the elastic support portion 420 can all be arranged For spring support portion, first flexible suspension 200 and the second flexible suspension 300 all may be configured as spring hanger.
Further, all stagger setting, and two the elastic support portion 420 of each combination suspension bracket 400 and rigid support portion 410 Individual elastic support portion 420 is respectively symmetrically and is arranged at 500 outside of Three-D compensator.By elastic support portion 420 and rigid support portion 410 Stagger setting, so that the two stress point on pipeline is in staggered distribution, it is to avoid the stress at pipeline one is excessive, force balance effect is also more Good.In the present embodiment, elastic support portion 420 is mutually staggered 90 ° with rigid support portion 410 and arranges.Two of combination suspension bracket 400 Misclassification opens 90 ° of settings, makes pipeline and itself stress reach optimum state.
As shown in Fig. 2 when heat primary air pipeline 100 installs unit off-duty (cold conditions), due to heat primary air pipeline Nothing media flow in 100, the setting of Three-D compensator 500 will not produce blind flange force, now combine the rigid support portion of suspension bracket 400 410 bear making a concerted effort for self weight of pipeline and elastic support portion 420, and now elastic support portion 420 is in compressive state;As shown in figure 3, At unit operation (hot), due to the setting of Three-D compensator 500, blind plate upwards at the second elbow of pipeline section 130, is produced Power, the rigid support portion 410 now combined in suspension bracket 400 fail, and 420 stress of elastic support portion downwards, balances this blind flange force, Piping stress balance is made, in addition the first flexible suspension 200 and the second flexible suspension 300 also share oneself of heat primary air pipeline 100 Weight, after Three-D compensator 500 setting of fixed mount 600 make pipeline vertical direction thermal walking upwards, and blind flange force is by combining Suspension bracket 400 absorbs, and 600 stress of fixed mount will not be very big, by two flexible suspensions (the first flexible suspension 200 and the second elasticity Suspension bracket 300) and combination suspension bracket 400 cause whole piping uniform force, and eliminate blind flange force effect, while eliminating air preheater Compensator at heat primary air interface 110, also eliminates blind flange force upwards, thoroughly solves at the first elbow of pipeline section 120 Interface compensator is drawn bad risk, improves the security of heat primary air pipeline 100, so as to improve the peace of unit operation Full reliability.
The boiler hot First air pipeline elevator arrangement that the present invention is provided, employs rigid hanger and spring hanger combination Form, without the need for arranging compensator at the air preheater heat primary air interface 110, eliminate the blind flange force arranged produced by compensator, So that the stress of interface is shared and can thoroughly solve compensator herein, and bad risk is drawn, unit operation security is improved.
Each technical characteristic of embodiment described above arbitrarily can be combined, for making description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only have expressed the several embodiments of the present invention, and its description is more concrete and detailed, but simultaneously Therefore can not be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, can also make some deformation and improvement, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (5)

1. a kind of boiler hot First air pipeline elevator arrangement, it is characterised in that including heat primary air pipeline and bracing frame;
It is vertical that the heat primary air pipeline includes to be sequentially connected the air preheater heat primary air interface of setting, channel bend section, pipeline Section and pipe outlet;The pipeline exit is additionally provided with fixed mount, and the fixed mount is connected to support frame as described above;
The channel bend section is provided with flexible suspension, and the pipeline vertical section is provided with Three-D compensator and combination is hung Frame, the flexible suspension and combination suspension bracket are all connected to support frame as described above;The channel bend section includes the pipeline being sequentially connected First elbow section and pipeline the second elbow section, and the first flexible suspension is provided with the pipeline the first elbow section, described The second flexible suspension is provided with pipeline the second elbow section;The pipeline vertical section both sides are respectively symmetrically and are provided with one described group Suspension bracket is closed, and two combination suspension brackets are enclosed on the outside of the Three-D compensator.
2. boiler hot First air pipeline elevator arrangement according to claim 1, it is characterised in that first elasticity Suspension bracket and the second flexible suspension all include the suspension bracket base for being set to U-shaped and being sheathed on pipeline, and are respectively symmetrically and are connected to The spring hanger portion at the suspension bracket base two ends, the spring hanger portion are connected to support frame as described above.
3. boiler hot First air pipeline elevator arrangement according to claim 1, it is characterised in that each described combination Suspension bracket includes the rigid support portion for being arranged at the pipeline vertical section top, and rigid support portion one end is connected to the pipeline Vertical section and the other end is connected to support frame as described above;
Also include to be arranged at the elastic support portion of the vertical pars infrasegmentalis of the pipeline, elastic support portion two ends are all connected to described Pipeline vertical section.
4. boiler hot First air pipeline elevator arrangement according to claim 3, it is characterised in that each described combination The elastic support portion of suspension bracket and the rigid support portion all stagger setting, and two springy support parts symmetrically do not set It is placed on the outside of the Three-D compensator.
5. boiler hot First air pipeline elevator arrangement according to claim 4, it is characterised in that the elastic support Portion is mutually staggered 90 ° with the rigid support portion and arranges.
CN201510347397.6A 2015-06-18 2015-06-18 Boiler hot First air pipeline elevator arrangement Active CN104930262B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510347397.6A CN104930262B (en) 2015-06-18 2015-06-18 Boiler hot First air pipeline elevator arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510347397.6A CN104930262B (en) 2015-06-18 2015-06-18 Boiler hot First air pipeline elevator arrangement

Publications (2)

Publication Number Publication Date
CN104930262A CN104930262A (en) 2015-09-23
CN104930262B true CN104930262B (en) 2017-03-08

Family

ID=54117565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510347397.6A Active CN104930262B (en) 2015-06-18 2015-06-18 Boiler hot First air pipeline elevator arrangement

Country Status (1)

Country Link
CN (1) CN104930262B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107202464B (en) * 2017-05-04 2019-09-27 合肥华凌股份有限公司 Blast connection and wind cooling refrigerator

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2632198Y (en) * 2003-07-15 2004-08-11 深圳市卓宝科技股份有限公司 Rainwater hanging pipeline arrangement
CN201496670U (en) * 2009-08-03 2010-06-02 江苏慧通成套管道设备有限公司 U-shaped suspension bracket of suspension pipeline
CN204785069U (en) * 2015-06-18 2015-11-18 中国能源建设集团广东省电力设计研究院有限公司 Wind pipe string hanger arrangement structure of boiler heat

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11257541A (en) * 1998-03-06 1999-09-21 Ishikawajima Harima Heavy Ind Co Ltd Pipeline supporting device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2632198Y (en) * 2003-07-15 2004-08-11 深圳市卓宝科技股份有限公司 Rainwater hanging pipeline arrangement
CN201496670U (en) * 2009-08-03 2010-06-02 江苏慧通成套管道设备有限公司 U-shaped suspension bracket of suspension pipeline
CN204785069U (en) * 2015-06-18 2015-11-18 中国能源建设集团广东省电力设计研究院有限公司 Wind pipe string hanger arrangement structure of boiler heat

Also Published As

Publication number Publication date
CN104930262A (en) 2015-09-23

Similar Documents

Publication Publication Date Title
CN206639140U (en) A kind of information security computer protection device for hard disk
CN108895206A (en) A kind of high temperature insulating suspension and support for heat distribution pipeline and equipment
CN104930262B (en) Boiler hot First air pipeline elevator arrangement
CN203309420U (en) Telescopic pipeline of tobacco airflow drying equipment
CN204785069U (en) Wind pipe string hanger arrangement structure of boiler heat
CN205244716U (en) Heat -resisting type non -metallic expansion joint
CN103422704B (en) Non-rigid crane system of chimney internal cylinder horizontal segment and chimney
CN206136324U (en) Woven wire cloth cover and cover have electric heating pipe of this woven wire cloth cover
CN106195980B (en) A kind of pendant superheater and its multipath circulating fluidized bed boiler of application
CN204313286U (en) A kind of sealing device for rotary kiln in refuse burning system
CN205938353U (en) Steam pipe spring support that insulates against heat
CN203024132U (en) March-type anti-vibration strip structure for pressurized water reactor nuclear power plant steam generator
CN202039076U (en) Air inlet device of blast furnace
CN207864830U (en) A kind of exhaust-gas treatment diversion pipe
CN207048825U (en) A kind of supporting system of Turbo-generator Set
CN105222122B (en) It is applied to the superheater of boiler
CN201502830U (en) Duplex free type expansion joint for outlet of flue gas turbine of catalytic cracking device
CN205048421U (en) Re -heater for boiler
CN103868051B (en) PWR nuclear power plant steam generator march-past vibrationproof bar structure
CN207501130U (en) A kind of suspension type superheater surface expansion structure
CN206803206U (en) Boiler coal feeding pipe
CN203412355U (en) Nonrigid supporting/suspending system on horizontal segment in chimney and chimney
CN108246368A (en) The self tuning mode main air distributor of thermal expansion
CN107420677A (en) A kind of weatherability expansion joint
CN204647736U (en) Jacket for flange

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant